ROW_RoadName_Maintenance_Responsability_Length_Road.pdf

PDF 114 KB Posted

Attached to
Maintaining Multi-Use Path and Rights of Way
Solicitation number
26-20
Issued by
Walton County, Florida

About this file

This file is a Right of Way (ROW) Maintenance Responsibility table from a Florida county jurisdiction that details multi-use path and rights of way maintenance assignments across 15 identified road segments. The document outlines maintenance responsibilities divided between two entities: Public Works and TDC (likely a third-party contractor or district). Services include full maintenance and limited maintenance activities on roads ranging from Allen Loop Drive to Thompson Road, with path lengths varying from 0.01 miles to 13.28 miles and corresponding road lengths from 0.01 miles to 6.64 miles. The contract period consists of an initial one-year term commencing upon full execution, with potential renewal options available at the County's discretion. The maintenance assignments are distributed across both Public Works and TDC, with TDC maintaining responsibility for segments including Allen Loop Drive, County Highway 283 South, Lake Causeway, South County Highway 393, South County Highway 395, South County Highway 83, South County Highway 395, Scenic Gulf Drive (limited maintenance), and Thompson Road.

The document does not provide specific pricing terms, bid amounts, set-aside information, or incumbent contractor details. No information regarding funding sources, budget allocations, or financial requirements is included in this table. The file is dated June 23, 2026, and serves as a reference document for understanding the geographic scope and maintenance responsibility allocation across the county's multi-use paths and rights of way.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROW Maintenance Responsability Road Name Maintenance Type Bid Budget Responsability

ALLEN LOOP DR

Full Maintenance

TDC

Path Length 2.39 Miles

Road Length 1.20 Miles

CHAT HOLLEY RD

Full Maintenance

Public Works

Path Length 3.22 Miles

Road Length 1.61 Miles

TDC

Path Length 3.23 Miles

Road Length 1.61 Miles

COUNTY HIGHWAY 283 N

Full Maintenance

Public Works

Path Length 1.35 Miles

Road Length 0.67 Miles

TDC

Path Length 1.34 Miles

Road Length 0.67 Miles

COUNTY HIGHWAY 283 S

Full Maintenance

TDC

Path Length 3.33 Miles

Road Length 1.66 Miles

COUNTY HIGHWAY 30A

Full Maintenance

Public Works

Path Length 9.93 Miles

Road Length 4.97 Miles

TDC

Tuesday, June 23, 2026 Page 1 of 4

Path Length 12.73 Miles

Road Length 6.36 Miles

Limited Maintenance

TDC

Path Length 13.28 Miles

Road Length 6.64 Miles

DRIFTWOOD RD

Full Maintenance

Public Works

Path Length 0.45 Miles

Road Length 0.23 Miles

TDC

Path Length 0.46 Miles

Road Length 0.23 Miles

ELLIS RD

Full Maintenance

Public Works

Path Length 0.47 Miles

Road Length 0.23 Miles

TDC

Path Length 0.47 Miles

Road Length 0.23 Miles

J D MILLER

Full Maintenance

Public Works

Path Length 1.40 Miles

Road Length 0.70 Miles

TDC

Path Length 1.40 Miles

Road Length 0.70 Miles

LAKE CSWY

Full Maintenance

TDC

Path Length 0.03 Miles

Road Length 0.01 Miles

Tuesday, June 23, 2026 Page 2 of 4

N COUNTY HIGHWAY 393

Full Maintenance

Public Works

Path Length 1.01 Miles

Road Length 0.50 Miles

TDC

Path Length 1.01 Miles

Road Length 0.50 Miles

N COUNTY HIGHWAY 395

Full Maintenance

Public Works

Path Length 1.09 Miles

Road Length 0.55 Miles

TDC

Path Length 1.10 Miles

Road Length 0.55 Miles

S COUNTY HIGHWAY 393

Full Maintenance

TDC

Path Length 3.67 Miles

Road Length 1.83 Miles

S COUNTY HIGHWAY 395

Full Maintenance

TDC

Path Length 2.92 Miles

Road Length 1.46 Miles

S COUNTY HIGHWAY 83

Full Maintenance

Public Works

Path Length 0.18 Miles

Road Length 0.09 Miles

TDC

Path Length 0.88 Miles

Road Length 0.44 Miles

Tuesday, June 23, 2026 Page 3 of 4

S COUNTY HIGWAY 395

Full Maintenance

TDC

Path Length 2.93 Miles

Road Length 1.47 Miles

S HOLIDAY RD

Full Maintenance

Public Works

Path Length 0.46 Miles

Road Length 0.23 Miles

TDC

Path Length 0.54 Miles

Road Length 0.27 Miles

SCENIC GULF DR

Full Maintenance

Public Works

Path Length 3.28 Miles

Road Length 1.64 Miles

TDC

Path Length 1.26 Miles

Road Length 0.63 Miles

Limited Maintenance

TDC

Path Length 1.33 Miles

Road Length 0.67 Miles

THOMPSON RD

Full Maintenance

TDC

Path Length 2.44 Miles

Road Length 1.22 Miles

Tuesday, June 23, 2026 Page 4 of 4

File details come from the government source that posted it. Updated .