Attachment B is a detailed technical specification document for seeding, sprigging, and mulching requirements for a federal contract. The document outlines comprehensive guidelines for seed selection, fertilization, and planting procedures, with specific focus on wildlife habitat restoration. Key requirements include using seeds from the latest crop with high purity standards, conforming to state agricultural regulations, and applying seeds within specified timeframes. The document emphasizes using BioPreferred® products in categories like mulch, erosion control materials, fertilizers, and agricultural spray adjuvants.
The seeding plan includes a diverse mix of 5 grass species (including Bulrush, Fox Sedge, and Bluejoint) and 21 forb/legume species (including Sunflower, Lobelia, and Arrowhead), totaling 2.61 PLS (Pure Live Seed) pounds per acre across 24 acres. The project is located in Tazewell County, Illinois, with seeding dates specified for the dormant zone (November 15 - March 1). The contractor must follow strict guidelines for seedbed preparation, fertilization, and maintenance, with an emphasis on preventing noxious weed introduction and ensuring uniform seed application. The specification is part of a Wildlife Resources Enhancement (WRE) project for the USDA Natural Resources Conservation Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements 6 - Seeding, Sprigging, and Mulching
1. Scope The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inocu lant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
The following BioPreferred® product categories are applicable to this specification:
- mulch and compost materials
- erosion control materials
- fertilizers
- agricultural spray adjuvants
2. Material Seed-All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available. It shall meet or exceed the standard for purity and germination listed in section 7.
Seed shall be labeled in accordance with the state laws and the U.S. Department of Agriculture rules and regula tions under the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination. No seed will be accepted with a test date of more than 9 months before the delivery date to the site.
Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable shall be as defined in the current State laws relating to agricultural seeds. Each type of seed shall be delivered in separate sealed containers and fully tagged unless exception is granted in writing by the contracting officer.
Fertilizer-Unless otherwise specified, the fertilizer shall be a commercial grade fertilizer. It shall meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contrac tor shall furnish a supplier's certification of analysis and weight. When required by the contract, a representative sample of the fertilizer shall be furnished to the contracting officer for chemical analysis.
Inoculants-The inoculant for treating legume seeds shall be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and shall not be used later than the date indicated on the container or as otherwise specified. A mixing medium, as recommended by the manufacturer, shall be used to bond the inoculant to the seed.
Two times the amount of the inoculant recommended by the manufacturer shall be used except four times the amount shall be used when seed is applied using a hydraulic seeder. Seed shall be sown within 24 hours of treat ment and shall not remain in the hydraulic seeder longer than 4 hours.
Lime and other soil amendments-Lime shall consist of standard ground agriculture limestone, or approved equiv alent. Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the
State Department of Agriculture. Other soil amendments shall meet quality criteria and application requirements specified in section 7.
Mulch tack(fiers-Asphalt emulsion tackifiers shall conform to the requirements of ASTM D 977, Specification for Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. N onasphaltic tackifiers required because of environmental considerations shall be as specified in section 7.
Straw mulch material-Straw mulch shall consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in section 7. The mulch material shall be air-dry, reasonably light in color, and shall not be musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted. The contractor shall provide a method satisfactory to the contracting officer for determining weight of mulch furnished.
(210-VI-NEH, January 2014) 6-1
Attachment B
Other mulch materials-Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh, are other mulching materials that may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer's recommendations for methods of application.
3. Seeding mixtures, sod, sprigs, and dates of planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting shall be as shown on the plans or as specified in section 7.
4. Seedbed preparation and treatment Areas to be treated shall be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed shall be adequately loosened ( 4 to 6 inches deep) and smoothed. Depending on soil and mois ture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equip ment cannot operate safely, the seedbed shall be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.
If seeding is to be accomplished immediately following construction operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.
Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or mainte nance operations shall be removed or disposed of as specified in section 7.
Seedbed preparation shall be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the contracting officer's technical representative (COTR).
5. Seeding, sprigging, fertilizing, mulching, and stabilizing All seeding or sprigging operations shall be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application shall be as specified in section 7. Unless otherwise specified, seeding or sprigging shall be accomplished within 2 days after final grading is completed and approved.
Fertilizer, lime, and other soil amendments shall be applied as specified in section 7. When specified, the fertilizer and soil amendments shall be thoroughly incorporated into the soil immediately following surface application.
The rate, amount, and kind of mulching or mesh shall be as specified in section 7. Mulches shall be applied uni formly to the designated areas. They shall be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material shall be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier. When the mulch crimper or equivalent anchoring tool is used, it shall have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it shall be operated on the contour. Hand methods shall be used where equipment cannot safely operate to perform the work required.
The tackifier shall be applied uniformly over the mulch material at the specified rate, or it shall be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials shall be applied smoothly, but loosely on the designated areas. The edges of these materials shall be buried or securely anchored using spikes or staples as specified in section 7.
The contractor shall maintain the mesh or netting areas until all work under the contract has been completed and accepted. Maintenance shall consist of the repair of areas damaged by water erosion, wind, fire, or other causes.
Such areas shall be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas shall be refertilized, reseeded, and remulched before the new application of the mesh or netting.
6--2 (210-VI-NEH, January 2014)
6. Materials Descriptions
All seed provided under this solicitation will be provided by the successful Contractor and shall meet the following contract requirements.
1. All seed furnished shall be true to name and no substitution of species is permitted;
2. The contractor shall guard against the introduction of noxious weeds, pests, both on equipment and plant materials brought to the site.
3. Seed must be calculated based on pure live seed basis
**SEEDING PLANS NOTED ON PAGE 6 OF STATEMENT OF WORK (SOW)**
7. Items of work and requirement details
See 327 IR and Seeding plans. Mulching is NOT required.
(210--VI-NEH, January 2014) 6--3