This document is a Problem Report with Potential Solutions for the Rosaryville State Park Perimeter Trail in Maryland. The report identifies 58 problem areas along the trail that require various types of repairs, including rebench (125 linear feet), special work (6 linear feet), RGD (10 locations), rebuild drain (19 locations), lift/tilt (11 locations), and reroute (775 linear feet). The report provides a detailed list of the locations and types of repairs needed.

The related state and local contract opportunity is for a Fixed Price contract to obtain a source of supply for the Maryland Department of Natural Resources - Maryland Park Service to perform the Rosaryville State Park Perimeter Trail Repairs. The contract will be awarded to the lowest responsive and responsible Bidder, and the State reserves the right to inspect each facility for compliance with the specifications. The contract is for the state of Maryland, specifically the jurisdictions of Prince George's County and Walker Mill CDP.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rosaryville SP - Perimeter Trail Problem Report w/ Potential Solutions report date: 12/27/2002

Index Type Length Note

1.1 rebench 125 Include removing step after root.

1.2 Special Add pavers to two swale crossings, 6 lf each

1.3 rebench 40

1.4 rebench 100 Includes rebuilding turn with constant radius + modest inslope

1.5 RGD

1.6 RGD

1.7 rebuild drain

1.8 rebench 450 Major rebuild with multiple new RGDs

1.9 Lift/Tilt 30

2.1 Lift Tilt 30

2.2 RGD

2.3 rebench 400 Includes improvement in swale crossing (via pavers?)

2.4 reroute 150 Reroute-in-corridor to slacken grade after swale crossing

2.5 Lift/Tilt 75

2.6 rebuild drain

2.7 rebuild drain

2.8 Lift/Tilt 30

2.9 rebench 175 Remove optional line to stream + sidewalk chunk

2.10 RGD

2.11 rebench 700 Major rebuild including reshaping of turns.

2.12 RGD At two locations

2.13 Lift/Tilt 50 Reshape turn to fix chronic wet spot

2.14 rebuild drain

2.15 rebuild drain

2.16 ??? 320 Was L/T, obsoleted by reroute + bridge?

3.1 RGD

3.2 Lift/Tilt 50

3.3 rebuild drain

3.4 RGD

3.5 rebuild drain

3.6 reroute 75 Reroute in-corridor to avoid head cutting issue

3.7 rebench 100 rework turn to make radius consistent + add modest inslope

3.8 rebuild drain

3.9 rebuild drain Three separate areas

3.10 RGD

3.11 Lift/Tilt 350 Lift/Tilt around drainage head to improve sustainability

3.12 rebuild drain

3.13 rebuild drain At two locations

3.14 Lift/Tilt 50 Lift/Tilt to repair chronic wet spot

3.15 Special In ROW, repair headcut; riprap fill + RGD

4.1 RGD At three locations

4.2 RGD At two locations

4.3 reroute 325 Reroute in corridor to better use modest terrain

4.4 Lift/Tilt 500 Lift/Tilt to improve sustainability in flatter area

4.5 rebuild drain

4.6 reroute Explore options for in-corridor improvements

4.7 reroute Explore options for in-corridor improvements

4.8 reroute Explore options for in-corridor improvements

4.9 rebench 200 descent to mansion access road

5.1 reroute Explore options for in-corridor improvements

5.2 Lift/Tilt 50

5.3 rebuild drain

5.4 Lift/Tilt 20 small hole

5.5 rebuild drain

5.6 rebuild drain

5.7 RGD

5.8 rebuild drain

5.9 RGD At three locations

5.10 rebuild drain At two locations

5.11 rebuild drain

5.12 rebuild drain At three locations

5.13 Special New puncheon, 10-feet

5.14 rebench 180

5.15 Lift/Tilt 30

5.16 Lift/Tilt 50

5.17 rebench 30

5.18 Special 50 Pavers on west side of ROW

6.1 Lift/Tilt 50 To repair chronic wet spot

6.2 Special Push back intruding stump

6.3 rebench 300 Include rebuild of turn with constant radius + modest inslope

6.4 RGD At three locations

6.5 rebench 125 Include rebuild of turn with constant radius + modest inslope

6.6 rebench 100 Rework flat turn to improve drainage

6.7 RGD

6.8 Lift/Tilt 60

6.9 RGD

6.10 rebench 125 Rework flat turn to improve drainage

6.11 rebench 300

6.12 Lift/Tilt 100 Lift/Tilt along field edge to improve drainage

6.13 rebench 240

6.14 RGD At three locations

6.15 rebuild drain