AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE

6. ISSUED BY

03/28/2022

CODE FPAC-HQ-12FPC3

FPAC BUS CNTR-ACQ DIV-OPS BRANCH-SE

1400 INDEPENDENCE AVE SW, RM 6801-S

1. CONTRACT ID CODE

4. REQUISITION/PURCHASE REQ. NO.

7. ADMINISTERED BY (If other than Item 6)

FPAC BUS CNTR-ACQUISITION

Fort Worth Federal Center

I

PAGE OF PAGES

1 I 1

5. PROJECT NO. (If applicable)

CODE IFPAC-HQ-APD-TX

DIV-TX

WASHINGTON DC 20250 501 w. Felix St., Building 23 Fort Worth TX 76115-3404

8. NAME AND ADDRESS OF CONTRACTOR (No .• street, county, State and ZIP Code)

J&

9A. AMENDMENT OF SOLICITATION NO.

12FPC322Q0014

X

9B. DATED (SEE ITEM 11)

03/16/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers Dis extended. rais not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment. and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

E. IMPORTANT:

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Contractor Dis not Dis required to sign this document and return ______ _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NRCS Oklahoma MacArthur l Skeleton Bridge Abutment Stabilization, Emergency Watershed Program (EWP), Logan County, OK

This Amendment serves to provide responses to questions from Site Visit as well as provides a list of Site Visit participants.

Date and Time for receipt of quotes is not changed.

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

(Signature of person authorized to sign)

Previous edition unusable

LAUREEN M. EIPP

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Q1: (On the west edge of the rock riprap placement area) Does the eroded area need to be excavated and shaped to a 2:1 or 3:1 slope before rip rap rock placement?

A1: The excavation and shaping of the eroded area on the West side of the rock riprap placement area will be sloped to 2:1 before rip rap placement.

Q2: (On the SE corner of the bridge, top of bank, there is a large tree near some inground utility lines the run under the bridge) Does the entire root ball need to be removed before rock placement?

A2: We will be calling OKIE 811 to identify the utility lines in the ground in the work area. The utilities company might tell us to not work with heavy equipment around the lines. This is the only large tree the needs to be removed from in the work area, so at this time the plan is that we will cut the tree off at the base and remove all other debris, not including the root ball. Some of the roots may need to be removed from the rock rip rap placement area during excavation. We will stay away from the utility line.

Regarding Bid Item #4 Crushed Rock Installed – on page 61-6, paragraph C. Crushed Rock, Installed of the specification package it states > “No Crushed rock shall be delivered to the site until the Contracting Officers Representative verifies that foundation conditions warrant the use of such material.” The crushed rock will be needed for the rock rip stockpiling site.

Comments from the County Commissioner:

- Commissioner does not plan on closing the road during construction, only signage for a construction zone/ work area.

- Commissioner wants debris to be piled on the SW corner of the work area on the west side of the road. This is where the Contracting Officer Representative will direct the contractor to stockpile the debris.

- Commissioner will have any fence removed (then later replaced) from the west side of the work area/ road.

- Commissioner has asked to have any rock riprap and riprap bedding stockpiled on the SE corner of the work area during construction.