RRU Project Cost Proposal Breakdown Template (031826).xls
XLS spreadsheet 34 KB Posted
- Solicitation number
- SRC0000033839
- Issued by
- Etowah County, Alabama
About this file
This is a Cost Proposal Breakdown Template for site remediation projects. The template is designed to capture labor, equipment, disposal, mobilization, and miscellaneous costs associated with remediation work. The proposal structure includes line items for up to eight labor categories and eight equipment categories, each with associated rates and hours, as well as disposal categories for solid waste and tires with quantity and unit of measure fields. Mobilization costs are pre-populated at $1,250.00, and the template includes provisions for materials related to seeding, mulching, and erosion control, other supplies, and engineering services if required. The template calculates subtotals and a final project total, with space for administrative costs to be added before arriving at the project total.
The pricing structure allows bidders to specify individual labor rates and hours for various skill categories and equipment types, enabling detailed cost breakdowns by labor classification and equipment deployment. The template accommodates multiple disposal line items with unit pricing for waste materials. Administrative costs can be added as a separate line item prior to calculating the final project total. This template serves as the standardized format for cost proposals on remediation projects, facilitating consistent evaluation of bids and enabling comparison across multiple proposals based on uniform cost categories and presentation methods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Proposal
| Site Remdiation Cost Proposal | ||||||
| Date: | ||||||
| Project Name: | ||||||
| LABOR | ||||||
| Labor | Rate | Hours | ||||
| 1 | $ - 0 | |||||
| 2 | $ - 0 | |||||
| 3 | $ - 0 | |||||
| 4 | $ - 0 | |||||
| 5 | $ - 0 | |||||
| 6 | $ - 0 | |||||
| 7 | $ - 0 | |||||
| 8 | $ - 0 | |||||
| Total | $ - 0 | |||||
| EQUIPMENT | ||||||
| Equipment | Rate | Hours | ||||
| 1 | $ - 0 | |||||
| 2 | $ - 0 | |||||
| 3 | $ - 0 | |||||
| 4 | $ - 0 | |||||
| 5 | $ - 0 | |||||
| 6 | $ - 0 | |||||
| 7 | $ - 0 | |||||
| 8 | $ - 0 | |||||
| Total | $ - 0 | |||||
| DISPOSAL | ||||||
| Solid Waste/ Tires | Rate | Quantity | UOM | |||
| 1 | $ - 0 | |||||
| 2 | $ - 0 | |||||
| 3 | $ - 0 | |||||
| 4 | $ - 0 | |||||
| Total | $ - 0 | |||||
| MOBILIZATION | ||||||
| Equipment Mobilization | $ 1,250.00 | 1 | 1 | $1,250.00 | ||
| OTHER | ||||||
| Materials - Seeding, Mulching & Erosion Control | ||||||
| Other Supplies | ||||||
| Engineering (if needed) | ||||||
| Total | $0.00 | |||||
| SUB-TOTAL | $ 1,250.00 | |||||
| Administrative Cost | ||||||
| PROJECT TOTAL | $ 1,250.00 |