Text version
TECHNICAL SPECIFICATIONS PERTINENT TO THIS REQUIREMENT:
TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD)
FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER "Z" LOCATION. VENDOR MUST
PROVIDE LIGHT LEVEL READINGS (DB LOSS) ON EXTENSION FROM COMMERCIAL POP TO
GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "Z" LOCATION PRIOR TO CIRCUIT
TURN UP. FACILITY SECURITY ACCESS REQUIREMENT: (SP A) ESCORT REQUIRED; (SP B)
ESCORT REQUIRED; (SP C) ESCORT REQUIRED; (SP D) ESCORT REQUIRED. TELECOMM
PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD) FROM THE
CUSTOMER "A" LOCATION TO THE CUSTOMER "Z" LOCATION. VENDOR MUST PROVIDE
LIGHT LEVEL READINGS (DB LOSS) ON EXTENSION FROM COMMERCIAL POP TO
GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "Z" LOCATION PRIOR TO CIRCUIT
TURN UP. THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST
BE ADJUSTED TO -3 TO -9. VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY
PRIOR TO INSTALLATION AT THE "Z" LOCATION ONLY. VENDOR MUST CONTACT DISA GOC
IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON RECEIPT OF A VALID
TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. (C) 618-418-8627 (D)
770-8627. PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP
SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT
SUITE AT THE "A" LOCATION TO THE GOVERNMENT'S SDP AT THE "Z" LOCATION AND
MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE
GOVERNMENT'S SDP AT THE "Z" LOCATION. VENDOR MUST ENSURE A TEST SET IS
PLACED AT THE DROP SIDE OF TELECOMM PROVIDER'S OR LOCAL ACCESS PROVIDERS
FDP AS APPLICABLE AT THE "A" LOCATION AND A SECOND TEST SET AT THE END OF THE
FIBER JUMPERS TO BE USED FOR TERMINATION TO THE GOVERNMENT'S SDP AT THE "Z"
LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE
GOVERNMENT FOR ACCEPTANCE TESTING. TESTING CRITERIA: VENDOR MUST TEST THE
CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 BENCH MARKING CONFIGURATION AND
PERFORMANCE OF ETHERNET SERVICE. NOTE-ETHERNET FRAME SIZE DESIGNATOR 'H'
(MTU) IS EQUAL TO 9100 BYTES. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A)
FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB
ETHERNET-LAN-PHY-SINGLE MODE FIBER), 802.3AE, 1310NM. "SC" CONNECTORS. (B)
COMMITTED INFORMATION RATE (CIR) - 10GB. (C) 10GB ETHERNET - LAN-PHY INTERFACE
REQUIRED AT COMMERCIAL DEMARC AT THE A AND Z LOCATIONS. (D) ETHERNET FRAME
SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF 9100
OCTETS (BYTES). (E) NO NETWORK INTERFACE UNIT, DEDICATED PATH (F) GFE
CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT. (G)
TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564
BENCH MARKING CONFIGURATION AND PERFORMANCE OF ETHERNET SERVICE. NOTE-
ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9100 BYTES. (H) LINE MUST
REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS
PER WEEK, AT LEAST 99.5% OR BETTER. (I) 1 HOUR RESPONSE TIME TO RESPOND TO
CUSTOMER UPON RECIEPT OF TROUBLE. (J) VENDOR REQUIRED TO HAVE CIRCUIT
VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES. (K) VENDOR MUST HAVE A 24X7
NETWORK OPERATIONS CENTER. (L) TELECOMM PROVIDER MUST MAINTAIN
OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT
IAW ITU-T-Y.1731. (M) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE
GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION
GROUP, SCOTT AFB, IL. (C) 618-418-8627 (D) 770-8627. (N) VENDOR MUST PROVIDE: 1. THE
LONG-HAUL CIRCUIT NO. AND LEC CKT ID'S AS APPLICABLE TO THE DISA IE161 PROGRAM
OFFICE PRIOR TO TURN UP TO THE GOVERNMENT. 2. VENDOR WINNING AWARD IS
RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF 10GBE SERVICE IAW THE
UNIQUE INSTALLATION FACTORS. 3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE
INSTALLATION FACTORS. R. REMARKS CONTINUED: 4. VENDOR MUST COORDINATE SITE
VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES
AT BOTH USER LOCATIONS. 5. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE
REPORTED BY PHONE TO THE DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C) 618-418-9950, (D) 770-9950 TOLL
FREE: 855-868-9950.
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.
GIGABITS/S, +- 100 PPM LINE CODE: OPTIC ETHERNET FRAME: 9100 OCTETS (BYTES) 1.
TEST AND ACCEPTANCE: 10GB LAN PHY CIRCUITS SHALL PASS A FULLY DOCUMENTED
SATISFACTORY 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-
418-8691 (D) 779-8691 FOR LEASED CIRCUIT ACTIVATION ASSISTANCE OR SERVICE
IMPLEMENTATION INQUIRIES/SCHEDULING, CONTACT THE DISA CONUS GLOBAL RF
ACTIVATIONS TEAM VIA EMAIL, DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-
INTEGRATION-LEASE-BB -T@MAIL.MIL, OR CALL DSN 418-8627, COML 618-418-8627 AND
PRESS THE BACKBONE LEASE TEAM OPTION. 2.
TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING PARAMETERS
SHALL BE MEASURED DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE
SHALL BE MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 24
HOUR TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED PER DEFINITION IN
ITU-T-Y.1564. 3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN
THE FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE
GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN
TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564
STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10
MSEC 4. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER
THAN 24 HOURS. 5. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 10GB
WAVE CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS. (**UNIQ
INSTALL FACTORS**) (SP A) THAT THE CIRCUIT IS PROPERLY TAGGED WITH CIRCUIT ID
AND TSR NUMBER OR CCSD. (2) FOR THE VENDOR: VENDOR WILL DELIVER SERVICE TO
THE SERVICE DELIVERY POINT (SDP) IDENTIFIED IN THE DOCUMENT AND PROVIDE ANY
EQUIPMENT NECESSARY TO COMPLETE THE CONNECTION. (3) MAINTENANCE OF
PROCURED EQUIPMENT IS THE VENDOR RESPONSIBILITY UNTIL THE END OF THE
CONTRACT. EQUIPMENT PROVIDED BY THE VENDOR BELONGS TO THE CUSTOMER.(SP T.
REMARKS CONTINUED: C) OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG
730, ROOM 132 TO LINE SIDE OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG
430, ROOM 105 USING ON-BASE SINGLE-MODE FIBER.