About this file
This Addendum #1 to a Request for Proposals issued by the Minnesota Department of Administration's State Historic Preservation Office (SHPO) modifies the SHPO Roseau River Cultural Resources RFP (SWIFT Event #2000018759) dated October 30, 2026. The addendum revises the scope of work for both architecture-history and archaeological components of the project, which involves developing cultural resources documentation for approximately 96 river miles along the Roseau River in Roseau and Kittson counties within flood-prone areas affected by FEMA disaster declaration DR 4722. Key scope revisions include amendments to the Historic Context Development requiring a Research Design and Context Report emphasizing affected counties and communities; modifications to the Reconnaissance Survey and Inventory tasks including specific exclusions for transportation-related properties, previously inventoried resources, and agricultural properties; clarifications on the two-track Phase I archaeological survey approach combining targeted survey with shoreline survey during low-water conditions; specification that at least one archaeological site will undergo Phase II evaluation; requirements that a minimum of ten properties receive intensive survey and National Register evaluation with at least one property in each township excluding Caribou; and direction that Architecture-History and Archaeological reports be separate but cross-referenced. The proposal deadline remains November 15, 2026, at 2:00 p.m. Central Standard Time, and the contract term extends from December 2026 through January 30, 2029.
The addendum establishes that proposals must address the complete project scope, though teams may consist of single companies or collaborative research teams with identified or subsequently added subcontractors. Separate contracts for individual projects will not be awarded; rather, proposals will be evaluated independently. Cost proposals must be deliverable-based and separated from technical submissions, with costs for artifact curation, additional proposed tasks, and related activities clearly itemized. Maximum hourly wages are capped at 120 percent of the Federal Civil Service GS-15, Step 10 salary, excluding overhead expenses. The project is funded through an Emergency Supplemental Historic Preservation Fund grant from the National Park Service administered by SHPO, with a total budget not to exceed $500,000. Personnel must comply with federal requirements including Title VI of the Civil Rights Act, the Anti-kickback Act, the Rehabilitation Act Section 504, and the Secretary of Interior's Standards and Guidelines for Archaeology and Historic Preservation. All archaeological materials must be curated in perpetuity at approved facilities meeting state and federal standards, with curation costs included in the proposal budget. The vendor questions and state answers section clarifies expectations regarding Principal Investigator qualifications, public engagement requirements, tribal consultation, landowner permissions, artifact ownership protocols, and contract modification limitations, noting that change orders are not anticipated for this Professional Technical Services contract.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 07.01.2024
Request for Proposals (RFP) Addendum #1 SWIFT Event #: 2000018759
Agency: Minnesota Department of Administration Addendum Number: 1 Date of Addendum: October 30, 2026 Title: SHPO Roseau River Cultural Resources RFP
SCOPE OF ADDENDUM
The following are changes to the RFP: (1) Revisions to the RFP language; and (2) Sharing vendor questions and State’s answers.
1) Revisions to the RFP language
Revision 1. Section 2 – Summary of Scope. Architecture-History Scope of Work number 1 of the RFP is amended as follows:
1. Historic Context Development – The consultant will develop a Research Design and Context Report that addresses the general historical development of each of the effected counties with an emphasis on communities within the identified project area (available in Attachment F).
Preliminary background research should be recorded in a research design. New context development should be combined with previously recorded information to produce a context survey report that groups information about related historic properties. Properties within this study area should be selected for reconnaissance survey.
Revision 2. Section 2 – Summary of Scope. Architecture-History Scope of Work number 2 of the RFP is amended as follows:
2. Reconnaissance Survey and Inventory – The consultant will conduct a reconnaissance survey, in accordance with the SHPO’s Architecture-History Survey Manual, NPS bulletins and guidelines, and developed sampling methodology (if appropriate), of buildings, structures, districts, and landscapes located on parcels meeting survey requirements (outlined below) that intersect the identified project area (available in Attachment F). Field survey should take place from public right-of-way and can be supplemented using historic and current aerial maps and photographs when properties are not visible. New and updated inventory records, meeting reconnaissance (formally Phase I) level-documentation requirements, will be submitted online by the consultant through the Minnesota Statewide Historic Inventory Portal (MnSHIP) as well as documented in the context survey report.
Inventory should exclude:
a. Individual resources within previously inventoried or newly identified district boundaries, unless the resource is expected to be individually eligible.
b. Transportation-related properties including roads, railroads, bridges, and culverts – regardless of previous survey.
c. Properties that have been recorded as No Intensive Survey Warranted, Not Eligible for NRHP, or Eligible for NRHP in the MnSHIP “Individual Resource Evaluation Status” in the past 10 years.
d. Agricultural properties, including earthen works (ditches, etc.) that are not specifically identified as having potential significance during context development.
Depending on the number of properties that meet survey criteria, a sampling strategy may be necessary. The respondent should propose a methodology for sampling that focuses on properties associated with areas of significance identified through context development.
Revision 3. Section 2 - Archaeology Scope of Work of the RFP is amended to add:
3. More information and clarification on the archaeological investigations.
There are two tracks for the Phase I archaeological survey in this project.
1. Targeted survey to test the probability model, and
2. Shoreline survey of exposed surfaces during low water
The targeted survey can be anywhere within the project area, pending permission to access the property. The shoreline survey, by necessity, is focused on exposed areas of the riverbanks. The shoreline survey is intended to be opportunistic, to hopefully identify sites that are exposed during low water, and to determine if they are at risk. This information can also be used to test the model, although it should not be relied upon to do so. For this reason, it should not be considered part of the targeted survey).
All artifacts from the archaeological investigations should be documented, collected, identified/analyzed, reported, and curated. This is particularly important for artifacts exposed on the riverbanks, because they would likely be displaced or impossible to find again once the water comes back up. In a case where a landowner has allowed permission to survey but does not want to donate the artifacts for curation, the collection should be fully documented. Consult with SHPO staff about any artifact collection issues while in the field.
Revision 4. Section 2 - Archaeology Scope of Work of the RFP is amended as follows:
4. 3. Phase II Evaluation – At least one archaeological site will be selected for evaluation using standard methods to determine its eligibility for the National Register of Historic Places. This site or sites will be selected through consultation with SHPO staff. If historical archaeology is identified in Caribou, such information might be appropriate to include in the National Register update for St. Nicholas Orthodox Church.
Revision 5. Section 3 – Proposal Instructions and Additional Information is amended to add:
2) Additional Tasks or Activities.
Responders are encouraged to propose additional tasks, activities, or goods above and beyond the scope of what is requested in this solicitation if they will substantially improve the results of this procurement. Any costs associated with these additional tasks, activities, or goods should be clearly marked and separated from costs associated with the tasks, activities, or goods specifically requested under this solicitation. Because cost is a factor in the evaluation of responses to this solicitation, failure to separate costs for additional tasks, activities, or goods may result in those costs being included in a responder's cost proposal and result in a lower cost score for that proposal.
Revision 6. Section 2 - Summary of Scope number 3. Intensive Survey and Evaluation of the RFP is amended as follows:
3. Intensive Survey and Evaluation – The consultant will choose a minimum of ten (10) properties to be evaluated, SHPO prefers the properties to be spread throughout the project area, if possible. at least one property in each township, excluding Caribou township, and complete a National Register evaluation for the property. A minimum of 10 properties will be evaluated.
The consultant will provide MnSHIP inventory forms meeting intensive (formerly Phase II)-level documentation requirements, including a recommendation of National Register of Historic Places eligibility. These properties will be selected near the end of the reconnaissance survey through consultation with SHPO staff.
Revision 7. Section 2 - Summary of Scope - section: The Architecture-History project should include the following tasks and deliverables: of the RFP is amended as follows:
The Architecture-History project should include the following tasks and deliverables:
1. An initial planning meeting between the consultants and SHPO staff before work begins to discuss the scope of services, methodology, and schedule. This meeting may be held remotely and can be combined with the Archaeology planning meeting.
2. The consultant will develop a Research Design and Draft Context that addresses the general historical development of each of the effected counties with an emphasis on communities within the identified project area (available in Attachment F).
3. The consultant will submit a draft of the Research Design prior to beginning fieldwork.
4. The consultant will provide a Draft Survey Report (PDF) and MnSHIP inventory forms (via MnSHIP) meeting reconnaissance (formerly Phase I)-level documentation requirements, including a recommendation for further research and evaluation for each resource surveyed.
5. The consultant will complete a National Register evaluation on a minimum of 10 properties, one in each township excluding Caribou. The consultant will provide MnSHIP inventory forms meeting intensive (formerly Phase II)-level documentation requirements, including a recommendation of National Register of Historic Places eligibility.
6. The consultant will provide a complete National Register Additional Documentation packet, including photographs, for the National Register listed St. Nicolas Orthodox Church, (NRIS 84001480). The update should include consideration of historical archaeology if applicable. As needed, multiple drafts of the nomination may be required. The consultant will address comments and concerns made by the SHPO, MN State Historic Preservation Review Board, and the NPS, as applicable.
7. The consultant will address SHPO review comments on the draft report and inventory forms and submit a Final Survey Report and MnSHIP inventory forms (via MnSHIP).
Revision 8. Table of Contents - Solicitation Attachments is amended as follows:
Solicitation Attachments
• Attachment A: Responder Declarations
• Attachment B: Exceptions to State's Terms and Conditions
• Attachment C: Cost Detail
• Attachment D: Responder Form o Workforce and Equal Pay Declaration Page
• Attachment E: Federal Fund Requirements
• Attachment F: Maps and zipped folder of GIS files
• Attachment G: Corrected GIS files
• Attachment H: Map PDF
Revision 9. Attachment E: Federal Fund Requirements is amended as follows:
Federal Fund Requirements The following rules are basic to this federal grant program:
1. No work may be funded retroactively. All work must be approved in advance through the grant selection and grant agreement. Subgrantees Contractors will be notified by the SHPO when work can begin.
2. All work must be an eligible program activity. Only certain types of work are allowable under this program, see section 2 “Summary of Scope.” No work other than that specified in the work program can contribute to the project’s completion.
3. The project must adhere to uniform administrative requirements. All federal programs must follow the same general set of administrative rules and conform to 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). They have been designed to ensure fair competition for federally assisted grant contracts, proper accounting and management practices, and conformance with government-wide regulations. These documents are available on the NPS website at https://www.nps.gov/subjects/historicpreservationfund/historic-preservation-fund-grant-manual.htm or request from SHPO.
All subgrants recipients Contractors must comply with all applicable federal statutes, regulations, executive orders (EOs), Office of Management and Budget (OMB) circulars. Any inconsistency or conflict in Standard Terms and Conditions, Program-Specific Terms and Conditions, and any Special Award Conditions of this Award will be resolved according to the following order of precedence: federal laws, Executive Orders, federal regulations, applicable notices published in the Federal Register, OMB circulars, NPS Standard Terms and Conditions, Program-Specific Terms and Conditions, and any Special Award Conditions
4. All expenses must be auditable. An expense is any cost relating to the assisted project. Each year this program is audited to determine if:
a. all expenses have been properly documented, and
b. All federal regulations have been followed with respect to the expenditure.
5. Curation of archaeological materials, unless noted in the grant agreement, the applicant agrees to curate and store in perpetuity all materials found and/or generated by the project. The federal guidelines are entitled "Curation of Federally-Owned and Administered Archaeological Collections" (36 CFR PART 79).
6. Proof of compliance with federal regulations or requirements. Applicants as well as contractors/consultants must comply with all applicable federal rules (including but are not limited to):
a. Title VI of the Civil Rights Act of 1964 (equal opportunity requirements, and non-discrimination on the basis of age),
b. procurement standards,
c. Section 504 of the Rehabilitation Act of 1973,
d. Anti-kickback Act of 1964,
e. Secretary of Interior's Standards and Guidelines for Archaeology and Historic Preservation,
f. Certify that it nor its principals are presently or proposed for debarment, suspension or excluded from participation in any federal program,
g. National Register Program Guidelines NPS-49, and
h. Any special conditions agreed to at the time of the subgrant award.
Project deadlines must be met. Each subgrant is funded for a specific period of time after which the funds are recaptured by the NPS. For this reason, all subgrant work programs must show task occurring between the Project Period dates shown on the application. Extensions may be possible, but only in extreme circumstances and within the project period which ends January 30, 2029. for this award is September of the year after it was awarded.
Requests for amendments must be made in writing to the SHPO at least 45 days prior to existing deadlines. Amendments can only be implemented after written approval by the SHPO. Failure to meet any deadline may result in termination or reduction of federal assistance.
Revision 10. Sample Contract - Exhibit E: Federal Fund Requirements is amended as follows:
Federal Fund Requirements The following rules are basic to this federal grant program:
1. No work may be funded retroactively. All work must be approved in advance through the grant selection and grant agreement. Subgrantees Contractors will be notified by the SHPO when work can begin.
2. All work must be an eligible program activity. Only certain types of work are allowable under this program, see section 2 “Summary of Scope.” No work other than that specified in the work program can contribute to the project’s completion.
3. The project must adhere to uniform administrative requirements. All federal programs must follow the same general set of administrative rules and conform to 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). They have been designed to ensure fair competition for federally assisted grant contracts, proper accounting and management practices, and conformance with government-wide regulations. These documents are available on the NPS website at https://www.nps.gov/subjects/historicpreservationfund/historic-preservation-fund-grant-manual.htm or request from SHPO.
All subgrants recipients Contractors must comply with all applicable federal statutes, regulations, executive orders (EOs), Office of Management and Budget (OMB) circulars. Any inconsistency or conflict in Standard Terms and Conditions, Program-Specific Terms and Conditions, and any Special Award Conditions of this Award will be resolved according to the following order of precedence: federal laws, Executive Orders, federal regulations, applicable notices published in the Federal Register, OMB circulars, NPS Standard Terms and Conditions, Program-Specific Terms and Conditions, and any Special Award Conditions
4. All expenses must be auditable. An expense is any cost relating to the assisted project. Each year this program is audited to determine if:
a. all expenses have been properly documented, and
b. All federal regulations have been followed with respect to the expenditure.
5. Curation of archaeological materials, unless noted in the grant agreement, the applicant agrees to curate and store in perpetuity all materials found and/or generated by the project. The federal guidelines are entitled "Curation of Federally-Owned and Administered Archaeological Collections" (36 CFR PART 79).
6. Proof of compliance with federal regulations or requirements. Applicants as well as contractors/consultants must comply with all applicable federal rules (including but are not limited to):
a. Title VI of the Civil Rights Act of 1964 (equal opportunity requirements, and non-discrimination on the basis of age),
b. procurement standards,
c. Section 504 of the Rehabilitation Act of 1973,
d. Anti-kickback Act of 1964,
e. Secretary of Interior's Standards and Guidelines for Archaeology and Historic Preservation,
f. Certify that it nor its principals are presently or proposed for debarment, suspension or excluded from participation in any federal program,
g. National Register Program Guidelines NPS-49, and
h. Any special conditions agreed to at the time of the subgrant award.
Project deadlines must be met. Each subgrant is funded for a specific period of time after which the funds are recaptured by the NPS. For this reason, all subgrant work programs must show task occurring between the Project Period dates shown on the application. Extensions may be possible, but only in extreme circumstances and within the project period which ends January 30, 2029. for this award is September of the year after it was awarded.
Requests for amendments must be made in writing to the SHPO at least 45 days prior to existing deadlines. Amendments can only be implemented after written approval by the SHPO. Failure to meet any deadline may result in termination or reduction of federal assistance.
2) Vendors’ questions to the RFP and the State’s answers are as follows:
1. Question: Can we apply for just the architecture/history or archaeology portion separately, or must we apply for the complete request?
Answer: The proposal should be for the complete project. We expect that some proposals will have teams of researchers while others will be single companies.
2. Question: Does the state intend to award separate contracts/teams for the Roseau River and Minnesota River projects, or will a single team be selected to execute both scopes?
Answer: The state has no set intentions and will address proposals of each project separately.
3. Question: Are the Architecture-History and Archaeological reports two separate documents, or should they be combined?
Answer: Documents should be separate but reference each other, as appropriate.
4. Question: After the contract has been awarded, is it permissible to add subcontractors? Or do possible subcontractors need to be identified within the proposal?
Answer: It is permissible to add subcontractors after the contract has been executed.
However, a proposal with the complete team identified will be considered stronger.
5. Question: Is one combined archaeology/architectural-history public engagement event intended, and who is responsible for venue costs, publicity, and event documentation?
Answer: It’s okay to do either combined or separate events. Costs for planning and related costs should be included in the proposal. It seems likely that venues can be found that have no or minimal costs.
6. Question: If suitable low-water conditions do not occur, will SHPO consider schedule adjustments or alternative methods?
Answer: It will be challenging to predict the best time for the shoreline survey. There will be two field seasons available in the contract period. In general, water will be lowest in late summer or fall, although of course this varies from year to year. The contractor should monitor river conditions and make the best determination they can for when to do the shoreline survey.
7. Question: For the Principal Investigators, is it expected that there will be one PI for each of the SOI categories (Architecture History, Historical Archaeology, Prehistoric Archaeology)?
Or can one person serve multiple roles? May one individual who meets both the Historical and Prehistoric Archaeology standards fill two PI roles, and may subconsultant staff serve as PIs? Please also clarify the difference between Section 2 (three PIs) and Section 4 (one or more).
Answer: Each PI will need to demonstrate their qualifications for each role or roles.
Yes, a PI may fill more than one role, Section 4 contains a more general statement about PI qualifications. The project team should have PIs meeting the qualifications for Architecture- History or History, Historical Archaeology, and Prehistoric Archaeology.
8. Question: Should the proposal include an estimate for artifact curation, or will that be covered under a separate budget after archaeological excavations are complete?
Answer: Costs for artifact curation should be included in the proposal.
9. Question: Appendix E, pg. 7 – Artifact curation; would MNHS be an appropriate curation location?
Answer: Yes, and other curation facilities that meet state and federal standards may be used.
10. Question: Can you provide more information on the curation of any artifacts collected and associated records? Is there a designated repository and curation agreement in place for this project? Will the curation costs need to be covered by the project budget?
Answer: Artifacts will need to be curated and the costs for doing so should be included in the budget. The contractor will select the repository and arrange the curation agreement.
11. Question: What are SHPO's expectations for Tribal engagement, and who leads that coordination?
Answer: SHPO will reach out to the THPOs and consult with them throughout the project.
We will also arrange introductions with the contractor, and encourage them to communication directly, keeping SHPO informed.
12. Question: Both RFPs appear to indicate one in-person community engagement event.
Would there be an expectation for any other engagement component such as maintaining an online project website or any other digital engagement activities as part of the project process?
Answer: There is a minimum of 1 engagement event required but additional activities may be discussed in partnership with SHPO. SHPO will initiate consultation with tribes and will reach out to local governments and agencies in the vicinity of the project.
13. Question: Will attorneys be provided regarding landowner permissions?
Answer: No, attorneys will not be provided. The contractor will need to allow time for arranging landowner permissions and any applicable permits or licenses.
14. Question: Will SHPO assist in facilitating communication with local governments or landowners to streamline access permissions?
Answer: SHPO will be reaching out to local governments and county historical societies with information about the project in general, as well as to major public owners. The contractor will need to arrange the permissions for access to survey areas.
15. Question: Will SHPO provide letters of introduction to landowners and arrange access for archaeological survey? Will artifact ownership fall under standard protocol (i.e., artifacts on private property returned to landowners)?
Answer: SHPO will work with the contractor to develop a letter of introduction. The contractor will need to arrange access, and obtain the relevant permits and licenses. Private landowners should be asked to donate artifacts for curation. If they prefer to not do this, the artifacts should be returned to them.
16. Question: The project areas cuts through a multitude of publicly and privately owned land. How will the State of Minnesota assist in gaining property accessibility to conduct the phase I survey on the floodplain and the uplands? Will the focus be on access to publicly owned land (local, county, or state parks and wildlife areas)?
Answer: The contractor will need to arrange access from owners. It is reasonable to look at public lands first for the targeted survey. The river itself is public water, but ownership of the shoreline will vary.
17. Question: Does the consultant need to do the boat survey for the entire shoreline, or is the assumption that the consultant would build the probability model first? Could the tributaries a quarter of a mile inland be completed using a targeted survey?
Answer: The shoreline survey is separate from testing the model, although the data collected will be relevant to the model. The boat survey should examine the entire shoreline unless comparable methods such as drone survey are described in the survey as meeting the same standard.
18. Question: If Drone survey is completed, would it be permissible to only visually inspect via boat smaller portions of the project area, or is 100% boat inspection required still?
Answer: Drone survey should still be checked from the boat, and any potential sites investigated in person, provided access is allowed by the owner. Methods can be proposed for drone survey as a compliment to the in-person survey. To replace portions of the survey, the drone would need to be able to detect a scatter of small artifacts, for example.
19. Question: What historic contexts should the archaeological probability model include (i.e., historic, paleo, archaic, woodland)? Should the probability model focus on one particular period or encompass all possible archaeological context periods?
Answer: The probability model should cover all potential archaeological contexts.
20. Question: Is an OSA/MNHS archaeological survey license and/or DNR Research permit anticipated for any portion of this survey?
Answer: Yes, it is reasonable to assume so. The selected contractor will need to determine what licenses and permits are required, along with other permissions. The projects areas can be anticipated to include state, federal, tribal, and private property.
21. Question: For the archaeological/geomorphological model would you prefer the model be characterized/classified based on previous MN/Model sediment assemblage projects, or is there any guidance/preference on this?
Answer: The model should be developed specifically for these project areas, but it is useful for it to correlate with other models, such as Mn/Model, to the extent possible. The model should correlate with the specified flood and disaster planning data.
22. Question: The RFP scopes state the phase II archaeological evaluations should include ‘at least’ one site. Should our cost proposal include estimated cost for evaluation of just one site or more?
Answer: One site is the minimum. Consultation with SHPO and selection of the site or sites for Phase II evaluation will be based on remaining cost in the budget and the Phase I data known at that time.
23. Question: Can the state clarify expectations related to the reconnaissance survey and documentation?
Answer: Information related to previously inventoried resources is available on the Minnesota Statewide Historic Resource Inventory Portal (MnSHIP). Both newly identified properties and those previously inventoried more than 10 years ago should be considered for survey.
It is difficult to predict the number of properties within the project area. The expectation is that all properties within the project area, which meet survey requirements, will be inventoried at the reconnaissance level unless the cost of that endeavor is greater than the allotted budget. In that case, a sampling strategy will be employed to determine which resources should be inventoried. A strong proposal will include a maximum number of properties anticipated to be inventoried at this level and a sampling methodology.
24. Question: Does the exclusion extend to transportation-related buildings such as depots, or only to roads, railroads, bridges, and culverts?
Answer: No. The transportation exclusion includes linear properties associated with the conveyance as well as structures related the linear resource (ie. bridges, culverts, tunnels, wayside rests) but does not include buildings associated with the linear resource (ie. depots, roundhouses). SHPO will be available for questions during survey if unexpected resources are discovered.
25. Question: Does the proposal context (work plan, methodology, qualifications, cost detail) need to be split between archaeology and architecture/history or can they be combined into one submittal?
Answer: The proposal context (work plan, methodology, qualifications, cost detail) should be combined into one submitted proposal following all the directions in the RFP such as keeping the cost proposal separate from the technical proposal.
26. Question: Is there any option for change orders for these projects?
Answer: Because this work with be contracting for Professional Technical Services, change orders are not anticipated. A contract will be written at the start, before work, through a negotiation process based on the proposal’s submitted. Assume all costs broken out in the proposal will remain the same throughout the entire contract. If unforeseen circumstances arise, an amendment to the contract may be possible, but it should not be relied upon.
27. Question: Is the contract anticipated to be fixed price by deliverable or time-and-materials?
May the consultant invoice monthly, and will any retainage be withheld? How will the Cost Detail points be calculated?
Answer: Cost will be 30% of possible points for the proposal. The lowest cost proposal will receive all 300 points, while the rest will receive a portion of the total 300 points based on their relation to the lowest cost proposal using a set formula. The contract will be deliverable based. Because this is for a Professional Technical Services contract, retainage will be withheld unless the work falls into work listed as professional services as defined in sections 326.02 to 326.15 of Sec. 326.02 MN Statutes. How services will be invoiced will be decided during contract negotiations but an invoicing schedule can be built into your proposal.
28. Question: May responders add interim invoicing milestones (such as completed fieldwork) to Attachment C?
Answer: Yes, but any interim invoicing milestones should appear as a part of one of the enumerated deliverables located in Attachment C.
29. Question: Can the State confirm terms related to liability insurance, contractor notification periods, intellectual property, and pre-existing tools, models, and software?
Answer: Please review the Sample Contract attached to the RFP and provide any exemptions to the terms in Amendment B of the RFP for contract negotiations, and any of https://www.revisor.mn.gov/statutes/cite/326.02 https://www.revisor.mn.gov/statutes/cite/326.15 these items can be discussed at that time. If a proposal is submitted without exemptions, you are agreeing to all the terms of the RFP and Sample Contract.
30. Question: The due date of November 15, 2026 falls on a Sunday. Please confirm the due date and time.
Answer: The due date is Sunday, November 15, 2026, 2pm Central Standard Time.
31. Question: Based on the RFP, it says “maximum hourly wages charged to this contract for personnel may not exceed 120% of the salary of a Federal Civil Service GS-15, Step 10.” Are the maximum hourly wages referring to the base pay not including overhead? When we provide our cost estimates, do you need us to show the base wages and overhead costs separately? Does 120% of a GS-15 Step 10 apply to overhead rates as well?
Answer: The requirement for the RFP is only applicable if hourly wages are charged in the contract. Please see Attachment C, Cost Detail for more information. The hourly wage referenced here does not include overhead expenses. Additionally, there may be other requirements as listed in Attachment E that the successful responder would have to comply with during the course of the contract as required by receiving federal funds.
32. Question: Does consideration of historical archaeology at the church require discussion of existing information, coordination with the archaeology team, or additional investigation?
Should we anticipate a Phase II archaeology evaluation, and under what section (archaeology or architectural history) should this be scoped?
Answer: There is not currently an archaeological site known associated with the church, although it is reasonable to assume that one exists. If one is identified in the survey, it could be included in the NR update. If it seems appropriate at the time, this could also be a site (or one of the sites depending on available budget) selected for Phase II evaluation.
33. Question: If 3D scanning is proposed as part of the Roseau River scope, is there a preferred deliverable such as a raw 3D scan data, a processed 3D model, or another format?
Answer: The proposal should specify the recommended format. In general, the scan should be something that is easily usable by reviewers and the church community, and something that can be curated.
34. Question: Can the state clarify expected number of reviews and deliverables for the Architecture-History scope of Work?
Answer: The expected deliverables for the Architecture-History scope of work include: a research design (submitted prior to survey work); a draft and a final survey report that includes appropriate contexts; inventory forms at the reconnaissance and intensive levels; a first and second draft of the additional documentation packet for St. Nicholas Orthodox church. Properties suggested for intensive level survey need to be inventoried during reconnaissance survey.
Consultants should expect review comments on the draft survey report and the first draft of the additional documentation packet. SHPO reserves the right to return reconnaissance inventory forms, seeking additional justification for the recommendation, when they are reviewed with the draft survey report. These comments should be fully addressed in the final survey report, resubmitted forms, and second draft of the additional documentation packet. SHPO review times reference calendar days.
35. Question: What are the goals and SHPO’s expectation for the Additional Documentation of St. Nicholas Orthodox Church?
Answer: St. Nicholas Orthodox Church off Co. Hwy. 53, Caribou Township (Inventory number KT-CAR-00001) was listed in the National Register of Historic Places March 8, 1984 (NRIS 84001480). The goal of the additional documentation is to expand and modernize the existing nomination. The grant requires two drafts of the additional documentation packet, although SHPO is available for additional consultation if desired. SHPO expects the packet to be largely complete at the conclusion of the grant. The consultant is not required to present or attend the Minnesota State Historic Preservation Review Board meeting.
SHPO will inform the owners of the project and gain consent to access the property. The consultant is required to coordinate site visit(s).
36. Question: Attachment F project area extends into Lake of the Woods and Beltrami Counties.
Are those portions in scope?
Answer: No. The scope only includes those portions of the project area within Kittson and Roseau Counties.
37. Question: Can the state clarify expectations related to the intensive survey and documentation?
Answer: The consultant is responsible for completing intensive-level documentation for ten
(10) properties within the project area. A property can be defined as a building, structure, district, object, or site. The SHPO is responsible for deciding which resources will be evaluated at the intensive level. The decision will be made based on the consultant recommendations in the draft survey report, or earlier if desired by the consultant.
File details come from the government source that posted it. Updated .