RTA_SF-00005-21_Training Area Range Improvements_SOTF_Plans_22x34 (LOCKED) (1).pdf
PDF 5 MB Posted
- Attached to
- SF-00005-21 Training Area Range Improvements Federal contract opportunity
- Solicitation number
- W912PM21B0012
About this file
This document provides details of a solicitation for construction services. The U.S. Army Corps of Engineers, Wilmington District is seeking a firm fixed price contract to clear and grade approximately two acres to support a training range at Fort Bragg, North Carolina. Work includes clearing, grubbing, grading, and compacting the area to support concrete targets and troop movements. The project magnitude is estimated between $500,000 to $1,000,000. The solicitation will be issued electronically on or around July 30, 2021 with a proposal due date specified upon issuance. This is a 100% Women Owned Small Business set-aside. Offerors must be registered in the System for Award Management to be eligible for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign in sheet bid opening.pdf | ||
| B1 Redacted Abstract W912PM21B0012.pdf | ||
| W912PM21B0012P00002.pdf | ||
| W912PM21B0012P00002_Conformed.pdf | ||
| SF-00005-21 Site Visit Attendance List 6 Aug 2021.pdf | ||
| W912PM21B00120001-SF-00005-21_Conformed.pdf | ||
| W912PM21B00120001-SF-00005-21.pdf | ||
| SF-00005-21 SOTF Site Visit Map.pdf | ||
| rev2(REC-USFWS)-RTA_SF-00005-21_Training-Area_Range_Improvements_Specifications.pdf | ||
| W912PM21B0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISSUE DATE:
US Army Corps of Engineers
SOLICITATION NO.:
CONTRACT NO.:
WILMINGTON DISTRICT
TBD
JULY 2021
W912PM21B0012
SF-00005-21
TRAINING AREA RANGE IMPROVEMENTS
SOTF
FORT BRAGG, NORTH CAROLINA
CUI
C O
N T
R A
C T
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
G E
I M
P R
O V
E M
E N
T S
S O
T F
F O
R
B
A
G G
N
O R
H
A R
O L
I N
A
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
W I L
M I N
G T
D
S
T R
I C
T
R
L I N
G T
V E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I L
M
E
C O
N T
R O
L L
U
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
G-001
C O
V E
R
S
H E
E T
G d w g
BLDG
01916
LAMONT ROAD
BORROW PIT
A 24 M
B
A
24 M
B
C
A
C
B
U
T
N
L
O
N
G
S
T
R
E
G
R
U
B
A
E
R
I
C
E
E
W
A
Y
Y
A
D
K
G
R
U
B
L
O
N
G
S
T
R
E
B
U
T
N
H
O
N
E
Y
C
U
H
O
N
E
Y
C
U
B
R
A
V
D
B
R
A
V
D
G
R
U
B
M
U
R
C
H
S
R
A
N
D
O
L
K
N
X
K
N
SIMMONS AIRFIELD
R
E
I L
Y
R
E
I L
R
E
I L
L
A
M
O
C
H
I
C
K
A
D
C
H
I
C
K
A
D
P
L
A
K
A
D
M
I
L
I
T
A
S
E
R
V
A
T
I
U
N
D
A
R
Y
M
I
L
I
T
A
S
E
R
V
A
T
I
U
N
D
A
R
Y
B
A
S
T
O
G
I
V
E c
D
A
D c
D
A
D
N
O
R
M
A
N
A
R
D
E
N
N
S
P
O
O
N
M A
IN
E
N T
R A
N C
E
A
R
M
I S
T
E
L
I
T
A
S
E
R
V
A
T
I
O
N
B
O
U
N
D
A
R
Y
POPE ARMY AIRFIELD
ACP #1
ACP #13
ACP #10
ACP #11
B
R
A
V
D
J
A
C
K
S
O
N
ACP #5 ALL AMERICAN VISITOR
CONTROL CENTER
M
C
K
E
L
L
A
ACP #2
USACE SOCOM RESIDENT OFFICE
BLDG. NO. 2-2414 WOODRUFF ST.
FT. BRAGG, NC 28310 (910) 432-8121
PROJECT LOCATION
C
O
O
L
Y
C
O
N
ACP #3
ACP #4
ACP #2A
ACP #8
ACP #16 TRUCK PLAZA AND
VISITOR CONTROL CENTER
W
O
M
A
K
M
Y
M
E
D
I C
N
T
E
R
ACP #18
B R
A G
G
B
L V
D
M
A
N
C
H
E
S
T
DIRECTORATE OF PUBLIC WORKS
BUILDING NO. 3-1631
L
I
L
L
I
N
G
T
W
Y
ACP #12
ROAD CLOSED WITH GATES
OR BARRIERS
MAJOR ROADS
STREETS
RAILROADS
INSTALLATION BOUNDARIES
INTERSTATE ROUTE
U. S. ROUTE
STATE ROUTE
LAKES
ACP ACCESS CONTROL POINT
LEGEND:
FORT BRAGG CANTONMENT
NOT TO SCALE
FORT BRAGG LAMONT
SOLID WASTE AND
RECYCLING FACILITY
W
O
O
D
R
U
F
F
B
U
K
P
S
Y
O
F
L
O
J
T
H
O
M
P
S t h
MANCHESTER RD.
N
PROJECT LOCATION MAP
L A
M
O N
T
R
D
M
C
K
E
L
L
A
N
MUNICIPAL SOLID
WASTE TRANSFER
STATION
Y
O
R
K
T
O
W
C
T
A
D
ACP #8A
NOTE:
UPON LEAVING SOTF LAMONT
GATE IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE
THE BEST HAUL ROUTE TO THE
FORT BRAGG RECYCLING FACILITY.
SOTF CONSTRUCTION
ENTRANCE GATE
PROJECT LOCATION
HAUL ROUTE
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
G-002
F O
A
N
T O
N M
E N
T
A N
D
P
R O
J E
C
A T
I O
N
M
A P
INDEX OF DRAWINGS
G-001 COVER SHEET
G-002 FORT BRAGG CANTONMENT, PROJECT LOCATION MAP, & INDEX OF
DRAWINGS
G-003 GENERAL CONSTRUCTION NOTES 1 of 2
G-004 GENERAL CONSTRUCTION NOTES 2 of 2
VF-101 TOPOGRAPHIC SURVEY
CD-101 DEMOLITION PLAN
GP-101 ROUGH GRADING AND EROSION & SEDIMENT CONTROL
GP-102 PLAN VIEW
GP-103 GRADING CROSS SECTION PROFILES
CG-101 SEDIMENT AND EROSION CONTROL NOTES
CG-102 SEDIMENT AND EROSION CONTROL NOTES (CONT.)
C-501 SEDIMENT & EROSION CONTROL DETAILS
C-502 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY SEDIMENT
& EROSION CONTROL DETAILS
C-503 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY SEDIMENT
& EROSION CONTROL DETAILS (CONT.)
G d w g
AutoCAD SHX Text
NOT TO SCALE
GENERAL NOTES:
A. CONTRACTOR SHALL COMPLY WITH CURRENT NORTH CAROLINA DEPARTMENT OF
ENVIRONMENTAL QUALITY (DEQ) EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL' AND FORT BRAGG WATER MANAGEMENT BRANCH (WMB) STANDARDS FOR
EROSION CONTROL WORK, IF APPLICABLE.
B. ALL NCDOT STANDARDS REFERENCES WILL BE THE LATEST EDITION. CONTRACTOR MAY
REFER TO HTTPS://CONNECT.NCDOT.GOV, IF APPLICABLE.
C. CONTRACTOR SHALL COMPLY WITH CURRENT UFC, NC BUILDING CODE AND OTHER
APPLICABLE REQUIREMENTS AS INDICATED ON THESE CONTRACT DOCUMENTS.
7. DEMOLITION
A. ALL CONSTRUCTION AFFECTING TRAFFIC SHALL COMPLY WITH THE FORT BRAGG TRAFFIC
CONTROL IDC, MUTCD, AND NCDOT STANDARD DRAWINGS AND SPECIFICATIONS - LATEST
EDITION. AN ALTERNATE EMERGENCY TRAFFIC CONTROL DETOUR MAY BE REQUIRED.
8. TRAFFIC CONTROL
A. UNLESS SPECIFICALLY NOTED TO BE REMOVED, ALL EXISTING BUILDING COMPONENTS
AND OTHER SITE ITEMS SHALL REMAIN INTACT AND BE PROTECTED AGAINST DAMAGE DURING
THE CONSTRUCTION PERIOD.
B. THE CONTRACTOR SHALL EXERCISE CAUTION DURING DEMOLITION OPERATIONS. THE
CONTRACTOR SHALL REPAIR AND RESTORE ALL EXISTING CONSTRUCTION TO REMAIN THAT IS
DAMAGED DURING DEMOLITION OPERATIONS. REPAIRS TO DAMAGED WORK AREAS SHALL
MATCH EXISTING ADJACENT FINISHED SURFACES OR THE CONTRACTOR SHALL REPLACE
DAMAGED CONSTRUCTION WITH NEW WORK.
C. NO KNOWN ASBESTOS EXISTS WITHIN THIS PROJECT AREA. IF CONTRACTOR SUSPECTS
ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE PRESENT HE SHALL NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATION IMMEDIATELY.
6. STANDARDS
9. EXISTING UTILITY INTERRUPTIONS
A. EXISTING UNDERGROUND UTILITY'S WERE NOT LOCATED. CONTRACTOR SHALL VERIFY THE
LOCATION OF ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. ANY UTILITIES
DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED IMMEDIATELY WITH NO ADDITIONAL
COST TO THE GOVERNMENT. CONTRACTOR SHALL NOTIFY GOVERNMENT IMMEDIATELY IN THE
EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING A DEVIATION FROM
THE PLANS.
B. EXISTING UTILITIES MAY BE INTERRUPTED FOR A MAXIMUM OF 12 HOURS AT A TIME.
CONTRACTOR IS REQUIRED TO CONTACT THE CONTRACTING OFFICER AND OBTAIN APPROVAL
PRIOR TO ANTICIPATED INTERRUPTION.
C. ALL UTILITY INTERRUPTIONS AND DURATIONS SHALL BE INDICATED ON THE
CONTRACTOR'S SCHEDULE AND COORDINATED WITH THE COR.
10. EXTERIOR UTILITY WORK
A. ANY EXTERIOR ELECTRICAL WORK PERFORMED BY THE CONTRACTOR SHALL BE COORDINATED
WITH SANDHILLS UTILITY SERVICE (SUS). CONTACT MR. BILL CANNON AT (910) 818-3204.
B. ANY EXTERIOR WATER OR SANITARY SEWER WORK PERFORMED BY THE CONTRACTOR SHALL
BE COORDINATED WITH AMERICAN STATES UTILITY SERVICES (ASUS). CONTACT ALLEN
FORRESTER AT (910) 495-1311.
C. ANY EXTERIOR GAS WORK PERFORMED BY THE CONTRACTOR SHALL BE COORDINATED WITH
PEIDMONT NATURAL GAS (PNG).
11. SECURITY POLICIES AND PROCEDURES
A. CONTRACTOR SHALL FOLLOW SECURITY OPERATIONS TRAINING FACILITY (SOTF) SECURITY
REQUIREMENTS AT ALL TIMES. REFER TO SPECIFICATION SECTION 01 00 60 FOR ADDITIONAL
INFORMATION.
B. ACCESS TO “CONTROLLED UNCLASSIFIED INFORMATION” (CUI) ON SOTF PROJECTS WILL BE
LIMITED TO U.S. CITIZENS WHO HAVE A VALID "NEED TO KNOW". IN THE EVENT THAT ACCESS TO
CLASSIFIED INFORMATION IS REQUIRED, AN ADDITIONAL SECURITY PROCEDURES GUIDE WILL BE
FURNISHED.
C. TO GAIN ACCESS TO THE SOTF SITE AND/OR PROJECT INFORMATION, A WRITTEN, EMAIL, OR FAX
REQUEST MUST BE MADE TO THE SOTF PROJECT MANAGER AT LEAST 5 BUSINESS DAYS IN
ADVANCE (SEE SPECIFICATIONS FOR REQUIRED FORM). A SEPARATE REQUEST MUST BE MADE
FOR EACH SITE VISIT. REFER TO SPECIFICATIONS FOR REQUIRED INFORMATION.
D. ONCE ACCESS HAS BEEN GRANTED, NO SOTF INFORMATION OR SITE ACCESS WILL BE GIVEN TO
THE INDIVIDUAL UNTIL HE OR SHE HAS SIGNED A SECURITY BRIEFING FORM. UPON SUCCESSFUL
COMPLETION, THE CONTRACTOR WILL BE GIVEN FULL ACCESS TO THE PROJECT SITE AS SHOWN
ON THE PLANS, HOWEVER, PERIODS MAY BE ENCOUNTERED WHEN NO CONTRACTOR OR
SUBCONTRACTOR PERSONNEL WILL BE ALLOWED ON THE CONSTRUCTION SITE. WORK
STOPPAGES DUE TO THOSE EVENTS WILL BE HELD TO AN ABSOLUTE MINIMUM, AND THE
CONTRACTOR WILL BE GIVEN AS MUCH ADVANCED NOTICE AS POSSIBLE. NOTICE OF THE WORK
STOPPAGE AND RESUMPTION WILL BE RELAYED THROUGH THE SOTF ENGINEERING TO THE COR
WHO WILL COMMUNICATE THIS INFORMATION TO CONTRACTOR. SUCH WORK STOPPAGE WILL NOT
BE THE BASIS FOR A CLAIM AGAINST THE GOVERNMENT. THE GOVERNMENT HAS THE RIGHT TO
INSTRUCT THE CONTRACTOR TO EVACUATE THE SITE WITHOUT PRIOR NOTIFICATION AT ANY TIME
AND MAY REFUSE ENTRY OF ANY OR ALL CONTRACTOR PERSONNEL.
E. PERSONNEL ENTERING SOTF WILL BE ESCORTED BY A FACILITY MEMBER OR BY A SECURITY
GUARD. USE OF ESCORTS WITHIN THE FACILITY IS DONE ROUTINELY FOR CONTRACTED AND
OTHER VISITING PERSONNEL REGARDLESS OF THEIR SECURITY CLEARANCE LEVEL.
F. THE CONTRACTOR'S PERSONNEL MUST WEAR IDENTIFICATION IN ACCORDANCE WITH
SOTF SECURITY POLICIES AT ALL TIMES.
G. CONTRACTOR/VISITOR SHALL NOTIFY (BY EMAIL OR PHONE) THE GOVERNMENT'S CONTRACTING
OFFICER'S REPRESENTATIVE (COR), PROJECT MANAGER (PM), OR DESIGNATED QA PERSONNEL OF
THEIR ANTICIPATED ARRIVAL TIME ON SOTF EACH DAY OF CONTRACT PERFORMANCE. IF THE
CONTRACTOR DOES NOT ARRIVE AT SOTF WITHIN 90 MINUTES OF THEIR SCHEDULED ARRIVAL
TIME, AND DOES NOT COORDINATE DIRECTLY WITH THE COR, PM, OR QA FOR ANY SUCH LATE
ARRIVAL, THE DESIGNATED ESCORT FOR THE DAY WILL BE RELEASED FOR OTHER DUTIES AND
WILL NO LONGER BE AVAILABLE TO THE CONTRACTOR ON THAT DAY. NO SUCH INSTANCES MAY
BE USED BY THE CONTRACTOR AS GOVERNMENT CAUSED DELAY AND THE GOVERNMENT WILL
NOT EXTEND THE PERIOD OF PERFORMANCE.
H. ACCESS TO THE PROJECT AREA IS LIMITED TO NORMAL WORK HOURS (0630 TO 1600), MONDAY
THROUGH FRIDAY, EXCLUDES FEDERAL HOLIDAYS. CONTRACTOR PERSONNEL SHALL REPORT TO
THE SOTF LAMONT ROAD VISITOR CENTER AT 0600 TO EXCHANGE VALID PICTURE IDENTIFICATION
FOR A SOTF VISITOR BADGE. ALL CONTRACTOR VEHICLES WILL BE SEARCHED EACH DAY
STARTING AT 0600. ONCE THE BADGE EXCHANGE AND VEHICLE SEARCH IS COMPLETE, THE
CONTRACTOR SHALL CONVOY WITH THE ESCORT TO THE JOB SITE. THE CONTRACTOR MUST EXIT
THE SOTF COMPOUND BY 1600 EACH DAY. EXCEPTIONS, IF APPROVED BY THE PROJECT
MANAGER, MUST BE COORDINATED TWO WORK DAYS IN ADVANCE.
I. IT IS A CRIME UNDER 18 USC 795 TO PHOTOGRAPH DEFENSE INSTALLATIONS WITHOUT
FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION. IT IS ALSO A CRIME UNDER 18 USC 797 TO REPRODUCE, PUBLISH SELL OR GIVE
AWAY ANY PHOTOGRAPH, PICTURE OR GRAPHIC REPRESENTATION OF A DEFENSE INSTALLATION
WITHOUT FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION AND SOTF.
J. FT. BRAGG AND SOTF ARE DESIGNATED AS RESTRICTED AREAS. IMAGERY SURVEILLANCE,
PHOTOGRAPHY AND VIDEO RECORDING ARE PROHIBITED WITHOUT THE INSTALLATION
COMMANDER'S AND SOTF CONSENT.
K. THE INTRODUCTION OF WEAPONS, AMMUNITION, EXPLOSIVES OR OTHER PROHIBITED ITEMS AND
PHOTOGRAPHY OF THE FACILITIES IS PROHIBITED WITHOUT SPECIFIC AUTHORIZATION FROM THE
SOTF COMMANDER AND FT. BRAGG COMMANDER.
INSTALLATION:
v AIR QUALITY (GENERATORS) - DPW-ECB AIR QUALITY PROGRAM MANAGER v ARMY RADIATION PERMIT (ARP) - INSTALLATION RADIATION SAFETY OFFICER - 910-9088-4138 v BOILERS & GENERATORS PERMIT - DPW-ECB AIR QUALITY v BORROW PIT PERMIT - DPW - ENVIRONMENTAL BRANCH (SUBMIT 14 CALENDAR DAYS PRIOR TO WORK) v CONSTRUCTION AND DEMOLITION (C&D) WASTE PERMIT - FOR FORT BRAGG LAMONT ROAD CONSTRUCTION AND
DEMOLITION LANDFILL FACILITY - DPW - ENVIRONMENTAL BRANCH. SEE DPW'S SOLID WASTE AND RECYCLING
REQUIREMENTS, DATED 6 OCT 2016, OR FAX TO (910)396-4188, ATTN: SOLID WASTE OFFICE.
v DIGGING/EXCAVATION PERMIT (FB FORM 1605-E) - DPW - FACILITIES ENGINEER (SUBMIT 15 CALENDAR DAYS
PRIOR TO WORK)
v ENVIRONMENTAL PERMITS (POSSIBLE 180 DAY PROCESS). SEE SPEC SECTION 01 57 19.
Ø REGULATORY PERMITS
Ø CLEAN AIR ACT (CAA) [FEDERAL, STATE AND LOCAL] - DPW - INSTALLATION ENVIRONMENTAL OFFICE (AIR
PROGRAM MANAGER)
Ø GENERAL USE PERMITTED EQUIPMENT (SEE FAR 52.236-7.)
Ø STREAM CROSSING PERMIT (SEE CLEAN WATER ACT SECTION 404 AND SECTION 401 (WATER QUALITY).
Ø TITLE V AIR PERMITS (BASED ON TYPE OF MATERIAL DUST, BOILERS AND DOMESTIC WATER HEATERS) - DPW -
ENVIRONMENTAL BRANCH, ENVIRONMENTAL COMPLIANCE BRANCH (ECB)
Ø TRANSPORTER AND DISPOSAL FACILITIES PERMITS
v IRRIGATION PERMIT - DPW WATER QUALITY PROGRAM MANAGER, 910-907-3214.
v CHENEGA GLOBAL SERVICES, LLC, STORAGE TANKS AND WATER QUALITY PROGRAM, FORT BRAGG-DPW-ECB, 910-907-3214.
v LANDFILL DISPOSAL PERMIT - DPW-ENVIRONMENTAL SUSTAINMENT DIVISION (ESD), 910-396-3372.
v PHOTOGRAPHY - INSTALLATION PERMIT - DIRECTOR OPERATIONS DIRECTORATE DCS G3/5/7 - POC IS MR.
DREDDRICK BROWN, DSN 225-8469 OR COM (703) 695-8469.
v TRAFFIC CONTROL PERMIT - DPW TRANSPORTATION ENGINEER, RAY GOFF, 910-907-1759 v UTILITY CONNECTION v UTILITY OUTAGE REQUESTS - FT BRAGG DPW
FEDERAL
v NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION - FAA FORM 7460-1
NC STATE:
v ASBESTOS REMOVAL FOR DEMOLITION/RENOVATION - NCPH, RALEIGH (10 WORKING DAYS PRIOR TO REMOVAL) v AIR QUALITY v DEMOLITION v EROSION & SEDIMENT CONTROL (E&SC) CERTIFICATE OF APPROVAL/PERMIT - DEQ (FORMALLY NCDENR) DEPT
OF WATER QUALITY (DWQ)
v GENERAL STORMWATER DISCHARGE v GEOTHERMAL (POSSIBLE COUNTY INVOLVEMENT) v SEPTIC SYSTEM (POSSIBLE COUNTY INVOLVEMENT) v STORMWATER MANAGEMENT - NCDEQ AND FT BRAGG WATER MANAGEMENT BRANCH v WATER SYSTEM SERVICE (FIRE PROTECTION AND DOMESTIC WATER SERVICE) - NCDEQ.
ASUS :
v WATER AND SANITARY SEWER
COE SAFETY:
v CONFINED SPACE ENTRY PERMIT - (SEE 22 CFR 1926; SUBPART AA DATED AUG. 2015) v ENERGIZED WORK PERMIT - MUST BE SUBMITTED TO THE COR IN ADVANCE FOR ACCEPTANCE. (SEE EM 385-1-1, DATED 30 NOV 14, PARAGRAPH 11.A.02C.
v HOT WORK PERMIT - DEFINED AS HOT RIVETING, WELDING, BURNING, ABRASIVE BLASTING, OR OTHER FIRE- OR
SPARK-PRODUCING OPERATIONS. (SEE EM 385-1-1, DATED 30 NOV 2014, PARA 09.A.04 (PAGE 9-1 & 2) & PAGE
Q-29. THE FORT BRAGG FIRE DEPARTMENT REQUIRES NOTICE 14 CALENDAR DAYS PRIOR TO WORK, FOR:
Ø WELDING
Ø CUTTING
Ø HEATING
12. PERMITS
A. CONTRACTOR SHALL SECURE ALL PERMITS NECESSARY FOR CONSTRUCTION OF THE PROJECT.
DETERMINE FEE BASIS AND PAY ALL FILING FEES AT NO ADDITIONAL COST TO THE GOVERNMENT.
CONSTRUCTION SHALL NOT BEGIN ON ANY PHASE WITHOUT APPROPRIATE PERMITS.
B. PERMITS ARE TO BE MAINTAINED IN THE CONTRACTOR'S ONSITE CONSTRUCTION OFFICE,
ORGANIZED IN A 3 RING BINDER, TABBED AND WITH A TABLE OF CONTENTS FOR INSPECTION BY THE
GOVERNMENT.
D. PERMITS, AS LISTED ABOVE, ARE NOT INTENDED TO BE A COMPLETE LIST. CONTRACTORS ARE TO ADD
ADDITIONAL PERMITS, AS THEY BECOME KNOWN. PERMIT SUBMITTALS ARE TO BE SUBMITTED TO THE
GOVERNMENT FOR REVIEW AND APPROVAL. AVOID OMISSIONS.
2. CONSTRUCTION PHASING & PROJECT SCHEDULES
A. THE CONTRACTOR SHALL ENSURE THAT HIS ACTIVITIES SHALL NOT INTERFERE WITH THE
OPERATIONS CONDUCTED AT SURROUNDING BUILDINGS AND WORK AREAS.
B. CONTRACTOR SHALL NOT BLOCK ACCESS TO EXISTING BUILDINGS, ROADS AND/OR FACILITIES.
C. CONTRACTOR SHALL PROVIDE A PROJECT SCHEDULE TO THE COR PRIOR TO CONSTRUCTION
AND MOBILIZATION. CONTRACTOR SHALL PROVIDE WEEKLY UPDATES ON THE PROJECT
SCHEDULE FOR FULL DURATION OF PROJECT. THE WEEKLY UPDATES SHALL BE PROVIDED
SHOWING THE SCHEDULE FOR THE UPCOMING 2 WEEKS INCLUDE UPDATES REGARDING THE
PHASING OF CONSTRUCTION.
D. ADJACENT AREAS WILL BE OCCUPIED BY GOVERNMENT PERSONNEL THROUGHOUT THE
CONSTRUCTION PERIOD. CONTRACTOR SHALL NOT ALLOW CONSTRUCTION ACTIVITIES TO
DISRUPT ON-GOING GOVERNMENT OPERATIONS.
3. CONTRACTOR STAGING AREA
A. SEE SHEET GP-101 FOR SEDIMENT AND EROSION CONTROL PLAN AND NOTES.
A. THE LAMONT ROAD BORROW PIT IS ANTICIPATED TO BE CLOSED DURING THE ENTIRE
CONSTRUCTION PHASE OF THIS PROJECT.
A. CONTRACTOR SHALL INSTALL TEMPORARY FENCING AROUND THE GENERAL PROJECT SITE.
THE TYPE, MATERIAL, HEIGHT, AND LOCATION OF THE FENCE SHALL BE IN ACCORDANCE
WITH SPECIFICATIONS AND APPROVED BY THE GOVERNMENT PRIOR TO INSTALLATION.
B. ALL WORK ACTIVITIES AND STORAGE SHALL BE CONFINED WITHIN THE ESTABLISHED
PROJECT LIMITS UNLESS SPECIFICALLY AUTHORIZED BY THE COR FOR SPECIFIED PERIODS
OF TIME. CONTRACTOR SHALL COORDINATE EXACT PROJECT LIMITS WITH THE COR.
C. THE CONTRACTOR MUST HAVE AT LEAST ONE EMPLOYEE ONSITE TO RECEIVE AND DIRECT
PLACEMENT OF DELIVERED MATERIALS AND SUPPLIES.
1. CONSTRUCTION METHODS AND PROCEDURES & CONTRACTOR ACCESS
A. THE WORK FOR THIS PROJECT CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT,
TRANSPORTATION, AND MATERIALS NECESSARY TO PERFORM ALL WORK IN STRICT
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, APPLICABLE UNITED STATES ARMY CORPS
OF ENGINEERS (USACE) DRAWINGS, UNIFIED FACILITIES CRITERIA (UFC), SECURITY OPERATIONS
TRAINING FACILITY (SOTF) STANDARDS, FORT BRAGG INSTALLATION DESIGN GUIDELINES (IDG)
AND OTHER CONTRACT DOCUMENTS. THE SCOPE OF WORK OF THIS CONTRACT IS REFERENCED
IN PROJECT SPECIFICATIONS SECTION 01 00 05.
B. THE CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS IN ALL SITUATIONS. THE
CONTRACTOR SHALL BRING CONFLICTS BETWEEN PROJECT SPECIFICATIONS AND PLANS TO THE
ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE (COR) FOR RESOLUTION. ALL
MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PROJECT SPECIFICATIONS.
C. ALL DIMENSIONS AND CONDITIONS TIED TO OR OTHERWISE RELATED TO EXISTING
CONSTRUCTION WILL BE FIELD VERIFIED BY THE CONTRACTOR. VERIFICATION SHALL BE MADE
PRIOR TO ORDERING, FABRICATING, OR CONSTRUCTING ANY RELATED STRUCTURAL
COMPONENTS. WHERE DISCREPANCIES OCCUR, THE CONTRACTOR SHALL ADVISE THE COR
IMMEDIATELY AND PROVIDE THE COR WITH THE CORRECT DIMENSIONS AND CONDITIONS.
D. THE CONTRACTOR SHALL PROVIDE ONSITE SANITARY FACILITIES FOR HIS WORKERS DURING THE
ENTIRE CONSTRUCTION PHASE. COORDINATE LOCATION WITH COR.
E. THE CONTRACTOR SHALL ADEQUATELY PROTECT ALL EXISTING SITE FEATURES AND FACILITIES
DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL COORDINATE EXACT PROJECT
LIMITS WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR).
F. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE BEST AVAILABLE HAUL ROUTE TO THE
FORT BRAGG LAMONT RECYCLING FACILITY AND SHALL COORDINATE WITH THE COR AS NEEDED.
4. LAMONT ROAD BORROW PIT
5. EROSION AND SEDIMENT CONTROL
C. THE FOLLOWING PERMITS MAY BE REQUIRED FOR PROJECTS AT FT. BRAGG:
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
G-003
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N O
T E o f
G d
THE FORT BRAGG LAMONT CONSTRUCTION AND DEMOLITION (C&D)
LANDFILL IS CLOSED AND WILL NOT BE ACCEPTING ANY C&D WASTE
AND, ASBESTOS WASTE. THE MUNICIPAL SOLID WASTE (MSW)
TRANSFER STATION AT THE LAMONT LANDFILL FACILITY IS CLOSED
AND WILL NOT ACCEPT MSW AT THE FACILITY.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D, ASBESTOS WASTE, AND MSW.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D, ASBESTOS WASTE, MSW, AND ALL OTHER FORMS OF
HAZARDOUS OR HARMFUL MATERIALS INCLUDING BUT NOT LIMITED
TO SLURRY FROM HORIZONTAL DIRECTIONAL DRILLING.
THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN DATA OF ALL
WASTE DISPOSED AND MATERIALS RECYCLED OFF FORT BRAGG.
THE DEPARTMENT OF THE ARMY (DA) AND THE NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY (NC DEQ) REQUIRES
MONTHLY AND ANNUAL REPORTING OF ALL MATERIALS (WASTE AND
RECYCLABLES) MANAGED BY FORT BRAGG. THE FORT BRAGG
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
OFFICE IS RESPONSIBLE FOR COMPILING DATA INTO MONTHLY
DIRECTORATE REPORTS TO BE CONSOLIDATED INTO REPORTS FOR
THE DA AND THE NC DEQ. A PROVIDED FORM FROM THE SOLID
WASTE/RECYCLING OFFICE OR A CONTRACTOR FORM SHALL BE
FILLED OUT WITH THE TYPE OF WASTE OR RECYCLED MATERIAL, THE
WEIGHT OF THE WASTE/MATERIAL (TONS OR POUNDS) AND THE
FACILITY THE WASTE OR RECYCLABLES WERE DELIVERED. THIS
INFORMATION IS REQUIRED TO BE SENT TO THE FORT BRAGG SOLID
WASTE/RECYCLING OFFICE BY THE SECOND FRIDAY OF EACH
MONTH. EMAIL TO JEFF SLOOP AT JEFFERY.W.SLOOP.CTR@MAIL.MIL
OR FAX TO (910)396-4188, ATTN: SOLID WASTE OFFICE.
THE LAMONT LANDFILL FACILITY WILL ACCEPT RECYCLABLES ITEMS.
1) CONCRETE, BRICK AND BLOCK
- SHALL BE TESTED AND FREE OF ASBESTOS AND LEAD BASED
PAINT TO BE RECYCLED
- SHALL BE NO LARGER THAN 2' BY 2' PIECES OR EQUIVALENT
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD
- SHALL HAVE NO REBAR PROTRUDING OUT OF THE CONCRETE
2) TREES, LIMBS AND STUMPS
- SHALL BE CUT TO 6 FEET OR LESS IN LENGTH
- IF THE TREE HAS A LARGE DIAMETER (EXAMPLE 3 FT. DIA.) IT
SHALL BE CUT TO LENGTHS OF 3 FEET OR LESS
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD OR IN STUMP
ROOTS
- WILL EXCEPT GROUND WOOD CHIPS
- LOADS SHALL BE FREE OF TRASH
3) PALLETS
- SERVICEABLE AND NON-SERVICEABLE PALLETS
4) SCRAP STEEL
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
5) SCRAP ALUMINUM
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
6) CARDBOARD TO BE RECYCLED
- A 40 YARD DUMPSTER IS AVAILABLE FOR CARDBOARD
- ALSO CARDBOARD CAN BE TAKEN TO THE FORT BRAGG
RECYCLING CENTER AT BLDG 3-1240, BUTNER AND REILLY
ROAD
- SHALL BE CLEAN OF PLASTICS, STYROFOAM, WOOD, METAL,
TRASH, ETC.
7) ALL RECYCLABLE MATERIALS FROM A CONSTRUCTION OR
DEMOLITION JOB IS PROPERTY OF THE GOVERNMENT UNLESS
THE CONTRACT SPECIFIES THAT THE CONTRACTOR CAN OBTAIN
THE MATERIALS. ITEMS SUCH AS HVAC UNITS (FREON REMOVED),
AIR HANDLERS, PIPING, METAL BEAMS, MOTORS, VALVES, COPPER
WIRE, ETC. THESE TYPES OF ITEMS SHALL BE TRANSPORTED TO
DPW RECYCLING CENTER OR THE RECYCLING AREA AT THE
LAMONT LANDFILL FACILITY.
A LANDFILL USAGE PERMIT, FOR CONTRACTORS, SHALL BE
OBTAINED FROM THE DIRECTORATE OF PUBLIC WORKS,
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
PROGRAM AT BLDG 3-1137, (910) 432-6412.
STATE LAW AND FORT BRAGG REGULATIONS REQUIRES COVERING
OF LOADS OF WASTE OR RECYCLABLES TO PREVENT LITTER.
ALL WASTE OR RECYCLABLE MATERIAL LOADS ARE SUBJECT TO BE
INSPECTED OF THEIR CONTENTS WHILE BEING PRESENT ON FORT
BRAGG.
SOLID WASTE AND RECYCLING NOTES
APPLY FERTILIZER/LIME AT RATES AS DETERMINED BY LABORATORY SOIL
ANALYSIS OF SOILS AT THE JOB SITE. IN THE ABSENCE OF THE SOIL ANALYSIS,
APPLY SOIL AMENDMENTS AT THE RATES INDICATED IN STEPS 2 AND 3.
1. AREA WILL BE TILLED TO 4" DEPTH.
2. APPLY LIME AT 70 POUNDS PER 1000 SQUARE FEET, OR 1.5 TONS PER
ACRE.
3. APPLY 10-20 FERTILIZER AT A RATE OF 850 POUNDS PER ACRE OR 20
POUNDS PER 1000 SQUARE FEET. THE FERTILIZER SHOULD BE EITHER
SLOW TIME RELEASE OR APPLIED IN TWO APPLICATIONS, HALF AT TIME OF
PLANTING AND THE SECOND HALF AFTER PERMANENT SEED GERMINATES.
4. THE LIME AND FERTILIZER WILL BE WORKED INTO THE TOP 2 TO 4 INCHES
OF SOIL PRIOR TO SEEDING.
5. SEED MIX AND RATE:
FORT BRAGG SEEDING SPECIFICATION
SITE AREA
DESCRIPTION
1) GROUND STABILIZATION *
STABILIZATION
TIME FRAME
PERIMETER DIKES,
SWALES, DITCHES
AND SLOPES
7 DAYS
STABILIZATION TIME
FRAME EXCEPTIONS
NONE
HIGH QUALITY
WATER (HQW)
ZONES
7 DAYS NONE
SLOPES STEPPER
THAN 3:1
7 DAYS
IF SLOPES ARE 10' OR LESS IN
LENGTH AND ARE NOT STEEPER
THAN 2:1, 14 DAYS ARE
ALLOWED.
SLOPES 3:1 OR
FLATTER
14 DAYS
7-DAYS FOR SLOPES GREATER
THAN 50 FEET IN LENGTH AND
WITH SLOPES STEEPER
THAN 4:1
ALL OTHER AREAS
WITH SLOPES
FLATTER THAN 4:1
14 DAYS
NONE (EXCEPT FOR
PERIMETERS AND
HQW ZONES)
* "EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY
BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE
COMPLIANCE IMPRACTICABLE." (SECTION II.B(2)(b))
MAINTENANCE DURING ESTABLISHMENT PERIOD
MAINTENANCE OF THE SEEDED AREAS SHALL INCLUDE PROTECTING
EMBANKMENTS AND DITCHES FROM SURFACE EROSION; MAINTAINING EROSION
CONTROL MATERIALS AND MULCH; PROTECTING INSTALLED AREAS FROM
TRAFFIC; MOWING; WATERING; AND POST-FERTILIZATION.
MOWING
A. TURF AREAS; TURF AREAS SHALL BE MOWED TO A MINIMUM 3-INCH
HEIGHT WHEN THE TURF IS A MAXIMUM 4 INCHES HIGH. CLIPPINGS
SHALL BE REMOVED WHEN THE AMOUNT CUT PREVENTS SUNLIGHT
FROM REACHING THE GROUND SURFACE.
B. EROSION CONTROL AREAS: EROSION CONTROL AREAS SHALL BE
MOVED TO A MINIMUM 4 INCH HEIGHT WHEN THE PLANTS ARE
MAXIMUM 8 INCHES HIGH. CLIPPINGS SHALL BE REMOVED WHEN THE
AMOUNT CUT PREVENTS SUNLIGHT FROM REACHING THE GROUND
SURFACE.
POST-FERTILIZATION
AFTER THE PERMANENT GRASS HAS BEEN ACCEPTED, AND BETWEEN
THE DATES OF APRIL 15 AND OCTORBER 15, APPLY 425 POUNDS OF
FERTILIZER PER ACRE.
REPAIR OF REINSTALL
UNSATISFACTORY STAND OF GRASS PLANTS AND MULCH SHALL BE
REPAIRED OR REINSTALLED, AND ERODED AREAS SHALL BE REPAIRED
UNTIL A SATISFACTORY STAND OF GRASS RESULTS.
(Rv. 9 JUNE 2017)
TEMPORARY SEEDING
"COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER AND 28 FEBRUARY 120 POUNDS
PER ACRE WINTER WHEAT (TRITICUM SPELTA)
"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST 65 POUNDS PER
ACRE GERMAN (SETARIA ITALICA), BROWN TOP (SETARIA ITALICA), OR FOX TAIL
MILLET (BRACHIARIA RAMOSUM)
PERMANENT SEEDING "COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER
AND 28 FEBRUARY 50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE
(FESTUCA ARUNDINACEA) 25 POUNDS PER ACRE COMMON BERMUDA
(CYNODON DACTYLON), HULLED 25 POUNDS PER ACRE COMMON BERMUDA
(CYNODON DACTYLON), UNHULLED
"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST 50 POUNDS
PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA) 25 POUNDS
PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED
STRAW MULCH: APPLY 4,000 POUNDS PER ACRE; LEAVING NO BARE SPOT LARGER
THAN A QUARTER. STRAW MUST BE STABILIZED BY EITHER USE OF EMULSIFIED
ASPHALT OR BY CRIMPING THE STRAW INTO THE GROUND.
EMULSIFIED ASPHALT: EMULSIFIED ASPHALT SHALL BE APPLIED AT A RATE
HEAVY ENOUGH THAT THE ENTIRE AREA APPEARS BLACK IN COLOR; WITH
PARTICULAR ATTENTION PAID TO THE EDGES OF AREAS, CRESTS OF RIDGES,
AND BANKS TO PREVENT WIND DAMAGE.
CRIMPING: STRAW MAY BE CRIMPED WITH A MULCH ANCHORING TOOL OR A
WHEEL DISK WITH DULL BLADES SET NEARLY STRAIGHT MAY BE USED AS A
MULCH ANCHORING TOOL. CRIMPING IS NOT PERMITTED ON SLOPES
STEEPER THAN 3:1.
HYDROSEEDING: HYDROSEEDING SHALL ONLYBE ALLOWABLE ON SLOPES
STEEPER THAN 1 HORIZONTAL TO 1 VERTICAL. STEPS 1 THROUGH 4 MUST BE
COMPLETED PRIOR TO HYDROSEEDING. HYDROSEEDING SHOULD BE APPLIED IN
TOW APPLICATIONS. THE FIRST APPLICATION WILL CONSIST OF
OF THE MULCH
AND
OF THE SEED AND THE SECOND APPLICATION WILL CONSIST OF
OF THE
MULCH AND
OF THE SEED. THE MULCH WILL INCLUDE A TRACKIFIER AND WILL BE
APPLIED AT A RATE OF 2,000 POUNDS PER ACRE OR THE MANUFACTURER'S
RECOMMENDATION, WHICHEVER IS HIGHER.
6. EXEMPTIONS: SPECIAL USE AREAS, SUCH AS WETLANDS, RIPARIAN AREAS,
FLOODPLAINS, GENERAL OFFICER QUARTERS AND HISTORIC DISTRICT. CONTACT
THE FORT BRAGG WATER MANAGEMENT BRANCH (WMB) AT 910-396-2301/2823
WHEN SEEDING THESE AREAS.
7. UPON COMPLETION OF THE PROJECT, PRIOR TO LEAVING THE SITE, THE WATER
MANAGEMENT BRANCH SHALL BE NOTIFIED TO INSPECT THE PROJECT. POC MR.
JACK WILSON AT 910-396-2301/2823.
NOTE: G.S. 113A-57 NO LAND-DISTURBING ACTIVITY SUBJECT TO THIS ARTICLE
SHALL BE UNDERTAKEN EXCEPT IN ACCORDANCE WITH THE FOLLOWING
MANDATORY REQUIREMENTS:
(1) PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED
WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER)
FOLLOWING THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT (FINAL
GRADE).
(2) THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE
ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE
EROSION-CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT
EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF
GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR
PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION.
ALL PERIMETER DIKES, DITCHES, SWALES PERIMETER SLOPES OR SLOPES
STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED
TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS
PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS.
FORT BRAGG SEEDING SPECIFICATION (CONT.)
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
G-004
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N O
T E o f
G d
234.744
21-SF5-HA-2
242.492
21-SF5-HA-1
237.450
21-SF5-HA-3
227.395
21-SF5-HA-4
221.185
21-SF5-HA-6
233.781
21-SF5-HA-5
INVERT
18 IN RCP
EL = 231.36
INVERT
18 IN RCP
EL = 232.95
CONEX TRAILERS
C
O
N
E
X
E
S
C E
N T
E R
L
IN
E O
F S
O
IL
B
A S
E D
R O
A D
FENCE
MANCHESTER RD
MANCHESTER RD
M
A
N
C
H
E
S
T
L
O
N
G
S
T
R
E
L
A
M
O
M
D
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
NOTES:
1. Survey performed by:
James D. Jacaruso, NC PLS L-3706
USACE, Wilmington District
910-251-4780 (Office)
910-409-8875 ( Cell)
2. Horizontal and Vertical Control:
The horizontal reference frame is North Carolina State Plane, NAD
1983(2011), in U.S. Survey Feet.
The vertical datum is NAVD 1988, in U.S. Survey Feet
The field survey was performed using a combination of RTK GNSS, with a local base station, and robotic total station. Initial on site control was established using the North Carolina Virtual Reference
Station (VRS) network.
3. No determination has been made by the surveyor as to the following:
A. 100-year flood limits;
B. Wetlands;
C. Underground Storage Facilities;
D. Graves, Cemeteries, or Burial Grounds;
E. Hazardous Waste
F. Underground Utilities
4. Date of Field Survey: 4 April 2021.
I, James D. Jacaruso, Certify this Map was completed on 14 JUN 21, under My
Direct and Responsible Charge from an Actual Field Survey performed under My
Supervision.
James D. Jacaruso, NC PLS L-3706 Date
SCALE: 1" = 40'
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
SHEET ID
US Army Corps of Engineers
LEGEND
BORE HOLE
CENTERLINE OF SOIL ROAD
Feet
0 40 80
D
VF-101
J U
N
T O
P O
G R
A P
H
R
V E
Y
J D
J
B M
A
END OF CULVERT
SITE
VICINTY MAP: NOT TO SCALE
X
X
X
X
X
X
X
X
X
X
234.744
21-SF5-HA-2
242.492
21-SF5-HA-1
237.450
21-SF5-HA-3
227.395
21-SF5-HA-4
221.185
21-SF5-HA-6
233.781
21-SF5-HA-5
CONEX TRAILERS
C
O
N
E
X
E
S
C E
N T
E R
L
IN
E O
F S
O
IL
B
A S
E D
R O
A D
FENCE
GRAVEL ROAD
SOIL ROAD
CONC
PAD
D
I
D
233.95
243.9
232.5
1.5:1
LIMITS OF GRADING FUTURE PROJECT
PN 95395 MULTIPURPOSE TRAINING FACILITY
241.00
N 516429.73
E 1976458.25
236.76
N 516402.24
E 1976678.95
233.28
N 516539.90
E 1976783.87
233.28
N 516508.67
E 1977047.13
239.00
N 516324.87
E 1977031.18
238.86
N 516371.44
E 1976660.23
241.00
N 516404.75
E 1976451.77
LIMITS OF DISTURBANCE
N 516438
E 1976454
N 516434
E 1976525
N 516434
E 1976591
N 516413
E 1976675
N 516583
E 1976732
N 516604
E 1976823
N 516627
E 1976827
N 516612
E 1976765
N 516608
E 1977011
N 516584
E 1977007
N 516546
E 1977104
N 516312
E 1977040
N 516328
E 1976831
N 516357
E 1976645
N 516377
E 1976577
N 516397
E 1976441
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
Feet
0 30 60
LIMITS OF DISTURBANCE ~ 2.7 ACRES
D E
M O
L I T
I O
N
P
L A
N
CD-101
SCALE 1"=30'
DEMOLITION/CONSTRUCTION SEQUENCE:
· INSTALL EROSION AND SEDIMENT CONTROLS
PER SHEET GP-101.
· COMMENCE CLEARING AND GRUBBING AND
TREE REMOVAL PER SPECIFICATIONS & PLANS.
· COMMENCE CONSTRUCTION GRADING PER
SHEET GP-101.
· COMMENCE PERMANENT SITE STABILIZATION
MEASURES PER SPECIFICATIONS & SHEETS
GP-101, AND C-501.
NOTES:
1. ALL WORK SHALL BE PERFORMED WITHIN THE
LIMITS SHOWN. POINTS NUMBERS 5000, & 5006
THRU 5015 DEFINE THE BOUNDARY LIMITS.
2. THIS INCLUDES ALL LAY DOWN AREAS, &
SEDIMENT AND EROSION CONTROL MEASURES.
3. SEE SHEET GP-101 FOR GRADING PLAN &
SEDIMENT AND EROSIOIN CONTROL PLAN.
LEGEND
DEMOLITION HATCH
LIMITS OF DISTURBANCE
C D d
X
X
X
X
X
X
X
X
X
X
234.744
21-SF5-HA-2
242.492
21-SF5-HA-1
237.450
21-SF5-HA-3
227.395
21-SF5-HA-4
221.185
21-SF5-HA-6
233.781
21-SF5-HA-5
INVERT
18 IN RCP
EL = 231.36
INVERT
18 IN RCP
EL = 232.95
CONEX TRAILERS
C
O
N
E
X
E
S
C E
N T
E R
L
IN
E O
F S
O
IL
B
A S
E D
R O
A D
FENCE
8" HDPE
ROOF DRAIN
INV=243.58'
X
P
O S
T
A
B
N
C E
10' TEMP
METAL WALL
GRAVEL ROAD
SOIL ROAD
CONC
PAD
D
I
D
233.95
243.9
232.5
"R
C P
C L A
S S
IV
R
L
A
1.5:1
LIMITS OF GRADING
FUTURE PROJECT PN 95395
MULTIPURPOSE TRAINING FACILITY
BORING LOCATION (TYP.)
240.00
N 516429.73
E 1976458.25
236.76
N 516402.24
E 1976678.95
233.28
N 516539.90
E 1976783.87
233.28
N 516508.67
E 1977047.13
239.00
N 516324.87
E 1977031.18
238.86
N 516371.44
E 1976660.23
242.00
N 516404.75
E 1976451.77
LIMITS OF DISTURBANCE
~2.7 ACRES
SF
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S F
S F
S F
S F
S
F
S
F
S
F
S
F
S
F
S
F
TS
TS
TS
TS
PS
PS
PS
PS
PS
MU
MU
MU
MU
MU
SOD
SOD
SOD
SOD
CE
TSD
TSD
TSD
SF
SF
SF
TS
TD
TD
TD
TD
TD
TD
SSB
CONTRACTOR TO CONFIRM EXISTING GRADES. TIE IN EDGE OF SKIMMER
SEDIMENT BASIN TO EXISTING GRADES AT MAX 2:1 CUT/FILL SLOPE.
SKIMMER SEDIMENT BASIN SHALL HAVE 2-FEET OF STORAGE DEPTH.
CONTRACTOR TO CONFIRM
EXISTING GRADES. PROVIDE A MIN.
0.5% LONGITUDINAL SLOPE.
SIDE SLOPES SHALL BE 2:1
SKIMMER 2" SIZE
1.25" ORIFICE SIZE
TD
TD
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
Feet
0 30 60
R O
U G
H
G
R A
D I N
G
A
N D
E R
O S
I O
D
I M
E N
T
C
O N
T R
O L
GP-101
GRADING NOTES:
1. CONTRACTOR SHALL FOLLOW OSHAA GUIDELINES WHEN GRADING THE SITE. ON-SITE SOILS ARE CATEGORIZED AS TYPE C SOILS AND SLOPES SHOULD BE CONSTRUCTION AT A MAXIMUM SLOPE OF 3H:1V.
2. THE ON-SITE SOILS ARE SUITABLE FOR REUSE AS FILL MATERIALS. SUITABLE MATERIALS FOR FILL SHOULD CONSIST OF SAND (SW, SP, SM, SC) AND LOW PLASTICITY SILTS AND CLAYS (ML, CL) WITH A PI OF LESS THAN 9.
SOILS USED AS FILL MATERIAL SHOULD BE COMPACTED TO 95% OF THE STANDARD PROCTOR AND WITHIN +/- 3 PERCENT OF THE OPTIMUM. IF SAND IS USED A FILLED MATERIAL, THE CONTRACTOR
SHALL USE A STEEL VIBRATORY DRUM ROLLER TO COMPACT FILL MATERIAL. IF LOW PLASTICITY SILTS AND CLAYS ARE USED, THE CONTRACTOR SHOULD USE A SHEEPSFOOT ROLLER TO COMPACT
THE FILL MATERIAL..
3. DPW FORESTRY BRANCH WILL DETERMINE IF MERCHANTABLE TIMBER IS PRESENT TO SUPPORT A SALVAGE OR SALE OPERATION. IF ENOUGH TIMBER IS AVAILABLE FOR SALE, THE CONTRACTOR
SHALL MARK THE CLEARING LIMITS AND THE GOVERNMENT HAS60 DAYS, FROM WHEN THE CLEARING LIMITS ARE COMPLETED, TO REMOVE THE MERCHANTABLE TIMBER. SMALL TREES, TREE TOPS, LIMBS, STUMPS OR ANY DEBRIS NOT SOLD BY THE GOVERNMENT SHALL BE REMOVED BY THE CONTRACTOR.
SCALE 1"=30'
SEDIMENT & EROSION CONTROL LEGEND
SF
TS
PS
MU
SOD
SILT FENCE
TEMPORARY SEEDING
PERMANENT SEEDING
MULCHING
SOD
SF
SILT FENCE LINETYPE
LIMITS OF DISTURBANCE LINETYPE
SEDIMENT & EROSION CONTROL NOTES:
1. CONTRACTOR SHALL FOLLOW THE MOST RECENT NCDEQ SEDIMENT & EROSION CONTROL MANUAL GUIDELINES .
2. PRIOR TO CONSTRUCTION ACTIVITIES CONTRACTOR SHALL COORDINATE WITH AND GAIN APPROVAL FROM CONTRACTING OFFICER AND/OR HIS/HER REPRESENTATIVE, AND DPW-E FOR LOCATIONS OF STOCKPILE
AREAS AND BORROW AREAS, AND HAUL ROUTES.
3. CONTRACTOR SHALL CONTAIN ALL EARTH MOVING ACTIVITIES WITHIN THE LIMITS OF GRADING SHOWN ON THIS SHEET, AND ALL CONSTRUCTION ACTIVITIES WITH IN THE LIMITS OF DISTURBANCE AS SHOWN ON
SHEET CD-101.
4. CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT THE BEGINNING AND END OF EACH WORKDAY. ANY OBSERVED DAMAGE SHALL BE FIXED PROMPTLY. SEE SHEETS C-501 & C-502
FOR DETAILS AND MAINTENANCE.
5. AFTER COMPLETION OF GRADING ACTIVITIES CONTRACTOR WILL BE RESPONSIBLE FOR THE SITE UNTIL IT IS FULLY STABILIZED WITH MATURE VEGETATION AND/OR THE SEDIMENT & EROSION CONTROL PERMIT IS
RELEASED.
6. ANY DAMAGE DONE OUTSIDE OF THESE LIMITS AND STANDARDS IS THE SOLE FINANCIAL RESPONSIBILITY OF THE CONTRACTOR.
7. TEMPORARY SLOPE DRAIN PIPING SHALL BE 18" I.D. HDPE PIPE.
CE CONSTRUCTION ENTRANCE/EXIT
TSD TEMPORARY SLOPE DRAINS
TD
TEMPORARY DIVERSION
LIMITS OF DISTURBANCE ~ 2.7 ACRES
#57 STONE (CLEAN) HATCH
LIMITS OF GRADING LINETYPE
G P
SSB SKIMMER SEDIMENT BASIN
TD
TEMPORARY DIVERSION FLOW PATH
Q10 = 9 CFS
X
X
X
X
X
X
X
X
X
X
234.744
21-SF5-HA-2
242.492
21-SF5-HA-1
237.450
21-SF5-HA-3
227.395
21-SF5-HA-4
221.185
21-SF5-HA-6
233.781
21-SF5-HA-5
INVERT
18 IN RCP
EL = 231.36
INVERT
18 IN RCP
EL = 232.95
CONEX TRAILERS
C
O
N
E
X
E
S
C E
N T
E R
L
IN
E O
F S
O
IL
B
A S
E D
R O
A D
FENCE
8" HDPE
ROOF DRAIN
INV=243.58'
X
P
O S
T
A
B
N
C E
10' TEMP
METAL WALL
GRAVEL ROAD
SOIL ROAD
G
A
T
E
CONC
PAD
D
I
D
R
C
P
246.2
DI
8" DIP
246.2
233.95
232.5 233.65
243.9
DI
232.5
"R
C P
C L A
S S
IV
R
L
A
1.5:1
240.00
N 516429.73
E 1976458.25
236.76
N 516402.24
E 1976678.95
233.28
N 516539.90
E 1976783.87
233.28
N 516508.67
E 1977047.13
239.00
N 516324.87
E 1977031.18
238.86
N 516371.44
E 1976660.23
242.00
N 516404.75
E 1976451.77
SF
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S F
S F
S F
S F
S
F
S
F
S
F
S
F
S
F
S
F
CE
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
Feet
0 30 60
LIMITS OF DISTURBANCE ~ 2.7 ACRES
P L
E
W
GP-102
SCALE 1"=30'
LEGEND
CLASS 1 RIP RAP HATCH
SF
SILT FENCE LINETYPE
LIMITS OF DISTURBANCE LINETYPE
#57 STONE (CLEAN)
NOTES:
1. SEE SHEET GP-103 FOR CROSS SECTION PROFILES.
G P
CROSS SECTION 0+50 - 0+50
0 10 20 300-10-20-30
CROSS SECTION 1+00 - 1+00
0 10 20 300-10-20-30
CROSS SECTION 1+50 - 1+50
0 10 20 300-10-20-30
CROSS SECTION 2+00 - 2+00
0 10 20 300-10-20-30
CROSS SECTION 2+50 - 2+50
0 10 20 300-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170
CROSS SECTION 3+00 - 3+00
0 10 20 300-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
CROSS SECTION 3+50 - 3+50
0 10 20 30 400-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
CROSS SECTION 4+00 - 4+00
0 10 20 30 400-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190
CROSS SECTION 4+50 - 4+50
0 10 20 30 400-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190
CROSS SECTION 5+00 - 5+00
0 10 20 30 400-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
CROSS SECTION 5+50 - 5+50
0 10 20 300-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
CROSS SECTION 6+00 - 6+00
0 10 20 300-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
Feet
0 30 60
G R
A D
I N
G
C
R O
C
T I O
N
P R
O F
I L
E S
GP-103
SCALE 1"=30'
LEGEND
EXISTING GROUND
PROPOSED FINISHED GRADE
C
O
F
I
O
C
O
F
I
O
MIN. 4" #57 STONE
GEOTEXTILE
COMPACTED SUBGRADE
SITE PAD AND ACCESS ROAD DETAIL
N.T.S.
G P
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE
WITH THE NCG01 CONSTRUCTION GENERAL PERMIT
IMPLEMENTING THE DETAILS AND SPECIFICATIONS ON THIS PLAN SHEET WILL RESULT IN THE CONSTRUCTION ACTIVITY BEING CONSIDERED COMPLIANT WITH THE GROUND STABILIZATION AND MATERIALS HANDLING SECTIONS OF THE NCG01 CONSTRUCTION GENERAL PERMIT (SECTIONS E AND F, RESPECTIVELY). THE PERMITTEE SHALL COMPLY WITH THE EROSION AND SEDIMENT CONTROL PLAN APPROVED BY THE DELEGATED AUTHORITY HAVING JURISDICTION. ALL DETAILS AND SPECIFICATIONS
SHOWN ON THIS SHEET MAY NOT APPLY DEPENDING ON SITE CONDITIONS AND THE DELEGATED
AUTHORITY HAVING JURISDICTION.
GROUND STABILIZATION SPECIFICATION
STABILIZE THE GROUND SUFFICIENTLY SO THAT RAIN WILL NOT DISLODGE THE SOIL. USE
ONE OF THE TECHNIQUES IN THE TABLE BELOW:
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. SELECT FLOCCULANTS THAT ARE APPROPRIATE FOR THE SOILS BEING EXPOSED
DURING CONSTRUCTION, SELECTING FROM THE NC DWR LIST OF APPROVED
PAMS/FLOCCULANTS.
2. APPLY FLOCCULANTS AT OR BEFORE THE INLETS TO EROSION AND SEDIMENT
CONTROL MEASURES.
3. APPLY FLOCCULANTS AT THE CONCENTRATIONS SPECIFIED IN THE NC DWR LIST OF
APPROVED PAMS/FLOCCULANTS AND IN ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS.
4. PROVIDE PONDING AREA FOR CONTAINMENT OF TREATED STORMWATER BEFORE
DISCHARGING OFFSITE.
5. STORE FLOCCULANTS IN LEAK-PROOF CONTAINERS THAT ARE KEPT UNDER
STORM-RESISTANT COVER OR SURROUNDED BY SECONDARY CONTAINMENT
STRUCTURES.
HAZARDOUS AND TOXIC WASTE
1. CREATE DESIGNATED HAZARDOUS WASTE COLLECTION AREAS ON-SITE.
2. PLACE HAZARDOUS WASTE CONTAINERS UNDER COVER OR IN SECONDARY
CONTAINMENT.
3. DO NOT STORE HAZARDOUS CHEMICALS, DRUMS OR BAGGED MATERIALS DIRECTLY
ON THE GROUND.
EQUIPMENT AND VEHICLE MAINTENANCE
1. MAINTAIN VEHICLES AND EQUIPMENT TO PREVENT DISCHARGE OF FLUIDS.
2. PROVIDE DRIP PANS UNDER ANY STORED EQUIPMENT.
3. IDENTIFY LEAKS AND REPAIR AS SOON AS FEASIBLE, OR REMOVE LEAKING
EQUIPMENT FROM THE PROJECT.
4. COLLECT ALL SPENT FLUIDS, STORE IN SEPARATE CONTAINERS AND PROPERLY
DISPOSE AS HAZARDOUS WASTE (RECYCLE WHEN POSSIBLE).
5. REMOVE LEAKING VEHICLES AND CONSTRUCTION EQUIPMENT FROM SERVICE
UNTIL THE PROBLEM HAS BEEN CORRECTED.
6. BRING USED FUELS, LUBRICANTS, COOLANTS, HYDRAULIC FLUIDS AND OTHER
PETROLEUM PRODUCTS TO A RECYCLING OR DISPOSAL CENTER THAT HANDLES
THESE MATERIALS.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. NEVER BURY OR BURN WASTE. PLACE LITTER AND DEBRIS IN APPROVED WASTE
CONTAINERS.
2. PROVIDE A SUFFICIENT NUMBER AND SIZE OF WASTE CONTAINERS (E.G DUMPSTER,
TRASH RECEPTACLE) ON SITE TO CONTAIN CONSTRUCTION AND DOMESTIC WASTES.
3. LOCATE WASTE CONTAINERS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS
AND SURFACE WATERS UNLESS NO OTHER ALTERNATIVES ARE REASONABLY
AVAILABLE.
4. LOCATE WASTE CONTAINERS ON AREAS THAT DO NOT RECEIVE SUBSTANTIAL
AMOUNTS OF RUNOFF FROM UPLAND AREAS AND DOES NOT DRAIN DIRECTLY TO A
STORM DRAIN, STREAM OR WETLAND.
5. COVER WASTE CONTAINERS AT THE END OF EACH WORKDAY AND BEFORE STORM
EVENTS OR PROVIDE SECONDARY CONTAINMENT. REPAIR OR REPLACE DAMAGED
WASTE CONTAINERS.
6. ANCHOR ALL LIGHTWEIGHT ITEMS IN WASTE CONTAINERS DURING TIMES OF HIGH
WINDS.
7. EMPTY WASTE CONTAINERS AS NEEDED TO PREVENT OVERFLOW. CLEAN UP
IMMEDIATELY IF CONTAINERS OVERFLOW.
8. DISPOSE WASTE OFF-SITE AT AN APPROVED DISPOSAL FACILITY.
9. ON BUSINESS DAYS, CLEAN UP AND DISPOSE OF WASTE IN DESIGNATED WASTE
CONTAINERS.
PAINT AND OTHER LIQUID WASTE
1. DO NOT DUMP PAINT AND OTHER LIQUID WASTE INTO STORM DRAINS, STREAMS OR
WETLANDS.
2. LOCATE PAINT WASHOUTS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS
AND SURFACE WATERS UNLESS NO OTHER ALTERNATIVES ARE REASONABLY
AVAILABLE.
3. CONTAIN LIQUID WASTES IN A CONTROLLED AREA.
4. CONTAINMENT MUST BE LABELED, SIZED AND PLACED APPROPRIATELY FOR THE
NEEDS OF SITE.
5. PREVENT THE DISCHARGE OF SOAPS, SOLVENTS, DETERGENTS AND OTHER LIQUID
WASTES FROM CONSTRUCTION SITES.
PORTABLE TOILETS
1. INSTALL PORTABLE TOILETS ON LEVEL GROUND, AT LEAST 50 FEET AWAY FROM
STORM DRAINS, STREAMS OR WETLANDS UNLESS THERE IS NO ALTERNATIVE
REASONABLY AVAILABLE. IF 50 FOOT OFFSET IS NOT ATTAINABLE, PROVIDE
RELOCATION OF PORTABLE TOILET BEHIND SILT FENCE OR PLACE ON A GRAVEL PAD
AND SURROUND WITH SAND BAGS.
2. PROVIDE STAKING OR ANCHORING OF PORTABLE TOILETS DURING PERIODS OF HIGH
WINDS OR IN HIGH FOOT TRAFFIC AREAS.
3. MONITOR PORTABLE TOILETS FOR LEAKING AND PROPERLY DISPOSE OF ANY LEAKED
MATERIAL. UTILIZE A LICENSED SANITARY WASTE HAULER TO REMOVE LEAKING
PORTABLE TOILETS AND REPLACE WITH PROPERLY OPERATING UNIT.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. STORE AND APPLY HERBICIDES, PESTICIDES AND RODENTICIDES IN ACCORDANCE
WITH LABEL RESTRICTIONS.
2. STORE HERBICIDES, PESTICIDES AND RODENTICIDES IN THEIR ORIGINAL
CONTAINERS WITH THE LABEL, WHICH LISTS DIRECTIONS FOR USE, INGREDIENTS
AND FIRST AID STEPS IN CASE OF ACCIDENTAL POISONING.
3. DO NOT STORE HERBICIDES, PESTICIDES AND RODENTICIDES IN AREAS WHERE
FLOODING IS POSSIBLE OR WHERE THEY MAY SPILL OR LEAK INTO WELLS,
STORMWATER DRAINS, GROUND WATER OR SURFACE WATER. IF A SPILL OCCURS,
CLEAN AREA IMMEDIATELY.
4. DO NOT STOCKPILE THESE MATERIALS ONSITE.
CONCRETE WASHOUTS
1. DO NOT DISCHARGE CONCRETE OR CEMENT SLURRY FROM THE SITE.
2. DISPOSE OF, OR RECYCLE SETTLED, HARDENED CONCRETE RESIDUE IN ACCORDANCE
WITH LOCAL AND STATE SOLID WASTE REGULATIONS AND AT AN APPROVED
FACILITY.
3. MANAGE WASHOUT FROM MORTAR MIXERS IN ACCORDANCE WITH THE ABOVE
ITEM AND IN ADDITION PLACE THE MIXER AND ASSOCIATED MATERIALS ON
IMPERVIOUS BARRIER AND WITHIN LOT PERIMETER SILT FENCE.
4. INSTALL TEMPORARY CONCRETE WASHOUTS PER DETAIL SHOWN ON PLANS. IF AN
ALTERNATE METHOD OR PRODUCT IS TO BE USED, CONTACT APPROVAL AUTHORITY
FOR REVIEW AND APPROVAL.
5. DO NOT USE CONCRETE WASHOUTS FOR DEWATERING OR STORING DEFECTIVE
CURB OR SIDEWALK SECTIONS. STORMWATER ACCUMULATED WITHIN THE
WASHOUT MAY NOT BE PUMPED INTO OR DISCHARGED TO THE STORM DRAIN
SYSTEM OR RECEIVING SURFACE WATERS. LIQUID WASTE MUST BE PUMPED OUT
AND REMOVED FROM PROJECT.
6. LOCATE WASHOUTS AT LEAST 50 FEET FROM STORM DRAIN INLETS AND SURFACE
WATERS UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE
REASONABLY AVAILABLE. AT A MINIMUM, INSTALL PROTECTION OF STORM DRAIN
INLET(S) CLOSEST TO THE WASHOUT WHICH COULD RECEIVE SPILLS OR OVERFLOW.
7. LOCATE WASHOUTS IN AN EASILY ACCESSIBLE AREA, ON LEVEL GROUND AND
INSTALL A STONE ENTRANCE PAD IN FRONT OF THE WASHOUT. ADDITIONAL
CONTROLS MAY BE REQUIRED BY THE APPROVING AUTHORITY.
8. INSTALL AT LEAST ONE SIGN DIRECTING CONCRETE TRUCKS TO THE WASHOUT
WITHIN THE PROJECT LIMITS. POST SIGNAGE ON THE WASHOUT ITSELF TO IDENTIFY
THIS LOCATION.
9. REMOVE LEAVINGS FROM THE WASHOUT WHEN AT APPROXIMATELY 75% CAPACITY
TO LIMIT OVERFLOW EVENTS. REPLACE THE TARP, SAND BAGS OR OTHER
TEMPORARY STRUCTURAL COMPONENTS WHEN NO LONGER FUNCTIONAL. WHEN
UTILIZING ALTERNATIVE OR PROPRIETARY PRODUCTS, FOLLOW MANUFACTURER'S
INSTRUCTIONS.
10. AT THE COMPLETION OF THE CONCRETE WORK, REMOVE REMAINING LEAVINGS
AND DISPOSE OF IN AN APPROVED DISPOSAL FACILITY. FILL PIT, IF APPLICABLE, AND
STABILIZE ANY DISTURBANCE CAUSED BY REMOVAL OF WASHOUT.
EARTHEN STOCKPILE MANAGEMENT
1. SHOW STOCKPILE LOCATIONS ON PLANS. LOCATE EARTHEN-MATERIAL STOCKPILE
AREAS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS, SEDIMENT BASINS,
PERIMETER SEDIMENT CONTROLS AND SURFACE WATERS UNLESS IT CAN BE SHOWN
NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE.
2. PROTECT STOCKPILE WITH SILT FENCE INSTALLED ALONG TOE OF SLOPE WITH A
MINIMUM OFFSET OF FIVE FEET FROM THE TOE OF STOCKPILE.
3. PROVIDE STABLE STONE ACCESS POINT WHEN FEASIBLE.
4. STABILIZE STOCKPILE WITHIN THE TIMEFRAMES PROVIDED ON THIS SHEET AND IN
ACCORDANCE WITH THE APPROVED PLAN AND ANY ADDITIONAL REQUIREMENTS.
SOIL STABILIZATION IS DEFINED AS VEGETATIVE, PHYSICAL OR CHEMICAL COVERAGE
TECHNIQUES THAT WILL RESTRAIN ACCELERATED EROSION ON DISTURBED SOILS FOR
TEMPORARY OR PERMANENT CONTROL NEEDS.
SECTION E: GROUND STABILIZATION
REQUIRED GROUND STABILIZATION TIMEFRAMES
NOTE: AFTER THE PERMANENT CESSATION OF CONSTRUCTION ACTIVITIES, ANY AREAS WITH
TEMPORARY GROUND STABILIZATION SHALL BE CONVERTED TO PERMANENT GROUND STABILIZATION AS SOON AS PRACTICABLE BUT IN NO CASE LONGER THAN 90 CALENDAR DAYS AFTER THE LAST LAND DISTURBING ACTIVITY. TEMPORARY GROUND STABILIZATION SHALL BE MAINTAINED IN A MANNER TO
RENDER THE SURFACE STABLE AGAINST ACCELERATED EROSION UNTIL PERMANENT GROUND
STABILIZATION IS ACHIEVED.
SITE AREA DESCRIPTION TIMEFRAME VARIATIONS
-7 DAYS FOR PERIMETER DIKES, SWALES,
DITCHES, PERIMETER SLOPES AND HQW ZONES
-10 DAYS FOR FALLS LAKE WATERSHED UNLESS
THERE IS ZERO SLOPE
STABILIZE WITHIN THIS
MANY CALENDAR DAYS
AFTER CEASING LAND
DISTURBANCE
NONE
NONE
(A) PERIMETER DIKES,
SWALES, DITCHES, AND
PERIMETER SLOPES
(B) HIGH QUALITY WATER
(HQW) ZONES
(C) SLOPES STEEPER
THAN 3:1
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE
ALLOWED
(D) SLOPES 3:1 TO 4:1
(E) AREAS WITH SLOPES
FLATTER THAN 4:1 14
-7 DAYS FOR SLOPES GREATER THAN 50' IN
LENGTH AND WITH SLOPES STEEPER THAN 4:1
-7 DAYS FOR PERIMETER DIKES, SWALES,
DITCHES, PERIMETER SLOPES AND HQW ZONES
-10 DAYS FOR FALLS LAKE WATERSHED
STATE OF NORTH CAROLINA NCG01 CONSTRUCTION GENERAL PERMIT REQUIREMENTS
CUI
C O
N T
R A
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
S O
L I C
I T
A T
I O
N
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A W
A R
D
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
S F
T R
A I N
I N
G
R
A N
P R
O V
E M
E N
T S
S O
T F
F O
A
G G
N
O R
R
O L
I N
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
N U
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
X
T K
N I G
H T
T K
N I G
H T
D R
A W
I N
G
C
O D
E
F B
J
M
A N
N I N
G
H
W
I L D
E
F I
M
E
C O
N T
R O
L L
C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
W P
M B
S T
A T
U S
R
T A
CG-101
S E
D I M
E N
T
A
O
S I O
N
C O
N T
R O
L
N
O T
E S
C G d
STATE OF NORTH CAROLINA NCG01 CONSTRUCTION GENERAL PERMIT REQUIREMENTS
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION A: SELF-INSPECTION
SELF-INSPECTIONS ARE REQUIRED DURING NORMAL BUSINESS HOURS IN ACCORDANCE WITH
THE TABLE BELOW. WHEN ADVERSE WEATHER OR SITE CONDITIONS WOULD CAUSE THE
SAFETY OF THE INSPECTION PERSONNEL TO BE IN JEOPARDY, THE INSPECTION MAY BE
DELAYED UNTIL THE NEXT BUSINESS DAY ON WHICH IT IS SAFE TO PERFORM THE INSPECTION.
IN ADDITION, WHEN A STORM EVENT OF EQUAL TO OR GREATER THAN 1.0 INCH OCCURS
OUTSIDE OF NORMAL BUSINESS HOURS, THE SELF-INSPECTION SHALL BE PERFORMED UPON
THE COMMENCEMENT OF THE NEXT BUSINESS DAY. ANY TIME WHEN INSPECTIONS WERE
DELAYED SHALL BE NOTED IN THE INSPECTION RECORD.
NOTE: THE RAIN INSPECTION RESETS THE REQUIRED 7 CALENDAR DAY INSPECTION
REQUIREMENT.
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION B: RECORDKEEPING
1. E&SC PLAN DOCUMENTATION
THE APPROVED E&SC PLAN AS WELL AS ANY APPROVED DEVIATION SHALL BE KEPT ON THE SITE. THE
APPROVED E&SC PLAN MUST BE KEPT UP-TO-DATE THROUGHOUT THE COVERAGE UNDER THIS
PERMIT. THE FOLLOWING ITEMS PERTAINING TO THE E&SC PLAN SHALL BE DOCUMENTED IN THE
MANNER DESCRIBED:
2. ADDITIONAL DOCUMENTATION
IN ADDITION TO THE E&SC PLAN DOCUMENTS ABOVE, THE FOLLOWING ITEMS SHALL BE KEPT ON
THE SITE AND AVAILABLE FOR AGENCY INSPECTORS AT ALL TIMES DURING NORMAL BUSINESS
HOURS, UNLESS THE DIVISION PROVIDES A SITE-SPECIFIC EXEMPTION BASED ON UNIQUE SITE
CONDITIONS THAT MAKE THIS REQUIREMENT NOT PRACTICAL:
(A) THIS GENERAL PERMIT AS WELL AS THE CERTIFICATE OF COVERAGE, AFTER IT IS RECEIVED.
(B) RECORDS OF INSPECTIONS MADE DURING THE PREVIOUS 30 DAYS. THE PERMITTEE SHALL
RECORD THE REQUIRED OBSERVATIONS ON THE INSPECTION RECORD FORM PROVIDED BY THE
DIVISION OR A SIMILAR INSPECTION FORM THAT INCLUDES ALL…
This is the start of the file's text. The full file is on GovTribe.