NATURAL RESOURCES CONSERVATION SERVICE
MINNNESOTA
CONSTRUCTION AND MATERIAL
SPECIFICATIONS FOR
ROGER AND ANNE JUAIRE TRUST
5463222001TQ9
WETLAND RESTORATION
SEC 10 T 42 N R 30 W
MORRISON CO
Prepared by: Caroline Clarin NRCS Easement Team Engineer
NRCS-Minnesota (210-VI-NEH, May 2005) MN5-1
Minnesota Construction Specification 5—Pollution Control
1. Scope The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
2. Material specification All material furnished shall meet the requirements of the material specifications listed in section 7 of this specification.
3. Erosion and sediment control measures and works The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile sediment fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 7 of this specification or required by Federal, State, or local government.
NRCS-Minnesota (210-VI-NEH, May 2005) MN5-2
4. Chemical pollution The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to dispose of chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. At the completion of the construction work, sumps shall be removed and the area restored to its original condition as specified in section 7 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 7 of this specification.
5. Air pollution The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
6. Maintenance, removal, and restoration All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
7. Construction details
Pollution control is subsidiary to mobilization. No separate payment will be made for pollution control.
NRCS-Minnesota (210-VI-NEH, May 2005) MN6-1
Minnesota Construction Specification 6—Seeding, Sprigging, and Mulching
1. Scope The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculants, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
2. Material Seed—All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available. It shall meet or exceed the standard for purity and germination listed in section 6.
Seed shall be labeled in accordance with the state laws and the U.S. Department of Agriculture rules and regulations under the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination. No seed will be accepted with a test date of more than 9 months before the delivery date to the site.
Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted.
The percent of noxious weed seed allowable shall be as defined in the current State laws relating to agricultural seeds. Each type of seed shall be delivered in separate sealed containers and fully tagged unless exception is granted in writing by the engineer.
Fertilizer—Unless otherwise specified, the fertilizer shall be a commercial grade fertilizer. It shall meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contractor shall furnish a supplier's certification of analysis and weight.
When required by the contract, a representative sample of the fertilizer shall be furnished to the engineer for chemical analysis.
Inoculants—The inoculant for treating legume seeds shall be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and shall not be used later than the date indicated on the container or as otherwise specified. A mixing medium, as recommended by the manufacturer, shall be used to bond the inoculant to the seed. Two times the amount of the inoculant recommended by the manufacturer shall be used except four times the amount shall be used when seed is applied using a hydraulic seeder. Seed shall be sown within 24 hours of treatment and shall not remain in the hydraulic seeder longer than 4 hours.
Lime and other soil amendments—Lime shall consist of standard ground agriculture limestone, or approved equivalent. Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the State Department of Agriculture. Other soil amendments shall meet quality criteria and application requirements specified in section 6.
Mulch tackifiers—Asphalt emulsion tackifiers shall conform to the requirements of ASTM D 977, Specification for Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. Nonasphaltic tackifiers required because of environmental considerations shall be as specified in section 6.
Straw mulch material—Straw mulch shall consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in section 6. The mulch material shall be air-dry, reasonably light in color, and shall not be musty, moldy, caked, or otherwise of low quality. The
NRCS-Minnesota (210-VI-NEH, May 2005) MN6-2 use of mulch that contains noxious weeds is not permitted. The contractor shall provide a method satisfactory to the engineer for determining weight of mulch furnished.
Other mulch materials—Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh, are other mulching materials that may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer's recommendations for methods of application.
3. Seeding mixtures, sod, sprigs, and dates of planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting shall be as shown on the plans or as specified in section 6.
4. Seedbed preparation and treatment Areas to be treated shall be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed shall be adequately loosened (4 to 6 inches deep) and smoothed. Depending on soil and moisture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equipment cannot operate safely, the seedbed shall be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.
If seeding is to be accomplished immediately following construction operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.
Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or maintenance operations shall be removed or disposed of as specified in section 6.
Seedbed preparation shall be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the engineer.
5. Seeding, sprigging, fertilizing, mulching, and stabilizing All seeding or sprigging operations shall be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application shall be as specified in section 6. Unless otherwise specified, seeding or sprigging shall be accomplished within 2 days after final grading is completed and approved.
Fertilizer, lime, and other soil amendments shall be applied as specified in section 6. When specified, the fertilizer and soil amendments shall be thoroughly incorporated into the soil immediately following surface application.
The rate, amount, and kind of mulching or mesh shall be as specified in section 6. Mulches shall be applied uniformly to the designated areas. They shall be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material shall be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier. When the mulch crimper or equivalent anchoring tool is used, it shall have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it shall be operated on the contour. Hand methods shall be used where equipment cannot safely operate to perform the work required.
The tackifier shall be applied uniformly over the mulch material at the specified rate, or it shall be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials shall be applied smoothly, but loosely on the designated areas. The edges of these materials shall be
NRCS-Minnesota (210-VI-NEH, May 2005) MN6-3 buried or securely anchored using spikes or staples as specified in section 6.
The contractor shall maintain the mesh or netting areas until all work under the contract has been completed and accepted. Maintenance shall consist of the repair of areas damaged by water erosion, wind, fire, or other causes. Such areas shall be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas shall be refertilized, reseeded, and remulched before the new application of the mesh or netting.
6. Construction details Seed and mulch all disturbed areas with the following seed mixture including the spoil placement areas. Rate is given for Pure Live Seed (PLS). To figure Pure Live Seed (PLS) rates, multiply the percent purity by the percent germination. Divide the seeding rate by the percent PLS to find the bulk seed needed per acre. For example, 98% purity X 60% germination = 0.588% PLS 10 lbs/acre 0.588% PLS = 17 lbs/acre. Seed shall be checked by NRCS representative prior to seeding and contractor/landowner will provide the seed tags to the NRCS representative. Seed test dates will not be more than 9 months prior to the date of seeding.
Mulch the crossing slope areas with clean straw free of weed seed as described in section 5.
Seeding, sprigging, mulching, and stabilizing.
The seeding mixture shall consist of the following species, varieties and rates of Pure Live Seed per acre.
Nurse Crop—Seed Oats at rate of .5 bushels/ac
Common Name Scientific Name Sod/Bunch Lbs PLS
Per Acre- Drill
Lbs PLS Per Acre- Broadcast
Side-oats Grama Bouteloua curtipendula Sod 7.5 10
Switchgrass Panicum virgatum Sod 3 10 Western Wheatgrass Pascoptrum smithii Sod 7.5 10 Canada Wildrye Eltmus canadensis Bunch 7.5 10
Seeding dates Spring May 1st -- Sept 1st Summer N/A Dormant Nov. 1 – Freeze-up
No permanent seeding will take place during the period of Sept 1st through October 31th. A cover crop of oats at a rate of 1 bushel/acres shall be seeded during this time, with a permanent seeding done as soon as possible at the next seeding window.
Seeding Method—Apply seed uniformly at the specified rate by broadcasting or drilling. Harrow lightly following the seeding operation to cover the seed unless the cultipacker seeder equipment cannot operate then cover the seed by hand using a rake or similar tool or a drag behind an ATV.
Mulch Certification—Mulch shall consist of clean grain oat or wheat straw that is certified by the
NRCS-Minnesota (210-VI-NEH, May 2005) MN6-4
Minnesota Crop Improvement Association (MCIA) to be noxious weed free. For information on obtaining certified mulch or getting a source of straw mulch certified go to the web address:
http://www.mncia.org/noxious-weed-seed-free-forage-mulch
Seeding of a cover crop is subsidiary to Disturbed area seeding and will not result in additional payment.
Seeding and mulching will be paid as a job in a lump sum payment.
NRCS-Minnesota (210-VI-NEH, May 2005) MN21-1
Minnesota Construction Specification 21—Excavation
1. Scope The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials.
2. Classification Excavation will be classified as common excavation or rock excavation in accordance with the following definitions or will be designated as unclassified.
Common excavation shall be defined as the excavation of all materials that can be excavated, transported, and unloaded by the use of heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped into place or loaded onto hauling equipment by means of excavators having a rated capacity of one cubic yard and equipped with attachments (such as shovel, bucket, backhoe, dragline or clam shell) appropriate to the character of the materials and the site conditions.
Rock excavation shall be defined as the excavation of all hard, compacted or cemented materials the accomplishment of which requires blasting or the use of excavators larger than defined for common excavation. The excavation and removal of isolated boulders or rock fragments larger than one cubic yard in volume encountered in materials otherwise conforming to the definition of common excavation shall be classified as rock excavation.
Excavation will be classified according to the above definitions by the Engineer, based on his judgment of the character of the materials and the site conditions.
The presence of isolated boulders or rock fragments larger than one cubic yard in size will not in itself be sufficient cause to change the classification of the surrounding material.
For the purpose of this classification, the following definitions shall apply:
Heavy ripping equipment shall be defined as a rear-mounted, heavy duty, single-tooth, ripping attachment mounted on a tractor having a power rating of 200-300 net horsepower (at the flywheel).
Wheel tractor-scraper shall be defined as a self-loading (not elevating) and unloading scraper having a struck bowl capacity of l2-20 yards.
Pusher tractor shall be defined as a track type tractor having a power rating of 200-300 net horsepower (at the flywheel) equipped with appropriate attachments.
Unclassified Excavation. Items designated as "Unclassified Excavation" shall include all materials encountered regardless of their nature or the manner in which they are removed. When excavation is unclassified, none of the definitions or classifications stated in Section 2 of this specification shall apply.
3. Blasting The transportation, handling, storage, and use of dynamite and other explosives shall be directed and supervised by a person of proven experience and ability in blasting operations.
NRCS-Minnesota (210-VI-NEH, May 2005) MN21-2
Blasting shall be done in such a way as to prevent damage to the work or unnecessary fracturing of the foundation and shall conform to any special requirements in Section 10 of this specification.
4. Use of excavated materials To the extent they are needed, all suitable materials from the specified excavations shall be used in the construction of required permanent earthfill or rockfill. The suitability of materials for specific purposes will be determined by the Engineer. The Contractor shall not waste or otherwise dispose of suitable excavated materials.
5. Disposal of waste materials All surplus or unsuitable excavated materials will be designated as waste and shall be disposed of at the locations shown on the drawings or shall be disposed of by the Contractor at sites of his own choosing away from the site of the work.
6. Bracing and shoring Excavated surfaces too steep to be safe and stable if unsupported shall be supported as necessary to safeguard the work and workmen, to prevent sliding or settling of the adjacent ground, and to avoid damaging existing improvements. The width of the excavation shall be increased if necessary to provide space for sheeting, bracing, shoring, and other supporting installations. The Contractor shall furnish, place and subsequently remove such supporting installations.
7. Structure and trench excavation Structure or trench excavation shall be completed to the specified elevations and to sufficient length and width to include allowance for forms, bracing and supports, as necessary, before any concrete or earthfill is placed or any piles are driven within the limits of the excavation.
8. Borrow Excavation When the quantities of suitable materials obtained from specified excavations are insufficient to construct the specified fills, additional materials shall be obtained from the designated borrow areas.
The extent and depth of borrow pits within the limits of the designated borrow areas shall be as directed by the Engineer.
Borrow pits shall be excavated and finally dressed in a manner to eliminate steep or unstable side slopes or other hazardous or unsightly conditions.
9. Overexcavation Excavation in rock beyond the specified lines and grades shall be corrected by filling the resulting voids with portland cement concrete made of materials and mix proportions approved by the Engineer.
Concrete that will be exposed to the atmosphere when construction is completed shall contain not less than 6 sacks of cement per cubic yard of concrete. Concrete that will be permanently covered shall contain not less than 4-1/2 sacks of cement per cubic yard. The concrete shall be placed and cured as specified by the Engineer.
Excavation in earth beyond the specified lines and grades shall be corrected by filling the resulting voids with approved compacted earthfill, except that, if the earth is to become the subgrade for riprap, rockfill, sand or gravel bedding, or drainfill, the voids may be filled with material conforming to the specifications for the riprap, rockfill, bedding or drainfill.
NRCS-Minnesota (210-VI-NEH, May 2005) MN21-3
The cost of unauthorized excavation and the backfill required to replace unauthorized excavation shall be borne by the Contractor.
10. Construction details
Excavation is subsidiary to the Dam Removal and Rock Crossing line item. No separate payment will be made for excavation.
The NRCS representative will identify the disposal area for the material removed during the Dam Removal and Rock Crossing installation.
NRCS-Minnesota (210-VI-NEH, May 2005) MN26-1
Minnesota Construction Specification 26—Topsoiling
The work consists of furnishing and spreading topsoil to specified depths at locations shown on the drawings.
2. Quality of topsoil Topsoil shall consist of friable surface soil reasonably free of grass, roots, weeds, sticks, rocks, or other unsuitable material. Additional quality requirements, if any, are in section 6 of this specification.
3. Furnishing Topsoil shall be salvaged from designated earth surfaces that will be disturbed by construction activities. After designated sites have been cleared and grubbed, the topsoil shall be removed from the designated areas and stockpiled at locations shown on the drawings or acceptable to the engineer. Unsuitable material encountered during removal of topsoil shall be disposed of at locations shown on the drawings or approved by the engineer, or it will be otherwise hauled and disposed of at locations removed from the construction site. The contractor is responsible for complying with all local rules and regulations and the payment of any and all fees that may result from the disposal at locations outside the construction work limits.
4. Stockpiling Stockpiles of topsoil shall not conflict with the requirements of Construction Specification 5, Pollution Control, when made a part of this contract.
5. Spreading Spreading shall not be performed when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to uniform spreading operations. Surfaces designated to receive a topsoil application shall be lightly scarified just before the spreading operation. Where compacted earthfills are designated to be topsoiled, the topsoil shall be placed concurrently with the earthfill and shall be bonded to the compacted fill with the compacting equipment.
Following the spreading operation, the topsoil surface shall be left reasonably smooth and without ruts or surface irregularities that could contribute to concentrated waterflow downslope.
6. Construction details
Topsoiling is subsidiary to the Dike Removal and Rock Crossing line item. No separate payment will be made for topsoiling.
NRCS-Minnesota (210-VI-NEH, May 2005) MN61-1
Minnesota Construction Specification 61—Rock Riprap
The work shall consist of the construction of rock riprap revetments and blankets, including filter or bedding where specified.
2. Material Specifications
Rock riprap shall conform to the requirements of Material Specification MN-523, Rock for Riprap, or if so specified, shall be obtained from designated sources. It shall be free from dirt, clay, sand, rock fines, and other material not meeting the required gradation limits.
At least 30 days before rock is delivered from other than designated sources, the contractor shall designate in writing the source from which rock material will be obtained and provide information satisfactory to the engineer that the material meets contract requirements. The contractor shall provide the engineer free access to the source for the purpose of obtaining samples for testing. The size and grading of the rock shall be as specified in section 7 or on the drawings.
Rock from approved sources shall be excavated, selected, and processed to meet the specified quality and grading requirements at the time the rock is installed.
Filter or bedding aggregates when required shall conform to Material Specification 521, Aggregates for Drainfill and Filters, unless otherwise specified. Geotextiles shall conform to Material Specification 592, Geotextile.
3. Subgrade preparation The subgrade surface on which the rock riprap, filter, bedding, or geotextile is to be placed shall be cut or filled and graded to the lines and grades shown on the drawings. When fill to subgrade lines is required, it shall consist of approved material and shall conform to the requirements of the specified class of earthfill.
Rock riprap, filter, bedding, or geotextile shall not be placed until the foundation preparation is completed and the subgrade surface has been inspected and approved.
4. Equipment-placed rock riprap The rock riprap shall be placed by equipment on the surface and to the depth specified. It shall be installed to the full course thickness in one operation and in such a manner as to avoid serious displacement of the underlying material. The rock for riprap shall be delivered and placed in a manner that ensures the riprap in place is reasonably homogeneous with the larger rocks uniformly distributed and firmly in contact one to another with the smaller rocks and spalls filling the voids between the larger rocks. Some hand placing may be required to provide a neat and uniform surface.
Rock riprap shall be placed in a manner to prevent damage to structures. Hand placing is required as necessary to prevent damage to any new and existing structures.
NRCS-Minnesota (210-VI-NEH, May 2005) MN61-2
5. Hand placed rock riprap The rock riprap shall be placed by hand on the surface and to the depth specified. It shall be securely bedded with the larger rocks firmly in contact one to another without bridging. Spaces between the larger rocks shall be filled with smaller rocks and spalls. Smaller rocks shall not be grouped as a substitute for larger rock. Flat slab rock shall be laid on its vertical edge except where it is laid like paving stone and the thickness of the rock equals the specified depth of the riprap course.
6. Filter or bedding When the contract specifies filter, bedding, or geotextile beneath the rock riprap, the designated material shall be placed on the prepared subgrade surface as specified. Compaction of filter or bedding aggregate is not required, but the surface of such material shall be finished reasonably smooth and free of mounds, dips, or windrows.
7. Construction details
Rock gradation shall be as described in the construction plan. Rock Riprap is subsidiary to the Dike Removal and Rock Crossing installation. No separate payment will be made for rock riprap.
NRCS-Minnesota (210-VI-NEH, May 2005) MN95-1
Minnesota Construction Specification 95—Geotextile
This work consists of furnishing all material, equipment, and labor necessary for the installation of geotextiles.
2. Quality Geotextiles shall conform to the requirements of Material Specification 592 and this specification.
3. Storage Before use, the geotextile shall be stored in a clean, dry location out of direct sunlight, not subject to extremes of either hot or cold temperatures, and with the manufacturer's protective cover undisturbed.
Receiving, storage, and handling at the job site shall be in accordance with the requirements listed in
ASTM D 4873.
4. Surface preparation The surface on which the geotextile is to be placed shall be graded to the neat lines and grades as shown on the drawings. It shall be reasonably smooth and free of loose rock and clods, holes, depressions, projections, muddy conditions, and standing or flowing water (unless otherwise specified in section 6 of this specification).
5. Placement Before the geotextile is placed, the soil surface will be reviewed for quality assurance of the design and construction. The geotextile shall be placed on the approved prepared surface at the locations and in accordance with the details shown on the drawings and specified in section 6 of this specification.
It shall be unrolled along the placement area and loosely laid, without stretching, in such a manner that it conforms to the surface irregularities when material or gabions are placed on or against it. The geotextile may be folded and overlapped to permit proper placement in designated area(s).
Method 1—The geotextile shall be joined by machine sewing using thread material meeting the chemical requirements for the geotextile fibers or yarn. The sewn overlap shall be 6 inches, and the sewing shall consist of two parallel stitched rows at a spacing of about 1 inch and shall not cross (except for any required re-stitching). The stitching shall be a lock-type stitch. Each row of stitching shall be located a minimum of 2 inches from the geotextile edge. The seam type and sewing machine to be used shall produce a seam strength, in the specified geotextile, that provides a minimum of 90 percent of the tensile strength in the weakest principal direction of the geotextile being used, when tested in accordance with ASTM D 4884. The seams may be factory or field sewn.
The geotextile shall be temporarily secured during placement of overlying material to prevent slippage, folding, wrinkling, or other displacement of the geotextile. Unless otherwise specified, methods of securing shall not cause punctures, tears, or other openings to be formed in the geotextile.
Method 2—The geotextile shall be joined by overlapping a minimum of 18 inches (unless otherwise specified) and secured against the underlying foundation material. Securing pins, approved and provided by the geotextile manufacturer, shall be placed along the edge of the panel or roll material to adequately hold it in place during installation. Pins shall be steel or fiberglass formed as a U, L, or T shape or contain "ears" to prevent total penetration through the geotextile. Steel washers shall be provided on all but the U-shaped pins. The upstream or upslope geotextile shall overlap the abutting
NRCS-Minnesota (210-VI-NEH, May 2005) MN95-2 downslope geotextile. At vertical laps, securing pins shall be inserted through the bottom layers along a line through approximately the mid-point of the overlap. At horizontal laps and across slope labs, securing shall be inserted through the bottom layer only. Securing pins shall be placed along a line about 2 inches in from the edge of the placed geotextile at intervals not to exceed 12 feet unless otherwise specified. Additional pins shall be installed as necessary and where appropriate to prevent any undue slippage or movement of the geotextile. The use of securing pins will be held to the minimum necessary. Pins are to remain in place unless otherwise specified.
Should the geotextile be torn or punctured, or the overlaps or sewn joint disturbed, as evidenced by visible geotextile damage, subgrade pumping, intrusion, or grade distortion, the backfill around the damaged or displaced area shall be removed and restored to the original approved condition. The repair shall consist of a patch of the same type of geotextile being used and overlaying the existing geotextile. When the geotextile seams are required to be sewn, the overlay patch shall extend a minimum of 1 foot beyond the edge of any damaged area and joined by sewing as required for the original geotextile except that the sewing shall be a minimum of 6 inches from the edge of the damaged geotextile. Geotextile panels joined by overlap shall have the patch extend a minimum of 2 feet from the edge of any damaged area.
Geotextile shall be placed in accordance with the following applicable specification according to the use indicated in section 6:
Slope protection—The geotextile shall not be placed until it can be anchored and protected with the specified covering within 48 hours or protected from exposure to ultraviolet light.
In no case shall material be dropped on uncovered geotextile from a height of more than 3 feet.
Subsurface drains—The geotextile shall not be placed until drainfill or other material can be used to provide cover within the same working day. Drainfill material shall be placed in a manner that prevents damage to the geotextile. In no case shall material be dropped on uncovered geotextile from a height of more than 5 feet.
Road stabilization—The geotextile shall be unrolled in a direction parallel to the roadway centerline in a loose manner permitting conformation to the surface irregularities when the roadway fill material is placed on its surface. In no case shall material be dropped on uncovered geotextile from a height of more than 5 feet. Unless otherwise specified, the minimum overlap of geotextile panels joined without sewing shall be 24 inches. The geotextile may be temporarily secured with pins recommended or provided by the manufacturer, but they shall be removed before the permanent covering material is placed.
6. Construction details
Geotextile shall be MNDOT Class IV Nonwoven, 8oz
Geotextile is subsidiary to the Dike Removal and Rock Crossing line item. No separate payment will be made for geotextile.
United States Department of Agriculture -CPS-1578
NRCS, MN
March 2017
NRCS reviews and periodically updates conservation practice standards. To obtain the current version of this standard, contact your Natural Resources Conservation Service State office or visit the Field Office Technical Guide online by going to the NRCS website at https://www.nrcs.usda.gov/ and type FOTG in the search field.
USDA is an equal opportunity provider, employer, and lender.
Natural Resources Conservation Service
CONSERVATION PRACTICE STANDARD
STREAM CROSSING
CODE 578
(no)
DEFINITION
A stabilized area or structure constructed across a stream to provide a travel way for people, livestock, equipment, or vehicles.
PURPOSE
This practice is used to accomplish the following purpose:
Provide access to another land unit •
Improve water quality by reducing sediment, nutrient, organic, and inorganic loading of the stream •
Reduce streambank and streambed erosion •
CONDITIONS WHERE PRACTICE APPLIES
This practice applies to all land uses where an intermittent or perennial watercourse exists and a ford, bridge, or culvert type crossing is needed
CRITERIA
General Criteria Applicable to All Purposes
Apply this standard in accordance with all local, State, Tribal, and Federal regulations, including flood plain regulations and flowage easements.
Identify significant cultural resources or threatened or endangered species that could be affected by the implementation of the practice.
Location
Locate stream crossings in areas where the streambed is stable or where it can be stabilized (see conservation practice standard Channel Bed Stabilization (584)). Do not place crossings where channel grade or alignment changes abruptly, excessive seepage or instability is evident, overfalls exist (evidence of incision and bed instability), where large tributaries enter the stream, or within 300 feet of known spawning areas of listed species. Avoid wetland areas.
Discourage livestock loafing in the stream by locating crossings, where possible, out of shady riparian areas or by including gates in the design.
Install stream crossings perpendicular to the direction of stream flow where possible. Fully consider the natural lateral migration pattern of the stream in the design. Avoid skews on all but the smallest streams.
Access Roads
Where the stream crossing is installed as part of a roadway, size the crossing according to conservation practice standard Access Road (560).
Width
Provide an adequate travel-way width for the intended use. Make “livestock- only” crossings no less than
6 feet wide and no more than 30 feet wide, as measured from the upstream end to the downstream end of the stream crossing, not including the side slopes. A multi-use stream crossing shall have a travel-way no less than 10 feet wide.
Side slopes
Make all side slope cuts and fills stable for the channel materials involved. Make the side slopes of cuts or fills in soil materials no steeper than 2 horizontal to 1 vertical (2:1). Make rock cuts or fills no steeper than
1.5 horizontal to 1 vertical (1.5:1).
Stream approaches
Blend approaches to the stream crossing with existing site conditions, where possible. Use streambank soil bioengineering practices as appropriate and feasible. Make the approaches stable, with gradual ascent and descent grades which are not steeper than 4 horizontal to 1 vertical (4:1), and of suitable material to withstand repeated and long term use. Make the minimum width of the approaches equal to the width of the crossing surface.
Divert surface runoff around the approaches to prevent erosion. Direct roadside ditches into a diversion or away from the crossing surface.
Configure the crossing approaches (gradient and curves) to properly accommodate the length and turning radius of vehicles using the crossing.
Rock
All rock must be able to withstand exposure to air, water, freezing, and thawing. Use rock of sufficient size and density to resist mobilization by design flood flows.
Use appropriate rock sizes to accommodate the intended traffic without damage to the livestock, people, or vehicles using the crossing.
Fencing
Exclude livestock access to the crossing through the use of fence and gates, as needed.
Install cross-stream fencing at fords, with breakaway wire, swinging floodgates, hanging electrified chain, or other devices to allow the passage of floodwater and large woody material during high flows.
Design and construct all fencing in accordance with conservation practice standard Fence (382).
Vegetation
Plant all areas to be vegetated as soon as practical after construction. If completion does not coincide with appropriate planting dates for permanent cover, use a cover of temporary vegetation to protect the site until permanent cover can be established. Native or functioning-as-native plant species are preferred. Use conservation practice standard Critical Area Planting (342) where vegetation is unlikely to become established by natural regeneration, or where acceleration of the recovery of vegetation is desired.
In areas where the vegetation may not survive, use conservation practice standard Heavy Use Area
Protection (561).
Criteria Applicable to Bridge Crossings
Design bridges in a manner that is consistent with sound engineering principles and adequate for the use, type of road, or class of vehicle. Design bridges with sufficient capacity to convey the design flow and transported material without appreciably altering the stream flow characteristics. Design bridges to fully span the stream, passing at least the bankfull flow where the design flow is not dictated by regulation.
Bankfull flow is the discharge that fills a stream channel up to the elevation at which flow begins to spill onto the floodplain.
-CPS-2
NRCS, MN
March 2017
Adequately protect bridges protected so that out-of-bank flows safely bypass without damaging the culvert or eroding the banks.
Vehicle and pedestrian bridges must be designed in accordance with the current American Association of
State Highway and Transportation Officials Load and Resistance Factor Design (LRFD) bridge design specifications (AASHTO, 2010).
Evaluate the need for safety measures such as guardrails and reflectors at bridge crossings.
Acceptable bridge materials include concrete, steel, and wood.
Criteria Applicable to Culvert Crossings
Design culverts in a manner that is consistent with sound engineering principles and adequate for the use, type of road, or class of vehicle. For culverts associated with a road, culvert design flow shall meet the criteria in conservation practice standard Access Road (560). The design flow for culverts not associated with a road will be the 2-year, 24- hour storm discharge, or bankfull flow, whichever is less. Design culverts with sufficient capacity to convey the design flow and transported material without appreciably altering the stream flow characteristics.
Design culverts to minimize habitat fragmentation and to minimize barriers to aquatic organism movement.
Do not use culverts where large flows of sediment or large woody material are expected, or where the channel gradient exceeds 6 percent (100 horizontal to 6 vertical).
Evaluate the need for safety measures such as guardrails at culvert crossings.
Crossings shall be adequately protected so that out-of-bank flows safely bypass without damaging the structure or eroding the streambanks or the crossing fill.
At least one culvert pipe shall be placed with its entire length set six inches below the existing stream bottom. Additional culverts may be used at various elevations to maintain terrace or floodplain hydraulics and water surface elevations.
Make the barrel length of the culvert adequate to extend the full width of the crossing, including side slopes, and inlet or outlet extensions.
Acceptable culvert materials include concrete, corrugated metal, corrugated plastic, new or used high quality steel, and any other materials that meet the requirements of conservation practice standard
Structure for Water Control (587).
Criteria Applicable to Ford Crossings
The following criteria apply to all ford crossings:
Make the cross-sectional area of the crossing equal to or greater than the natural channel cross-sectional area. Make a portion of the crossing depressed at or below the average stream bottom elevation when needed to keep base flows or low flows concentrated.
Match ford shape to the channel cross-section to the extent possible.
Provide cutoff walls at the upstream and downstream edges of ford-type stream crossings when needed to protect against undercutting.
Evaluate the need for water depth signage at ford crossings.
-CPS-3
NRCS, MN
To the extent possible, the top surface of the ford crossing shall follow the contours of the stream bottom but in no case shall the top surface of the ford crossing be higher than 0.5 foot above the original stream bottom at the upstream edge of the ford crossing.
Make the downstream edge of the ford crossing with a low-flow hydraulic drop less than 0.5 foot above the original stream bottom.
Concrete Fords
Use concrete ford crossings only where the foundation of the stream crossing is determined to have adequate bearing strength.
Use concrete with a minimum compressive strength of 3,000 psi at 28 days, with a ratio of water to cementitious materials of 0.50 or less. Use coarse aggregate of 0.75 to 1 inch nominal size. If designed for freezing conditions, use concrete with 4 to 8 percent air entrainment.
Use a minimum thickness of 5 inches of placed concrete with minimum reinforcement of 6-inch by 6-inch, 6 gauge welded wire fabric. Pour the concrete slab on a minimum 4-inch thick gravel base, unless the foundation is otherwise acceptable.
Construct toe-walls at the upstream and downstream ends of the crossing. Make the toe-walls a minimum of 6 inches thick and 18 inches deep. Extend the toe-walls in the stream approaches to the bankfull flow elevation.
Precast concrete panels may be used in lieu of cast-in-place concrete slabs. To the extent possible, the panels shall follow the contours of the stream bottom in order to avoid potential problems with sediment accumulation. Use concrete units that have adequate reinforcement for transportation and placement.
Precast concrete units shall comply with ACI 525 or 533, or as otherwise acceptable for local conditions.
When heavy equipment loads are anticipated, the concrete slab shall be designed using an appropriate procedure as described in American Concrete Institute ACI 360, Design of Slabs on Ground.
Dewatering of the site and toe-walls is required during placement of the concrete to maintain the proper water/cement ratio. Flowing water will erode concrete that is not sufficiently hardened. The stream must be diverted or retained from flowing over the concrete for at least 12 hours after placement of the concrete.
During construction, aquatic species must be removed from the construction area according to State protocols.
Rock Fords and the Use of Geosynthetics
Coarse aggregate or crushed rock ford crossings are often used in steep areas subject to flash flooding and where normal flow is shallow or intermittent. When the site has a soft or unstable subgrade, use geotextiles in the design of rock ford crossings.
Dewater and excavate the bed of the channel to the necessary depth and width and cover with geotextile material. Install the geotextile material on the excavated surface of the ford and extend it across the bottom of the stream and at least up to the 10 year, 24 hour storm flow elevation.
Cover the geotextile material with at least 6 inches of crushed rock. Use minimum 6-inch deep geocells, if geocells are used. Use durable geosynthetic materials and install them according to the manufacturer’s recommendations, including the use of staples, clips, and anchor pins.
Design all rock ford stream crossings to remain stable for the 10 year, 24 hour storm flow. Compute channel velocities and choose rock size using procedures in National Engineering Handbook, Part 630
(NEH630); NEH654 Technical Supplement14N (TS14N); Engineering Field Handbook, Chapter 16
(EFH16) Appendix 16A; or other procedures approved by the State Conservation Engineer.
-CPS-4
NRCS, MN
Where rock is used for ford crossings for livestock, use a hoof contact zone or alternative surfacing method over the rock.
CONSIDERATIONS
Avoid or minimize the use of or number of stream crossings, when possible, through evaluation of alternative trail or travel-way locations. Assess land user operations to consolidate and minimize the number of crossings. Where feasible, use existing roads.
Evaluate proposed crossing sites for variations in stage and discharge, tidal influence, hydraulics, fluvial geomorphic impacts, sediment transport and flow continuity, groundwater conditions, and movement of woody and organic material. Increase crossing width or span to accommodate transport of large woody material in the flow.Design passage features to account for the known range of variation.
For culvert crossings, consider incorporating natural streambed substrates throughout the culvert length for passage of aquatic organisms (see Bunt and Abt, 2001, for sampling procedures). Natural streambeds provide passage and habitat benefits to many life stage requirements for aquatic organisms and may reduce maintenance costs.
Consider all life stages of aquatic organisms in the stream crossing design to accommodate their passage, in accordance with the species’ requirements. Design criteria are available in NEH654, TS14N, Fish Passage and Screening Design; U.S Forest Service Low-water Design Guidance (USFS, 2006); and
Stream Simulation Guidance (USFS, 2008). Each State also has specific design criteria for culverts and stream crossings (e.g., MassDOT, 2010). See also Harrelson, et al. 1994, for stream reference site descriptions.
Where a stream crossing is installed to remove an existing barrier to the passage of aquatic organisms, consider using conservation practice standard, Aquatic Organism Passage (396).
Consider relevant aquatic organisms in the design and location of crossings to improve or provide passage for as many different aquatic species and age classes as possible.
Consider the habitat requirements of other aquatic or terrestrial species that may be affected by construction of a stream crossing. For example, a crossing may be designed with features that also promote safe crossing by terrestrial vertebrates.
MN DNR should be consulted during the planning process to ensure that fish passage concerns are addressed and wildlife habitat considered.Ford crossings have the least detrimental impact on water quality when their use is infrequent.
Ford crossings are adapted for crossing wide, shallow watercourses with firm streambeds. If the stream crossing is to be used frequently, or daily, as in a dairy operation, a culvert crossing or curbed bridge should be used, rather than a ford crossing.
Locate stream crossings to avoid adverse environmental impacts and consider the following:
Effects on upstream and downstream flow conditions that could result in increases in erosion, • deposition, or flooding. Consider habitat upstream and downstream of the crossing to avoid fragmentation of aquatic and riparian habitats.
Short-term and construction-related effects on water quality. •
Overall effect on erosion and sedimentation that will be caused by the installation of the crossing • and any necessary stream diversion.
Effects of large woody material on the operation and overall design of the crossing. •
Consider adding a well-graded rock riprap apron on the downstream edge of concrete crossings to • dissipate flow energy.
Ford crossings should not be placed immediately downstream from a pipe or culvert because of •
-CPS-5
NRCS, MN
potential damage from localized high velocity flows.
PLANS AND SPECIFICATIONS
Prepare plans and specifications for stream crossings in keeping with this standard. The plans and specifications must clearly describe the requirements for applying the practice to achieve its intended purpose.
As a minimum, include the following in plans and specifications:
Location of stream crossing. •
Stream crossing width and length with profile and typical cross sections. •
Design grades or slopes of stream approaches. •
Design flow calculations. •
Thickness,…