This is a site plan and layout document for the Remaining Upstream Approach Wall project, depicting work areas and available staging locations for a waterway infrastructure improvement contract.

The project encompasses three distinct work areas along an upstream approach wall: Work Area A consists of steel sheetpile wall construction, Work Area B involves soldier pile and concrete panel wall installation, and Work Area C requires steel sheetpile wall work. Three laydown areas are designated for material and equipment staging: Laydown Area 1 (6,500 square yards) and Laydown Area 2 (5,000 square yards) are available for supporting work on Areas A and C, while Laydown Area 3 (12,500 square yards) is allocated for Area B operations. The site includes an active navigation channel that must remain operational during construction, a work channel shared with other concurrent contracts, and facility access points for equipment and material transport. The aerial site plan illustrates the spatial relationship between the work areas, laydown zones, and existing infrastructure, providing contractors with a clear understanding of available workspace and logistical constraints for project execution.

View the file

Other files

File Type Posted
20260528_RUAW_Plans1.pdf PDF
RUAW Market Research Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Remaining Upstream Approach Wall – Potential Work and Laydown Areas

Laydown Area 1 - Available for work on Area A and C – 6,500 sq. yds Laydown Area 2 - Available for work on Area A and C – 5,000 sq. yds Laydown Area 3 - Available for work on Area B – 12,500 sq. yds

A C

B

Work Area A – Steel Sheetpile Wall Work Area B – Soldier Pile and Concrete Panel Wall Work Area C – Steel Sheetpile Wall

Active Navigation Channel