This is a Bid Addendum Number 1 issued by the City of Raleigh, North Carolina for the Raleigh Police Evidence Storage Facility (Bid Number 274-FY2027-CM-PSSP07), with Consigli Construction serving as Construction Manager at Risk. The project comprises two structures: approximately 24,000 square feet of CMU and steel construction for evidence storage with finishes and mechanical, electrical, and plumbing systems, and approximately 26,000 square feet of pre-engineered metal building for auto storage. Site work includes excavation, utilities, septic systems, and geothermal wells. The solicitation is divided into 32 bid packages covering general trades and specialized trades including concrete, masonry, structural steel, roofing, waterproofing, doors, drywall, ceilings, flooring, painting, fire protection, plumbing, HVAC, geothermal wells, electrical work, sitework, radon mitigation, and landscaping. All bids are due November 24, 2026 at 10:30 AM via hand delivery or mail to Consigli Construction at 4819 Emperor Blvd., Suite 130, Durham, North Carolina. Requests for information were due November 13, 2026, with responses anticipated November 18. A non-mandatory pre-bid meeting was held November 10, 2026 at One Exchange Plaza, Suite 809, Raleigh. Apparent low bidders are required to attend mandatory scope review meetings at Consigli's Durham office, scheduled between November 30 and December 10, 2026, with specific meeting times assigned to each bid package.

The addendum incorporates 12 attachments including a redacted CMAR contract, geotechnical engineering evaluation reports, NCDOT driveway permit application, prequalified bidders list, scope review meeting schedule, and responses to Requests for Information addressing clarifications on sitework surfacing materials, parking lot specifications, substrate preparation responsibilities, and bond form requirements. Bid security equal to 5% of the bid amount is required, with the bid bond submitted separately using the AIA A310 form. Award will be made to the lowest responsible and responsive bidder considering quality, performance, and time specified for contract performance. The City of Raleigh reserves the right to waive informalities or reject any or all bids. Bidders must be prequalified and demonstrate licensure under North Carolina General Statute Chapter 87.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Raleigh 00100-1 Advertisement for Bids

ADVERTISEMENT FOR BIDS

ADDENDUM NUMBER 1

POSTED: NOVEMBER 13, 2026

CITY BID NUMBER: 274-FY2027-CM-PSSP07

Project: Raleigh Police Evidence Storage Facility

Owner: City of Raleigh, North Carolina, Engineer Services Department Contact: Reese Wamsley, reese.wamsley@raleighnc.gov

CMAR: Consigli Construction Contact: Levi Levesque LLevesque@Consigli.com

Bid Opening: 10:30 AM, November 24, 2026

One Exchange Plaza Suite 809 Raleigh, NC 27601

RFI’s Due: November 13, 2026

RFI Responses: Anticipated November 18, 2026

This Addendum, containing the following additions, clarifications, and/or changes, is issued prior to receipt of proposal packages and does hereby become part of the original Advertisement for Bids and supersedes the original in case of conflict.

Receipt of this addendum must be acknowledged. Please make the following additions, clarifications, and/or changes to the Advertisement for Bids as listed below.

Redacted CMAR Contract Report of Subsurface Exploration and Geotechnical Engineering Evaluation and Addendum NCDOT Application for Driveway Entrance and Permit Prequalified Bidders List Prebid Meeting Sign In Sheet Scope Review Meeting Schedule RFI Questions and Answers Bid Manual Revisions

City of Raleigh Janet Cowell, Mayor

Reach out to Levi Levesque (llevesqe@consigli.com) for a copy of these documents:

Bid Addendum No. 01 City of Raleigh Police Evidence Storage Facility November 12, 2026

TO ALL BIDDERS:

This Addendum supplements and amends the Bid Manual and shall be taken into account in preparing proposals and shall become part of the Contract Documents. The Bidder shall indicate receipt of this Addendum on the Bid Form. Each prequalified bidder is responsible for distribution of information conveyed in this Addendum to their sub-bidders and suppliers. This Addendum contains the following items and attachments and shall be incorporated into the Contract Documents.

1. Redacted CMAR Contract dated 11/06/2024 with Signature 10/31/2026 – 129 pages

2. Report of Subsurface Exploration and Geotechnical Engineering Evaluation dated 12/10/2025 – 92 pages

3. Addendum Letter No. 1 for Report of Subsurface Exploration and Geotechnical

Engineering Evaluation dated 03/16/2026 – 5 pages

4. NCDOT Application for Driveway Entrance and Permit dated 12/23/2025 – 27 pages

5. Prequalified Bidders List dated 11/12/2026 – 5 pages

6. Prebid Meeting Sign In Sheet dated 11/10/2026 – 2 pages

7. Scope Review Meeting Schedule dated 11/12/2026 – 1 page

8. RFI #2 BP 31A Sitework Questions dated 11/11/2026 – 2 pages

9. RFI #3 BP 07B Waterproofing Questions dated 11/11/2026 – 2 pages

10. RFI #7 Bid Bond Form Requirements dated 11/12/2026 – 1 page

11. RFI #8 BP 08B Glass & Glazing Questions dated 11/12/2026 – 1 page

12. Bid Manual – Bid Package BP 31A Sitework: Revise Item 26 to state, “Trade contractor shall furnish, install, maintain, and remove a level 12” thick ABC stone pad beneath the construction manager’s field office, which will be a furnished 12’ x 56’ trailer with two sets of stairs. Trade contractor shall also include level surfaces to locate adjacent restrooms and dumpsters.”

13. Bid Manual – Bid Package 31A Sitework: Revise Item 65 to state, “Trade contractor shall furnish, install, maintain, and remove a 12” thick ABC stone parking lot surface for contractor parking at 2320 Law Enforcement Drive, Raleigh, NC 27610. This shall include erosion control provisions of 1 construction entrance with silt and tree protection fencing around the entire perimeter and typical silt fence outlets. The area shall be no more than

0.4 acres. Trade contractor shall layout, stake, and maintain 60 wheel stops to develop organized parking spaces. Trade contractor shall return the area to its pre-disturbed condition when directed by the construction manager and seed it. Refer to the Logistics Plan dated 09/09/2026 for further details.

14. Bid Manual – Bid Package 31A Sitework: Revise Item 66 to state, “Trade contractor shall furnish, install, maintain, and remove 12” thick ABC stone stabilized and maintained construction traffic surfaces on site. Refer to the Logistics Plan dated 09/09/2026 for further details.

END OF BID ADDENDUM NO. 01

Raleigh Police Dept. Evidence Storage Facility

Prequalified Bidders - 11.12.26

Number Bid Package Company

BP 01A General Trades Estrello Construction Group

BP 01A General Trades Classic Contracting LLC

BP 01A General Trades Clear Site Industrial, LLC

BP 01A General Trades P&P SERVICE GROUP

BP 01A General Trades U & L Contractors LLC

BP 01A General Trades Sparkle & Shine Cleaning Service Inc.

BP 03 Concrete Acosta Construction & Concrete INC

BP 03 Concrete Baker Concrete Construction, Inc.

BP 03 Concrete Capital City Curb & Gutter

BP 03 Concrete C & C Industrial Inc.

BP 03 Concrete DiMaio Concrete & Construction

BP 03 Concrete Eric Pugh Concrete LLC

BP 03 Concrete Estrello Construction Group

BP 03 Concrete Fessler & Bowman, Inc.

BP 03 Concrete Hine Sitework Inc.

BP 03 Concrete IQ Contracting

BP 03 Concrete Mante Strucutural Contractors

BP 03 Concrete Raleigh East Concrete

BP 03 Concrete U & L Contractors LLC

BP 04 Masonry Acosta Construction & Concrete INC

BP 04 Masonry Brodie Contractors

BP 04 Masonry Citadel Masonry

BP 04 Masonry Edgar Boettcher Mason Contractors

BP 04 Masonry Estrello Construction Group

BP 04 Masonry Joyner Masonry Works, Inc.

BP 04 Masonry Mante Strucutural Contractors

BP 04 Masonry Old North State Masonry LLC.

BP 04 Masonry Stone Creek Masonry, Inc

BP 04 Masonry U & L Contractors LLC

BP 04 Masonry Vega Construction Company, Inc.

BP 04 Masonry Manning Masonry, Inc.

BP 05 Struct. Steel & Misc. Metals Engineered Steel Products

BP 05 Struct. Steel & Misc. Metals North State Steel

BP 05 Struct. Steel & Misc. Metals Sanford Steel Corp.

BP 05 Struct. Steel & Misc. Metals Smith Architectural Metals LLC

BP 05 Struct. Steel & Misc. Metals Steel and Pipe Corporation

BP 06 Millwork Blankenship Associates LLC

BP 06 Millwork Interior Wood Specialties, Inc.

BP 06 Millwork MDN Cabinets Inc.

BP 06 Millwork Nycom, Inc.

BP 06 Millwork Stephenson Millwork Co., Inc.

BP 06 Millwork Atlantic Commercial Caseworks

BP 07A Roofing Bardi-Davis Construction LLC

BP 07A Roofing Curtis Construction Co., Inc.

BP 07A Roofing Eskola LLC

BP 07A Roofing Hamlin Roofing Company Inc

BP 07A Roofing J.T. Murphy Construction, Inc.

BP 07A Roofing Triad Roofing Company, Inc.

BP 07B Waterproofing & Joint Sealants Alpha Insulation & Waterproofing, Inc.

BP 07B Waterproofing & Joint Sealants Atlantic Concrete Services Inc.

BP 07B Waterproofing & Joint Sealants Eskola LLC

BP 07B Waterproofing & Joint Sealants J.T. Murphy Construction, Inc.

BP 07B Waterproofing & Joint Sealants Live Green

BP 07B Waterproofing & Joint Sealants NC Caulking & Waterproofing Inc.

BP 07B Waterproofing & Joint Sealants Queens Waterproofing & Restoration

BP 07B Waterproofing & Joint Sealants Strickland Waterproofing Company, Inc.

BP 08A Doors, Frames & Hardware Cook & Boardman, LLC dba Martin Architectural Products

BP 08A Doors, Frames & Hardware D.H. Pace Company, Inc.

BP 08A Doors, Frames & Hardware Davidson Sash & Door

BP 08B Glass & Glazing A1 Glass and Aluminum LLC

BP 08B Glass & Glazing BMF Corporation(formerly Eastern Corporation)

BP 08B Glass & Glazing Brightleaf Glass And Metal Co.

BP 08B Glass & Glazing Innovative Glass Solutions, LLC

BP 08B Glass & Glazing MSJ Glass and Glazing, Inc

BP 08C Overhead Doors D.H. Pace Company, Inc.

BP 08C Overhead Doors Custom Door & Gate

BP 09A Drywall Acousti Engineering Company of Florida

BP 09A Drywall Gerloff Contracting

BP 09A Drywall Grey Interiors

BP 09A Drywall LC Contract LLC

BP 09A Drywall Precision Walls, Inc.

BP 09B Ceilings Acousti Engineering Company of Florida

BP 09B Ceilings Brock Contract Services

BP 09B Ceilings Gerloff Contracting

BP 09B Ceilings Paul Barbour & Son Inc.

BP 09B Ceilings Precision Walls, Inc.

BP 09C Flooring Acousti Engineering Company of Florida

BP 09C Flooring Brock Contract Services

BP 09C Flooring GPS Floors, LLC

BP 09C Flooring Lomax Tile & Marble, Inc.

BP 09C Flooring Real Floors Commercial Inc.

BP 09C Flooring Storr Office Environments

BP 09D Painting E. Caligari & Son, Inc.

BP 09D Painting That 1 Painter Raleigh

BP 09D Painting National Coatings, Inc.

BP 09D Painting Platinum Coating of NC

BP 09D Painting Resource Painting

BP 09D Painting Integrated Products Group - Material Supplier

BP 10A Specialties Cook & Boardman, LLC dba Martin Architectural Products

BP 10A Specialties Nycom, Inc.

BP 10A Specialties Precision Walls, Inc.

BP 10A Specialties Sparkle & Shine Cleaning Service Inc.

BP 10B Wire Mesh Partitions Nycom, Inc.

BP 10B Wire Mesh Partitions Precision Walls, Inc.

BP 10C Storage Shelving Nycom, Inc.

BP 10C Storage Shelving Precision Walls, Inc.

BP 10C Storage Shelving Patterson Pope, Inc

BP 10C Storage Shelving Workspace Technology, Inc.

BP 11 Equipment Abaco Inc.

BP 11 Equipment Nycom, Inc.

BP 12 Furnishings Mid- Atlantic Specialties, Inc.

BP 12 Furnishings Nycom, Inc.

BP 12 Furnishings Precision Walls, Inc.

BP 12 Furnishings Storr Office Environments

BP 12 Furnishings United Supply Co.

BP 13 PEMB Cooper Tacia General Contracting

BP 13 PEMB SKA Construction

BP 13 PEMB Smithson, Inc.

BP 21A Fire Protection ABL & Associates LLC

BP 21A Fire Protection Allied Fire Protection, Inc.

BP 21A Fire Protection Regional Fire Services of NC LLC

BP 21A Fire Protection Strategic Connections, LLC

BP 21A Fire Protection The Hiller Companies, LLC

BP 21A Fire Protection Wolverine Fire Protection Co.

BP 23A Plumbing ABL & Associates LLC

BP 23A Plumbing Comfort Mechanical Contractors, Inc.

BP 23A Plumbing Earnhardt Plumbing LLC

BP 23A Plumbing Haire Plumbing & Mechanical Co., Inc.

BP 23A Plumbing Hillsborough Plumbing Company, Inc.

BP 23A Plumbing JR Mechanical, LLC

BP 23A Plumbing SE&M Constructors, LLC

BP 23A Plumbing SPC Mechanical Corporation

BP 23A Plumbing Watco Corporation

BP 25A HVAC ABL & Associates LLC

BP 25A HVAC Haire Plumbing & Mechanical Co., Inc.

BP 25A HVAC Mechworks

BP 25A HVAC SE&M Constructors, LLC

BP 25A HVAC SPC Mechanical Corporation

BP 25A HVAC JR Mechanical, LLC

BP 25A HVAC Abl & Associates Plumbing, LLC

BP 25B Geo Thermal Allied Drilling LLC

BP 25B Geo Thermal Haire Plumbing & Mechanical Co., Inc.

BP 25B Geo Thermal Mechworks

BP 26A Electrical Bryant-Durham Electric Co., Inc.

BP 26A Electrical D.W. Evans Electric Inc.

BP 26A Electrical Gregory Electric Co. Inc.

BP 26A Electrical Hewitt Power LLC

BP 26A Electrical L.L. Vann Electric, Inc.

BP 26A Electrical Moonlite Electric & Construction, Inc.

BP 26A Electrical M-Power Electric, LLC

BP 26A Electrical Pitt Electric

BP 26A Electrical SE&M Constructors, LLC

BP 26A Electrical SPC Mechanical Corporation

BP 26A Electrical Vaughan Electric Co. Inc

BP 26A Electrical Wayne J Griffin Electric Inc.

BP 31A Site Work Barnhill Contracting Company

BP 31A Site Work Carolina Civilworks, Inc.

BP 31A Site Work Faulconer Construction Company Incorporated

BP 31A Site Work Fessler & Bowman, Inc.

BP 31A Site Work Fred Smith Company

BP 31A Site Work Hine Sitework Inc.

BP 31A Site Work Jenns Hardscape Construction

BP 31A Site Work MARKS CLEARING AND GRADING

BP 31A Site Work State Contracting

BP 31A Site Work Triangle Grading & Paving Inc.

BP 31B Radon Mitigation Buckeye Elm Contracting

BP 31B Radon Mitigation Clean Vapor Newco, LLC

BP 31B Radon Mitigation Tennessee Radon Services, LLC

BP 32A Landscaping Davis Landscape Ltd.

BP 32A Landscaping Estrello Construction Group

BP 32A Landscaping Ideal Landscaping Inc.

BP 32A Landscaping Landart Solutions LLC

BP 32A Landscaping Mid-South Irrigation & Landscape

BP 32A Landscaping Southern Garden, Inc

Scope Review Meeting Schedule City of Raleigh Police Evidence Storage Facility November 12, 2026

The apparent low bidders will be required to attend a scope review meeting at the Consigli office located 4189 Emperor Blvd, Suite 130, Durham, NC 27703.

The following is a listing of the bid packages, the bid due date, and the scope review meeting time schedule for the apparent low bidder:

Bid Package Bid Date and Time Mandatory Scope Review Meeting BP 31A Sitework November 24, 2026 at 10:30am November 30, 2026 at 1:00pm BP 25B Geothermal Wells November 24, 2026 at 10:30am November 30, 2026 at 2:30pm BP 25A HVAC November 24, 2026 at 10:30am December 1, 2026 at 8:00am BP 26A Electrical November 24, 2026 at 10:30am December 1, 2026 at 10:30am BP 21A Fire Protection November 24, 2026 at 10:30am December 1, 2026 at 3:00pm BP 23A Plumbing November 24, 2026 at 10:30am December 2, 2026 at 8:00am BP 03A Concrete November 24, 2026 at 10:30am December 2, 2026 at 9:30am BP 13A PEMB November 24, 2026 at 10:30am December 2, 2026 at 11:00am BP 05A Steel & Misc. Metals November 24, 2026 at 10:30am December 2, 2026 at 1:30pm BP 04A Masonry November 24, 2026 at 10:30am December 3, 2026 at 8:00am BP 07B Waterproofing November 24, 2026 at 10:30am December 3, 2026 at 9:30am BP 31B Radon Mitigation November 24, 2026 at 10:30am December 3, 2026 at 11:00am BP 07A Roofing November 24, 2026 at 10:30am December 3, 2026 at 1:30pm BP 08B Glass & Glazing November 24, 2026 at 10:30am December 4, 2026 at 8:00am BP 01A General Trades November 24, 2026 at 10:30am December 4, 2026 at 9:30am BP 10C Storage Shelving November 24, 2026 at 10:30am December 4, 2026 at 11:00am BP 08A Doors, Frames, & Hardware November 24, 2026 at 10:30am December 7, 2026 at 1:00pm BP 09A Framing & Drywall November 24, 2026 at 10:30am December 7, 2026 at 2:30pm BP 06A Millwork November 24, 2026 at 10:30am December 8, 2026 at 11:00am BP 11A Equipment November 24, 2026 at 10:30am December 8, 2026 at 1:30pm BP 08C Overhead Doors November 24, 2026 at 10:30am December 8, 2026 at 3:00pm BP 09D Painting November 24, 2026 at 10:30am December 9, 2026 at 8:00am BP 09C Flooring November 24, 2026 at 10:30am December 9, 2026 at 9:30am BP 09B Ceilings November 24, 2026 at 10:30am December 9, 2026 at 11:00am BP 10A Specialties November 24, 2026 at 10:30am December 9, 2026 at 1:30pm BP 10B Wire Mesh Partitions November 24, 2026 at 10:30am December 10, 2026 at 8:00am BP 12A Furnishings November 24, 2026 at 10:30am December 10, 2026 at 9:30am BP 32A Landscaping November 24, 2026 at 10:30am December 10, 2026 at 11:00am

Sitework Package BP31A RFIs TO: Molly Marino (Becker Morgan Group, Inc.)

Kelly Reitzmmer (Becker Morgan Group, Inc.)

Riley DelVasto (Becker Morgan Group, Inc.)

Levi Levesque (Consigli Construction Co., Inc.)

FROM: Levi Levesque (Consigli Construction Co., Inc.)

4819 Emperor Blvd. | Suite 130 Durham, North Carolina 27703

DATE INITIATED: 11/11/2026 STATUS: Closed on 11/12/26

LOCATION: DUE DATE: 11/17/2026

COST CODE: REFERENCE:

COST IMPACT: TBD SCHEDULE IMPACT: N/A

DRAWING NUMBER: N/A SPEC SECTION:

RECEIVED FROM: Levi Levesque (Consigli Construction Co., Inc.)

COPIES TO:

Myles McDonough (Consigli Construction Co., Inc.), Samuel Packard (Consigli Construction Co., Inc.), Sara Rentler (Consigli Construction Co., Inc.), Reese Wamsley (City Of Raleigh), James Wood (Consigli Construction Co., Inc.)

Question from Levi Levesque (Consigli Construction Co., Inc.) at 01:05 PM on 11/10/2026 Consigli's preliminary responses provided to the subcontractor are shown in red.

Please revise as necessary to align with the Contract Documents.

Please also provide responses to any / all items shown in blue.

1. Can the site CAD file and geotechnical report be provided? The Geotechnical Reports will be issued in the forthcoming Addenda. CAD Files will not be distributed during the bidding process.

2. Is there an encroachment permit in place for work in the NCDOT right-of-way? Can it be provided? The NCDOT Driveway Permit will be issued in the forthcoming Addenda.

3. Note 65 in BP31A states trade contractor to install temporary 12” thick surface parking lot. What is the surface? ABC? Asphalt? Do you have a striping plan? The note states we must install erosion control. Do you have an erosion control plan for this area? Assume 12” thick ABC stone for the contractor parking lot. Updated Drawings have neither been approved by NCDEQ nor issued by the Design Team yet. Assume (1) construction entrance then silt and tree protection fence around the entire perimeter with typical silt fence outlets. Layout, stake, and maintain (60) wheel stops instead of pavement markings at the contractor parking lot.

4. Note 63 BP31A states contractor to re-establish grade at vehicle storage building after building has been erected, note 109 States Concrete contractor is responsible for all backfill and final grading throughout interior building areas. These notes contradict each other please provide direction.

BP31A shall restore any subgrade disturbed by PEMB erection activities. BP03A shall perform all final interior backfill, grading, and slab preparation required for slab-on-grade installation. Please refer to BP 31A scope item #63.

5. Note 64 states all topsoil must be triple screened and respread onsite. It also states topsoil must not be stockpiled. Will some stockpile be allowed so that we can properly respread in correct areas? Please refer to BP 31A Sitework scope item #42.

6. Who will be responsible for moving and placing or disposing of spoils generated by concrete and geothermal well installations? If it is the responsibility of the sitework contractor can an estimate be provided of the quantity of spoils from the various trades? BP25B shall remove and dispose of geothermal drilling spoils generated by its work, while BP31A remains responsible for removal and disposal of excess soils associated with overall sitework operations, including foundations, slabs, retaining walls, and utility excavations. Please refer to BP 31A Sitework scope item #69.

7. Per the logistics plan, can more detail be provided as to what “12” thick stabilized and maintained construction traffic rated areas” means specifically? What surface or aggregates are required? Similarly to the construction parking lot, should be considered 12” thick ABC

Awaiting an Official Response

All Replies:

Consigli Construction Co., Inc. Page 1 of 2 Printed On: 11/12/2026 12 :50 PM

Project: 3251 - Raleigh Police Evidence Facility 8120 Battle Bridge Road Raleigh, North Carolina 27610

RFI #2

Response from Molly Marino (Becker Morgan Group, Inc.) at 05:02 PM on 11/11/2026 Consigli confirmed they have a copy of the Driveway Permit. No further answers should be needed from the Design Team on this RFI.

Attachments:

Response from Levi Levesque (Consigli Construction Co., Inc.) at 04:07 PM on 11/11/2026 All questions have been answered and addressed by Consigli and will be formalized as part of an addenda to issue to all prequalified subcontractors unless BMG notes exception to Consigli's responses in red.

BY DATE COPIES TO

Page 2 of 2 72 Sumner Street Milford, Massachusetts 01757

Printed On: 11/12/2026 12:50 PM

RFI #2

BP 07B Dewatering and Substrate Preparation Scope TO: Levi Levesque (Consigli Construction Co., Inc.)

4819 Emperor Blvd. | Suite 130 Durham, North Carolina 27703

DATE INITIATED: 11/11/2026 STATUS: Closed on 11/11/26

LOCATION: DUE DATE: 11/17/2026

COST CODE: REFERENCE:

COST IMPACT: TBD SCHEDULE IMPACT: N/A

DRAWING NUMBER: SPEC SECTION: 071300 - Sheet Waterproofing

RECEIVED FROM: Levi Levesque (Consigli Construction Co., Inc.)

COPIES TO:

Riley DelVasto (Becker Morgan Group, Inc.), Molly Marino (Becker Morgan Group, Inc.), Myles McDonough (Consigli Construction Co., Inc.), Samuel Packard (Consigli Construction Co., Inc.), Kelly Reitzmmer (Becker Morgan Group, Inc.), Reese Wamsley (City Of Raleigh), James Wood (Consigli Construction Co., Inc.)

Question from Levi Levesque (Consigli Construction Co., Inc.) at 02:57 PM on 11/11/2026 Exhibit A in the Bid Manual assigns sheet waterproofing and Air Barriers to BP 04A Masonry (item 15), while item 7 requires

BP 07B to include dewatering, dirt/spoil removal, and substrate cleaning.

A BP 07B bidder identified that their exterior sealant work consists of vertical brick control joints, which they do not anticipate requiring dewatering.

Could Consigli please clarify the locations and activities covered by item 7 and confirm whether BP 07B is responsible for preparing substrates for below-grade waterproofing installed by BP 04A?

Please clarify the limits of this work so this BP 07B bidder can accurately price the required labor and tools.

Official Response: Levi Levesque (Consigli Construction Co., Inc.) responded on Wednesday, November 11th, 2026 at 2:59PM EST BP 07B Item 7 applies only to surface preparation required for BP 07B sealant work, including removal of dirt, debris, dewatering, and similar contaminants necessary for sealant installation.

Per the Bid Manual, BP 04A Masonry is responsible for furnishing and installing the sheet waterproofing, below-grade waterproofing, and air barrier systems.

Based on the contents of the bid manual, any substrate prep required for those systems is included within BP 04A's scope.

Given this, Consigli's direction is that BP 07B's substrate preparation responsibilities are limited to its own sealant work and do not extend to project-wide substrate prep or preparation associated with waterproofing systems furnished and installed by BP 04A.

Response from Levi Levesque (Consigli Construction Co., Inc.) at 02:59 PM on 11/11/2026 BP 07B Item 7 applies only to surface preparation required for BP 07B sealant work, including removal of dirt, debris, dewatering, and similar contaminants necessary for sealant installation.

Per the Bid Manual, BP 04A Masonry is responsible for furnishing and installing the sheet waterproofing, below-grade waterproofing, and air barrier systems.

Based on the contents of the bid manual, any substrate prep required for those systems is included within BP 04A's scope.

Given this, Consigli's direction is that BP 07B's substrate preparation responsibilities are limited to its own sealant work and do not extend to project-wide substrate prep or preparation associated with waterproofing systems furnished and installed by BP 04A.

Consigli Construction Co., Inc. Page 1 of 2 Printed On: 11/12/2026 12 :51 PM

RFI #3

Page 2 of 2 72 Sumner Street

Printed On: 11/12/2026 12:51 PM

RFI #3

Bid Bond Form Requirements

4819 Emperor Blvd. | Suite 130 Durham, North Carolina 27703

DATE INITIATED: 11/12/2026 STATUS: Closed on 11/12/26

LOCATION: DUE DATE: 11/17/2026

COST CODE: REFERENCE:

COST IMPACT: TBD SCHEDULE IMPACT: N/A

DRAWING NUMBER: N/A SPEC SECTION: 005000 - Contracting Forms and Supplements

RECEIVED FROM: Sara Rentler (Consigli Construction Co., Inc.)

COPIES TO:

Riley DelVasto (Becker Morgan Group, Inc.), Molly Marino (Becker Morgan Group, Inc.), Myles McDonough (Consigli Construction Co., Inc.), Samuel Packard (Consigli Construction Co., Inc.), Kelly Reitzmmer (Becker Morgan Group, Inc.), Reese Wamsley (City Of Raleigh), James Wood (Consigli Construction Co., Inc.)

Question from Levi Levesque (Consigli Construction Co., Inc.) at 09:46 AM on 11/12/2026

Does this project have a specific bid bond form, or is a generic one from our bonding company acceptable?

Official Response: Levi Levesque (Consigli Construction Co., Inc.) responded on Thursday, November 12th, 2026 at 9:49AM EST Per specification section 005000 - Contracting Forms and Supplements, section 1.2-B states that the specified bid bond form is as follows.

Bond Forms:

1. Bid Bond Form: AIA A310

Response from Levi Levesque (Consigli Construction Co., Inc.) at 09:49 AM on 11/12/2026 Per specification section 005000 - Contracting Forms and Supplements, section 1.2-B states that the specified bid bond form is as follows.

Bond Forms:

1. Bid Bond Form: AIA A310

Page 1 of 1 72 Sumner Street

Printed On: 11/12/2026 12:52 PM

RFI #7

BP08B Glass & Glazing Questions

4819 Emperor Blvd. | Suite 130 Durham, North Carolina 27703

DATE INITIATED: 11/12/2026 STATUS: Closed on 11/12/26

LOCATION: DUE DATE: 11/17/2026

COST CODE: REFERENCE:

COST IMPACT: TBD SCHEDULE IMPACT: N/A

DRAWING NUMBER: A101A, A601A SPEC SECTION: 085553 - Security Glazing Entrances and Storefront

RECEIVED FROM: Sara Rentler (Consigli Construction Co., Inc.)

COPIES TO:

Riley DelVasto (Becker Morgan Group, Inc.), Molly Marino (Becker Morgan Group, Inc.), Myles McDonough (Consigli Construction Co., Inc.), Samuel Packard (Consigli Construction Co., Inc.), Kelly Reitzmmer (Becker Morgan Group, Inc.), Reese Wamsley (City Of Raleigh), James Wood (Consigli Construction Co., Inc.)

Question from Levi Levesque (Consigli Construction Co., Inc.) at 10:05 AM on 11/12/2026

Are both SF-8 and SF-9 Ballistic or is just SF-8?

Also, is it the responsibility of the BP08B bidder to furnish and install the ballistic HM door (104)?

Official Response: Levi Levesque (Consigli Construction Co., Inc.) responded on Thursday, November 12th, 2026 at 10:06AM EST Please reference the Door Schedule per Drawing A601A. The storefront SF-8 is at opening 101/2 and per drawing A101A, SF-9 is at opening 134/2.

The hollow metal frame and solid core wood door at opening 104 is to be furnished and installed by BP 08A Doors, Frames, & Hardware.

Response from Levi Levesque (Consigli Construction Co., Inc.) at 10:06 AM on 11/12/2026 Please reference the Door Schedule per Drawing A601A. The storefront SF-8 is at opening 101/2 and per drawing A101A, SF-9 is at opening 134/2.

The hollow metal frame and solid core wood door at opening 104 is to be furnished and installed by BP 08A Doors, Frames, & Hardware.