rpedpreappwebinarslidesfinal.pdf
PDF 1 MB Posted
- Opportunity number
- ED-GRANTS-110521-003
- Issued by
-
Department of Education
About this file
FY 2021 RPED Preapplication Technical Assistance Webinar Slides
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY 2021 RURAL POSTSECONDARY & ECONOMIC
DEVELOPMENT PROGRAM
PRE- APPLICATION WEBINAR
BEATRIZ CEJA – WILLIAMS, SENIOR DIRECTOR, INSTITUTIONAL SERVICE (IS)
KURRINN ABRAMS, PROGRAM CO-LEAD & COMPETITION MANAGER
EVERARDO GIL, PROGRAM CO-LEAD & COMPETITION MANAGER
NOVEMBER 17, 2021
AGENDA
WELCOME
PROGRAM PURPOSE
PROGRAM AUTHORITY & APPLICABLE REGULATIONS
FY 2021 COMPETITION AT A GLANCE
ELIGIBILITY & IMPORTANT INFORMATION/DATES
PRIORITIES
SELECTION CRITERIA
UNDERSTANDING INDIRECT COST
PERFORMANCE MEASURES
THE LOGIC MODEL
PLANNING YOUR GRANT APPLICATION
APPLICATION SUBMISSION AND REVIEW
QUESTIONS FROM THE FIELD
NOTE: THE FEDERAL REGISTER IS THE OFFICIAL APPLICATION
SUBMISSION GUIDE. THIS WEBINAR PROVIDES TECHNICAL
ASSISTANCE ONLY.
PROGRAM PURPOSE
• TITLE VII, PART B, CFDA 84.116W
• THE PURPOSE OF THE RPED GRANT PROGRAM IS TO IMPROVE RATES OF
POSTSECONDARY ENROLLMENT, PERSISTENCE, AND COMPLETION AMONG
RURAL STUDENTS THROUGH DEVELOPMENT OF CAREER PATHWAYS
ALIGNED TO HIGH-SKILL, HIGH-WAGE, AND IN-DEMAND INDUSTRY SECTORS
AND OCCUPATIONS IN THE REGION.
PROGRAM AUTHORITY
• 20 U.S.C. 1138-1138D
• DEPARTMENTS OF LABOR, HEALTH AND HUMAN SERVICES, AND EDUCATION AND
RELATED AGENCIES APPROPRIATIONS ACT, 2021, H.R. 7614, 116TH CONGRESS (2020)
• THE EXPLANATORY STATEMENT ACCOMPANYING H.R. 133 (PUB. L. 116-260).
APPLICABLE REGULATIONS
• THE EDUCATION DEPARTMENT GENERAL ADMINISTRATIVE REGULATIONS IN 34 CFR PARTS 75, 77, 79, 82, 84, 86, 97, 98, AND 99.
• THE OFFICE OF MANAGEMENT AND BUDGET GUIDELINES TO AGENCIES ON GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) IN 2 CFR PART 180, AS ADOPTED AND AMENDED AS REGULATIONS
OF THE DEPARTMENT IN 2 CFR PART 3485.
• THE UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS IN 2 CFR PART 200, AS ADOPTED AND AMENDED AS REGULATIONS OF THE DEPARTMENT
IN 2 CFR PART 3474.
FY 2021 COMPETITION AT A GLANCE
• APPLICATION AVAILABLE: NOVEMBER 5, 2021*
• APPLICATION DEADLINE: DECEMBER 13, 2021*
• ESTIMATED AVAILABLE FUNDS: $9,900,000
• ESTIMATED RANGE OF AWARDS: $1,100,000 TO
$1,237,500 (FOR 3 YEARS)**
• ESTIMATED AVERAGE SIZE OF AWARDS: $1,200,000**
• PROJECT PERIOD: 36 MONTHS
• ESTIMATED NUMBER OF AWARDS: 8
• PRIORITIES
• 1 ABSOLUTE PRIORITY
• 2 COMPETITIVE PREFERENCE PRIORITIES
• RESTRICTED INDIRECT COST RATE 8%
• DO NOT EXCEED MAXIMUM AWARD AMOUNT
*NOTE: A CORRECTED NIA WILL BE PUBLISHED IN THE FEDERAL
REGISTER NOVEMBER 19, 2021, TO EXPAND ELIGIBILITY AND
DELAY THE DUE DATE FROM DEC. 6 TO DEC. 13, 2021
** ALL AWARDEE FUNDS WILL BE FRONTLOADED.
ELIGIBILITY
• FOR THE FY 2021 GRANT COMPETITION IN ACCORDANCE WITH
SECTION 437(D)(1) OF GEPA, THE FOLLOWING ARE ELIGIBLE
APPLICANTS: PUBLIC AND PRIVATE NONPROFIT INSTITUTIONS OF
HIGHER EDUCATION (IHES), AS DEFINED IN SECTION 101 OF THE
HEA, WITH ENROLLMENT OF AT LEAST 30 PERCENT OF STUDENTS
WHO ATTENDED HIGH SCHOOLS LOCATED IN RURAL AREAS* AND
PUBLIC AND PRIVATE NON-PROFIT ORGANIZATIONS AND
AGENCIES THAT PARTNER WITH IHES**.
• *RURAL AREA MEANS AN AREA THAT IS CHARACTERIZED BY
LOCALE CODE 41, 42, OR 43. PLEASE REFER TO THE NCES LOCALE
LOOKUP MAP:
HTTPS://NCES.ED.GOV/PROGRAMS/MAPED/LOCALELOOKUP/.
• **NOTE: A CORRECTED NIA WILL BE PUBLISHED IN THE FEDERAL
REGISTER NOVEMBER 19, 2021, TO EXPAND ELIGIBILITY AND DELAY
THE DUE DATE FROM DEC. 6 TO DEC. 13, 2021
https://nces.ed.gov/programs/maped/LocaleLookup/
IMPORTANT
INFO
• DEADLINE TO APPLY: DECEMBER 13, 2021, AT 11:59:59 PM ET
• THE SYSTEM TO APPLY WILL BE DOWN FROM 12:00AM ET ON
THURSDAY, DECEMBER 9, 2021, TO 6:00AM ET ON MONDAY,
DECEMBER 13, 2021.
• HOW TO APPLY: GRANTS.GOV
• SEARCH FOR CFDA 84.116W
• PAGE LIMIT OF 50 PAGES MAXIMUM
• PEER REVIEW: DECEMBER 15TH – DECEMBER 22ND
• AWARDS WILL BE MADE BY DECEMBER 31, 2021, FOR A
PERFORMANCE START DATE OF JANUARY 1, 2022.
ABSOLUTE PRIORITY (REQUIRED)
ABSOLUTELY PRIORITY: PROJECTS THAT INCREASE POSTSECONDARY ACCESS, AFFORDABILITY, SUCCESS, AND COMPLETION
FOR RURAL STUDENTS (REQUIRED)
PROJECTS THAT WILL SERVE RURAL STUDENTS BY—
• (A) INCREASING THE NUMBER AND PROPORTION OF RURAL STUDENTS WHO ENROLL IN AND COMPLETE POSTSECONDARY EDUCATION PROGRAMS THROUGH ACTIVITIES AND STRATEGIES RELATED TO COLLEGE PREPARATION, OUTREACH IN RURAL COMMUNITIES, AWARENESS OF POSTSECONDARY OPTIONS, RECRUITMENT OF STUDENTS FROM RURAL COMMUNITIES, SUPPORT THROUGHOUT THE COLLEGE APPLICATION AND SELECTION PROCESS, AND LONG-TERM COLLEGE AND CAREER ADVISING RELATIONSHIPS WITH MIDDLE AND HIGH SCHOOL STUDENTS TO SUPPORT THEM THROUGH THEIR TRANSITION TO POSTSECONDARY
EDUCATION;
ABSOLUTELY PRIORITY: PROJECTS THAT INCREASE POSTSECONDARY ACCESS, AFFORDABILITY, SUCCESS, AND COMPLETION
FOR RURAL STUDENTS (REQUIRED)
PROJECTS THAT WILL SERVE RURAL STUDENTS BY—
• (B) SUPPORTING THE DEVELOPMENT AND IMPLEMENTATION OF COMPREHENSIVE STUDENT SUCCESS PROGRAMS THAT INTEGRATE MULTIPLE SERVICES OR INITIATIVES ACROSS ACADEMIC AND STUDENT AFFAIRS, SUCH AS ACADEMIC ADVISING, STRUCTURED/GUIDED PATHWAYS, CAREER SERVICES, STUDENT FINANCIAL AID, TRANSFER SUPPORT FROM TWO- TO FOUR-YEAR
PROGRAMS, AND OTHER WRAP AROUND SERVICES;
• (C) SUPPORTING THE DEVELOPMENT AND IMPLEMENTATION OF HIGH-QUALITY AND ACCESSIBLE LEARNING OPPORTUNITIES FOR RURAL STUDENTS THAT CATER TO THEIR UNIQUE NEEDS AND GEOGRAPHIC DISTANCE FROM POSTSECONDARY EDUCATION INSTITUTIONS, AND ALIGN WITH CAREER PATHWAYS TO HIGH-NEED OCCUPATIONS, INCLUDING LEARNING OPPORTUNITIES THAT ARE
ACCELERATED; HYBRID ONLINE; WORK-BASED; OR FLEXIBLE FOR WORKING STUDENTS;
ABSOLUTELY PRIORITY: PROJECTS THAT INCREASE POSTSECONDARY ACCESS, AFFORDABILITY, SUCCESS, AND COMPLETION
FOR RURAL STUDENTS (REQUIRED)
PROJECTS THAT WILL SERVE RURAL STUDENTS BY—
• (D) SUPPORTING THE DEVELOPMENT OR IMPLEMENTATION OF EVIDENCE-BASED STRATEGIES TO PROMOTE RURAL STUDENTS’ DEVELOPMENT OF THE KNOWLEDGE AND SKILLS NECESSARY FOR SUCCESS IN THE WORKFORCE AND IN HIGH-NEED OCCUPATIONS, INCLUDING CAREER TRAINING THAT LEADS TO GOOD JOBS IN FIELDS RELEVANT TO THE REGIONAL ECONOMY, AND TO RAISE AWARENESS OF, AND ACCESS TO, PAID INTERNSHIP, FELLOWSHIP, APPRENTICESHIP, AND JOB OPPORTUNITIES; AND
• (E) IMPLEMENTING A SUSTAINABILITY PLAN TO MAINTAIN PROGRAMS AND SERVICES AFTER COMPLETION OF THE GRANT.
COMPETITIVE PREFERENCE PRIORITY (UP TO 5 POINTS)
COMPETITIVE PREFERENCE PRIORITY 1--SUPPORTING ACCESS TO TECHNOLOGY.
PROJECTS THAT ARE DESIGNED TO PROMOTE EDUCATIONAL EQUITY AND ADEQUACY IN RESOURCES
AND OPPORTUNITY FOR RURAL STUDENTS THROUGH STUDENT-CENTERED LEARNING MODELS THAT
PROVIDE ACCESS TO TECHNOLOGY AND LEVERAGE TECHNOLOGY TO ADDRESS LEARNER VARIABILITY
(E.G., UNIVERSAL DESIGN FOR LEARNING, COMPETENCY-BASED EDUCATION, PROJECT-BASED
LEARNING, OR HYBRID/BLENDED LEARNING) AND PROVIDE HIGH-QUALITY LEARNING CONTENT,
APPLICATIONS, OR TOOLS.
COMPETITIVE PREFERENCE PRIORITY (UP TO 5 POINTS)
COMPETITIVE PREFERENCE PRIORITY 2--STRENGTHENING CROSS-AGENCY COORDINATION AND
COMMUNITY ENGAGEMENT TO ADVANCE SYSTEMIC CHANGE.
PROJECTS THAT ARE DESIGNED TO TAKE A SYSTEMIC APPROACH TO IMPROVING OUTCOMES FOR RURAL STUDENTS THROUGH THE DEVELOPMENT OF CAREER PATHWAYS ALIGNED TO HIGH-SKILL, HIGH-WAGE
OR IN-DEMAND INDUSTRY SECTORS AND OCCUPATIONS IN THE REGION IN PARTNERSHIP WITH
REGIONAL ECONOMIC DEVELOPMENT ENTITIES, WORKFORCE AGENCIES, REGIONAL EMPLOYERS, OR
OTHER RELEVANT NONPROFIT ORGANIZATIONS.
SELECTION
CRITERIA
Selection Criteria Maximum Points
Quality of the Project Design 35
Quality of the Management Plan 35
Adequacy of Resources 10
Quality of Project Evaluation 20
Total Maximum Score for Selection Criteria
Competitive Preference Priority #1 5
Competitive Preference Priority #2 5
Total Possible Score Per Application 110
Quality of the Project Design (maximum 35 points)
The Secretary considers the quality of the design of the proposed project. In determining the quality of the design of the proposed project, the Secretary considers the following factors:
• (i) The extent to which the goals, objectives, and outcomes to be achieved by the proposed project are clearly specified and measurable.
(Up to 10 points)
• (ii) The extent to which the design of the proposed project is appropriate to, and will successfully address, the needs of the target population or other identified needs. (Up to 10 points)
• (iii) The extent to which the design of the proposed project includes a thorough, high-quality review of the relevant literature, a high-quality plan for project implementation, and the use of appropriate methodological tools to ensure successful achievement of project objectives. (Up to 5 points)
• (iv) The extent to which the proposed project demonstrates a rationale (as defined in this notice). (Up to 5 points)
• (v) The extent to which the proposed project is designed to build capacity and yield results that will extend beyond the period of Federal financial assistance. (Up to 3 points)
• (vi) The extent to which the services to be provided by the proposed project involve the collaboration of appropriate partners for maximizing the effectiveness of project services. (Up to 2 points)
QUESTIONS TO
CONSIDER-
PROJECT
DESIGN
• DOES THE APPLICATION IDENTIFY CLEAR GOALS,
OBJECTIVES, AND OUTCOMES TO BE ACHIEVED BY THE
PROJECT?
• HOW DO THE ISSUES, NEEDS, AND PROPOSED ACTIVITIES
RELATE TO THE PURPOSE OF THE PROGRAM AND THE
TARGETED POPULATION?
• DOES THE APPLICATION PROVIDE A THOROUGH, HIGH-
QUALITY REVIEW OF LITERATURE THAT IS RELEVANT AND
CONNECTS TO THE PROJECT?
• WHAT ARE THE COMPONENTS OF THE HIGH-QUALITY PLAN
FOR PROJECT IMPLEMENTATION?
• DOES THE APPLICATION PROVIDE APPROPRIATE
METHODOLOGICAL TOOLS TO ENSURE THE SUCCESS OF THE
PROJECT?
• HOW WOULD THE PROJECT BE PRESENTED USING A LOGIC
MODEL?
Quality of the Management Plan (maximum 35 points)
The Secretary considers the quality of the management plan for the proposed project. In determining the quality of the management plan, the Secretary considers the following factors:
• (i) The adequacy of the management plan to achieve the objectives of the proposed project on time and within budget, including clearly defined responsibilities, timelines, and milestones for accomplishing project tasks. (Up to 10 points)
• (ii) The extent to which the costs are reasonable in relation to the number of persons to be served and to the anticipated results and benefits. (Up to 5 points)
• (iii) The adequacy of mechanisms for ensuring high-quality products and services from the proposed project. (Up to 5 points)
• (iv) The adequacy of procedures for ensuring feedback and continuous improvement in the operation of the proposed project. (Up to 5 points)
• (v) The extent to which the time commitments of the project director and principal investigator and other key project personnel are appropriate and adequate to meet the objectives of the proposed project. (Up to 10 points)
CONSIDER –
MANAGEMENT
PLAN
• HOW WILL THE PROPOSED PROJECT BE MANAGED AND WHO WILL
MANAGE THE VARIOUS COMPONENTS?
• DOES THE MANAGEMENT PLAN INCLUDE CLEARLY DEFINED
RESPONSIBILITIES, TIMELINES, AND MILESTONES FOR
ACCOMPLISHING THE PROJECT?
• HOW WILL YOU ENSURE THAT THE PROJECT IS ON SCHEDULE TO
MEET THE IDENTIFIED GOALS AND OBJECTIVES OF THE PROJECT?
• HOW WILL YOU DETERMINE THAT THE COSTS WERE REASONABLE
IN RELATION TO THE NUMBER OF STUDENTS TO BE SERVED AND
THE ANTICIPATED RESULTS AND BENEFITS?
• HOW WILL YOU ENSURE THAT THE PROJECT PRODUCES HIGH-
QUALITY PRODUCTS AND SERVICES?
• HOW WILL YOU ENSURE FEEDBACK AND CONTINUOUS
IMPROVEMENT IN THE OPERATION OF THE PROJECT?
• HAVE SUFFICIENT STAFF AND TIME BEEN COMMITTED TO ENSURE
THAT THE IDENTIFIED GOALS AND OBJECTIVES ARE MET?
Adequacy of Resources (maximum 10 points)
The Secretary considers the adequacy of resources for the proposed project. In determining the adequacy of resources for the proposed project, the Secretary considers the following factors:
• (i) The adequacy of support, including facilities, equipment, supplies, and other resources, from the applicant organization or the lead applicant organization. (Up to 5 points)
• (ii) The relevance and demonstrated commitment of each partner in the proposed project to the implementation and success of the project. (Up to 5 points)
ADEQUACY OF
RESOURCES
• HOW WILL YOU LEVERAGE SUPPORT FROM
OTHER CAMPUS RESOURCES TO ENHANCE THE
PROJECT?
• HOW DOES YOUR APPLICATION ARTICULATE BUY-
IN AND SUPPORT FROM STAKEHOLDERS AND ALL
OTHERS INVOLVED IN THE PROJECT?
• HOW DOES YOUR APPLICATION SPEAK TO HOW
THE PROJECT PARTNERS WILL SUPPORT THE
PROJECT BEYOND THE LIFE OF THE GRANT?
Quality of the Project Evaluation (maximum 20 points)
The Secretary considers the quality of the evaluation to be conducted of the proposed project. In determining the quality of the evaluation, the Secretary considers:
• (i) The extent to which the methods of evaluation are thorough, feasible, and appropriate to the goals, objectives, and outcomes of the proposed project. (Up to 10 points)
• (ii) The extent to which the methods of evaluation provide for examining the effectiveness of project implementation strategies. (Up to 10 points)
PROJECT
EVALUATION
• ARE THERE DATA COLLECTION TOOLS THAT WILL BE USED
TO DETERMINE WHETHER THE PROJECT IS SUCCESSFUL?
• ARE THE METRICS THAT WILL BE USED TO MEASURE
PROGRESS IDENTIFIED?
• HOW WILL YOU DETERMINE THAT THE METHODS OF
EVALUATION ARE THOROUGH, FEASIBLE, AND
APPROPRIATE TO THE GOALS, OBJECTIVES, AND
OUTCOMES OF THE PROJECT?
• ARE LONG- AND SHORT-TERM OBJECTIVES CLEAR AND
MEASURABLE?
• DOES THE APPLICATION INCLUDE METHODS OF
EVALUATION FOR EXAMINING THE EFFECTIVENESS OF THE
PROJECT?
UNDERSTANDING
INDIRECT COST
INDIRECT COST
APPLICABLE INDIRECT COST RATE TYPE
• RESTRICTED INDIRECT COST RATE
• FOR THE FY 2021 GRANT COMPETITION AND ANY
SUBSEQUENT YEAR IN WHICH WE MAKE
AWARDS FROM THE LIST OF UNFUNDED
APPLICATIONS FROM THIS COMPETITION, A
GRANTEE’S INDIRECT COST REIMBURSEMENT IS
LIMITED TO EIGHT PERCENT (8%) OF A MODIFIED
TOTAL DIRECT COST BASE.
• FOR MORE INFORMATION REGARDING INDIRECT
COSTS, PLEASE SEE
WWW2.ED.GOV/ABOUT/OFFICES/LIST/OCFO/INT
RO.HTML.
Cognizant Agencies for Indirect Cost Institutions of Higher Education
Department of Health and Human Services
(DHHS)
(https://rates.psc.gov/) or
Office of Naval Research (ONR)
(https://www.onr.navy.mil/en/work-with-us/manage-your-award/manage-grant-award)
REGULATION
• UNIFORM GUIDANCE
• 2 CFR 200 SUBPART E
DEPARTMENTAL REGULATIONS
• EDUCATION DEPARTMENT GENERAL
ADMINISTRATIVE REGULATIONS
• 34CFR 75.560 - 75.580
• 34 CFR 76.560 - 76.580
GUIDANCE
• UNIFORM GUIDANCE FREQUENTLY ASKED
QUESTIONS UPDATED
(HTTPS://WWW.CFO.GOV/ASSETS/FILES/2CRFFREQUE
NTLYASKEDQUESTIONS_2021050321.PDF)
PERFORMANCE
MEASURES
THE PERFORMANCE INDICATORS FOR THE RURAL POSTSECONDARY &
ECONOMIC DEVELOPMENT PROGRAM ARE:
1. THE NUMBER OF RURAL STUDENTS SERVED BY DIRECT STUDENT
SERVICES SUPPORTED BY THE GRANT.
2. THE CHANGE IN THE ANNUAL ENROLLMENT RATE AT GRANTEE AND
PARTNER INSTITUTIONS OF RURAL STUDENTS WHO ARE SERVED BY
DIRECT STUDENT SERVICES SUPPORTED BY THE GRANT FROM ONE
YEAR TO THE NEXT.
3. THE NUMBER OF RURAL STUDENTS SERVED BY DIRECT STUDENT
SERVICES SUPPORTED BY THE GRANT THAT TRANSFER TO A FOUR-YEAR
INSTITUTION OR OBTAIN A DEGREE OR CERTIFICATE OF COMPLETION.
4. THE NUMBER OF RURAL STUDENTS SERVED BY THE PROGRAM WHO
OBTAIN A PAID INTERNSHIP, APPRENTICESHIP, OR EMPLOYMENT.
THE LOGIC MODEL
COMPONENTS OF A PROGRAM LOGIC MODEL
RESOURCES: MATERIALS TO IMPLEMENT THE PROGRAM
ACTIVITIES: STEPS FOR PROGRAM IMPLEMENTATION
OUTPUTS: PRODUCTS OF THE PROGRAM
IMPACTS ON OUTCOMES: CHANGES IN PROGRAM
PARTICIPANTS’ KNOWLEDGE, BELIEFS, OR BEHAVIOR
SAMPLE LOGIC MODEL
REGIONAL
EDUCATIONAL
LABORATORY
(REL)
RESOURCES
ON LOGIC
MODELS
• LOGIC MODELS: A TOOL FOR EFFECTIVE PROGRAM PLANNING,
COLLABORATION, AND MONITORING
HTTPS://IES.ED.GOV/NCEE/EDLABS/PROJECTS/PROJECT.ASP?PROJECTID=409
• LOGIC MODELS: A TOOL FOR DESIGNING AND MONITORING PROGRAM
EVALUATIONS
HTTPS://IES.ED.GOV/NCEE/EDLABS/PROJECTS/PROJECT.ASP?PROJECTID=404
• LOGIC MODELS FOR PROGRAM DESIGN, IMPLEMENTATION, AND EVALUATION:
WORKSHOP TOOLKIT
HTTPS://IES.ED.GOV/NCEE/EDLABS/PROJECTS/PROJECT.ASP?PROJECTID=401
• EDUCATION LOGIC MODEL APPLICATION FOR CREATING LOGIC MODELS:
HTTPS://IES.ED.GOV/NCEE/EDLABS/REGIONS/PACIFIC/ELM.ASP
https://ies.ed.gov/ncee/edlabs/projects/project.asp?projectID=409 https://ies.ed.gov/ncee/edlabs/projects/project.asp?ProjectID=404 https://ies.ed.gov/ncee/edlabs/projects/project.asp?ProjectID=401 https://ies.ed.gov/ncee/edlabs/regions/pacific/elm.asp
PLANNING
YOUR GRANT
APPLICATION
• IDENTIFY GOALS FOR YOUR PROPOSED PROJECT,
ESPECIALLY HOW THEY WILL FOCUS ON STUDENT
ACADEMIC AND CAREER SUCCESS.
• ANALYZE EVERY PROPOSED ACTIVITY TO ENSURE THAT
IT IS ATTAINABLE, MEANINGFUL, AND MEASURABLE.
• CHOOSE METRICS AND EVALUATION METHODS THAT
WILL PRODUCE EVIDENCE ABOUT THE PROJECT’S
EFFECTIVENESS.
• USE THE IDENTIFIED PERFORMANCE MEASURES TO
BUILD YOUR PROJECT ASSESSMENTS.
APPLICATION
• USE ANALYSIS AND EVALUATION TO IDENTIFY
INSTITUTIONAL CHALLENGES OR ISSUES.
• FOCUS ON THE MOST WELL ANALYZED
CHALLENGES OR ISSUES THAT CONFRONT YOUR
INSTITUTION.
• CONSIDER ADDRESSING CHALLENGES OR ISSUES
THAT YOUR INSTITUTION WILL HAVE TO RESOLVE
REGARDLESS OF FUNDING.
• DEDICATE ADEQUATE RESOURCES AND TIME TO
DEVELOP YOUR FUNDING APPLICATION.
APPLICATION
• BE REALISTIC AND STRAIGHTFORWARD ABOUT
EVERY ASPECT OF YOUR PROJECT DESIGN.
• DESIGN ACTIVITIES AND SERVICES THAT ARE
MANAGEABLE AND DIRECTLY ADDRESS YOUR
IDENTIFIED CHALLENGES AND ISSUES.
• KNOW YOUR BUDGET AND ENSURE THAT ALL
COSTS ARE ALLOWABLE, ALLOCABLE, AND
REASONABLE.
• FORECAST AND CREATE AN IMPLEMENTATION
AND MANAGEMENT PLAN THAT IS REALISTIC.
LOGISTICAL ADVICE
• MAKE SURE YOU ARE PROPERLY REGISTERED IN THE GRANTS.GOV SYSTEM: HTTPS://WWW.GRANTS.GOV/, YOUR AOR PROFILE IS CURRENT, AND YOU ARE APPLYING TO THE CORRECT GRANT OPPORTUNITY NUMBER.
• ENSURE THAT YOUR IHE’S DUNS NUMBER IS UP-TO-DATE AND ACTIVE IN SAM HTTPS://WWW.SAM.GOV/SAM/.
• BE AWARE THAT THE DUNS NUMBER WILL BE TRANSITIONING TO A UNIQUE ENTITY IDENTIFIER (UEI) IN APRIL 2022 (SEE HERE FOR MORE INFORMATION: HTTPS://WWW.GSA.GOV/ABOUT-US/ORGANIZATION/FEDERAL-ACQUISITION- SERVICE/OFFICE-OF-SYSTEMS-MANAGEMENT/INTEGRATED-AWARD-ENVIRONMENT-IAE/IAE-INFORMATION-
KIT/UNIQUE-ENTITY-IDENTIFIER-UPDATE).
• SUBMIT YOUR GRANT APPLICATION EARLY!
https://www.grants.gov/ https://www.sam.gov/SAM/ https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-information-kit/unique-entity-identifier-update
SUBMITTING
YOUR
APPLICATION
IN
GRANTS.GOV
• HTTPS://WWW.GRANTS.GOV/
• SEACH GRANTS FOR
• CFDA 84.116W
• OR LOOK FOR THE OPPORTUNITY NUMBER: ED-
GRANTS-110521-003
• YOU WILL THEN SEE ALL OF THE APPLICATION
INFORMATION AND INSTRUCTIONS, INCLUDING
THE NIA AND APPLICATION BOOKLET, WHICH
OUTLINES THE CHECKLIST AND FORMS YOU NEED
TO FILL OUT.
https://www.grants.gov/
CALL FOR PEER REVIEWERS
• THOSE INTERESTED IN READING FOR THIS PROGRAMS AND OTHER PROGRAMS HAVING
COMPETITIONS IN FY 2021 IN THE OFFICE OF POSTSECONDARY EDUCATION MUST REGISTER
OR (IF ALREADY REGISTERED) UPDATE THEIR INFORMATION IN G5 AT WWW.G5.GOV
• PLEASE CONTACT NEMEKA MASON FOR MORE INFORMATION, NEMEKA.MASON@ED.GOV
http://www.g5.gov/ mailto:Nemeka.mason@ed.gov
QUESTIONS FROM THE FIELD
MAY AN APPLICANT REQUEST LESS THAN THE AVERAGE AWARD SIZE?
• YES. AN APPLICANT MAY REQUEST LESS THAN THE AVERAGE AWARD SIZE BUT CANNOT
EXCEED $1,237,500.
CAN AN INSTITUTION SUBMIT MORE THAN ONE APPLICATION?
• NO.
CRITERION 2 UNDER QUALITY OF MANAGEMENT PLAN REFERS TO THE "PROJECT DIRECTOR AND PRINCIPAL INVESTIGATOR." ARE PROJECTS EXPECTED TO INCLUDE BOTH A PRINCIPAL INVESTIGATOR AND A PROJECT DIRECTOR?
• NO.
CAN WE HIRE STUDENTS FOR TUTORING OR OTHER PEER TO PEER SUPPORT SERVICES?
• YES.
AM I REQUIRED TO SUBMIT A LOGIC MODEL WITH MY APPLICATION?
• YES.
WHAT DO I NEED TO SUBMIT IN THE BUDGET SECTION?
• APPLICANTS SHOULD PREPARE A 3-YEAR BUDGET REQUEST.
HOW WILL MY GRANT FUNDS BE DISTRIBUTED?
• APPLICANTS WILL RECEIVE THEIR FEDERAL FUNDS FOR ALL 3 YEARS UP FRONT WITH A START DATE OF JANUARY 1, 2022.
WHAT POPULATION OF STUDENTS SHOULD THIS GRANT BE GEARED TOWARDS?
• IT IS UP TO YOU IN YOUR GRANT APPLICATION BUT SHOULD FOCUS ON THE RURAL STUDENTS YOU DETERMINE ARE MOST IN NEED OF THE GRANT ACTIVITIES YOU PROPOSE. JUST KEEP IN MIND THAT ALL ACTIVITIES MUST MEET THE
ELIGIBILITY REQUIREMENTS, AS WELL AS THE REQUIREMENTS OF THE ABSOLUTE PRIORITY.
CAN I HOLD A RPED GRANT AT THE SAME TIME AS A TITLE V GRANT?
• YES.
WHERE SHOULD WE ADDRESS THE COMPETITIVE PREFERENCE PRIORITIES?
• PLEASE ADDRESS THEM WITHIN THE 50-PAGE NARRATIVE LIMIT. PLEASE MAKE SURE THAT WHEN YOU ADDRESS BOTH THE COMPETITIVE AND ABSOLUTE PRIORITIES, IT IS CLEAR AND OBVIOUS TO THE RPED TEAM AND PEER REVIEWERS.
WHAT SHOULD WE DO IF OUR HIGH SCHOOLS ARE NOT LOCATED IN RURAL AREAS, BUT OUR STUDENTS LIVE IN RURAL
AREAS WITH RURAL LOCALE CODES?
• BASED ON THE ELIGIBILITY CRITERIA, YOU NEED TO FOCUS ON THE HIGH SCHOOLS YOUR STUDENTS COME FROM. THAT BEING SAID, INYOUR APPLICATION YOU CAN MAKE THE CASE THAT YOU MEET THE ELIGIBILITY BECAUSE YOUR STUDENTS
ARE FROM RURAL AREAS BECAUSE THEY LIVE WITHIN THE RURAL LOCALE CODES.
WHAT DO YOU MEAN BY RURAL AREA?
• WE DEFINE RURAL AREA AS AN AREA THAT IS CHARACTERIZED BY LOCALE CODE 41, 42, OR 43. PLEASE REFER TO THE
NCES LOCALE LOOKUP MAP: HTTPS://NCES.ED.GOV/PROGRAMS/MAPED/LOCALELOOKUP/.
https://nces.ed.gov/programs/maped/LocaleLookup/
WHAT IS THE BEST WAY TO FIND THIS DATA?
• WE RECOMMEND STARTING WITH YOUR INSTITUTIONS DATA TEAM. IF YOU ARE HAVING TROUBLE, THE EASIEST WAY TO COLLECT THIS DATA WOULD BE FOR YOUR INSTITUTION TO ID THE RURAL HIGH SCHOOLS YOU WILL BE SERVING AND
FIND OUT WHO COMES FROM THOSE RURAL AREAS VERSUS FOLKS WHO DO NOT.
• YOU MAY ALSO WANT TO REACH OUT TO THE NATIONAL CENTER FOR EDUCATION STATISTICS (NCES) AND SEE IF THEY HAVE A MASTER LIST OF SCHOOL DISTRICTS WITH THE LOCALITY IDENTIFIED. AN ESTIMATE OF THE DATA IS FINE IF YOU CAN INDICATE THE HIGH SCHOOL DISTRICTS THAT YOUR STUDENTS COME FROM AND IF THOSE HIGH SCHOOL DISTRICTS
ARE IN THE RURAL LOCALE AREA BASED ON THE DEFINITION IN THE NIA.
WHAT CAN WE USE GRANT FUNDS FOR/WHAT IS ALLOWABLE? CAN WE USE GRANT FUNDS FOR DIRECT AID TO STUDENTS (I.E., VIA SCHOLARSHIPS, STIPENDS, VOUCHERS, ETC.)?
• ALL ACTIVITIES AND BUDGET ITEMS MUST AT LEAST SATISFY THE ABSOLUTE PRIORITY (A-E) AS STATED IN THE NIA. THERE ARE NO PROGRAM-SPECIFIC REGULATIONS, BUT ACTIVITIES AND BUDGET ITEMS MUST DIRECTLY ALIGN WITH PROJECT OBJECTIVES AND ADHERE TO APPLICABLE EDGAR AND UNIFORM GUIDANCE CITATIONS THAT GOVERN THE PROGRAM.
• IN THE BIG PICTURE A PROGRAM SHOULD BE PROVIDING SUPPORTS TO STUDENTS BASED ON WHAT IS EXPECTED IN THE ABSOLUTELY PRIORITY, BUT KEEP IN MIND TO TAKE AN APPROACH THAT IS INCLUSIVE AND CREATES SYSTEMIC CHANGE.
• THINK ABOUT WHAT YOU CAN DO TO HELP RURAL STUDENTS ACCESS, PERSIST AND SUCCEED IN COLLEGE AND IN TO A HIGH- NEED OCCUPATION. PLEASE ALSO KEEP IN MIND ABSOLUTE PRIORITY (E) WHEN THINKING ABOUT ACTIVITIES: “IMPLEMENTING A SUSTAINABILITY PLAN TO MAINTAIN PROGRAMS AND SERVICES AFTER COMPLETION OF THE GRANT.”
APPLICABLE REGULATIONS: (A) THE EDUCATION DEPARTMENT GENERAL ADMINISTRATIVE REGULATIONS IN 34 CFR PARTS 75, 77, 79, 82, 84, 86, 97, 98, AND 99. (B) THE OFFICE OF MANAGEMENT AND BUDGET GUIDELINES TO AGENCIES ON GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) IN 2 CFR PART 180, AS ADOPTED AND AMENDED AS REGULATIONS OF THE DEPARTMENT IN 2 CFR PART 3485. (C) THE UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS IN 2 CFR PART 200, AS ADOPTED AND AMENDED AS REGULATIONS OF THE DEPARTMENT IN
2 CFR PART 3474.
Q&A
CONTACT INFORMATION
MAIN CONTACT EMAIL FOR QUESTIONS: RPED@ED.GOV
COMPETITION MANAGERS/PROGRAM CO-LEADS:
• KURRINN ABRAMS | KURRINN.ABRAMS2@ED.GOV
• EVERARDO (LALO) GIL | EVERARDO.GIL@ED.GOV
RURAL POSTSECONDARY & ECONOMIC DEVELOPMENT PROGRAM PAGE:
HTTPS://WWW2.ED.GOV/PROGRAMS/RPED/INDEX.HTML
mailto:rped@ed.gov mailto:Kurrinn.abrams2@ed.gov mailto:Everardo.gil@ed.gov https://www2.ed.gov/programs/rped/index.html
OTHER FIPSE PROGRAMS
• BASIC NEEDS PROGRAM (84.116N), NJERI CLARK, NJERI.CLARK@ED.GOV
• HTTPS://WWW2.ED.GOV/PROGRAMS/BASIC-NEED/INDEX.HTML
• HBCU CENTER FOR EDUCATIONAL EXCELLENCE FOR BLACK TEACHERS PROGRAM (84.116V), WENDY
LAWRENCE, WENDY.LAWRENCE@ED.GOV
• HTTPS://WWW2.ED.GOV/PROGRAMS/CEEBT/INDEX.HTML
• MODELING AND SIMULATION PROGRAM (84.116S), ROBIN DABNEY, ROBIN.DABNEY@ED.GOV, OR KISSY
CHAPMAN-THAW, KISSY.CHAPMAN-THAW@ED.GOV
• HTTPS://WWW2.ED.GOV/PROGRAMS/MSP/INDEX.HTML
• TRANSITIONING GANG-INVOLVED YOUTH TO HIGHER EDUCATION PROGRAM (84.116Y), JYMECE SEWARD, JYMECE.SEWARD@ED.GOV , OR MARGARITA MELENDEZ, MARGARITA.MELENDEZ@ED.GOV
• HTTPS://WWW2.ED.GOV/PROGRAMS/GIYP/INDEX.HTML
mailto:Njeri.clark@ed.gov https://www2.ed.gov/programs/basic-need/index.html mailto:wendy.Lawrence@ed.gov https://www2.ed.gov/programs/ceebt/index.html mailto:robin.Dabney@ed.gov mailto:kissy.chapman-thaw@ed.gov https://www2.ed.gov/programs/msp/index.html mailto:Jymece.seward@ed.gov mailto:margarita.Melendez@ed.gov https://www2.ed.gov/programs/giyp/index.html
| FY 2021 Rural Postsecondary & Economic Development Program �Pre- Application Webinar� |
| Agenda |
| Program Purpose |
| Program Authority |
| Applicable regulations |
| �FY 2021 Competition At A Glance� |
| Eligibility |
| Important info |
| Absolute Priority (REQUIRED) |
| Absolute Priority (REQUIRED) |
| Absolute Priority (REQUIRED) |
| Competitive preference priority (up to 5 points) |
| Competitive preference priority (up to 5 points) |
| Selection Criteria |
| Selection criteria |
| Questions to Consider- Project Design |
| Selection criteria |
| Questions to Consider – Management Plan |
| Selection criteria |
| Questions to Consider – Adequacy of resources |
| Selection criteria |
| Questions to Consider – Project Evaluation |
| Understanding �Indirect Cost |
| Indirect Cost |
| Performance Measures |
| ��The Logic Model |
| �Components of a Program Logic Model� |
| �Sample Logic Model� |
| Regional Educational Laboratory (REL)�Resources on Logic Models |
| Planning Your Grant Application |
| Planning Your Grant Application |
| Planning Your Grant Application |
| Logistical advice |
| SUBMITTING YOUR APPLICATION IN GRANTS.GOV |
| Call for peer reviewers |
| Questions from the Field |
| Questions from the Field |
| Questions from the Field |
| Questions from the Field |
| Questions from the Field |
| Questions from the Field |
| Questions from the Field |
| Q&A |
| Contact Information |
| Other fipse programs |
File details come from the government source that posted it. Updated .