S01 SOW - HQ Conference Room Update.pdf
PDF 275 KB Posted
- Attached to
- USDA FPAC HQ Conference Rooms Upgrade
- Solicitation number
- 12FPC224Q0081
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to install audio conferencing equipment in several conference rooms at the Department of Agriculture headquarters in Washington, DC.
The key requirements include providing and installing 4 modular video conferencing systems, including 65-inch displays, Poly Studio video bars with auto-tracking cameras, and Barco ClickShare wireless presentation devices. The Contractor must also provide help desk and onsite support during the warranty period. The period of performance is 15 days for installation, testing, and training. Special requirements include contractor personnel having the necessary security clearances and experience in government facilities. The government will provide backend infrastructure and credentials to connect the systems to the USDA network. The related federal contract opportunity, Solicitation Number 12FPC224Q0081, is for the "USDA FPAC HQ Conference Rooms Upgrade".
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
CONFERENCING SYSTEM (NEW-IAB-010)
South & Whitten Building Rooms 3860, 3006, 3002, 213E
Table of Contents
1 INTRODUCTION
Farm Production and Conservation (FPAC)-Business Center (BC), requires audio conferencing equipment installed Department of Agriculture South Building, 1400 Independence Avenue SW
Washington DC 20250 in rooms 3860, 3006, 3002, Jamie L Whitten Building, Washington, DC
20250 in rooms 213E to create a training room which will also serve as a conference room.
1.1 Mission
1.2 Background
1.3 Scope
2 GENERAL REQUIREMENTS
2.1 Non-Personal Services
2.2 Contractor Personnel Qualifications
2.3 Key Personnel
2.2 Location and Hours of Work
2.3 Invoicing
2.4 Identification of Contractor Personnel
3 REQUIREMENTS/TASKS
3.1 Requirement/Task 1
4 DELIVERABLES/SCHEDULE
5 SPECIAL REQUIREMENTS
5.1 Security
5.2 Government Furnished Property (GFP), Equipment (GFE), Information (GFI), and/or Services
5.3 Restrictions Against Disclosure
5.4 Organizational Conflicts of Interest
5.5 Insurance
1 INTRODUCTION
Farm Production and Conservation (FPAC)-Business Center (BC), requires audio conferencing equipment installed at the Department of Agriculture, 1400 Independence Avenue SW Washington DC 20250 rooms 3860, 3006, 3002, and Jamie L Whitten Building, Washington, DC 20250 in room 213E to create a training room which will also serve as a conference room.
1.1 Mission
The FPAC-BC mission is to deliver sound, customer-focused financial services through effective and innovative approaches that optimize resources, strengthen accountability, and provide transparency for FPAC programs to agricultural producers, stakeholders, and the Nation.
1.2 Background
FPAC-BC requires the training room to increase efficiencies and productivity for the Mission area.
1.3 Scope
The purposed planning of the conference room (3860, 3006, 3002, 213E) is to create a user-friendly conference area that will be used by FPAC-BC. For such purposes proper audio and camera needs must be met so that employees can interact with other employees in other locations.
2 GENERAL REQUIREMENTS
The list below are the requirements: The Contractor shall provide/install including all labor and equipment/supplies necessary for installation.
Qty Description
3 65" Class 4K UHD Display 3 Professional grade wall mount.
one (1) new Poly Studio X30, All-in-One Video Bar, video conference equipment and TC8 touch panel. EPTZ auto-track camera, codec. The stereo speaker and mic are integrated in the video bar one (1) new Barco ClickShare CX20. This will allow content to be shared wirelessly with the system and used for Device Mode.
Gvt Provided re-use the two (2) GFE 65" displays, one (1) GFE Audio one (1) GFE Audio Amp, and the existing ceiling speakers
One (1) new Poly Studio X52, All-in-One Video Amp, and the existing ceiling speakers.
one (1) new Poly Studio X52, All-in-One Video Bar, video conference equipment and TC8 touch panel. This unit includes EPTZ auto-track camera, codec, and integrated stereo speaker and microphone.
One (1) new Barco ClickShare CX20. This will allow content to be shared wirelessly with the system and used for Device Mode.
Pricing shall include disconnection of old equipment, delivery and installation, testing and training of newly installed equipment, existing equipment will be linked to the new equipment provided by vendor.
The Poly Studio X52 Bar will be under the displays on top of the credenza.
The Poly Studio X30 Bar will be installed/mounted under the display
- The Contractor shall provide/install four modular video conferencing systems including all labor and equipment/supplies that provides the following:
o Microsoft Teams conference room teleconference equipment Specifically, hardware MUST either be Polycom or Cisco devices. These are the only devices that are currently certified for use on the USDA network.
o Quality Audio
Ensures voice clarity for the entire room.
Keep background noise and side conversations out of meetings.
o Seamless connections Delivers an easily accessible modular room solution by seamlessly connecting to cameras, microphones, and other 3rd party components.
o Auto Tracking Camera o Wireless connections for laptops
- The Contractor shall provide “help desk” support to resolve equipment operations deficiencies from 8:00 AM to 4:00 PM EST during normal workdays.
- The Contractor shall provide onsite support within 48 hours after notification to resolve equipment operations deficiencies not resolved by “help desk” support, during the warranty period of the equipment.
- Period of Performance: Completion of Installation, Test, and Training is required no later than 15 days following installation.
2.1 Non-Personal Services
The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees, except for the site lead. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor’s responsibility to notify the Contracting Officer, in writing, immediately.
2.2 Contractor Personnel Qualifications
The contractor shall have clearance and experience installing audio video equipment in government facilities. Contractor shall provide documentation of key personnel experience.
2.3 Key Personnel
The contractor shall provide a point of contact who will provide updates and be available to the customer during the period of performance.
2.2 Location and Hours of Work
Work under this contract is performed at the USDA-Headquarters, 1400 Independence Ave., S.W.
Washington, DC 20250 and Jamie L Whitten Building, Washington, DC 20250. Normal agency workdays are Monday through Friday, except U.S. Federal Holidays. Agency employees typically work eight hours per day, 40 hours per week. Federal employee core hours of work are from 9:00 AM to 3:00 PM daily.
The Contractor shall be responsible for establishing their work hours under this contract, except when access to the USDA-HQ South Building and Whitten Building is required, in which case the Government may limit the Contractors access based on availability of agency employees. However, Contractor employees in possession of a valid HPDS-12 PIV-II Compliant Credential (e.g., LincPass) can work unaccompanied at government locations upon Government approval. See Section SOW 5.1 for additional information.
Weather and security closures by their nature usually arise without advance notice. As such, the Government will notify the Contractor as soon as possible once any closures have been announced.
2.3 Invoicing
Invoices must be submitted electronically through the Invoice Processing Platform (IPP) system and in accordance with the payment clause(s) in the contract.
2.4 Identification of Contractor Personnel
Contractor employees, including subcontractors, who attend meetings, send emails, answer Government telephones or place calls, or work in situations where their actions could be construed as acts of Government officials, must clearly identify themselves as Contractor employees.
3 CONTRACTOR PERFORMANCE
3.1 Performance Objectives/Tasks
3.1.1 Installation
The Contractor shall install all components to meet the General Requirements.
3.1.2 Test and Training
The Contractor shall test and train employees on all components and operating devices and verify that they are functioning and operating to meet the requirements specified in section 2 General Requirements.
3.2 Deliverable/Schedule
Timely completion of deliverables is essential to a successful outcome. Below are the required due dates for each requirement/task.
Item No.
Deliverable Performance Objective/Task
Due
1 Task 1: Installation Phase PWS Section 3.1.1 120 Days 2 Task 2: Test and Train Phase PWS Section 3.1.2 15 Days
3.3 Performance Requirements Summary
The Performance Requirements Summary (PRS) establishes a minimum performance standard for each performance objective/task that must be met for the work to be considered acceptable. Contractor performance not meeting these standards is considered nonconforming. At its discretion, the Government may require reperformance of nonconforming services at no increase in contract price. If reperformance will not correct the defects or is not possible, the Government is entitled to an equitable price reduction or adequate consideration for acceptance of nonconforming services and/or supplies. The absence of any contract requirement from this PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract for noncompliance.
PWS
Section
Performance Objectives/Tasks Performance Standards and Acceptable Quality Levels
3.1.1 Installation Phase Installation of all components listed in Section 2. General Requirements
3.1.2 Test and Training Phase Test and Training as defined in PWS Section 3.1.2.
4 SPECIAL REQUIREMENTS
This section describes the special requirements that apply to this contract. The following sub-sections provide additional detail for each requirement.
4.1 Security
FAR Subpart 4.13, Personal Identification Verification of Contractor Personnel, establishes the policy and use requirements for FAR Clause 52.204.9, Personal Identification Verification of Contractor Personnel, which is hereby incorporated into this order by reference. It requires Contractor compliance with Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.
USDA policy implementing referred to in paragraph (a) of the clause is at USDA Department Manual 4620-002, USDA Departmental Regulation 4620-002. This policy applies to Contractor employees, including subcontractor employees, who require routine access to federally controlled facilities and information systems. All such employees must have been successfully identity proofed (FBI fingerprint check) and have at minimum a successfully adjudicated Tier 1 (T1) or Department of Defense/Defense Counterintelligence Security Agency (DCSA)/National Security (NS) community background investigation to serve on the contract. USDA agencies may grant access to USDA information systems after successful adjudication of the FBI fingerprint check. Completion and successful adjudication of the final T1 (or higher) results or DCSA/NS BI are still required to continue work under this contract.
If the fingerprint or background investigation result is unsatisfactory the employee shall be removed from the contract immediately and replaced immediately. Unless an employee already has successfully completed these requirements and the investigation is current, the employee will be required to complete an electronic Questionnaire for Investigations Processing (eQIP), fingerprint check (instructions to be provided by the Farm Production and Conservation, Homeland Security Division, Personnel Security Branch), and other required forms. The Contractor is responsible for any cost of obtaining the fingerprints. The Government is responsible for the cost of the FBI fingerprint check and background investigation. The agency does not have any control over the timeliness of the background investigation or that it will be completed within the performance period of this contract, but it is estimated to be completed approximately 120 calendar days (depending on the level of the background investigation), once the Contractor provides all of the required documentation and the agency submits it to DCSA. Fingerprint check results are estimated to be received within 10 calendar days once the Contractor provides all of the required documentation and the agency submits it to DCSA. Upon award of the contract, and once the agency has provided the Contractor with the required documentation and instructions, the Contractor must complete and submit the required documentation promptly to prevent delays in granting access.
If employees will be provided access to USDA information technology equipment and systems, they will be required to take information security awareness training and pass a test prior to be granted access.
The Contractor shall establish and implement methods of making sure all keys/badges issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
The Contractor shall not duplicate any keys issued by the Government.
The Contractor shall prohibit the use of keys, issued by the Government, by any persons other than the Contractor’s employees and the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in performance of contract work requirements in those areas.
The Contractor shall safeguard all Government property and controlled forms provided for Contractor use and adhere to the Government property requirements contained in this contract. At the end of each workday, all Government facilities, equipment and materials shall be secured.
The Contractor shall maintain a current listing of all employees, including subcontractor employees that have access to Government facilities and information technology systems. The list shall be made available to the Government upon request.
4.2 Government Furnished Property (GFP), Equipment (GFE), Information (GFI), and/or Services The Government will make the following available to the Contractor:
1. Necessary backend infrastructure. This is to include the necessary addresses and/or credentials necessary to connect to the USDA system. This will either be provided directly to the contractor or as a proxy by the USDA IT services.
4.3 Restrictions Against Disclosure
The Contractor agrees, in the performance of this contract, to keep all information contained in source documents or other media furnished by the Government in the strictest confidence. The Contractor also agrees not to publish or otherwise divulge such information in whole or in part, in any manner or form, nor to authorize or permit others to do so, taking such reasonable measures as are necessary to restrict access to such information while in the Contractor’s possession, to those employees needing such information to perform the work provided herein (e.g., on a "need to know" basis). The Contractor shall to immediately notify the Contracting Officer, in writing, in the event that the Contractor determines or has reason to suspect a breach of this requirement.
The Contractor agrees not to disclose any information concerning work under this contract to any persons or individual unless prior written approval is obtained from the Contracting Officer. The Contractor agrees to insert the substance of this clause in any consultant agreement or subcontract hereunder.
Performance of work may involve access to potentially sensitive information about governmental and landowner issues. All Contractor personnel shall comply with the terms of AGAR clause 452.224-70 (Confidentiality of Information), as well as provisions of the Privacy Act of 1974 (5 U.S.C. 552a) Additionally, the Contractor’s personnel shall comply with privacy of personal information relating to agency programs in accordance with Section 1244 of Title II of the Farm Security and Rural Investment Act of 2002 (P.L. 107-171) and Section 1619 of Title I of the Food, Conservation, and Energy Act of 2008. The Contractor’s employees shall not disclose contents of agency case files and/or records to anyone other than authorized United States Department of Agriculture employees without the express written consent of the Freedom of Information Act and Privacy Act Officer, through the Contracting Officer.
4.4 Organizational Conflicts of Interest
The Contractor acknowledges that it is familiar with Federal Acquisition Regulation (FAR) Subpart 9.5, Organizational and Consultant Conflicts of Interest, and agrees to avoid, neutralize or mitigate such conflicts of interest in accordance with the principles set forth in the FAR. If the performance would require the Contractor, including subcontractors, to provide services related to systems or projects with which the Contractor is already directly concerned, either by prime or subcontract, that would cause an organizational conflict of interest, the Contractor shall immediately notify the Contracting Officer, in writing, and not perform the work until direction is provided by the Contacting Officer.
4.5 Insurance
The table below lists the kinds and minimum amounts of insurance required, as referenced in contract clause 52.228-5 (Insurance–Work on a Government Installation).
Minimum Insurance Requirements
1 Workers' compensation and employer's liability $100,000 or per statute 2 General liability:
Bodily injury $500,000 per occurrence Property damage $100,000 per occurrence 3 Automobile liability:
Bodily injury $200,000 per person /
$500,000 per occurrence Property damage $20,000 per occurrence.
In addition, the contractor must provide coverage for any other risks as deemed appropriate, since the Government is not indemnifying the Contractor against any risks under the contract. A current duplicate (not machine reproduced) certificate of insurance must be submitted to the Contracting Officer (CO) for approval before the Contractor begins work under this contract duplicates of renewal certificates (not machine reproduced) obtained by the CONTRACTOR during the life of this contract must immediately be provided to the CO. Also, see the cause, "Insurance Additional Named Insured" below.
The insurance policy must contain an endorsement that any cancellations or material decreases in the coverage’s shall not be effective, unless the insurer or the Contractor gives advance written notices of cancellations or changes in accordance with the CO's instructions.
All premiums or costs incurred to comply with these insurance requirements will be paid by the Contractor. If the Contractor already has an organizational policy in effect, the CO requires evidence that it satisfies all the above stated requirements. The Contractor is required to provide such evidence as deemed necessary by the Contracting Officer before a notice to proceed with contract performance issued.
The Government reserves the right to disapprove the purchase of any insurance coverage not in the Government's interest. This contract requires that all insurance coverages be kept in full force and effect until all contract work is completed; the insurance requirements also apply to subcontractors.
The Government will not be responsible for any losses, damages, or liabilities beyond the amounts, limits, and conditions of the above-required insurance.
The requirement of contract clause 52.228-5 is hereby supplemented to provide that the general liability policy shall name "The United States of America, acting by and through the U.S. Department of Agriculture Farm Production and Conservation Business Center," as an additional insured with respect to operations performed under this contract.
| 1 INTRODUCTION |
| 1.1 Mission |
| 1.2 Background |
| 1.3 Scope |
| 2 GENERAL REQUIREMENTS |
| 2.1 Non-Personal Services |
| 2.2 Contractor Personnel Qualifications |
| 2.3 Key Personnel |
| 2.2 Location and Hours of Work |
| 2.3 Invoicing |
| 2.4 Identification of Contractor Personnel |
| 3 CONTRACTOR PERFORMANCE |
| 3.2 Deliverable/Schedule |
| 3.3 Performance Requirements Summary |
| 4 SPECIAL REQUIREMENTS |
| 4.1 Security |
| 4.2 Government Furnished Property (GFP), Equipment (GFE), Information (GFI), and/or Services |
| 4.3 Restrictions Against Disclosure |
| 4.4 Organizational Conflicts of Interest |
| 4.5 Insurance |
File details come from the government source that posted it. Updated .