This is a Statement of Work (SOW) for the JSU RPMS Replacement project, submitted by ConvergeOne for the Indian Health Service's Jicarilla Service Unit.
The project scope encompasses procurement, installation, configuration, and three-year support of an IBM Power S1014 server environment to replace an end-of-life RPMS server supporting critical healthcare operations. Hardware deliverables include the IBM Power S1014 Server (Power10, 8-core processor), 64GB DDR5 memory, NVMe and SSD storage, LTO-8 tape backup solution, Hardware Management Console (HMC), 10GbE and 1GbE networking adapters, and associated power and cabling components. Software installation and configuration includes IBM AIX 7.3 (Base + Expansion Pack), IBM PowerVM V4 with virtualization capabilities, NovaLink integration, system firmware, and US English/TAA compliance configurations. Support services comprise 3-Year Advanced Expert Care with 24x7 same-day onsite response (6-hour call, 4-hour parts delivery) for hardware and 3-Year Software Maintenance Agreements with 24x7 support for AIX and PowerVM. ConvergeOne is responsible for hardware procurement, delivery coordination, installation, configuration, system integration, validation, documentation, and knowledge transfer. The customer (Jicarilla Service Unit) is responsible for providing rack space, power, network connectivity, data center readiness, facility access, and participation in validation and acceptance testing. The SOW requires all Information and Communication Technology deliverables to comply with Revised Section 508 Standards (36 CFR Part 1194) and WCAG 2.1 Level AA standards, with conformance documentation provided via VPAT 2.5 template or HHS Section 508 Accessibility Checklists, and mandates that applicable HHSAR clauses 352.239-73 and 352.239-74 be included in the resulting contract.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Project Title JSU RPMS Replacement
1. Purpose This Statement of Work (SOW) defines the scope, deliverables, responsibilities, and timeline for the procurement, installation, configuration, and support of an IBM Power S1014 server environment, associated storage, software, and Hardware Management Console (HMC) for the Jicarilla Service Unit.
The Indian Health Service (IHS), Jicarilla Service Unit, requires replacement of an end-of-life (EOL) RPMS server currently supporting critical healthcare operations. The existing system is no longer supported and does not meet current security and reliability standards.
Acquisition of a modern, supported IBM Power Systems server is required to maintain continuity of RPMS services, ensure compliance with federal security requirements, and improve system performance and resiliency.
2. Scope of Work
2.1 Hardware Implementation
ConvergeOne will provide and coordinate delivery, installation, and validation of the following hardware components:
• IBM Power S1014 Server (Power10, 8-core processor)
• 64GB DDR5 Memory
• NVMe and SSD storage configuration
• Tape backup solution (LTO-8 tape drive and media)
• Multi-media storage enclosure
• Hardware Management Console (HMC)
• Networking components (10GbE and 1GbE adapters)
• Power supplies, cabling, and rack integration components
2.2 Software Installation & Configuration
Installation and configuration of:
• IBM AIX 7.3 (Base + Expansion Pack)
• IBM PowerVM V4 (including VIOS and virtualization capabilities)
• NovaLink integration
• System firmware and preload configurations
• Language and compliance configurations (US English, TAA)
3. Deliverables
• Fully installed and operational IBM Power S1014 system
• Configured AIX 7.3 environment
• Functional PowerVM virtualization platform
• Operational HMC system
• Configured backup solution
• System documentation (configuration summary)
• Knowledge transfer session
4. Support & Maintenance
The following support services are included:
4.1 Hardware Support
• 3-Year Advanced Expert Care
• 24x7 Same Day Onsite Response (6hr Call / 4hr Parts Delivery)
4.2 Software Support
• 3-Year Software Maintenance Agreements (SWMA)
• 24x7 support for AIX and PowerVM
5. Roles & Responsibilities
5.1 ConvergeOne Responsibilities
• Hardware procurement and delivery coordination
• Installation and configuration of all systems
• System integration and validation
• Provide documentation and knowledge transfer
• Coordinate support activation
5.2 Customer Responsibilities
• Provide rack space, power, and network connectivity
• Ensure data center readiness
• Provide access to facilities and personnel
• Participate in validation and acceptance testing
6. Section 508 and Accessibility
• This product must conform to the Revised Section 508 (https://www.access-board.gov/guidelines-and-standards/communications-and-it/about-the-ict-refresh/final-rule/text-of-the-standards-and-guidelines) and WCAG 2.1 Level AA standards as outlined below.
• Solicitations for supplies and services shall require the submission of a Section 508 Product Assessment Template. The template can be found at https://www.itic.org/policy/accessibility/vpat.
All Information and Communication Technology (ICT) deliverables under this contract (e.g., websites, applications, electronic documents, and multimedia) must comply with the Revised Section 508 Standards (36 CFR Part 1194) and the Web Content Accessibility Guidelines (WCAG) 2.1 Level AA standards. The Contractor shall ensure accessibility of all ICT deliverables and provide conformance documentation in the form of a Voluntary Product Accessibility Template (VPAT®) / Accessibility Conformance Report (ACR), or by completing the HHS Section 508 Accessibility Checklists. The current VPAT 2.5 template includes fields for reporting conformance to WCAG 2.1 and shall be used to document accessibility. The Contractor shall remediate any identified accessibility issues at no additional cost. The Contracting Officer will include the applicable Health and Human Services Acquisition Regulation (HHSAR) clauses 352.239-73 and 352.239-74 in the solicitation and resulting contract.
https://urldefense.us/v3/__https:/www.access-board.gov/guidelines-and-standards/communications-and-it/about-the-ict-refresh/final-rule/text-of-the-standards-and-guidelines__;!!Og_tST9LxTiQE1I!vedKLLB5_q-JnK_FWuxIHjnfvu3bigv6MkrYklx75ENWFof8NoauH6JFLD1wOKGX-P6kI-KyTMAxuVtJTY90E0t0pOA0ev6N0g$ https://urldefense.us/v3/__https:/www.access-board.gov/guidelines-and-standards/communications-and-it/about-the-ict-refresh/final-rule/text-of-the-standards-and-guidelines__;!!Og_tST9LxTiQE1I!vedKLLB5_q-JnK_FWuxIHjnfvu3bigv6MkrYklx75ENWFof8NoauH6JFLD1wOKGX-P6kI-KyTMAxuVtJTY90E0t0pOA0ev6N0g$ https://urldefense.us/v3/__https:/www.access-board.gov/guidelines-and-standards/communications-and-it/about-the-ict-refresh/final-rule/text-of-the-standards-and-guidelines__;!!Og_tST9LxTiQE1I!vedKLLB5_q-JnK_FWuxIHjnfvu3bigv6MkrYklx75ENWFof8NoauH6JFLD1wOKGX-P6kI-KyTMAxuVtJTY90E0t0pOA0ev6N0g$ https://urldefense.us/v3/__https:/www.itic.org/policy/accessibility/vpat__;!!Og_tST9LxTiQE1I!vedKLLB5_q-JnK_FWuxIHjnfvu3bigv6MkrYklx75ENWFof8NoauH6JFLD1wOKGX-P6kI-KyTMAxuVtJTY90E0t0pOAoG-BB7w$ https://www.w3.org/TR/WCAG21/ https://www.w3.org/TR/WCAG21/ https://www.itic.org/policy/accessibility/vpat https://www.itic.org/policy/accessibility/vpat https://www.hhs.gov/web/section-508/accessibility-checklists/index.html https://www.hhs.gov/web/section-508/accessibility-checklists/index.html https://www.acquisition.gov/hhsar/part-352-solicitation-provisions-and-contract-clauses#Section_352_239_73_T48_4018362938 https://www.acquisition.gov/hhsar/part-352-solicitation-provisions-and-contract-clauses#Section_352_239_73_T48_4018362938