ROSENFELD PARK BIDDING PLANS 2026 05 18 1.pdf
PDF 43 MB Posted
- Solicitation number
- PE-66956-NONST-2026-000000064
- Issued by
- Dekalb County, Georgia
About this file
Rosenfeld Park Improvements Construction Project Summary
This document is a comprehensive set of construction bidding plans for the City of Tucker, Georgia, prepared by Keck & Wood, Inc., for the Rosenfeld Park Improvements project located at 2088 Glacier Drive in DeKalb County, Georgia. The project encompasses site construction improvements including demolition of existing structures (tennis courts, bleachers, retaining walls, and concrete paths), site preparation and grading, construction of new tennis courts with NovaCushion surface systems, a bioretention pond and infiltration trench for stormwater management, retaining walls, concrete sidewalks and pedestrian paths with ADA-compliant ramps, a parking area with striping, chain-link fencing, landscape improvements, and electrical work including Musco lighting systems. The plans include detailed construction details, erosion and sediment control measures, drainage profiles, and specifications for all components. The project is issued for bidding as of May 18, 2026, with the construction documents serving as the basis for competitive bids from qualified contractors.
The bidding plans establish comprehensive technical and administrative requirements for the contractor, including responsibility for obtaining all necessary permits (demolition and construction), compliance with local, state, and federal building codes, utility coordination and verification, erosion control installation prior to any work, daily inspections and maintenance of erosion controls, spill prevention and cleanup procedures, and proper disposal of all demolition debris and hazardous materials. The contractor must coordinate with Musco for salvage of existing light poles, conduct geotechnical proof-roll of subgrade in the presence of a geotechnical engineer, maintain temporary site access through all entrances, and provide equipment storage within the site limits unless written permission is obtained. The plans incorporate Georgia Department of Transportation (GDOT) standards and City of Tucker specifications, with the more stringent standard applying in cases of conflict. Contractor costs include all demolition, erosion control, inspections, sampling, testing, and mobilization, with the project subject to NPDES storm water permitting requirements and turbidity monitoring protocols for the receiving water (Little Stone Mountain Creek).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 2026_001 Rosenfeld Park Improvements_ Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Tucker 1975 Lakeside Parkway, Suit 350 Tucker, GA 30084 (470)273-3076 Contacts: Sara Holmes
Construction Drawings for the
Keck and Wood 3090 Premiere Pkwy, Suite 200 Duluth, GA 30097 (678)417-4000
LOCATION MAP
N.T.S.
Rosenfeld Park Improvements
2088 Glacier Drive Tucker, Dekalb, Georgia April 20, 2026
OWNED BY:
DEVELOPED BY:
AREA MAP
I-75
I-85
ATLANTA
I-20
Tucker
N.T.S.
C-0.0
C O
V E
R S
H E
E T
N
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
C-0.0 COVER SHEET
C-0.1 GENERAL NOTES AND LEGEND
C-1.0 EXISTING CONDITIONS PLAN
C-2.0 DEMOLITION PLAN
C-3.0 SITE PLAN
C-4.0 GRADING PLAN
C-4.2 DRAINAGE PROFILES
SITE PLANS
D-1.0 CONSTRUCTION DETAILS
D-2.0 CONSTRUCTION DETAILS
SHEET NUMBER SHEET TITLE
EC-0.1 ESPCP NOTES
EC-1.0 ESPCP - PHASE 1
EC-1.1 ESPCP - PHASE 2
EC-1.2 ESPCP - PHASE 3
EC-2.0 ESPCP DETAILS
L-1.0 LANDSCAPE PLAN
L-2.0 LANDSCAPE DETAILS
EC-0.2 ESPCP NOTES
EC-2.1 ESPCP DETAILS
PROJECT
LOCATION
EC-0.3 ESPCP NOTES & LEGEND
EC-0.4 ESPCP CHECKLIST
C-4.1 STORM DRAINAGE PLAN
D-3.0 CONSTRUCTION DETAILS
D-4.0 CONSTRUCTION DETAILS
D-5.0 CONSTRUCTION DETAILS
D-6.0 CONSTRUCTION DETAILS
D-7.0 CONSTRUCTION DETAILS
E-0.1 NOTES & LEGENDS - ELECTRICAL
E-0.2 COMCHECK - ELECTRICAL
E-1.0 DEMOLITION - ELECTRICAL
E-3.0 LIGHTING & POWER - ELECTRICAL
E-4.0 RISER DIAGRAM & LIGHTING SCHEDULE
E-2.0 PHOTOMETRICS - ELECTRICAL
D-8.0 CONSTRUCTION DETAILS
D-9.0 CONSTRUCTION DETAILS
5/18/26
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc. C-0.1
G E
N E
R A
L N
O T
E S
A N
D L
E G
E N
D
S
SS
H Y D
LOC
GV
W
FM
OE
T1
W
UE
G
UT
GRADING / EROSION CONTROL
W
FM
OE
UE
G
UT
ACCACC
WL
u u u
LOD
WV
u
B1
WQ2
Tc
F F
SANITARY MANHOLE
SANITARY SEWER LINE
SANITARY SEWER SERVICE
SEWER FORCE MAIN
AIR RELEASE VALVE
POTABLE WATER
SANITARY SEWER
EXISTING PROPOSED
FIRE HYDRANT
WATER SERVICE
WATER VALVE
TEE
TAP
REDUCER
BLOWOFF
STUBOUT
WATERLINE
FIRE LINE
WELL
STORM SEWER
FLARED END SECTION
TYPE 1 CATCH BASIN
TYPE 9 CATCH BASIN
STORM DRAIN JUNCTION BOX
DROP INLET
STORM DRAIN
STORM DRAIN EASEMENT
MAJOR CONTOUR
MINOR CONTOUR
TEMPORARY CONTOUR
SPOT ELEVATION
TOP OF WALL ELEVATION
BOTTOM OF WALL ELEVATION
TEMPORARY INLET PROTECTION
LIMITS OF CONSTRUCTION
LIMITS OF DISTURBANCE
TEMPORARY DIVERSION DIKE
TEMPORARY DIVERSION SWALE
PERMANENT SWALE/DITCH
EXISTING SWALE/DITCH
SILT FENCE
TIME OF CONCENTRATION
TEMPORARY SEDIMENT TRAP
BASIN
WATER QUALITY BASIN
TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE
CHECK DAM
TEMPORARY FILTER BERM
TREE PROTECTION FENCING
CONCRETE WASHOUT AREA
EXISTING PROPOSED
DRY UTILITIES
LIGHT POLE
POWER POLE
GUY WIRE
ELECTRICAL TRANSFORMER
ELECTRICAL BOX
TELEPHONE PEDESTAL
TRANSMISSION TOWER
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
GAS VALVE
GAS LINE
UNDERGROUND TELEPHONE
SITE PLAN
ACCESSIBLE RAMP
SIGN
DOUBLE POLE SIGN
ACCESSIBLE PARKING SPACE
CROSSWALK
DIRECTIONAL ARROWS
(FOR INFORMATION ONLY)
DIRECTIONAL ARROWS
(TO BE PAINTED)
CONCRETE SIDEWALK
BOLLARD
MAIL BOX
REVISION MARKER
SURVEY
EXISTING IRON PIN
NEW IRON PIN (5/8" REBAR)
CALCULATED POINT
BENCHMARK
D
W
S
500.00
TW-500.00
BW-500.00
500.00
TW-500.00
BW-500.00
A B
>-SS-> >-SS->
DD
D D
SD
N 61°47'59" E 1413.93'
X
XXX
X
XXX
ooooooooooooooooooooooooo
AA
PP
R/W
OTHER LINE TYPES
ROAD CENTERLINE
PROPERTY LINE
PROPERTY BOUNDARY
WOOD FENCE
BARBED WIRE FENCE
CHAIN LINK FENCE
CITY LIMITS
PHASE LINES
STREAM
STREAM BUFFER
CURB AND GUTTER
EDGE OF PAVEMENT
SETBACK
AIR LINES
PETRO LINES
PERMANENT EASEMENT
TEMPORARY EASEMENT
RIGHT OF WAY
SS
WM
G E
N E
R A
L N
O T
E S
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o ooo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o oo oo oo oo oo oo oo oo oo oo oo oo oo o o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oR /W
SD
SD
SD
SD
SD
SD
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R/W
R/W
R/W
R/W R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
SD
SDSD
100010
C-1.0
E X
IS
T
IS
T
IN
G
C O
N D
IT
IO
N S
PL
A
N
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
N
0 20' 40'
SCALE: 1" = 20'
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o ooo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o oo oo oo oo oo oo oo oo oo oo oo oo oo o o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oR /W
SD
SD
SD
SD
SD
SD
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R/W
R/W
R/W
R/W R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
SD
SDSD
100010
REMOVED AND SAVE
EXISTING LIGHT POLES, TYP.
CONTRACTOR TO COORDINATE WITH
MUSCO TO SALVAGE LIGHT POLES.
REMOVE EXISTING
BLOCK WALL
REMOVE EXISTING
BLEACHERS
REMOVE EXISTING
TIMBER STEPS
REMOVE EXISTING
CONCRETE PATH
DO NOT DISTURB
EXISTING BATH HOUSE
REMOVE EXISTING
TIMBER WALL
REMOVE EXISTING
TENNIS COURTS
REMOVE EXISTING
CONCRETE SIDEWALK
REMOVE EXISTING 10'
CHAIN LINK FENCE, TYP.
REMOVE EXISTING
CURB & GUTTER
AT PROPOSED DRIVEWAY
REMOVE EXISTING
CONC SIDEWALK
AT PROPOSED DRIVEWAY
C-2.0
D E
M O
L
IT
IO
N
P L
A N
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
N
0 20' 40'
SCALE: 1" = 20'
GENERAL NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE DEMOLITION PERMIT FROM CITY OF TUCKER PRIOR TO
DEMOLITION OF THE SITE.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.
3. ALL CONSTRUCTION RELATED PERMITS DURING THE CONSTRUCTION PHASE ARE THE RESPONSIBILITY OF THE
CONTRACTOR.
4. REMOVE SHRUBS AND TREES AS NOTED. ROOTS AND STUMPS TO BE GRUBBED OUT.
5. CONTRACTOR IS RESPONSIBLE FOR THE LEGAL DISPOSAL OF ALL DEBRIS.
DEMOLITION NOTES:
1. ALL NEW WORK SHOWN IN THESE PLANS SHALL COMPLY WITH LOCAL, STATE, AND FEDERAL BUILDING AND UTILITY
INSTALLATION CODES.
2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH GEORGIA DOT SPECIFICATIONS FOR ROADS AND STRUCTURES EXCEPT IN CASES WHERE WITHIN CITY OF TUCKER JURISDICTION. IN THESE CASES, THE
CONTRACTOR SHALL USE WHICHEVER SPECIFICATION IS MORE STRINGENT.
3. THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY THE OWNER IN CASE OF DISCREPANCIES THAT
AFFECT THE CONSTRUCTION PROJECT.
4. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY OCCUR TO ADJACENT STRUCTURES OR PROPERTY AS WELL AS ANY DAMAGE TO EXISTING STRUCTURES WITHIN THE LIMITS OF CONSTRUCTION DESIGNATED TO REMAIN.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF DAMAGED PROPERTY TO THE OWNER'S
SATISFACTION AT NO ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR SHALL NOT DEVIATE FROM THE PLANS OR SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT
OF THE ENGINEER.
6. THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE TEMPORARY MEASURES AS NECESSARY TO MAINTAIN ACCESS TO THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING CONSTRUCTION. THESE TEMPORARY PROVISIONS MAY INCLUDE BUT ARE NOT LIMITED TO: TRAFFIC CONTROL, BARRICADES, FLAG-PERSON, SIGNAGE, OR OTHER METHODS
NECESSARY TO ACCOMPLISH THE WORK.
7. CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF CRANES AND CONSTRUCTION EQUIPMENT OPERATIONS
DURING DEMOLITION ACTIVITY.
8. CONTRACTOR EQUIPMENT SHALL NOT BE PARKED IN COUNTY, CITY OR STATE RIGHT-OF-WAY AND MUST BE STORED WITHIN THE SITE UNLESS GRANTED WRITTEN CONSENT BY THE OWNER OF THE AFOREMENTIONED RIGHT-OF-WAY.
9. THE CONTRACTOR IS RESPONSIBLE FOR COMMUNICATION AND COORDINATION WITH CITY OF TUCKER AS REQUIRED
DURING ALL DEMOLITION AND CONSTRUCTION ACTIVITY.
10. THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE
LOCAL, STATE, AND FEDERAL LAWS AND REQUIREMENTS.
11. THE CONTRACTOR IS RESPONSIBLE FOR THE LEGAL DISPOSAL OF ALL ITEMS DESIGNATED FOR REMOVAL.
12. THE CONTRACTOR SHALL CONTRACT UTILITIES PROTECTION CENTER PRIOR TO ANY EXCAVATION.
13. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
14. ALL COSTS FOR DEMOLITION SHALL BE INCLUDED IN BID QUOTE.
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o ooo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o oo oo oo oo oo oo oo oo oo oo oo oo oo o o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oR /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R/W
R/W
R/W
R/W R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
157'
121'
9.0'
18.0'
5.0'
24.0'
5' CONCRETE SIDEWALK
TENNIS COURTS
SEE DETAILS
PROOF ROLL SUBGRADE
IN PRESCENCE OF
GEOTECHNICAL ENGINEER
9.0' 9.0'
12.00'
78.00'21.50' 21.50'
36.00'
12.50'
12.50'
R25'
R49'
R3'R3'
SIDEWALK ADA RAMP
GDOT TYPE C
WITH HEADER CURB
SEE DETAIL
LOCLOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC
LOC LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C LOC LO
C
LOC
LOC
LOC
LOC
LOC
LO
C
LOCLOCLOCLOC
LO
C
LOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC LOC
5'
TIE TO EXISTING
CURB & GUTTER
TIE TO EXISTING
CURB & GUTTER
PROPOSED ADA RAMP
SEE DETAIL
TIE TO EXISTING SIDEWALK
PROPOSED ADA RAMP
SEE DETAIL
TIE TO EXISTING SIDEWALK
5' CONRETE SIDEWALK
5' CONRETE SIDEWALK
24 IN CURB & GUTTER, TYP.
PROPOSED DRIVEWAY TO
MATCH EXISTING
PAVEMENT ELEVATION
CONTRACTOR TO IDENTIFY
BEST LOCATION THAT MINIMIZES
IMPACT TO THE WOODED AREA
AND ALLOWS FOR AN ADA
COMPLIANT PATH
CHAIN LINK
FENCE GATE - 7' HT.
CHAIN LINK
FENCE GATE - 7' HT.
REMOVE EXISTING STOP SIGN
AND REPLACE WITH NEW
GDOT STD. STOP SIGN
PROPOSED TYPE B RAMP.
SEE SHEET D-4.0 FOR DETAIL.
R14' R24'
PROPOSED STOP SIGN
PROPOSED PAINT STOP BAR
53'
PROPSED MUSCO LIGHTING (TYP., 4 ON SITE)
PROPOSED BIORETENTION POND #1
SEE DETAILS
BOTTOM ELEV: 989.0
PONDING ELEV: 990.0
TOP OF BERM: 991.0
21.00' 18.00'
13.50'
13.50'
4.50'
12.00'
4.50'
21.50'
12.00'
21.00'
12.00'
21.00'
24.87' 24.87'
24.87'
80.00'
8.00' 10.00'
98.83'
50.83'
6.00'
6.00'
51.50'
42.00'
51.50'
18.00'
MATCH EX.
PROPOSED BLOCK STAIRS
SEE DETAIL 24, SHEET D-5.0
PROPOSED SWALE
PROPOSED GRAVITY WALLS
SEE DETAIL 29, SHEET D-8.0
PROPOSED CONCRETE
PEDESTRIAN PATH
PROPOSED CONCRETE STEPS
(SEE DETAIL 25, SHEET D-6.0)
CHAIN-LINK FENCE (10' HT.)
(SEE DETAIL 30, SHEET D-9.0)
TERRACED SEATING SECTION
(SEE DETAIL 28, SHEET D-7.0)
ADA SIGN LOCATION
ATTACHED TO FENCE FABRIC
24.87'
CONNECT BLOCK STAIRS
TO CONCRETE STEPS
C-3.0
SI
T
E P
L A
N
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
N
0 20' 40'
SCALE: 1" = 20'
A A'
E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
R /W
SD
SD
SD
SD
SD
SD
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R/W
R/W
R/W
R/W R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
SD
SDSD
100010
S
S
S S
S
S
S
S
S S S
S
S
S
S S
S
S S
S
S
S S
S
S S
SS
S
S
992.55
992.55
992.55
992.55993.10
993.10
993.10
993.05
991.50
991.76
992.24
992.22
992.25
992.14
992.09
992.40
992.39
992.48
992.52
992.49
992.55
991.34
989.00
990.71 991.14
991.34 991.30
991.50
992.00
992.00
992.00
992.00
992.00
990.00
989.75
988.58
989.81
989.93
987.65
991.77
993.10
LOCLOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC
LOC LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C LOC LO
C
LOC
LOC
LOC
LOC
LOC
LO
C
LOCLOCLOCLOC
LO
C
LOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC LOC
PROPOSED BIORETENTION POND #1
SEE DETAILS
BOTTOM ELEV: 989.0
PONDING ELEV: 990.0
TOP OF BERM: 991.0
CONCRETE SPILLWAY
GDOT STD. 9013
SEE DETAIL
PROPOSED PEDESTAL TOP INLET
SEE DETAIL
18" DOME NYLOPLAST DRAIN BASIN
SEE DETAIL
GRASS CHANNEL
BMP #3
SEE DETAIL
6" PERFORATED PVC
UNDERDRAIN
6" PERFORATED PVC
UNDERDRAIN
10001003
992 992
992 991 990
INFILTRATION TRENCH
5' WIDE X 160' LONG X 3.5' DEEP
BMP #4
SEE DETAIL
OBSERVATION WELL (TYP)
6" PERFORATED PVC TO
BOTTOM OF TRENCH
OBSERVATION WELL (TYP)
6" PERFORATED PVC TO
BOTTOM OF TRENCH
OBSERVATION WELL (TYP)
6" PERFORATED PVC TO
BOTTOM OF TRENCH
S
S
18" DOME NYLOPLAST DRAIN BASIN
SEE DETAIL
1008.16 (ex. stair connection)
TOP: 996.30
18" NYLOPLAST JUNCTION BOX
SEE DETAIL
18" DOME NYLOPLAST DRAIN BASIN
SEE DETAIL
993.04
992.94
993.10
993.20
993.17
993.17 995.20
995.20
993.17
993.17 995.20
995.20
993.20
995.27 997.27
995.20
995.26
995.26
TW 997.27
997.27
HP 996.78
996.86
996.93
995.57
997.20
RIP RAP LINED CHANNEL TO CURVE TOWARD
EXISTING DITCH, REF. EC-1.1
FOR RIP RAP DETAILS
C-4.0
G R
A D
IN
G
P L
A N
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
N
0 20' 40'
SCALE: 1" = 20'
FLOODPLAIN CUT/FILL ANALYSIS:
CUT: 139.70 CY
FILL: 114.18 CY
E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o ooo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo o oo oo oo oo oo oo oo oo oo oo oo oo oo o o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo o oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo oo ooo oo oo oo oo oR /W
SD
SD
SD
SD
SD
SD
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R/W
R/W
R/W
R/W R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
R/W R/W
SD
SDSD
100010
15" HDPE
LOCLOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC
LOC LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C LOC LO
C
LOC
LOC
LOC
LOC
LOC
LO
C
LOCLOCLOCLOC
LO
C
LOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC LOC
PROPOSED BIORETENTION POND #1
SEE DETAILS
BOTTOM ELEV: 989.0
PONDING ELEV: 990.0
TOP OF BERM: 991.0
CONCRETE SPILLWAY
GDOT STD. 9013
SEE DETAIL
PROPOSED PEDESTAL TOP INLET
SEE DETAIL
18" DOME NYLOPLAST DRAIN BASIN
SEE DETAIL
GRASS CHANNEL
BMP #3
SEE DETAIL
6" PERFORATED PVC
UNDERDRAIN
6" PERFORATED PVC
UNDERDRAIN
10001003
992 992
992 991 990
12" HDPE
INFILTRATION TRENCH
5' WIDE X 160' LONG X 3.5' DEEP
BMP #4
SEE DETAIL
OBSERVATION WELL (TYP)
6" PERFORATED PVC TO
BOTTOM OF TRENCH
OBSERVATION WELL (TYP)
6" PERFORATED PVC TO
BOTTOM OF TRENCH
OBSERVATION WELL (TYP)
6" PERFORATED PVC TO
BOTTOM OF TRENCH
18" R
CP
12" HDPE
12" HDPE
6" P
VC
P ip e
- P
ER
FO
R
AT
ED
18" DOME NYLOPLAST DRAIN BASIN
SEE DETAIL
0+00
1+00
2+00
2+11.76
18" NYLOPLAST JUNCTION BOX
SEE DETAIL
18" DOME NYLOPLAST DRAIN BASIN
SEE DETAIL
RIP RAP LINED CHANNEL TO CURVE TOWARD
EXISTING DITCH, REF. EC-1.1
FOR RIP RAP DETAILS
C-4.1
ST
O
R M
D R
A
IN
A G
E P
L A
N
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
N
0 20' 40'
SCALE: 1" = 20'
STORM SYSTEM A
7.
0.
1.
0.
3.
1.
3.
9.
4.
9.
4.
0.
4.
1.
5.
2.
5.
5.
5.
6.
7.
6.
7.
6.
7.
PROPOSED GRADE
EXISTING GRADE
70 LF OF 15" HDPE
@ 0.50%108 LF OF 18" RCP
@ 1.00%
A3
18" NYLOPLAST DRAIN BASIN
TOP ELEV. 991.50
INV. IN 987.53 (12" HDPE)
INV. IN 989.36 (12" HDPE)
INV. OUT 987.43 (15" HDPE)
A2
GRATE INLET - GDOT 1019A TYPE C
TOP ELEV. 990.00
INV. IN 987.08 (15" HDPE)
INV. OUT 987.00 (18" RCP)
A1
HEADWALL -
GDOT 1125
INV. 985.92
STORM SYSTEM B
41 LF OF 12" HDPE
@ 2.00%
99 LF OF 12" HDPE
@ 1.65%
A4
18" NYLOPLAST JUNCTION BOX
TOP ELEV. 994.78
INV. IN 992.17
INV. OUT 990.17
A5
18" NYLOPLAST DRAIN BASIN
TOP ELEV. 996.30
INV. OUT 993.80
PROPOSED GRADE
EXISTING GRADE
70 LF OF 15" HDPE
@ 0.50%
1.
1.
2.
2.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
A3
18" NYLOPLAST DRAIN BASIN
TOP ELEV. 991.50
INV. IN 987.53 (12" HDPE)
INV. IN 989.36 (12" HDPE)
INV. OUT 987.43 (15" HDPE)
A3.2
12" CLEAN OUT
TOP ELEV. 993.16
INV. OUT 988.69 (6" PVC Pipe)
6" PVC Pipe-PERFORATED
12" HDPE
A3.1
18" NYLOPLAST JUNCTION BOX
TOP ELEV. 992.48
INV. IN 987.80 (6" PVC Pipe)
INV. OUT 987.70 (12" HDPE)
RIP RAP PROTECTION
SEE SHEET EC-1.1
FOR LIMITS AND QUANTITY
C-4.2
ST
O
R M
D R
A
IN
A G
E P
R O
F
IL
E
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
D-1.0
C O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
DRAINAGE IN A SINGLE PLAN
TYPICAL DRAINAGE PATTERN
FOR MULTIPLE TENNIS COURTS
(NOT TO SCALE)
NOTES:
MAXIMUM RECOMMENDED LENGTH OF
SLOPE ACROSS COURT SURFACES IS
180'. LONGER LENGTHS CAN LEAD TO
EROSION OF THE SURFACE OR
SURROUNDING AREAS.
1 2 3 TENNIS NET POST FOOTING
DRAINAGE PATTERN
ASPHALT COURT SECTION
6 TYPICAL COURT OVERRUNS
EXTENDED APRON SECTION - ASPHALT COURT
COURT SURFACE SYSTEMS 7
PLAYING LINE LAYOUT
NOTE:
FOOTING FOR INFORMATION PURPOSES ONLY.
CONTRACTOR TO PROVIDE SHOP DRAWINGS
FOR APPROVAL.
NOTES:
STRIPING TO BE PROVIDED BY COURT
SURFACE VENDOR, INCLUDE IN
SUBMITTAL
NOTES:
TENNIS COURT SURFACE TO BE NOVACUSHION COLOR FINISH SYSTEM BY NOVA
SPORTS U.S.A. INC. (800 USA NOVA) / WWW.NOVASPORTS.COM, OR CITY APPROVED
EQUAL
SURFACING SHALL BE A COMPLETE SYSTEM INSTALLATION, WITH ALL PREPARATION,
PRODUCTS, ETC. AS REQUIRED BY THE MANUFACTURER'S SPECIFICATIONS. DEPENDING
ON SELECTED MANUFACTURER, SUFACE CONDITIONS OF THE ASPHALT MAY DIFFER.
INCLUDE MODIFICATIONS TO ASPHALT SYSTEM AS RECOMMENDED BY THE
MANUFACTURER AS PART OF THE BID PRICE. SUBMIT PRODUCT INFORMATION FOR
REVIEW AND COLOR SAMPLES FOR APPROVAL PRIOR TO ANY ORDERING, INSTALLATION,
ETC.
TENNIS EQUIPMENT8
TENNIS EQUIPMENT SPECIFICATION:
DOUGLAS INDUSTRIES, INC. WWW.DOUGLAS-SPORTS.COM
FOR EACH COURT PROVIDE:
NET: TN-28DM TOURNAMENT TENNIS NET (ITEM NO. 30060)
SIDEWINDER CRANK, 3.5", GREEN (63005);
GS-24 STEEL GROUND SLEEVE FOR 3.5" O.D. POST;
DELUXE ACS ADJUSTABLE CENTER STRAP (20600),
CENTER TIE-DOWN ANCHOR (63428)
ALL EQUIPMENT: PROVIDE MANUFACTURER'S CUTSHEETS FOR COLOR REIVEW AND
APPROVAL. INSTALL ALL COMPONENTS PER MANUFACTURER'S RECOMMENDATIONS.
MANUFACTURES SHALL BE THOSE LISTED, OR CITY APPROVED EQUAL.
D-2.0
O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
TENNIS NET CENTER STRAP ANCHOR8 10 CONCRETE SIDEWALK DETAIL
1. SIDEWALK FINISH IS TO BE A BROOM FINISH AND TO THE SATISFACTION OF THE CITY OF TUCKER. CITY & ENGINEER
TO REVIEW FIRST POUR, PRIOR TO MOVING FORWARD WITH REMAINING CONCRETE PLACEMENT.
GENERAL NOTES:
2. A GROOVE JOINT 1" DEEP WITH 1/8" RADII SHALL BE REQUIRED IN THE CONCRETE SIDEWALK AT MAXIMUM 8' INTERVALS. ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT MAXIMUM 48' INTERVALS. A 1/2" EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. SEE PLANS FOR JOINT LOCATIONS.
3. JOINT SEALANT SHALL COMPLY WITH GDOT STANDARD SPECIFICATIONS.
4. SIDEWALKS SHALL HAVE A MAXIMUM CROSS SLOPE OF 2.00% AND A MAXIMUM LONGITUDINAL SLOPE OF 8.3%.
5. ALL CONCRETE TO BE A MINIMUM 3,500 PSI.
9 TENNIS NET ELEVATION
PAINTED ACCESSIBLE SYMBOL
ACCESSIBLE PARKING SIGN
2" 2"
2" 5"
2" 5"
12"
N.T.S.
SIGN MOUNTING DETAIL11 PAINTED ACCESSIBLE SYMBOL12
STOP
(USE WHERE SIGN IS NOT WITHIN CURBED ISLAND)
SIGN MOUNTING AND BASE WITH BOLLARD
(USE WHERE SIGN IS WITHIN CURBED ISLAND)
SIGN MOUNTING AND BASE WITHOUT BOLLARD
D-3.0
O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
PARKING STRIPING DETAIL13 15 ADA PARKING STRIPING DETAIL14 PAVEMENT SECTION DETAIL
ADA PARKING STRIPING
TYPICAL PARKING STRIPING
GENERAL NOTES
BIORETENTION DETAIL16 INFILTRATION TRENCH DETAIL17
D-4.0
O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
CONCRETE SPILLWAY DETAIL18 19 SIDEWALK WHEELCHAIR RAMP DETAIL
CURB & GUTTER DETAIL20 PEDESTAL TOP INLET DETAIL21
NOTE:
TYPE 'C' WITH A PEDESTAL
TOP TO BE USED.
D-5.0
O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.24 BLOCK STAIR DETAIL
18" NYLOPLAST DRAIN BASIN22 23 18" NYLOPLAST DRAIN BASIN
SCALE: 2" = 1' - 0"
GDOT STANDARD GAB
(GRADED AGGREGATE BASE)
#57 STONE
4"
4"
18" MIN.
(VARIES)
NOTES:
1. BLOCK WALL & CAP TO BE BELGARD HERITAGE AB
COLLECTION, OR CITY APPROVED EQUAL.
2. COLOR TO BE SELECTED BY OWNER DURING SUBMITTAL
PROCESS. CONTRACTOR TO PROVIDE FULL COLOR RANGE
FOR APPROVAL PRIOR TO ORDERING.
3. INCLUDE CORNER BLOCKS AS REQUIRED BASED ON LAYOUT.
FILTER FABRIC
COMPACTED SUBGRADE
BLOCK WALL CAP
BLOCK WALL
CORNER BLOCK
PLAN VIEW (NTS)
CORNER BLOCK
GDOT STANDARD GAB
(GRADED AGGREGATE BASE)
6" - 7" RISER
D-6.0
O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.27 POST SECTION AND FOOTING DETAIL
NTS
1 12" O.D. HANDRAIL,
REF. HANDRAIL DETAILS
SHEET C.6.X
ADJACENT PAVING,
REF. SITE PLAN
1'-0" FROM
NOSE OF
TOP STAIR
3'-0"
3'-0"
EQUAL SPACING
5' MAX. / 4' MIN.
1'-0" FROM
NOSE OF
TOP STAIR
1'-0"
ADJACENT PAVING,
REF. SITE PLAN
EXPANSION JOINT
1'-0"
6"
TYP.
2% SLOPE
NOTES:
1. REVIEW GRADING PLANS FOR RISER
NUMBERS
2. ALL RISERS TO BE 6" HT. UNLESS
OTHERWISE INDICATED ON THE PLANS.
3. PROVIDE LIGHT BROOM FINISH
4. TREADS TO SLOPE 1% FOR POSITIVE
DRAINAGE
5. CONCRETE TO BE 3500 PSI AIR
ENTRAINED, FIBER REINFORCED CONC.
6"
1'-0"
1'-6"
1'-0"
R1.5"
#4 BARS 12" O.C.E.W.
2" CLEAR
TO REINFORCING
#3 BARS CONT.
1" CLEAR
4"
3500 PSI CONCRETE
CHEEKWALL, SEE PLANS FOR
LOCATION, REF DETAIL THIS SHEET
R1.5"
6"
3"
RAIL NOTES26
1 12" O.D. ALUMINUM PIPE RAIL
(1.90 O.D., 0.145 WALL THICKNESS)
WELD ALL AROUND
FINISHED GRADE / ADJACENT
PEDESTRIAN PAVING
NOTE: FOOTING TO BE INTEGRAL
WITH PAVING
8"
1'-0"
2" CLEAR
16" Ø WEEP HOLE, LOCATE
AWAY FROM PED. PAVING
WHEN POSSIBLE
CORE DRILL HOLE LARGE ENOUGH
TO RECEIVE POST (POST DIA. + 12")
INSTALL POST W/ NON-SHRINK
GROUT
PROVIDE SLIGHT SLOPE W/ GROUT
AWAY FROM POST
16" Ø GROUT HOLE
CONCRETE STEPS WITH HANDRAIL
D-7.0
O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.
8'-0"
STRUCTURAL FILL FOR AREA
BETWEEN GRAVITY WALLS
TERRACED SEATING - SECTION CUT (A - A')
PROPOSED SWALE
(REFERENCE GRADING PLAN)
18"
1" 4"
10'-0"
PROPOSED TENNIS
COURTS
COURT FENCING
3"
2:1 MAX SLOPE
SLOPE 1%
1" SAND BEDDING
6" PERFORATED PVC PIPE
COMPACTED SUBGRADE TO 95%
SUBGRADE (TYP.)
SUBGRADE (TYP.)
SCALE: 1" = 1' - 0"
SCALE: 2" = 1' - 0"
1"
1" AIR GAP
SEE GDOT DETAIL (GDOT903IL, SEE SHEET D-8.0)
4" STONE VENEER
(TYP.)
3" ROUNDED STONE CAP
(TYP.)
EXPANSION JOINT
(TYP.)
POURED IN PLACE CONCRETE
(TYP.)
GROUT FILL BEFORE GRADE
(TYP.)
#57 STONE CRUSHED
AGGREGATE (TYP.)
1" OVERHANG
D-8.0
O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.29 GRAVITY WALL TYPICAL SECTIONS
D-9.0
O
N
ST
R U
C T
IO
N
D E
T A
IL
S
THIS BAR IS
1 INCH LONG
PLOTTED FULL SCALE
Drawing No.:
Project No.:
Date:
Drawn By: Checked By:
Project Manager:
Scale: As Shown
/1
8/
N O
D
AT
E
R
EV
IS
IO
N
Adam Shelton, P.E.
05/18/2026
KR BF
R os en fe ld P ar k
Im pr ov em en ts
G la ci er
D ri ve T uc ke r, G eo rg ia
220238
Is su ed fo r B id di ng
P re m ie re P ar kw ay , S ui te
D ul ut h, G A
(6
) 4
-4 ke ck w oo d.
co m
G :\S ha re d D riv es
\2
Pr oj ec ts \2
- R os en fe ld
P ar k Im pr ov em en ts \C
AD
\D ra w in gs
\R os en fe ld P ar k
C on st ru ct io n-
-2 1-
-2
5.
dw g
This drawing and the design shown are the property of Keck & Wood, Inc. The reproduction, copying or other use of this drawing without written consent is prohibited and any infringement will be subject to legal action.
© 2025 Keck & Wood, Inc.30 CHAIN-LINK FENCE
END & CORNER POST 3" DIA.
POST SIZING CHART
CORNER & END POST LINE POST De HOLE DIA
FENCE HEIGHT A B C D
4' - 0" 4' - 3" 7' - 3" 3' - 11 34" 6' - 11 34" 3' - 0" 1'-0"
5' - 0" 5' - 3" 7' - 8" 4' - 11 34" 7' - 6"
6' - 0" 6' - 0 58" 9' - 9 58" 5' - 8 78" 9' - 5 78" 3' - 9" 1'-0"
8' - 0" 8' - 0 58" 12' - 3 58" 7' - 8 78" 11' - 11 78" 4' - 3" 1'-0"
10' - 0" 10' - 0 58" 13' - 1" 9' - 8 78" 12' - 8"
12' - 0" 12' - 0 58" 16' - 6 58" 11' - 8 78" 16' - 2 78" 4' - 6" 1'-0"
SINGLE LEAF GATES
N O
M
IN
AL
O
PE
N
IN
G
SQ
. H
IN
G
E
LA
TC
H P
O
ST
AC
TU
AL
O
PE
N
IN
G
H
IN
G E
SE
TT
IN
G
C
R D
H
IN
G E
LA
TC
H
P O
ST
AC
TU
AL
O
PE
N
IN
G
H
IN
G E
SE
TT
IN
G
S C
FR
AM
E B
3' - 0"
1/
2" O
R
" 3' - 1"
0' -2
3" O
D
3'1-1/2"
1/
2'8-1/2" 3' - 6" 3' - 7" 3'7-1/2" 3'2-1/2" 4' - 0" 4' - 1" 4'1-1/2" 3'8-1/2" 5' - 0" 5' - 1" 5'1-1/2" 4'8-1/2" 6' - 0" 6' - 1" 6'1-1/2" 5'8-1/2" 7' - 0"
0' -3
7' - 1"
4" O
D
7'1-1/2" 6'8-1/2" 8' - 0" 8' - 1" 8'1-1/2" 7'8-1/2" 9' - 0" 9' - 1" 9'1-1/2" 8'8-1/2"
10' - 0" 10' - 1" 10'1-1/2" 9'8-1/2" " --- --- --- 6-5/8" 10'2-1/2" 3-1/2" 9'8-1/2"
11' - 0" --- --- --- 4" 11'1-1/2" 2-1/4" 10'8-1/2" " --- --- --- 6-5/8" 11'2-1/2" 3-1/2" 10'8-1/2"
12' - 0" --- --- --- 4" 12'1-1/2" 2-1/4" 11'8-1/2"
6-5/8" 12'2-1/2"
3-1/2" 11'8-1/2"
13' - 0" --- --- --- 13'1-1/2" 12'7-1/2"
DOUBLE LEAF GATES
N O
M
IN
AL
O
PE
N
IN
G
SQ
. H
IN
G
E
LA
TC
H P
O
ST
AC
TU
AL
O
PE
N
IN
G
H
IN
G E
SE
TT
IN
G
C
R D
H
IN
G E
LA
TC
H
P O
ST
AC
TU
AL
O
PE
N
IN
G
H
IN
G E
SE
TT
IN
G
S C
FR
AM
E B
6' - 0"
1/
2" O
R
" 6' - 0"
0' -2
3" OD 6'0-1/2"
1/
2'8-1/2" 7' - 0" 7' - 0"
4" O
D
7'0-1/2" 3'2-1/2" 8' - 0" 8' - 0" 8'0-1/2" 3'8-1/2"
10' - 0" 10' - 0" 10'0-1/2" 4'8-1/2" 12' - 0" 12' - 0" 12'0-1/2" 5'8-1/2" 14' - 0"
0' -3
14' - 0"
4" O
D
14'0-1/2" 6'8-1/2" 16' - 0" 16' - 0" 16'0-1/2" 7'8-1/2" 18' - 0" 18' - 0" 18'0-1/2" 8'8-1/2" 20' - 0" 20' - 0" 20'0-1/2" 9'8-1/2"
" --- --- --- 6-5/8" 20'2-1/2" 3-1/2" 9'8-1/2" 22' - 0" --- --- --- 4" 22'0-1/2" 2-1/4" 10'8-1/2"
" --- --- --- 6-5/8" 22'2-1/2" 3-1/2" 10'8-1/2" 24' - 0" --- --- --- 4" 24'0-1/2" 2-1/4" 11'8-1/2"
6-5/8"
24'2-1/2" 3-1/2"
11'8-1/2" 26' - 0" --- --- --- 26'0-1/2" 12'7-1/2"
GATE SIZING CHART
8'
OPENING
(REF. TO PLANS)
PROVISION FOR PADLOCK
ALL JOINTS SHALL BE
WELDED TO CREATE A
RIGID FRAME.
2 78" O.D. ROUND HINGE
POST
POST CAP (SAME MAT'L/COATING AS POST) - TYP
#9 GAUGE BEFORE
COATING CHAIN LINK
FABRIC 2" MESH
3" O.D. GATE POST
POST FOOTING AS
REQUIRED
A
B D
10' MAX. O.C.
POST CAP (TYP.)
TIE WIRES SPACED ON 24"
1 5/8" O.D TOP & BOTTOM RAILS
LINE POST CAP
LINE POST 2 3/8" O.D
1 5/8" O.D MIDDLE RAIL
LINE POST TIES ON 12"+C
MID-HEIGHT OF FENCE
1 5/8" O.D BRACE RAIL 8'
AND 10' FENCING ONLY
3000 PSI CONC. @ 28 DAYS REFER TO POST
SIZING CHART, FOOTING TYP. FOR LINE POST
NOTE:
ALL FENCE HAS BOTTOM RAIL.3000 PSI CONC. @ 28 DAYS, SEE 2/C4.03
FOR POST SIZING CHART FOOTING
TYP. FOR CORNER AND PULL POST
FINISHED GRADE
TRUSS ROD 1/2" DIA.
TURNBUCKLE
1 5/8" O.D. BRACE RAIL
9 GAUGE CHAIN LINK
KNUCKLED TOP AND
BOTTOM
END/CORNER
POST CAP
GATE HINGE
END/CORNER
POST
TENSION BAND
(TYP.)
TENSION BAR
(TYP.)
FINISHED GRADE
TIE WIRE,
18" O.C., (TYP.)
9 GAUGE CHAIN
LINK; KNUCKLED
TOP AND BOTTOM
CONCRETE FOOTING;
SLOPE FOOTING TO
DRAIN, (TYP.)
WELD ALL JOINTS TO
MAKE RIGID FRAME
PADLOCK PROVISION
2" ANCHOR PIN
1" O.D ANCHOR SLEEVE
A
B
6" 1'
FRAME
ACTUAL OPENING
(REF. TO PLANS)
CHAIN LINK FENCE1
CHAIN LINK GATE (DOUBLE-SWING)2
CHAIN LINK GATE (SINGLE-SWING)3
EC-0.1
SP
C P
N O
T E
S
GENERAL NOTES
1. LOCAL, STATE AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY
POSTED AND PROCEDURES WILL BE MADE AVAILABLE TO SITE PERSONNEL.
2. MATERIAL AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, BROOMS, DUSTPANS, MAPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST AND PROPERLY LABELED PLASTIC AND
METAL WASTE CONTAINERS.
3. SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED AFTER A SPILL AND ADJUSTED AS
NECESSARY TO PREVENT FUTURE SPILLS.
4. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. ALL SPILLS WILL BE REPORTED AS
REQUIRED BY LOCAL, STATE AND FEDERAL REGULATIONS.
5. FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER), THE NATIONAL
RESPONSE CENTER (NRC) WILL BE CONTACTED WITHIN 24 HOURS AT 1-800-424-8802.
6. FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL RESPONSE CENTER (NRC) WILL BE CONTACTED
WITHIN 24 HOURS AT 1-800-424-8802.
7. FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER IMPACT, THE GEORGIA EPD WILL BE
CONTACTED WITHIN 24 HOURS.
8. FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACT, THE SPILL WILL BE CLEANED UP
AND LOCAL AGENCIES WILL BE CONTACTED AS REQUIRED.
9. THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF MORE THAN 1,320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES CAPACITIES OF EQUIPMENT) OR IF ANY ONE PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660 GALLONS. THE CONTRACTOR WILL NEED A SPILL PREVENTION CONTAINMENT AND COUNTERMEASURES PLAN PREPARED BY THAT LICENSED
PROFESSIONAL.
10. SPILL AREA WILL BE KEPT WELL VENTILATED AND PERSONNEL WILL WEAR APPROPRIATE PROTECTIVE
CLOTHING TO PREVENT INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE
11. SPILLS OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL
GOVERNMENT AGENCY REGARDLESS OF THE SIZE.
12. THE SPILL PREVENTION PLAN WILL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE IS ANOTHER ONE. A DESCRIPTION OF
THE SPILL, WHAT CAUSED IT, AND THE CLEANUP MEASURES WILL ALSO BE INCLUDED.
13. THE CONTRACTOR'S SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY-TO-DAY SITE OPERATIONS WILL BE THE SPILL PREVENTION AND CLEANUP COORDINATOR. HE WILL DESIGNATE AT LEAST ONE OTHER SITE PERSON WHO WILL RECEIVE SPILL PREVENTION AND CLEANUP TRAINING. THIS INDIVIDUAL WILL BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND CLEANUP. THE NAMES OF RESPONSIBLE SPILL PERSONNEL WILL BE POSTED IN THE MATERIAL STORAGE AREA AND IN THE OFFICE TRAILER ONSITE
(OR DESIGNATED ONSITE JOB LOCATION).
1. PETROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS AND TARS WILL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES ON-SITE VEHICLE AND MACHINERY DAILY INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH EQUIPMENT. EQUIPMENT MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE WATERS, NATURAL DRAINS AND STORM WATER DRAINAGE INLETS. IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO PREVENT/MINIMIZE SITE CONTAMINATION. DISCHARGE OF OILS, FUELS AND LUBRICANTS IS PROHIBITED. PROPER DISPOSAL METHODS WILL INCLUDE COLLECTION IN A SUITABLE CONTAINER AND DISPOSAL AS REQUIRED BY LOCAL AND STATE REGULATIONS.
2. PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS WILL BE STORED IN TIGHTLY SEALED ORIGINAL CONTAINERS WHEN NOT IN USE. EXCESS PRODUCT WILL NOT BE DISCHARGED TO THE STORM WATER COLLECTION SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS AND PRODUCT CONTAINERS WILL BE DISPOSED OF ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND
RECOMMENDATIONS.
3. CONCRETE TRUCK WASHING - NO CONCRETE TRUCKS WILL BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE OR DRUM
WASH WATER ONSITE.
4. FERTILIZER/HERBICIDES - THESE PRODUCTS WILL BE APPLIED AT RATES THAT DO NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS OR ABOVE THE GUIDELINES SET FORTH IN THE CROP ESTABLISHMENT OR IN THE GSWCC MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA. ANY STORAGE OF THESE MATERIALS WILL BE UNDER ROOF IN SEALED CONTAINERS.
5. BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS WILL BE BURIED OR DISPOSED OF ONSITE. ALL SUCH MATERIAL
WILL BE DISPOSED OF USING PROPER WASTE DISPOSAL PROCEDURES.
1. CONCRETE TRUCK DRUMS WILL NOT BE WASHED OUT ONSITE.
2. SURPLUS CONCRETE WILL NOT BE DISCARDED ONSITE.
3. CONCRETE TRUCK SHOOTS AND TOOLS WILL BE WASHED OUT INTO THE WORKING TRENCH PRIOR TO BACKFILL.
4. NO WATER FROM WASHING OFF TOOLS OR SHOOTS WILL LEAVE THE SITE OR DRAIN ONTO UNDISTURBED AREAS.
SANITARY WASTE
1. A MINIMUM OF ONE PORTABLE SANITARY UNIT WILL BE PROVIDED FOR EVERY TEN WORKERS ON THE SITE. ALL SANITARY WASTE WILL
BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF ONE TIME PER WEEK BY A LICENSED PORTABLE FACILITY PROVIDER IN
COMPLETE COMPLIANCE WITH LOCAL AND STATE REGULATIONS.
2. ALL SANITARY WASTE UNITS WILL BE LOCATED IN AN AREA WHERE THE LIKELIHOOD OF THE UNIT CONTRIBUTING TO STORM WATER DISCHARGE IS NEGLIGIBLE. ADDITIONAL CONTAINMENT BMPS MUST BE IMPLEMENTED, SUCH AS GRAVEL BAGS OR SPECIALLY DESIGNED PLASTIC SKID CONTAINERS AROUND THE BASE TO PREVENT WASTE FROM CONTRIBUTING TO STORM WATER DISCHARGES.
THE LOCATION OF SANITARY WASTE UNITS MUST BE IDENTIFIED ON THE EROSION CONTROL PLAN GRADING PHASE.
INSPECTIONS
PRIMARY PERMITTEE RESPONSIBILITIES. THE DESIGN PROFESSIONAL WHO PREPARED THIS ES&PC PLAN IS TO INSPECT THE INSTALLATION
OF THE INITIAL SEDIMENT REQUIREMENTS AND PERIMETER.
1. EACH DAY WHEN ANY TYPE OF CONSTRUCTION ACTIVITY HAS TAKEN PLACE AT A PRIMARY PERMITTEE'S SITE, CERTIFIED PERSONNEL
PROVIDED BY THE PRIMARY PERMITTEE SHALL INSPECT: (A) ALL AREAS AT THE PRIMARY PERMITTEE'S SITE WHERE PETROLEUM PRODUCTS ARE STORED, USED, OR HANDLED FOR SPILLS AND LEAKS FROM VEHICLES AND EQUIPMENT AND (B) ALL LOCATIONS AT THE PRIMARY PERMITTEE'S SITE WHERE VEHICLES ENTER OR EXIT THE SITE FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING. THESE
INSPECTIONS MUST BE CONDUCTED UNTIL A NOTICE OF TERMINATION IS SUBMITTED.
2. MEASURE AND RECORD RAINFALL WITHIN DISTURBED AREAS OF THE SITE THAT HAVE NOT MET FINAL STABILIZATION ONCE EVERY 24 HOURS EXCEPT ANY NON-WORKING SATURDAY, NON-WORKING SUNDAY AND NON-WORKING FEDERAL HOLIDAY. THE DATA COLLECTED FOR THE PURPOSE OF COMPLIANCE WITH THIS PERMIT SHALL BE REPRESENTATIVE OF THE MONITORED ACTIVITY. MEASUREMENT OF RAINFALL MAY BE SUSPENDED IF ALL AREAS OF THE SITE HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL
VEGETATION AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION.
3. CERTIFIED PERSONNEL (PROVIDED BY PRIMARY PERMITTEE) SHALL INSPECT THE FOLLOWING AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.5 INCHES RAINFALL OR GREATER (UNLESS SUCH STORM ENDS AFTER 5:00 PM ON ANY FRIDAY OR ON ANY NON-WORKING SATURDAY, NON-WORKING SUNDAY OR ANY NON-WORKING FEDERAL HOLIDAY IN WHICH CASE THE INSPECTION SHALL BE COMPLETED BY THE END OF THE NEXT BUSINESS DAY AND/OR WORKING DAY, WHICHEVER OCCURS FIRST): (A) DISTURBED AREAS OF THE PRIMARY PERMITTEE'S CONSTRUCTION SITE; (B) AREAS USED BY THE PRIMARY PERMITTEE FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION; AND (C) STRUCTURAL CONTROL MEASURES. EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN APPLICABLE TO THE PRIMARY PERMITTEE'S SITE SHALL BE OBSERVED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATER(S). FOR AREAS OF A SITE THAT HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION, THE PERMITTEE MUST COMPLY WITH PART IV.D.4.A.(4). THESE
INSPECTIONS MUST BE CONDUCTED UNTIL A NOTICE OF TERMINATION IS SUBMITTED.
4. CERTIFIED PERSONNEL (PROVIDED BY THE PRIMARY PERMITTEE) SHALL INSPECT AT LEAST ONCE PER MONTH DURING THE TERM OF THIS PERMIT (I.E., UNTIL A NOTICE OF TERMINATION IS SUBMITTED TO EPD) THE AREAS OF THE SITE THAT HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION. THESE AREAS SHALL BE INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM AND THE RECEIVING WATER(S). EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN SHALL BE OBSERVED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATER(S).
5. BASED ON THE RESULTS OF EACH INSPECTION, THE SITE DESCRIPTION AND THE POLLUTION PREVENTION AND CONTROL MEASURES IDENTIFIED IN THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN, THE PLAN SHALL BE REVISED AS APPROPRIATE NOT LATER THAN SEVEN (7) CALENDAR DAYS FOLLOWING EACH INSPECTION. IMPLEMENTATION OF SUCH CHANGES SHALL BE MADE AS SOON AS PRACTICAL BUT IN NO CASE LATER THAN SEVEN (7) CALENDAR DAYS FOLLOWING EACH INSPECTION.
6. A REPORT OF EACH INSPECTION THAT INCLUDES THE NAME(S) OF CERTIFIED PERSONNEL MAKING EACH INSPECTION, THE DATE(S) OF EACH INSPECTION, CONSTRUCTION PHASE (I.E., INITIAL, INTERMEDIATE OR FINAL), MAJOR OBSERVATIONS RELATING TO THE IMPLEMENTATION OF THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN, AND ACTIONS TAKEN IN ACCORDANCE WITH PART IV.D.4.A.(5). OF THE PERMIT SHALL BE MADE AND RETAINED AT THE SITE OR BE READILY AVAILABLE AT A DESIGNATED ALTERNATIVE LOCATION UNTIL THE ENTIRE SITE OR THAT PORTION OF A CONSTRUCTION PROJECT THAT HAS BEEN PHASED HAS UNDERGONE FINAL STABILIZATION AND A NOTICE OF TERMINATION IS SUBMITTED TO EPD. SUCH REPORTS SHALL BE READILY AVAILABLE BY END OF THE SECOND BUSINESS DAY AND/OR WORKING DAY AND SHALL IDENTIFY ALL INCIDENTS OF BEST MANAGEMENT PRACTICES THAT HAVE NOT BEEN PROPERLY INSTALLED AND/OR MAINTAINED AS DESCRIBED IN THE PLAN. WHERE THE REPORT DOES NOT IDENTIFY ANY INCIDENTS, THE INSPECTION REPORT SHALL CONTAIN A STATEMENT THAT THE BEST MANAGEMENT PRACTICES ARE IN COMPLIANCE WITH THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN. THE REPORT SHALL BE SIGNED IN ACCORDANCE WITH PART V.G.2. OF THIS
PERMIT.
CITY OF TUCKER
2088 GLACIER DRIVE
TUCKER, GEORGIA 30087
EMAIL: SHOLMES@TUCKERGA.GOV
OWNER1.
EMERGENCY
24-HOUR
CONTACT
2. NAME: SARA HOLMES
PARKS AND RECREATION DEPUTY DIRECTOR
OFFICE # (470) 481-0205 / MOBILE # (470) 554-2595
3. TOTAL SITE AREA: 4.04 ACRES DISTURBED AREA: 1.39 ACRES
4. THE LAND DISTRICTS AND LAND LOTS FOR THE PROJECT ARE: 18 181 01 011 AND 18 181 01 012
5. DESCRIPTION: THE CONSTRUCTION ACTIVITIES GENERALLY INCLUDE CLEARING, GRADING, AND EARTHWORK
REQUIRED TO INSTALL TENNIS COURTS, PARKING LOT, BIORETENTION POND, SIDEWALK, AND ALL NECESSARY EROSION CONTROLS. THE PROJECT WILL ALSO INCLUDE THE DEMOLITION OF EXISTING TENNIS COURTS, RETAINING WALLS, BLEACHERS, STAIRS AND SIDEWALK.
6. EXISTING SITE CONDITIONS AND ADJACENT AREAS: . THE EXISTING SITE CONSIST OF TENNIS COURTS, BLEACHERS, RETAINING WALLS, AND VEGETATION. SLOPES VARY FROM GENTLE TO STEEP AND THE VEGETATION
VARIES FROM GRASS AND SOD TO UNDISTURBED WOODS.
7. THIS SITE DOES NOT CONTAIN WETLANDS OR ANY KNOWN CEMETERIES.
8. NO UNIQUE VEGETATION, INCLUDING WETLAND VEGETATION, HAVE BEEN FOUND TO EXIST WITHIN THE LIMITS OF
THIS PROJECT.
9. PROJECT SITE CONTAINS STATE WATERS REQUIRING UNDISTURBED BUFFERS, 25'.
10. LITTLE STONE MOUNTAIN CREEK IS THE RECEIVING WATERS.
11. THIS PROJECT DOES NOT DISCHARGE STORM WATER INTO AN IMPAIRED STREAM SEGMENT AND IS NOT WITHIN 1
MILE UPSTREAM OF AND WITHIN THE SAME WATERSHED AS ANY PORTION OF A BIOTA IMPAIRED STREAM
SEGMENT.
12. NO EXISTING STORM DRAIN PIPES OR WEIRS WILL BE AFFECTED.
13. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A
SECTION 404 PERMIT.
14. SITES ARE LOCATED IN THE CITY OF TUCKER UNLESS OTHERWISE NOTED.
15. ALL LAND…