SCOPE OF WORK

PULLMAN PLANT MATERIALS CENTER (PMC)

ROOFING SHINGLES AND GUTTER REPLACEMENT - BUILDINGS 195B AND 195E

PULLMAN, WHITMAN COUNTY WA

INTRODUCTION:

The United States Department of Agriculture Natural Resources Conservation Service Pullman Plant Materials Center (WAPMC), located at 4900 SE Terre View Drive, Pullman WA 99163, provides conservation plant solutions for North Idaho, Eastern Washington, and Eastern Oregon. The Center focuses on providing vegetative technologies for conservation and soil health in cropland, orchards & vineyards, rugged scablands, forests, and native rangelands to NRCS field staff.

BACKGROUND:

The roofing shingles and gutters on PMC buildings 195B and 195W exhibit slight damage and deterioration and require replacement.

PROJECT DETAILS:

Note: All quantities and measurements are estimates and need to be verified by the contractor.

• The Contractor shall remove approximately 3,300 ft² + 2,400 ft² = 5700 square feet of asphalt shingles and tar paper underlayment on buildings 195B, and 195E and replace with new underlayment, ice and water shield, flashing, and asphalt shingles equivalent to Owens Corning TruDefinition Duration shingles, onyx black in color, the same shingles used on the PMC building 195C.

• The Contractor will remove approximately 350 linear feet of old gutters and down spouts from buildings 195B and 195E and replace with new gutters, downspouts, and leaf/debris guards over the top of all gutters.

• Contractor shall provide specifications on materials for approval prior to ordering and installation.

Contractor shall present any warranty documentation to the Plant Materials Center upon completion of project.

All work performed, to include material and debris removal, shall be in accordance with federal, state, local laws, codes, ordinances, rules, regulations, orders, and other legal requirements of public authorities that bear on performance of work; and, in accordance to accepted industry standards, including but not limited to:

a. Occupational Safety and Health Administration (OSHA)

b. The International Code Council (ICC)

c. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual

d. Sheet Metal and Air Conditioning Contractors' National Association (SMACNA) publication, Architectural

Sheet Metal Manual.

PROJECT TECHNICAL POINT OF CONTACT:

Steven Lee, Plant Materials Center Manager: steven.lee@usda.gov (509) 822-1763 mailto:steven.lee@usda.gov