TECHNICAL SPECIFICATIONS PERTINENT TO THIS REQUIREMENT:

TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD)

FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER "Z" LOCATION. VENDOR MUST

PROVIDE LIGHT LEVEL READINGS (DB LOSS) ON EXTENSION FROM COMMERCIAL POP TO

GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "Z" LOCATION PRIOR TO CIRCUIT

TURN UP. FACILITY SECURITY ACCESS REQUIREMENT: (SP A) ESCORT REQUIRED; (SP B)

ESCORT REQUIRED; (SP C) ESCORT REQUIRED; (SP D) ESCORT REQUIRED. TELECOMM

PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD) FROM THE

CUSTOMER "A" LOCATION TO THE CUSTOMER "Z" LOCATION. VENDOR MUST PROVIDE

LIGHT LEVEL READINGS (DB LOSS) ON EXTENSION FROM COMMERCIAL POP TO

GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "Z" LOCATION PRIOR TO CIRCUIT

TURN UP. THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST

BE ADJUSTED TO -3 TO -9. VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY

PRIOR TO INSTALLATION AT THE "Z" LOCATION ONLY. VENDOR MUST CONTACT DISA GOC

IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON RECEIPT OF A VALID

TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. (C) 618-418-8627 (D)

770-8627. PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP

SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT

SUITE AT THE "A" LOCATION TO THE GOVERNMENT'S SDP AT THE "Z" LOCATION AND

MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE

GOVERNMENT'S SDP AT THE "Z" LOCATION. VENDOR MUST ENSURE A TEST SET IS

PLACED AT THE DROP SIDE OF TELECOMM PROVIDER'S OR LOCAL ACCESS PROVIDERS

FDP AS APPLICABLE AT THE "A" LOCATION AND A SECOND TEST SET AT THE END OF THE

FIBER JUMPERS TO BE USED FOR TERMINATION TO THE GOVERNMENT'S SDP AT THE "Z"

LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE

GOVERNMENT FOR ACCEPTANCE TESTING. TESTING CRITERIA: VENDOR MUST TEST THE

CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 BENCH MARKING CONFIGURATION AND

PERFORMANCE OF ETHERNET SERVICE. NOTE-ETHERNET FRAME SIZE DESIGNATOR 'H'

(MTU) IS EQUAL TO 9100 BYTES. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A)

FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB

ETHERNET-LAN-PHY-SINGLE MODE FIBER), 802.3AE, 1310NM. "SC" CONNECTORS. (B)

COMMITTED INFORMATION RATE (CIR) - 10GB. (C) 10GB ETHERNET - LAN-PHY INTERFACE

REQUIRED AT COMMERCIAL DEMARC AT THE A AND Z LOCATIONS. (D) ETHERNET FRAME

SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF 9100

OCTETS (BYTES). (E) NO NETWORK INTERFACE UNIT, DEDICATED PATH (F) GFE

CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT. (G)

TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564

BENCH MARKING CONFIGURATION AND PERFORMANCE OF ETHERNET SERVICE. NOTE-

ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9100 BYTES. (H) LINE MUST

REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS

PER WEEK, AT LEAST 99.5% OR BETTER. (I) 1 HOUR RESPONSE TIME TO RESPOND TO

CUSTOMER UPON RECIEPT OF TROUBLE. (J) VENDOR REQUIRED TO HAVE CIRCUIT

VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES. (K) VENDOR MUST HAVE A 24X7

NETWORK OPERATIONS CENTER. (L) TELECOMM PROVIDER MUST MAINTAIN

OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT

IAW ITU-T-Y.1731. (M) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE

GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION

GROUP, SCOTT AFB, IL. (C) 618-418-8627 (D) 770-8627. (N) VENDOR MUST PROVIDE: 1. THE

LONG-HAUL CIRCUIT NO. AND LEC CKT ID'S AS APPLICABLE TO THE DISA IE161 PROGRAM

OFFICE PRIOR TO TURN UP TO THE GOVERNMENT. 2. VENDOR WINNING AWARD IS

RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF 10GBE SERVICE IAW THE

UNIQUE INSTALLATION FACTORS. 3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE

INSTALLATION FACTORS. R. REMARKS CONTINUED: 4. VENDOR MUST COORDINATE SITE

VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES

AT BOTH USER LOCATIONS. 5. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE

REPORTED BY PHONE TO THE DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C) 618-418-9950, (D) 770-9950 TOLL

FREE: 855-868-9950.

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.

GIGABITS/S, +- 100 PPM LINE CODE: OPTIC ETHERNET FRAME: 9100 OCTETS (BYTES) 1.

TEST AND ACCEPTANCE: 10GB LAN PHY CIRCUITS SHALL PASS A FULLY DOCUMENTED

SATISFACTORY 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-

418-8691 (D) 779-8691 FOR LEASED CIRCUIT ACTIVATION ASSISTANCE OR SERVICE

IMPLEMENTATION INQUIRIES/SCHEDULING, CONTACT THE DISA CONUS GLOBAL RF

ACTIVATIONS TEAM VIA EMAIL, DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-

INTEGRATION-LEASE-BB -T@MAIL.MIL, OR CALL DSN 418-8627, COML 618-418-8627 AND

PRESS THE BACKBONE LEASE TEAM OPTION. 2.

TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING PARAMETERS

SHALL BE MEASURED DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE

SHALL BE MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 24

HOUR TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED PER DEFINITION IN

ITU-T-Y.1564. 3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN

THE FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE

GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN

TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564

STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10

MSEC 4. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER

THAN 24 HOURS. 5. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 10GB

WAVE CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS. (**UNIQ

INSTALL FACTORS**) (SP A) THAT THE CIRCUIT IS PROPERLY TAGGED WITH CIRCUIT ID

AND TSR NUMBER OR CCSD. (2) FOR THE VENDOR: VENDOR WILL DELIVER SERVICE TO

THE SERVICE DELIVERY POINT (SDP) IDENTIFIED IN THE DOCUMENT AND PROVIDE ANY

EQUIPMENT NECESSARY TO COMPLETE THE CONNECTION. (3) MAINTENANCE OF

PROCURED EQUIPMENT IS THE VENDOR RESPONSIBILITY UNTIL THE END OF THE

CONTRACT. EQUIPMENT PROVIDED BY THE VENDOR BELONGS TO THE CUSTOMER.(SP T.

REMARKS CONTINUED: C) OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG

730, ROOM 132 TO LINE SIDE OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG

430, ROOM 105 USING ON-BASE SINGLE-MODE FIBER.