H941--HVAC/Air Flow | Airflow Testing Services Federal contract opportunity
Solicitation number
36C24422Q0839
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This is a combined synopsis/solicitation from the Department of Veterans Affairs seeking airflow testing services at the Pittsburgh VA Medical Center facilities. The solicitation requires monthly, quarterly, and semi-annual airflow testing of various rooms at the University Drive and H.J. Heinz campuses, including operating rooms, isolation rooms, laboratories, pharmacies, sterile storage areas, and soiled utility rooms. Testing must include supply and exhaust air measurements, temperature, humidity, and pressure readings to determine air changes per hour. The base period of performance is from September 2022 through September 2023, with four one-year option periods. The solicitation is set aside for small businesses and responses are due by the defined closing date and time. Awards will be fixed-price contracts consisting of the base year and options.

View the file

Other files for this federal contract opportunity

Other files attached to H941--HVAC/Air Flow | Airflow Testing Services, newest first.
File Type Posted
36C24422Q0839.docx DOCX document
SCA Wage Det 2015-4235 Rev 19 dtd 3-15-2022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24422Q0839

COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS

General Information

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 in conjunction with Part 13 of Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This Solicitation is issued as a Request for Quote (RFQ), and the solicitation number is 36C24422Q0839.

This notice incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2022-06 effective May 26, 2022, and the Veterans Affairs Acquisition Regulations (VAAR). The complete text of any of the clauses and provisions may be accessed in full text at www.acquisition.gov.

This Solicitation is 100% set-aside for Small Business. The NAICS Code is 541620 – Environmental Consulting Services and the business size standard is $16.5 million.

The Contracting Office is seeking to purchase services for environmental abatement services at the Pittsburgh Healthcare System. The Statement of Work (SOW) is included.

Service Contract Act Wage Determinations applies to this acquisition and will be incorporated into the resulting contract. A copy of the current Wage Determination is included with this solicitation.

Complete instructions for submitting a response to this solicitation and applicable provisions and clauses are enclosed. All offerors are advised to pay careful attention to the quote submission instructions as there are very specific instructions as what is required to be provided (see pages 55-57).

The applicable line item/CLIN is enclosed.

The contract period of performance (POP) will begin as described in the Statement of Work and shown in the schedule. Any award resulting from this solicitation will be issued on a Standard Form 1449. The government anticipates a Firm-Fixed Price contract consisting of a base and four option years.

NOTE: To receive an award resulting from this solicitation, offerors MUST be registered in the System for Award Management (SAM) database IAW FAR 52.212-1(k). Registration may be done online at: https://beta.sam.gov Contractors are advised that all questions concerning this solicitation shall be sent in writing to the Contracting Office at Network Contracting Office 4 (NCO). No questions will be answered after July 11, 2022, at 10:00 AM EST. Questions shall be sent via email to Nicholas Guzenski at nicholas.guzenski@va.gov.

All quotes shall be submitted electronically to Nicholas Guzenski at Nicholas.guzenski@va.gov by the defined closing date and time of the solicitation.

Table of Contents

SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 CONTRACT ADMINISTRATION DATA3
B.2 PRICE/COST SCHEDULE4
ITEM INFORMATION4
B.3 DELIVERY SCHEDULE17
B.4 STATEMENT OF WORK22
SECTION C - CONTRACT CLAUSES38
C.1 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)38
C.2 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)38
C.3 SUPPLEMENTAL INSURANCE REQUIREMENTS38
C.4 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020)39
C.5 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)41
C.6 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)41
C.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)41
C.8 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2022) (JUL 2020) (DEVIATION)42
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS50
SECTION E - SOLICITATION PROVISIONS51
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)51
E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)57
E.3 52.216-1 TYPE OF CONTRACT (APR 1984)60
E.4 52.233-2 SERVICE OF PROTEST (SEP 2006)60
E.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)60
E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) (JUL 2020) (DEVIATION)61

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C244 Department of Veterans Affairs Network Contracting Office 4 1010 Delafield Rd Pittsburgh PA 15215

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] Monthly

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC University Drive Campus Building 1 IAW the Statment of Work (outlined in Section 3.1).

Contract Period: Base POP Begin: 09-29-2022 POP End: 09-28-2023 PRINCIPAL NAICS CODE: 541620 - Environmental Consulting Services PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Animal Research Laboratory Building 6 IAW the SOW (outlined in Section 3.2).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Clinical Laboratory Rooms in Building 1 IAW the SOW (outlined in Section 3.3).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Out-Patient/In-Patient Pharmacy Rooms in Building 1 IAW the SOW (outlined in Section 3.4).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Soiled Utility Rooms in Building 1 IAW the SOW (outlined in Section 3.5) .

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Consumables Storage in Building 1 and Building 29 IAW the SOW (outlined in Section 3.6).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Durables (RMEs) Storage in Building 1 IAW the SOW (outlined in Section 3.7).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.1).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Soiled Utility Rooms in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.2).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC H.J. Hienz Campus In-Patient/Out-Patient Pharmacy Rooms in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.3).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Sterile Consumables Storage in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.4).

POP Begin: 09-29-2022 POP End: 09-28-2023

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC University Drive Campus Building 1 IAW the Statment of Work (outlined in Section 3.1).

Contract Period: Option 1 POP Begin: 09-29-2023 POP End: 09-28-2024

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Animal Research Laboratory Building 6 IAW the SOW (outlined in Section 3.2).

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Clinical Laboratory Rooms in Building 1 IAW the SOW (outlined in Section 3.3).

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Out-Patient/In-Patient Pharmacy Rooms in Building 1 IAW the SOW (outlined in Section 3.4).

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Soiled Utility Rooms in Building 1 IAW the SOW (outlined in Section 3.5) .

POP Begin: 09-29-2023 POP End: 09-28-2024

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Consumables Storage in Building 1 and Building 29 IAW the SOW (outlined in Section 3.6).

POP Begin: 09-29-2023 POP End: 09-28-2024

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Durables (RMEs) Storage in Building 1 IAW the SOW (outlined in Section 3.7).

POP Begin: 09-29-2023 POP End: 09-28-2024

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.1).

POP Begin: 09-29-2023 POP End: 09-28-2024

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Soiled Utility Rooms in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.2).

POP Begin: 09-29-2023 POP End: 09-28-2024

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC H.J. Hienz Campus In-Patient/Out-Patient Pharmacy Rooms in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.3).

POP Begin: 09-29-2023 POP End: 09-28-2024

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Sterile Consumables Storage in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.4).

POP Begin: 09-29-2023 POP End: 09-28-2024

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC University Drive Campus Building 1 IAW the Statment of Work (outlined in Section 3.1).

Contract Period: Option 2 POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Animal Research Laboratory Building 6 IAW the SOW (outlined in Section 3.2).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Clinical Laboratory Rooms in Building 1 IAW the SOW (outlined in Section 3.3).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Out-Patient/In-Patient Pharmacy Rooms in Building 1 IAW the SOW (outlined in Section 3.4).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Soiled Utility Rooms in Building 1 IAW the SOW (outlined in Section 3.5) .

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Consumables Storage in Building 1 and Building 29 IAW the SOW (outlined in Section 3.6).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Durables (RMEs) Storage in Building 1 IAW the SOW (outlined in Section 3.7).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.1).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Soiled Utility Rooms in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.2).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC H.J. Hienz Campus In-Patient/Out-Patient Pharmacy Rooms in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.3).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Sterile Consumables Storage in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.4).

POP Begin: 09-29-2024 POP End: 09-28-2025

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC University Drive Campus Building 1 IAW the Statment of Work (outlined in Section 3.1).

Contract Period: Option 3 POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Animal Research Laboratory Building 6 IAW the SOW (outlined in Section 3.2).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Clinical Laboratory Rooms in Building 1 IAW the SOW (outlined in Section 3.3).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Out-Patient/In-Patient Pharmacy Rooms in Building 1 IAW the SOW (outlined in Section 3.4).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Soiled Utility Rooms in Building 1 IAW the SOW (outlined in Section 3.5) .

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Consumables Storage in Building 1 and Building 29 IAW the SOW (outlined in Section 3.6).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Durables (RMEs) Storage in Building 1 IAW the SOW (outlined in Section 3.7).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.1).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Soiled Utility Rooms in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.2).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC H.J. Hienz Campus In-Patient/Out-Patient Pharmacy Rooms in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.3).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Sterile Consumables Storage in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.4).

POP Begin: 09-29-2025 POP End: 09-28-2026

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC University Drive Campus Building 1 IAW the Statment of Work (outlined in Section 3.1).

Contract Period: Option 3 POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Animal Research Laboratory Building 6 IAW the SOW (outlined in Section 3.2).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Clinical Laboratory Rooms in Building 1 IAW the SOW (outlined in Section 3.3).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC University Drive Campus Out-Patient/In-Patient Pharmacy Rooms in Building 1 IAW the SOW (outlined in Section 3.4).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Soiled Utility Rooms in Building 1 IAW the SOW (outlined in Section 3.5) .

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Consumables Storage in Building 1 and Building 29 IAW the SOW (outlined in Section 3.6).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC University Drive Campus Sterile Durables (RMEs) Storage in Building 1 IAW the SOW (outlined in Section 3.7).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

12.00
MO
__________________
__________________

Monthly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.1).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Soiled Utility Rooms in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.2).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

2.00
SV
__________________
__________________

Semi-Annual airflow testing at the Pittsburgh VAMC H.J. Hienz Campus In-Patient/Out-Patient Pharmacy Rooms in Building 51 and Building 71 IAW the Statment of Work (outlined in Section 4.3).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

4.00
SV
__________________
__________________

Quarterly airflow testing at the Pittsburgh VAMC H.J. Hienz Campus Sterile Consumables Storage in Building 71, Building 5, and Building 50 IAW the Statment of Work (outlined in Section 4.4).

POP Begin: 09-29-2026 POP End: 09-28-2027

PRODUCT/SERVICE CODE: H941 - Other Quality Control, Testing, and Inspection - Refrigeration, Air Conditioning, and Air Circulating Equipment

GRAND TOTAL
__________________

B.3 DELIVERY SCHEDULE

ITEM NUMBER
QUANTITY
DELIVERY DATE
0001
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

USA

12.00

0002
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

0003
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

0004
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

0005
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

0006
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

0007
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

0008
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

12.00

0009
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

0010
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

0011
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

1001
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

US

12.00

1002
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

1003
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

1004
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

1005
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

1006
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

1007
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

1008
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

12.00

1009
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

1010
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

1011
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

2001
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

12.00

2002
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

2003
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

2004
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

2005
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

2006
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

2007
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

2008
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

12.00

2009
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

2010
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

2011
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

3001
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

12.00

3002
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

3003
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

3004
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

3005
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

3006
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

3007
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

3008
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

12.00

3009
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

3010
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

3011
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

4001
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

12.00

4002
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

4003
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

4004
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

4005
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

4006
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

4007
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

4008
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

12.00

4009
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

4010
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

2.00

4011
SHIP TO:
Pittsburgh VAMC

1010 Delafield Rd Pittsburgh, PA 15215

4.00

Page 1 of Page 1 of

B.4 STATEMENT OF WORK

Statement of Work for Healthcare System Airflow Testing Services at the Pittsburgh VA Medical Center University Drive C Pittsburgh, PA 15240

1.0 Scope of Work: The VA Pittsburgh Healthcare System (VAPHS) has a requirement for all labor, tools, supervision, material, parts, equipment, and transportation necessary to provide comprehensive airflow testing services at our Oakland Division, located at University Drive C, Pittsburgh, PA 15240.

1.1 Testing shall include monthly, quarterly, and semi-annual testing performed in accordance with the schedule.

1.2 All the monthly testing will be performed on the 3rd Saturday of the month between 6 a.m. and 2 p.m. The 4th Saturday will be the alternate for scheduling conflicts.

1.3 All quarterly and semi-annual testing must be accomplished Monday - Friday, 7:00 a.m. to 3:00 p.m. excluding federal holidays.

1.4 Heinz campus shall be done Monday - Friday, 6:00am to 3:00pm excluding federal holidays.

2.0 Contract Type: Award shall be a firm fixed price contract with a base plus four option years. The estimated base year period of performance is 10/1/2022 – 9/30/2023.

3.0 University Drive (UD) Campus:

3.1 Monthly University Drive Testing -Twelve (12) Operating Rooms, Three (3) Procedure Room (OR Standards), Twenty-One (21) TB Isolation Rooms, Eleven(11) Scrub/Anterooms, Two (2) Decon Rooms, Three (3) Sterile Prep Rooms, Three (3) Sterile Storage Rooms, Three (3) Cardiac Cath Labs, One (1) Sterilizer Equipment Access, Three (3) Morgue Autopsy Rooms, and Eight (8) Ambulatory Surgery Procedure Rooms in Building 1.

3.1.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

3.1.2 Operating room (OR) measurements shall be taken in accordance with the operating room (OR) schedules. Testing shall be coordinated with the contracting officer’s representative (COR) or delegated program official ahead of time.

3.1.3 Regulation Air Changes are as follows:

ROOM
DESCRIPTION
REGULATION
OR1, OR2, OR3, OR4, OR5, OR6, OR7, OR8, OR9, 3W232 (OR10), 3A211, 3A212
Operating Rooms
20 Air Changes/Positive
3W219, 2A220, 2A221
Procedure Room (OR Standards)
20 Air Changes/Positive
1NW103, 3A117, 3A121, 3A147, 3A149, 3A150, 3A152, 3E118, 3E133, 3N239, 4E102, 4E104, 4W113, 4W115, 4W116, 4W138, 5A107, 5W113, 5W115, 5W116, 5W138
TB Isolation Rooms
12 Air Changes/Negative
3A148, 3A151, 3A179, 3A180, 3A190, 3A197, 3A199, 3A206,3A211A, 3A212A 5A106
Scrub/Ante Rooms
12 Air Changes/Negative
AA117, 3W218
Decon Rooms
6 Air Changes/Negative
AA122, 2A214, 3W215
Sterile Prep Rooms
4 Air Changes/Positive
AA103/106, 3A201
Sterile Storage
4 Air Changes/Positive
6E109
Sterilizer Equipment Access
10 Air Changes
4N113, 4N114, 4N115
Cardiac Cath Labs
20 Air Changes/Positive
BN201, BN202, BN206
Morgue Autopsy Rooms
12 Air Changes/Negative
3W201, 3W211, 3W231, 3W233, 3W234, 3W235, 3W236, 3W237
Ambulatory Surgery Unit (ASU) Procedure Rooms
12 Air Changes/Negative

3.2 Semi-Annual Testing University Drive - Testing shall be performed in December and May in Thirty-Three (33) Animal Research Laboratory Rooms in Building 6.

3.2.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

3.2.2 Regulation Air Changes are as follows:

ROOM #
DESCRIPTION
REGULATION
GA101
Dirty Cage Wash
15 Air Changes/Negative
GA102
Animal Holding
15 Air Changes/Positive
GA103
Animal Holding
15 Air Changes/Positive
GA104
Animal Holding
15 Air Changes/Positive
GA109
Office
15 Air Changes/Positive
GA110
Supply Room
15 Air Changes/Negative
GA111
Autoclave
15 Air Changes/Negative
GA112
Tank Storage
15 Air Changes/Negative
GA115
Procedure Room
15 Air Changes/Positive
GA117
Lunchroom
15 Air Changes/Positive
GA119
Procedure Room
15 Air Changes/Negative
GA123
Animal Holding
15 Air Changes/Positive
GA124
Animal Holding
15 Air Changes/Positive
GA127
Animal Holding
15 Air Changes/Positive
GA128
Animal Holding
15 Air Changes/Positive
GA130
Animal Holding
15 Air Changes/Positive
GA131
General Storage
15 Air Changes/Negative
GA140
Feed and Bedding
15 Air Changes/Positive
GA141
Storeroom
15 Air Changes/Negative
GA142
Animal Holding
15 Air Changes/Positive
GA143
Animal Holding
15 Air Changes/Positive
GA144
Animal Holding
15 Air Changes/Positive
GA145
Diet/Procedure
15 Air Changes/Positive
GA146
Procedure Room
15 Air Changes/Negative
GA147
Operating Room
15 Air Changes/Positive
GA148
Operating Room
15 Air Changes/Positive
GA149
Scrub Area
15 Air Changes/Negative
GA149A
Storeroom
15 Air Changes/Positive
GA150
Procedure Room
15 Air Changes/Negative
GA151
Office
15 Air Changes/Neutral
GA152
Animal Holding
15 Air Changes/Positive
GA153
Animal Holding
15 Air Changes/Positive
GA154
Clean Cage Wash
15 Air Changes/Positive

*Building 6 closes, those rooms will be eliminated and rooms in building 30 will be added.

3.3 Semi Annual Testing at UD - Testing shall be performed in December and May in Thirty-One (31) Clinical Laboratory Rooms in Building 1.

3.3.1The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.
3.3.2Regulation Air Changes are 6 per hour/negative airflow:
ROOM #
DEPARTMENT DESCRIPTION
REGULATION
10E115
Clinical Lab - ancillary testing
6 Air Changes/Negative
2E143
Anatomic Path Lab - molecular
6 Air Changes/Negative
2NE100
Clinical Lab - ancillary testing
6 Air Changes/Negative
2NE105
Clinical Lab - blood bank
6 Air Changes/Negative
2NE108
Anatomic Path Lab - block and slide storage
6 Air Changes/Negative
2NE112
Anatomic Path Lab - cytology
6 Air Changes/Negative
2NE113
Anatomic Path Lab - molecular lab
6 Air Changes/Negative
2NE116
Anatomic Path Lab - gross room
6 Air Changes/Negative
2NE117
Anatomic Path Lab - histo lab
6 Air Changes/Negative
2NE118
Anatomic Path Lab - histo lab
6 Air Changes/Negative
2NE119
Anatomic Path Lab - histo lab
6 Air Changes/Negative
2NE128
Anatomic Path Lab - cytology
6 Air Changes/Negative
2NW101
Clinical Lab - automated
6 Air Changes/Negative
2NW102
Clinical Lab Supplies
6 Air Changes/Negative
2NW103
Clinical Lab - molecular
6 Air Changes/Negative
2NW104
Clinical Lab - molecular
6 Air Changes/Negative
2NW106
Clinical Lab - micro
6 Air Changes/Negative
2NW107
Clinical Lab - micro
6 Air Changes/Negative
2NW107a
Clinical Lab - micro
6 Air Changes/Negative
2NW107b
Clinical Lab - micro
6 Air Changes/Negative
2NW108
Clinical Lab - micro
6 Air Changes/Negative
2NW110
Clinical Lab - micro
6 Air Changes/Negative
2NW111
Clinical Lab - micro
6 Air Changes/Negative
2NW117
Electrical Closet
6 Air Changes/Negative
2NW120
Clinical Lab - immuno
6 Air Changes/Negative
2W168
Clinical Lab - molecular
6 Air Changes/Negative
2W168b
Clinical Lab - molecular
6 Air Changes/Negative
2W171
Clinical Lab - molecular
6 Air Changes/Negative
2W173
Clinical Lab - molecular
6 Air Changes/Negative
2W174
Clinical Lab - molecular
6 Air Changes/Negative
3N115
Frozen Section Room
6 Air Changes/Negative

3.4 Semi-Annual Testing UD - Testing shall be performed in March and September in Seven (7) Out-Patient/In-Patient Pharmacy Rooms in Building 1.

3.4.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

3.4.2 Regulation Air Changes are as follows:

ROOM #
DESCRIPTION
REGULATION
AN125
Prescription Filling and Assembly Area
4 Air Changes/Positive
AN124
Controlled Substance Vault
4 Air Changes/Positive
AN120
Breakdown and Verification Receiving
4 Air Changes/Neutral to Negative
1N211/1N205
Prescription Filling and Assembly Area
4 Air Changes/Positive
1N210
Prescription Receiving Window
4 Air Changes/Positive
1N212
Controlled Substance Vault
4 Air Changes/Positive
1N147
Breakdown and Verification Receiving
4 Air Changes/Neutral to Negative

3.5 Quarterly testing UD - Testing shall be performed 4 times; once each in December, March, June, September in Forty (40) Soiled Utility Rooms in Building 1.

3.5.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

3.5.2 Regulation Air Changes are 6 per hour/negative airflow:

2A218
Soiled Utility/ Trophon
6 Air Changes
Negative
2NW118
Biohazardous Waste
6 Air Changes
Negative
3A153
Soiled Utility
6 Air Changes
Negative
3E102
Soiled Utility
6 Air Changes
Negative
3E120
Soiled Utility
6 Air Changes
Negative
3W228
Soiled Utility
6 Air Changes
Negative
4E100
Soiled Utility
6 Air Changes
Negative
4N119
Soiled Utility
6 Air Changes
Negative
4N138
Soiled Utility
6 Air Changes
Negative
4W150
Soiled Utility
6 Air Changes
Negative
5W150
Soiled Utility
6 Air Changes
Negative
6W150
Soiled Utility
6 Air Changes
Negative
7E125
Soiled Utility
6 Air Changes
Negative
8W108
Soiled Utility
6 Air Changes
Negative
9W140
Soiled Utility
6 Air Changes
Negative
10W111
Soiled Utility
6 Air Changes
Negative
1A147
Soiled Utility/ Trophon
6 Air Changes
Negative
1A194
Soiled Utility
6 Air Changes
Negative
1E120
Soiled Utility
6 Air Changes
Negative
1NW115
Soiled Utility/ Trophon
6 Air Changes
Negative
2W131
Soiled Utility
6 Air Changes
Negative
3A133
Soiled Utility
6 Air Changes
Negative
3A211B
Soiled Utility
6 Air Changes
Negative
3N204
Soiled Utility
6 Air Changes
Negative
3W108
Soiled Utility
6 Air Changes
Negative
5A115
Soiled Utility/ Trophon
6 Air Changes
Negative
6E110
Soiled Utility /Trophon
6 Air Changes
Negative
8E104
Soiled Utility
6 Air Changes
Negative
2W104
Soiled Utility
6 Air Changes
Negative
1A111
Soiled Utility
6 Air Changes
Negative
1A112
Soiled Utility
6 Air Changes
Negative
BW233
Soiled Utility
6 Air Changes
Negative
5M151
Soiled Utility
6 Air Changes
Negative
5M104
Soiled Utility
6 Air Changes
Negative
4M151
Soiled Utility
6 Air Changes
Negative
4M104
Soiled Utility
6 Air Changes
Negative
3M151
Soiled Utility
6 Air Changes
Negative
3M104
Soiled Utility
6 Air Changes
Negative
1M137
Soiled Utility
6 Air Changes
Negative

3.6 Quarterly Testing UD - Testing shall be performed 4 times; once each in December, March, June, September in Forty-Nine (49) Sterile Consumables Storage in Building 1 and Building 29.

3.6.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

3.6.2 Regulation Air Changes are 4 per hour/positive airflow:

10W107
Sterile Storage
4 Air Changes
Positive
10E115
Sterile Storage
4 Air Changes
Positive
9W137
Sterile Storage
4 Air Changes
Positive
8W122
Sterile Storage
4 Air Changes
Positive
8E111
Sterile Storage
4 Air Changes
Positive
8N104A
Sterile Storage
4 Air Changes
Positive
8N106
Sterile Storage
4 Air Changes
Positive
7E132
Sterile Storage
4 Air Changes
Positive
7E124
Sterile Storage
4 Air Changes
Positive
6W143
Sterile Storage
4 Air Changes
Positive
6E139
Sterile Storage
4 Air Changes
Positive
5W143
Sterile Storage
4 Air Changes
Positive
5A116
Sterile Storage
4 Air Changes
Positive
4NW111
Sterile Storage
4 Air Changes
Positive
4NW118
Sterile Storage
4 Air Changes
Positive
4E123
Sterile Storage
4 Air Changes
Positive
4NE140
Sterile Storage
4 Air Changes
Positive
4W143
Sterile Storage
4 Air Changes
Positive
3A195
Sterile Storage
4 Air Changes
Positive
3E130
Sterile Storage
4 Air Changes
Positive
3N206
Sterile Storage
4 Air Changes
Positive
3A210
Sterile Storage
4 Air Changes
Positive
3A146
Sterile Storage
4 Air Changes
Positive
3A131
Sterile Storage
4 Air Changes
Positive
3A134
Sterile Storage
4 Air Changes
Positive
3E131
Sterile Storage
4 Air Changes
Positive
3E130
Sterile Storage
4 Air Changes
Positive
3W213
Sterile Storage
4 Air Changes
Positive
3W214
Sterile Storage
4 Air Changes
Positive
2W132
Sterile Storage
4 Air Changes
Positive
2A224
Sterile Storage
4 Air Changes
Positive
2A206
Sterile Storage
4 Air Changes
Positive
1NW121
Sterile Storage
4 Air Changes
Positive
1E122
Sterile Storage
4 Air Changes
Positive
1A114
Sterile Storage
4 Air Changes
Positive
1A115
Sterile Storage
4 Air Changes
Positive
1A148
Sterile Storage
4 Air Changes
Positive
1A120C
Sterile Storage
4 Air Changes
Positive
1A175B
Sterile Storage
4 Air Changes
Positive
1A106
Sterile Storage
4 Air Changes
Positive
1W118
Sterile Storage
4 Air Changes
Positive
1A193
Sterile Storage
4 Air Changes
Positive
1NE108
Sterile Storage
4 Air Changes
Positive
5M105
Sterile Storage
4 Air Changes
Positive
4M105
Sterile Storage
4 Air Changes
Positive
3M105
Sterile Storage
4 Air Changes
Positive
2M201A
Sterile Storage
4 Air Changes
Positive
1M169
Sterile Storage
4 Air Changes
Positive
GM111
Sterile Storage
4 Air Changes
Positive

3.7 Quarterly Testing UD - Testing shall be performed 4 times; once each in December, March, June, September in Thirty-Nine (39) Sterile Durables (RMEs) Storage in Building 1.

3.7.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

3.7.2 Regulation Air Changes are 4 per hour/positive airflow:

8W109
RME
4 Air Changes
Positive
6E111
RME
4 Air Changes
Positive
6E113
RME
4 Air Changes
Positive
6E115
RME
4 Air Changes
Positive
6E117
RME
4 Air Changes
Positive
6E119
RME
4 Air Changes
Positive
6E119
RME
4 Air Changes
Positive
6E123
RME
4 Air Changes
Positive
6E125
RME
4 Air Changes
Positive
6E127
RME
4 Air Changes
Positive
6W153
RME
4 Air Changes
Positive
5W137
RME
4 Air Changes
Positive
5W153
RME
4 Air Changes
Positive
4NE125
RME
4 Air Changes
Positive
4NW117
RME
4 Air Changes
Positive
4NW153
RME
4 Air Changes
Positive
3A208
RME
4 Air Changes
Positive

3A209/ 3A193

RME
4 Air Changes
Positive
3A192
RME
4 Air Changes
Positive
3A192A
RME
4 Air Changes
Positive
3A188
RME
4 Air Changes
Positive
3A177
RME
4 Air Changes
Positive
3A196
RME
4 Air Changes
Positive
3A195
RME
4 Air Changes
Positive
3A144
RME
4 Air Changes
Positive
3A203
RME
4 Air Changes
Positive
3A204
RME
4 Air Changes
Positive
3A128
RME
4 Air Changes
Positive
3A132
RME
4 Air Changes
Positive
3W216
RME
4 Air Changes
Positive
3W217
RME
4 Air Changes
Positive

C3A25 C3A26 C3A27 C3A28 C3A29

RME
4 Air Changes
Positive
2W150
RME
4 Air Changes
Positive
2W149
RME
4 Air Changes
Positive
2W148
RME
4 Air Changes
Positive
2W153
RME
4 Air Changes
Positive
2W154
RME
4 Air Changes
Positive
2W146
RME
4 Air Changes
Positive
2A216
RME
4 Air Changes
Positive

4.0 H.J. Heinz Campus:

4.1 Monthly Heinz Testing - Testing shall be performed in Monthly in: One (1) Oral Surgery Room, Four (4) Ante Rooms, Four (4) Isolation Rooms, and One (1) Sterile Storage Room in Building 51 and Building 71.

4.1.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

ROOM
DESCRIPTION
REGULATION
B71/ 1A146
Oral Surgery
15 Air Changes/Positive
B51/ 3B193A, 2A146A*, 2B190A*
Ante Rooms
4 Air Changes/Negative
B51/ 3B193, 2A146*, 2B190*
Isolation Rooms
12 Air Changes/Negative
B50/ GA131
SPD
4 Air Changes/Positive

*Rooms under construction

4.2 Quarterly Heinz Testing - Testing shall be performed 4 times; once each in December, March, June, September in Eight (8) Soiled Utility Rooms in Building 71, Building 5, and Building 50.

4.2.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

4.2.2 Regulation Air Changes are 6 per hour/negative airflow:

B71/ 2C125
Soiled Utility
6
Negative
B71/ 2A124
Soiled Utility
6
Negative
B71/ 2A148
Soiled Utility
6
Negative
B71/ 1C114
Soiled Utility
6
Negative
B71/ 1A159
Soiled Utility
6
Negative
B51/ 2B186
Soiled Utility
6
Negative
B51/ 3A112
Soiled Utility
6
Negative
B50/ 1A162
Soiled Utility
6
Negative

4.3 Semi Annual Heinz Testing - Testing shall be performed in March and September in Four (4) In-Patient/Out-Patient Pharmacy Rooms in Building 51and Building 71.

4.3.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

ROOM #
DESCRIPTION
REGULATION
B51/GA122E
Prescription Filling and Assembly Area
4 Air Changes/Positive
B51/GA122F
Controlled Substance Vault
4 Air Changes/Positive
B71/1A101B
Prescription Filling and Assembly Area
4 Air Changes/Positive
B71/1A102
Controlled Substance Vault
4 Air Changes/Positive

4.4 Quarterly Heinz testing -Testing shall be performed 4 times; once each in December, March, June, September in Seventeen (17) Sterile Consumables Storage in Building 71, Building 5, and Building 50.

4.4.1 The testing shall include measurement of supply air, exhaust air, temperature, relative humidity, and positive/negative pressure determination. Air changes per hour shall be calculated.

4.4.2 Regulation Air Changes are 4 per hour/positive airflow:

B71/1B116
Sterile Storage
4 Air Changes
Positive
B71/1C116
Sterile Storage
4 Air Changes
Positive
B71/1A157
Sterile Storage
4 Air Changes
Positive
B71/1A141
Sterile Storage
4 Air Changes
Positive
B71/1A136
Sterile Storage
4 Air Changes
Positive
B71/2C126
Sterile Storage
4 Air Changes
Positive
B71/2A114
Sterile Storage
4 Air Changes
Positive
B71/2A149
Sterile Storage
4 Air Changes
Positive
B71/2C121
Sterile Storage
4 Air Changes
Positive
B51/GM116
Sterile Storage
4 Air Changes
Positive
B51/GA109
Sterile Storage
4 Air Changes
Positive
B51/2B154
Sterile Storage
4 Air Changes
Positive
B51/3A144
Sterile Storage
4 Air Changes
Positive
B51/3B152
Sterile Storage
4 Air Changes
Positive
B50/GA111
Sterile Storage
4 Air Changes
Positive
B50/1A145
Sterile Storage
4 Air Changes
Positive
B50/1A109
Sterile Storage
4 Air Changes
Positive

5.0 Required Air Changes:

5.1.1 TB/Isolation Rooms 12 Air Changes/Hour (negative)

5.1.2 Sterile Storage 4 Air Changes/Hour (positive), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)

5.1.3 Clinic/Injections 6 Air Changes/Hour (positive), 20 to 60% RH

5.1.4 Scrub/Anterooms 4 Air Changes/Hour (positive), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)- Scrub/Anterooms are negative with respect to the OR

5.1.5 ORs 20 Air Changes/Hour (positive), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)

5.1.6 Cardiac Cath 20 Air Changes/Hour (positive)

5.1.7 Morgue/Autopsy 12 Air Changes/Hour (positive)

5.1.8 Sterile Prep 4 Air Changes/Hour (positive), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)

5.1.9 Sterile Storage 4 Air Changes/Hour (positive), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)

5.1.10 Decontamination Room 6 Air Changes/Hour (Negative), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)

5.1.11 ORs 20 Air Changes/Hour (positive), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)

5.1.12 Sterile Prep 4 Air Changes/Hour (positive), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)

5.1.13 Sterilizer Equipment Access Room 10 Air Changes/Hour (positive), <85 degrees F

5.1.14 Decontamination Room 6 Air Changes/Hour (Negative), 66 to 72 degrees Fahrenheit, 20-60% Relative Humidity (RH)

5.1.15 ASU Procedure Rooms 12 Air Changes/Hour (negative)

5.1.16 Sterilizer Equipment Access Room 10 Air Changes/Hour (positive), <85 degrees

5.1.17 Utility Rooms require six (6) air changes per hour (negative).

6.0 General:

6.1 Contractor shall report to the VA police to sign in and obtain access control badge, then report to COR on date and time previously arranged with COR. Once work is complete, contractor shall leave field report with COR, sign out with VA police, and return access control badge before leaving medical center property.

6.2 All testing shall be completed by the 28th of each month.

6.3 All scheduling shall be coordinated in advance with the COR and/or designated program representative.

6.4 Mail hard copies of reports when complete to the COR and/or designated program personnel.

6.5 Report any deficiencies immediately to COR, and other designated program representatives.

6.6 The contractor shall provide a report including test methods and field test forms shall be provided to the COR upon completion of all testing visits. Report shall be in an Excel spreadsheet format with the following column headings: Room, Room Number, Supply (cubic feet per minute), Exhaust (cubic feet per minute), Temperature (degrees F), Relative Humidity (%), Air Balance (required), Air Balance (actual), Room Volume (cubic feet), Air Changes per Hour, Baulin Tube Functioning (Y/N) within 7 days of testing completion to the COR or designated program representative.

6.6 During the contract rooms it may be necessary to add and subtract rooms due to construction changes/repurposing of a room. Changes to rooms shall be executed by written bilateral modification.

6.7 The contractor is required to complete…