RQ145269\SOW RQ145269 40 METAL PANELS PURCHASE FOR J LINE STATIONS .pdf
PDF 106 KB Posted
- Solicitation number
- RQ145269
- Issued by
- California
About this file
This Statement of Work (SOW RQ145269) is issued by Los Angeles Metropolitan Transportation Authority (LA Metro) for the procurement of forty (40) stainless steel metal panels to support wayfinding information and durable station equipment at multiple stations along the J Line Transitway. The metal panels will be fabricated to match existing column designs, with sizes ranging from 19.75" x 89.75" to 19.75" x 104.75", manufactured using hi-def plasma, waterjet, flatbed laser, or tube laser cutting methods. All panels must include a lifetime structural warranty and meet specified tolerances of 0.063 inches. Delivery must be completed in one shipment no later than four weeks after contract execution to LA Metro Headquarters in Los Angeles, California, between 8:00 AM and 4:00 PM, Monday through Friday. Quotes must be submitted via email to ortizdelgadoj@metro.net no later than 4:00 PM PDT on September 2, 2026, with a minimum 30-day quote validity period. Installation will be performed by Metro staff using manufacturer-provided instructions.
Award selection will be based on best value to Metro, considering price, tax, freight, lead time, and past performance. All costs including taxes, delivery charges, freight, tariffs, and applicable fees must be included in the submitted quote, or the quote will be deemed non-responsive. Questions or requests for approved equals must be submitted at least three business days prior to the solicitation close date. This solicitation is open to all vendors, with no specific set-asides or incumbent restrictions noted.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
RQ145269
40 METAL PANELS PURCHASE FOR J LINE STATIONS
1.0 Project Overview
Metro is looking to acquire new metal for several stations along the J Line Transitway to improve patron wayfinding information and durable station equipment.
2.0 Parts Requirements
Metro has existing metal columns at multiple stations and is seeking to match the design of the current columns to install J Line wayfinding information. Metro needs forty
(40) metal panels. All panels shall have a lifetime structural warranty.
All structural steel shall be fabricated through hi-def plasma, waterjet, flatbed laser, or tube laser cutting. Manufacturer should be able to fabricate metal panels in different sizes ranging from 19.75” x 104.75” (maximum) to 19.75” x 89.75” with standard sheer cutting capabilities. Tolerance for metal cutting should be 0.063. All fabrication of units shall be completed at the manufacturer’s facility prior to delivery to Metro. Below are the sizes panels and quantity.
Measurements Qty.
19.75” x 100.75” 4 pieces
19.75” x 104.75” 4 pieces
19.75” x 89.75” 4 pieces
19.75” x 93.75” 8 pieces
19.75” x 94.75” 8 pieces
19.75” x 95.75” 4 pieces
19.75” x 96.75” 4 pieces
19.75” x 97.75” 4 pieces
Total Qty. 40
The following specifications are required:
Type: Sheet & Plate
Metal: Stainless
Alloy: 304
Thickness: 16 ga
Length: 120"
Weight of Each Panel: 100.80
Width: 48"
Finish: 4
3.0 Delivery
Units are to be delivered to Metro’s Headquarters at the following address:
LA Metro Headquarters Attn: Blanca Buenrostro (7th Floor) 1 Gateway Plaza, Los Angeles, CA 90012 Phone No. (213)922-2969
Delivery is to be scheduled between the hours of 8:00AM – 4:00PM, Monday through Friday. Delivery is expected to occur in one shipment no later than 4 weeks after the signed purchase order/Contract.
All Taxes, Delivery charges, Freight, Tariffs, and any applicable Fees shall be included in the quote, or the quote will be deemed non-responsive. Quotes must be valid for a minimum of 30 days.
4.0 Installation
Installation of the metal panels will be completed by Metro staff. The manufacturer will only provide installation instructions and requirements.
File details come from the government source that posted it. Updated .