Roof Replacement
893 KB Posted
- Attached to
- RFP Â ROOF REPLACEMENT - 061522
- Solicitation number
- Not on record
- Issued by
- Fulton County, Georgia
About this file
This is a Request for Sealed Proposal (RFP) issued by the City of College Park, Georgia, for roof replacement services at the Tracey Wyatt Recreation Complex located at 2300 Godby Road, College Park, Georgia 30349. The project involves complete roof replacement on three interconnected pre-engineered metal building sections with dimensions ranging from 38'8" to 189' in width and 42' to 180' in length, including removal and offsite disposal of existing roof materials, removal and restoration of electrical grounding components, temporary weather protection, installation of 24-gauge standing seam roof panels with Aluminum Zinc Alloy coated finish, roof insulation, clips, cleats, curbs, flashing, and fasteners meeting all applicable local and state building codes. A mandatory in-person pre-proposal meeting was scheduled for June 1, 2022, at 10:00 am EST at the Tracey Wyatt Recreation Complex. The deadline for questions and clarifications was June 7, 2022, at 12:00 pm EST, with all addenda published by June 10, 2022, at 4:00 pm EST. Sealed proposals were due no later than June 15, 2022, at 9:30 am EST at the City of College Park Purchasing Department, 3667 Main Street, College Park, Georgia 30337, with bid opening scheduled for June 15, 2022, at 10:00 am EST.
All proposals must include a 5% bid bond, proof of insurance, performance and payment bonds equal to 100% of the contract amount, workers' compensation insurance with limits not less than required by the State of Georgia, comprehensive general liability insurance with a minimum limit of $1,000,000, automobile liability insurance not less than $500,000, and applicable professional licenses. The City of College Park established a 5% certified Disadvantaged Business Enterprise (DBE) goal for the project and strongly encourages minority, woman, and small businesses to apply. Local preference may be given to vendors with a business location within the City of College Park city limits, provided their bid is not more than 3% greater than the lowest non-local vendor bid. The contract will be awarded to the most responsive and responsible bidder based on lowest price, adherence to specifications, delivery capability, and past performance with the City, though lowest price is not necessarily the determining factor. The City reserved the right to reject any or all bids, waive technicalities, and accept or reject proposals within 90 days from the bid opening date. Contractor shall commence work immediately upon Notice to Proceed and achieve substantial completion within a timeframe specified by the owner.
Text of this file
RFP – ROOF REPLACEMENT - 061522 Page 1
REQUEST FOR SEALED PROPOSAL
ADVERTISEMENT for ROOFING SERVICES
RFP – ROOF REPLACEMENT - 061522
The City of College Park is accepting sealed proposals from qualified vendors for ROOF REPLACEMENT. Proposals will be received no later than WEDNESDAY, JUNE 15, 2022 at 9:30 am (EST) at the City of College Park Purchasing Department, 3667 Main Street, College Park Georgia, 30337. Proposals received after the above date and time, or in any other location other than the Purchasing Department will not be considered.
A (mandatory) in-person pre-proposal meeting will be held at the Tracey Wyatt Recreation Complex 2300 Godby Road | College Park, GA | 30349.
A bid packet may be obtained by clicking related solicitation link on the City of College Park website www.collegeparkga.com under the Bids / RFPs section.
Timeline
Mandatory Information Conference/Pre-Proposal Meeting June 1, 2022 10:00 am (EST)
Q&A and Clarifications deadline (email only to wmoody@collegeparkga.com) Ref: Roof Replacement
June 7, 2022 12:00 pm (EST)
Any/All Addendum(s) published deadline June 10, 2022 4:00 pm (EST)
Open Sealed Bids June 15, 2022 10:00 am (EST)
Any/all addenda must be signed and dated and made a part of the bid packet. It is always the vendor’s responsibility to check the City of College Park’s website for any/all addenda.
The City of College Park reserves the right to reject any or all bids based on past performance waive technicalities and informalities and re-advertise. All Minorities, Woman and Small Businesses are strongly encouraged to apply. Only responsive bids that are determined to meet the requirements and criteria set forth by the City of College Park will be considered.
http://www.collegeparkga.com/ mailto:wmoody@collegeparkga.com
RFP – ROOF REPLACEMENT - 061522 Page 2
CITY OF COLLEGE PARK
PURCHASING DEPARTMENT
“GENERAL INSTRUCTION TO PROPOSER”
1. The following instructions are to be considered an integral part of this proposal; unless otherwise requested and MUST BE TYPEWRITTEN OR PRINTED IN INK. See checklist for number of submittals to provide. The person signing the bid form must initial any changes or corrections made to this proposal, using blue ink.
2. The person, firm or corporation making the proposal shall submit their bid attaching the final page of this proposal to the front of their proposal to City Hall. The cover submittal page must be complete with the bidding company’s name, bid title, bid number and bid date. No proposal may be withdrawn or modified in any way after the bid-opening deadline.
3. If descriptive literature is attached to the bid, bidding company’s name, bid title, bid number and bid date must appear on all sheets.
4. If there is any question whatsoever regarding any portion of the instructions or specifications, it shall be the bidding company’s responsibility to seek clarification immediately from the City of College Park Purchasing Department during the question period stated herein. It shall be the bidder’s responsibility to check the City’s website (www.collegeparkga.com) for any/all addenda(s). Answer(s) to all questions will be answered after the deadline for questions has expired, and posted on the City’s web site, if applicable, within the specified timeline on page one (1).
5. Any variation from the specifications must be clearly stated by the bidding company in writing and submitted with his/her proposal.
6. The apparent silence of the specifications and any supplement specifications as to any details or the omission from it of a detailed description concerning any point shall be regarded as meaning that only the best commercial practices are to prevail and that only materials of first quality and correct type, size and design are to be used. All workmanship is to be of first quality. All interpretations of this specification shall be made upon the basis of this statement.
7. The following bid shall be awarded to one “responsible” bidder on a total lump sum price basis.
An award shall be made to one vendor, or split between vendors, for the total bid. Unit prices and extensions will be verified and total checked. Unit price extension and net total must be shown.
8. In most cases, proposals shall be evaluated on the following items, but not necessarily in this order:
a. Lowest Price (not always the winning proposal)
b. Adherence to specifications
c. Delivery of good/service(s)
i. If Applicable to Scope of Work
ii. Though delivery will be a large consideration, please be as truthful and precise with your date(s) as possible.
d. Past record of vendor’s delivery/performance to the City of College Park
9. The City of College Park desires delivery of the material or services specified at the earliest possible time after the date of award. An unreasonable delivery proposal may be cause for disqualification of a bid. Each bidder shall state a definite time and avoid using the terms ASAP or approximately so many days.
10. The bidder or contractor shall provide copies of Workers’ Compensation Insurance with a limit of not less than required by the State of Georgia or otherwise stated in the bid instructions. In addition, a copy of your Commercial General Liability Insurance (if applicable) shall be provided.
RFP – ROOF REPLACEMENT - 061522 Page 3
11. All prices shall be for delivery, our destination, and F.O.B. freight prepaid and allows, College Park, Georgia unless otherwise shown. (if applicable)
12. Federal or State Sales Tax is inapplicable
a. The City of College Park’s Tax Identification Number (TIN) is 58-6000542
b. The City of College Park is tax-exempt under the code of Georgia, Charter 88-18
13. Cash discounts or end of month terms should be shown separately, even if terms are net.
14. The City of College Park:
a. Reserves the right to accept or reject any or all bids, due to past performance, etc. and waive any informality. Further, the City expressly reserves the right to postpone the opening of proposal for its own convenience and to reject any or all proposals in response to this RFP without indicating any reasons for such rejection(s).
b. Request and consider the submission of proposal modifications at any time before the award is made, if such is in the best interest of the City.
c. Request clarification and/or additional information from proposers during the evaluation process.
d. Negotiate with the selected consultant to include further services not identified in this RFP.
e. In the event of contract termination, enter into contract negotiations with other qualified companies that submitted acceptable proposals, rather than redoing the proposal process for the project.
f. The City of College Park will accept or reject all bids within 90 days from the date of the bid opening
SIGNATURE: ___________________________________________ DATE: _____________________
NOTE: This solicitation document is a standard boilerplate form in addition; take into consideration this may not be modified for every solicitation.
The undersigned on the bid proposal certifies that he/she has carefully examined the instructions to bidders, terms and specifications applicable to and made a part of this proposal.
He/she further certifies; the prices shown in the schedule of items on which he/she is bidding, are in accordance with the conditions, terms and specifications of the proposal and that any exception taken thereto may disqualify the bid.
RFP – ROOF REPLACEMENT - 061522 Page 4
CITY OF COLLEGE PARK
PURCHASING DEPARTMENT
SIGNATURE: ______________________________________ DATE: ___________________
REF: ROOF REPLACEMENT
Show all exceptions and comments below
RFP – ROOF REPLACEMENT - 061522 Page 5
E-VERIFICATION AFFIDAVIT
The College Park contract holder, signed below, confirms and verifies its compliance with Georgia law (See OCGA § 13-10-91), and affirmatively states that the business (Sole Proprietor, Partnership, Corporation, Non-Profit, LLC Corporation, or LLC Partnership) which performs services for the College Park: (check and complete #1 or #2 below)
____ 1. Has registered with, is authorized to use, and uses the federal work authorization program commonly known as “E-Verify”, or any subsequent replacement program. Furthermore, the undersigned will continue to use the federal work authorization program throughout the contract period. The undersigned will contract for the physical performance of services for the contract only with subcontractors who present an affidavit to the contract holder with the information required by OCGA § 13-10-91, as amended. The undersigned hereby attests that its federal work authorization user identification number and date for authorization are as follows:
Federal Work Authorization User Identification Number (not Taxpayer ID)
Date of Authorization
Legal Business Name of City of College Park Contract Holder/Applicant
____ 2. Employs no employees, or otherwise does not fall within the requirements of OCGA § 13-10-91.
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _________________________, 20____ in _______________________________ (city) _______ (state)
Signature of Authorized Owner/Officer
Printed Name and Title of Authorized Owner/Officer
NOTARY PUBLIC
My Commission Expires: _____________________
RFP – ROOF REPLACEMENT - 061522 Page 6
BID DOCUMENT
REQUIREMENTS & CHECKLIST
Complete, sign and submit the following bid documents in the order listed below. The proposal shall be submitted using the forms included in the bid document.
1. Form of Proposal completed, signed and dated
2. Bid document requirements & checklist completed, signed and dated
3. One (1) marked “Original” and Two (2) marked “Copy”
4. AIA Document A310 Bid Bond (5%) (NOT provided, proposer locates own agency and includes document in bid package)
5. Exceptions Sheet
6. Contract Affidavit
7. Proofs of Insurance (must be included in proposal package)
8. List of subcontractors
9. Reference Request pages
10. Addendum Acknowledgement page
11. Successful bidder acknowledges requirement to provide 100%
Performance and Payment Bond before execution of contract
12. Current Form W-9
13. Purchasing Vendor Questionnaire
1. Is the company’s physical location within the College Park city limits? _________
2. Is your company a minority-owned business? ________ if yes, which category? ____________ * Include copy of current MBE certificate(s) in packet
A “Minority Business Enterprise” (MBE) is a business, which is an independent and continuing operation for profit, performing a commercially useful function, owned and/or controlled by one or more minority group member(s).
African American Business Enterprise (AABE), Hispanic Business Enterprise (HBE), Female Business Enterprise (FBE), Asian Business Enterprise (ABE), Native American Business Enterprise (NABE)
3. Has the vendor previously conducted business with College Park? ________
4. Has your company ever been debarred from doing business with any federal, state or local agency?
_______ (If yes, on a separate sheet of paper, provide details including agency name, date(s) and reason for debarment.)
Vendor Contact Name (print) Title
Vendor Contact Signature Date
* Faxed, emailed or late proposals will not be accepted.
* The City of College Park will not be held responsible for submissions not properly identified, late or undelivered mail or courier service(s).
RFP – ROOF REPLACEMENT - 061522 Page 7
Purchasing Department Vendor Questionnaire
The City of College Park Purchasing Department is seeking vendor information to create a database of current and new businesses doing business with the City of College Park. We ask that all vendors take this time to provide the following information so that we can update our records and develop a process to benefit the needs of the community. The information collected from this questionnaire will not be used in the award of bids. The City will continue to utilize a fair, equitable and impartial process and award bids based upon the lowest responsible bidder.
Vendor Name:
Vendor Category:
Physical Address:
City, State, Zip:
Telephone: Fax:
Alternate Phone:
Remit To:
City, State, Zip:
◊ A “Minority Business Enterprise” (MBE) is a business, which is an independent and continuing operation for profit, performing a commercially useful function, which is owned and/or controlled by one or more minority group member(s).
African American Business Enterprise (AABE), Hispanic Business Enterprise (HBE), Female Business Enterprise (FBE), Asian Business Enterprise (ABE), Native American Business Enterprise (NABE), Minority Veteran (MV)
◊ An “Owned” is a minority or female owner which possesses an ownership interest 51% of the business ◊ A “Controlled” is a minority or female, which possess and exercise the legal authority and power to manage business assets, good will and daily operations of the business and actively and continuously exercise such managerial authority and power in determining the policies and directing the operations of the business.
Classification of your MBE Company (requested) _________________________________________________
RFP – ROOF REPLACEMENT - 061522 Page 8
Insurance Requirements
Within ten (10) days of Notice of Award, and at all times that this contract is in force, the contractor shall obtain, maintain and furnish the City of College Park, Certificates of Insurance from licensed companies doing business in the State of Georgia and acceptable to the City of College Park covering:
1. Worker’s Compensation Insurance
2. Comprehensive General Liability Insurance - Minimum limit of $1,000,000
3. Automobile Liability - Not less than $500,000
4. Umbrella Liability Insurance
Copies of these Certificates of Insurance shall be furnished to the City of College Park prior to execution of the contract. Such policies shall be non-cancellable except on thirty-day (30) written notice to the City of College Park.
Local Preference Policy
Local preference may be given to businesses that have a business location within the geographic boundaries of the City of College Park (Fulton County) as long as all requirements of the bid have been met. Should a local vendor submit a bid proposal that is not more than three percent (3%) greater than the bid of the lowest non-local vendor for bids up to $150,000 or not more than three percent (3%) greater than the bid of the lowest non-local vendor for bids in excess of $150,000, then the local vendor’s bid shall be recommended for approval provided all requirements of the bid proposal/process have been met.
This policy shall not apply to any purchases of materials, equipment or services in excess of $1,000,000. The term business location means that the business has a staffed, fixed, physical place of business located within City of College Park City Limits and has had the same for at least one
(1) year prior to the date of the business’ submission of its proposal or bid, as applicable and has held a valid business license from the City of College Park.
Sealed Bid Delivery Service(s)
If your company elects to use a delivery service (FedEx, UPS, USPS, etc.), the City assumes no responsibility for submittals received after the advertised deadline or at any office or location other than that specified herein, whether due to mail delays, courier mistake, mishandling, or any other reason.
If proposals are delivered other than by hand delivery, it is recommended that the proposer verify delivery. Any proposal received after the specified time and date will not be considered and may be returned unopened to the Proposer.
RFP – ROOF REPLACEMENT - 061522 Page 9
Permits (required)
The contractor shall be responsible for all inspections and ensuring compliance with all Federal, State, and County laws and codes. The contractor shall be solely responsible for obtaining all permits. The contract awardee will need to file with the Building & Inspections with the City of College Park projects; there is no cost for the permit.
Basis of Award
The contract, if awarded, will be awarded to the most responsive and responsible bidder, which may not be the lowest response. Each bid must be accompanied by a bid bond, on a surety company’s standard bid bond form acceptable to the City in an amount no less than 5% of the amount bid.
The successful bidder will be required to furnish a performance bond and payment bond, on or before the issuance of Notice to Proceed, each for 100% of the Contract Amount. All other required contract documents must be fully completed and executed by the contractor and his/her Surety, and submitted to the Owner on or before the issuance of the Notice to Proceed.
The performance bond shall remain in effect for one (1) year after final acceptance of the work or the guaranty period under the agreement, whichever is the larger. The payment bond shall remain in effect for the period required under Georgia law for the payment bonds on public construction agreements. Do not date these bonds, the City will date this bond the same date or later than the date of the Agreement.
Professional Licenses (if applicable)
The State of Georgia requires that the following professions be required by state law to be licensed:
1. Electricians
2. Plumbers
3. Conditioned Air Contractors
4. Low voltage Contractors
Bidders and any sub-contractors performing any of the above-described work must provide a copy of current license(s) for the work they will perform on this project.
Ethics Hotline
The City of College Park has an ethics hotline for anyone with the knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report such activities, anonymously online or by phone.
Phone: 1-844-714-0962
Online: collegeparkga.ethicspoint.com
RFP – ROOF REPLACEMENT - 061522 Page 10
Subcontractor
I will / will not propose to subcontract some of the work on this project? _________________ (response) I propose to subcontract work to the following:
Note:
1. The City of College Park requires the (primary) contracted vendor to complete no less than fifty-one (51) percent of the proposed projected.
2. It is the sole responsibility of the prime contractor to ensure any/all subcontractors are properly insured for the type and amount of work completing under the contract.
Subcontractor Print Name
Brief Description of Work to be Performed by Subcontractor
Percent of Work
RFP – ROOF REPLACEMENT - 061522 Page 11
Subcontractor Affidavit Under O.C.G.A. § 13-10-91(b)(3)
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10- 91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with _____________________________________________ (name of subcontractor) on behalf of THE CITY OF COLLEGE PARK, GEORGIA has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b).
Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice of receipt of an affidavit from any sub-subcontractor that has contracted with a sub-subcontractor to forward, within five business days of receipt, a copy of such notice to the contractor.
Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number (not Taxpayer ID)
Date of Authorization
Name of Contractor
Name of Project
Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _________________________, 20____ in _______________________________ (city) _______ (state)
Signature of Authorized Owner/Officer
Printed Name and Title of Authorized Owner/Officer
NOTARY PUBLIC
My Commission Expires: _____________________
RFP – ROOF REPLACEMENT - 061522 Page 12
Reference Request
The following references are from current and past government, educational and/or commercial accounts of similar size and scope. Your list should consist of a minimum of five (5) references, and will not include the City of College Park. Nor should your references be current of former City of College Park employees.
REFERENCE # 1:
Name of Company/Entity: _______________________________________________________
City/State: ___________________________________________________________________
Contact Person Name: __________________________________________________________
Contact Email: ________________________________________________________________
Contact Person Telephone Number: ________________________________________________
Date When Work Performed: _____________________________________________________
Brief Description of Work Performed _______________________________________________
REFERENCE # 2:
Name of Company/Entity: _______________________________________________________
City/State: ___________________________________________________________________
Contact Person Name: __________________________________________________________
Contact Email: ________________________________________________________________
Contact Person Telephone Number: ________________________________________________
Date When Work Performed: _____________________________________________________
RFP – ROOF REPLACEMENT - 061522 Page 13
REFERENCE # 3:
City/State: ___________________________________________________________________
Contact Person Name: __________________________________________________________
Contact Email: ________________________________________________________________
Contact Person Telephone Number: ________________________________________________
Date When Work Performed: _____________________________________________________
Brief Description of Work Performed _______________________________________________
REFERENCE # 4:
Name of Company/Entity: _______________________________________________________
City/State: ___________________________________________________________________
Contact Person Name: __________________________________________________________
Contact Email: ________________________________________________________________
Contact Person Telephone Number: ________________________________________________
Date When Work Performed: _____________________________________________________
REFERENCE # 5:
City/State: ___________________________________________________________________
Contact Person Name: __________________________________________________________
Contact Email: ________________________________________________________________
Contact Person Telephone Number: ________________________________________________
Date When Work Performed: _____________________________________________________
RFP – ROOF REPLACEMENT - 061522 Page 14
Non-Collusion
By signing below, I certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a bid for same materials, supplies or equipment, and is in all respects fair and without collusion or fraud. I understand that collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of this bid, and certify that I am authorized to sign this bid for the bidder.
In addition, the selected company will be required to comply with all existing State and Federal laws, including applicable equal opportunity employment provisions. The Contract between the company and the City shall be construed and governed in accordance with the law of the State of Georgia and the City of College Park. The company, at its own expense, shall secure all occupational and professional licenses and permits necessary for the fulfillment of its obligations under this contract.
It shall be unethical for any City Employee or City Official to transact any business or participate directly or indirectly in a procurement contract when the City Employee or City Official knows;
the City Employee or City Official or immediate family of such has a substantial interest pertaining to the procurement contract, except that the purchase of goods and services from businesses, which a member of the city council or other City Employee has a substantial interest is authorized as per O.C.G.A. § 36-1-14, or the procurement contract is awarded pursuant to O.C.G.A. § 45-10-22 and § 45-10-24, or the transaction is excepted from said restrictions by O.C.G.A. § 45-10-25, interpreting such statutes as if they were applicable to a municipality.
Vendor Name:
Physical Address:
City, State, Zip
Phone: Fax:
Signature:
Date:
RFP – ROOF REPLACEMENT - 061522 Page 15
ADDENDUM ACKNOLEDGEMENT
The offer has examined and carefully studied the speciation(s) and the following addendum receipt of all of which is hereby acknowledged:
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
There were no addendum published (initial): _______
I/We the undersigned hereby offer and agree to supply and deliver the service as outlined in the Request for Proposal documents. The signature(s) below dignify that I/we have read and agree with the procedures outlined in the Request for Proposal document.
Proposals that fail to acknowledge the offer’s receipt of any/all addendum will result in the rejecting of the proposal
Signature
Print/Type Name
Title
Date
RFP – ROOF REPLACEMENT - 061522 Page 16
PURPOSE & S.O.W.
GENERAL PURPOSE
The City of College Park is soliciting for a qualified roofing company to provide construction service(s) to install a new roof at the Tracey Wyatt Recreation Center at 2300 Godby Rd | College Park, GA | 30349.
The City of College Park is looking to have a 5% certified DBE Goal on this project.
SCOPE OF WORK
College Park Wyatt Recreation Roof Replacement including but not limited to the following:
A. disposal offsite of all roof system material removed, B. removal and restoration of existing roof electrical grounding components, C. temporary weather proof roof covering as required, D. Standing Seam Roof Panels with Aluminum Zinc Alloy coated finish, clips, cleats, roof curbs, pipe flashing and sheet panel fasteners, roof insulation and accessories in accordance with original Drawings and Specifications equivalent or better (attached).
E. All materials and methods shall meet all applicable local and state building codes.
BUILDING SPECIFICATIONS
A. Pre-Engineered Metal Building
1. Width: 189’
2. Length: 100’
3. Height: 30’8”
4. Roof Pitch: 25:12
5. Live Load: 20 PSF
6. Wind Load: 90 mph
7. Collateral Load: 3 lbs.
8. Sill Cond.: Formed base trim
9. Wall Color: Sig 200
10. Roof Color: Galvalume Plus
11. All Trim: Signature 200
12. Bay Spacing: 4@25’
13. Column Type: Standard
14. Wall Girts: Sidewalls bypass and endwalls flush
15. Roof Panels: 24 Gauge standing seam
16. Wall Panels: 26 Gauge PBR
Building Accessories:
RFP – ROOF REPLACEMENT - 061522 Page 17
Insulation: Super Saver at Roof, 4” reinforced vinyl at walls Gutters and Downs: 380 LF Bracing: Portal frames to be used – NO cable bracing Open Walls: All walls open 10’8” aff for block (block by others) Fasteners: Zac long-life roof and wall fasteners Drawings: Three (3) sets of stamped engineered for pre-engineered metal building Estimated delivery times are 7 to 9 weeks, depending on class of job
B. Pre-Engineered Metal Building
1. Width: 38’8”
2. Length: 180’
3. Height: 32’4”
4. Roof Pitch: 25:12
5. Live Load: 20 PSF
6. Wind Load: 90 mph
7. Collateral Load: 3 lbs.
8. Sill Cond.: Formed base trim
9. Wall Color: Sig 200
10. Roof Color: Galvalume Plus
11. All Trim: Signature 200
12. Bay Spacing: 1@25’
13. Column Type: Standard
14. Wall Girts: Sidewalls bypass and endwalls flush
15. Roof Panels: 24 Gauge standing seam
16. Wall Panels: 26 Gauge PBR
Building Accessories:
Insulation: Super Saver at Roof, 4” reinforced vinyl at walls Gutters and Downs: 380 LF Bracing: Portal frames to be used – NO cable bracing Open Walls: All walls open 10’8” aff for block (block by others) Fasteners: Zac long-life roof and wall fasteners
C. Pre-Engineered Metal Building
1. Width: 110’
2. Length: 42’
3. Height: 30’8”
4. Roof Pitch: 25:12
5. Live Load: 20 PSF
6. Wind Load: 90 mph
7. Collateral Load: 3 lbs.
8. Sill Cond.: Formed base trim
9. Wall Color: Sig 200
10. Roof Color: Galvalume Plus
RFP – ROOF REPLACEMENT - 061522 Page 18
11. All Trim: Signature 200
12. Bay Spacing: 2@25’
13. Column Type: Standard
14. Wall Girts: Sidewalls bypass and endwalls flush
15. Roof Panels: 24 Gauge standing seam
16. Wall Panels: 26 Gauge PBR
Building Accessories:
Insulation: Super Saver at Roof, 4” reinforced vinyl at walls Gutters and Downs: 380 LF Bracing: Portal frames to be used – NO cable bracing Open Walls: All walls open 10’8” aff for block (block by others) Fasteners: Zac long-life roof and wall fasteners
RFP – ROOF REPLACEMENT - 061522 Page 19
OWNER’S PROPOSAL FORM
OWNER: City of College Park
3667 Main Street College Park, GA 30337
PROJECT: Roof Replacement
2300 Godby Road College Park, Georgia 30349
DATE:
1. The Undersigned, as Respondent, declares the only person interested in the Proposal as Principal is as named below, and no other person has any interest in this Proposal or in the Contract to be entered into; and this Proposal is in all respects fair and in good faith.
Respondent further declares he has examined the site of Work and informed himself fully in regard to all conditions pertaining to the place where the work is to be done, and he has examined the Drawings and Specifications, including Addenda Nos. ________________ for the work and the other Contract Documents, and has satisfied himself relative to the Work to be performed.
In compliance with your Request for Proposal (RFP) and subject to all the conditions of thereof:
The undersigned, ____________________, Georgia License No. ______________, Classification _____________________, a Corporation organized and existing under the laws of the State of _____, or a Partnership consisting of ______________________________, or an Individual trading as ____________________________________________, of the City of ________________________, hereby proposes to furnish all labor and materials and perform all work required for the General Construction of the College Park Wyatt Recreation Roof Replacement including but not limited to the following: disposal offsite of all material removed, removal and restoration of existing electrical grounding components, temporary weather proof roof covering, standing Seam Roof Panels with Aluminum Zinc Alloy coated finish, clips, cleats, roof curbs, pipe flashing and sheet panel fasteners, roof insulation and accessories in accordance with original Drawings and Specifications equivalent or better (attached). All materials and methods shall meet all applicable local and state building codes.
BASE PROPOSAL AMOUNT:
(For construction complete as shown and specified, the sum of (in words)
Dollars ($
The Base Proposal Amount includes the cost of all bonds required under the proposed Contract Documents, and the cost of all provisions of the General Requirements, including the General Conditions and the Supplementary Conditions, and the 10% Contingency.
2. TIME OF COMPLETION
Time is of the essence of this contract. Contractor shall commence work immediately after Notice to Proceed (NTP) and shall Substantially Complete the Construction within [insert #] consecutive days as requested by the Owner as illustrated by the Architects and Consulting Engineers in their Plans and Technical Specifications.
RFP – ROOF REPLACEMENT - 061522 Page 20
In submitting this proposal, I further agree:
a. That this proposal will not be modified, withdrawn or canceled during the 90-day period following the time and date designated for the receipt of proposals.
b. The Owner reserves the right to waive any information in any proposal, or to reject any or all proposals, in whole or impart, and to accept the proposal most advantageous to the Owner, should it be deemed in his best interest to do so.
c. To execute and deliver the formal contract to the Owner with bonds and proof of insurance coverages. Delivery will be made within 10 days of receipt of written notice or acceptance of this proposal, with or without Alternates or other agreed-upon modifications.
d. Proposal Security, payable to the Owner in the amount of five percent (5%) of the Base Proposal, is enclosed and is the measure of liquidated damages, which the Owner will sustain in the event the Contract and Bonds are not executed within the time set forth above.
e. The undersigned further agrees that in case of failure on his part to execute the Contract Agreement and required Contract Bonds within 10 consecutive calendar days after being given written notice of the Award of the Contract, the Respondent’s Bond accompanying this Proposal is callable and the surety will be called upon by the Owner for the liquidation;
otherwise, the Bond accompanying this Proposal shall be returned to the undersigned.
RFP – ROOF REPLACEMENT - 061522 Page 21
Signed and sealed this ______ day of ______________________ 2022.
Name of Respondent:
By:
Title:
Business Address
Telephone:
(CORPORATE SEAL)
STATE OF __________
COUNTY OF _________________
Sworn to and subscribed before me this ____
Day of _____________, 2022.
Notary Public
My Commission Expires: ____________________
Attachment:
RFP – ROOF REPLACEMENT - 061522 Page 22
BASE PROPOSAL BREAKDOWN
Division Name Price
Division 01 - Contract Requirements/General Requirements $
Division 13 – Roof System Replacement $
TOTAL (Divisions) $
Contingency At 10% for Items in Divisions 01-33 above
TOTAL BASE PROPOSAL $
RFP – ROOF REPLACEMENT - 061522 Page 23
EXHIBIT A
CITY OF COLLEGE PARK, GEORGIA
RISK MANAGEMENT REQUIREMENTS
CONTRACTS FOR MORE THAN $100,000
A. For public works contracts, surety performance and payment bonds each in the amount of at least the total amount payable by the terms of the contract.
B. Insurance Required (only if Contractor or any agent or employee of Contractor will be:
driving a vehicle during the performance of the contract; acting on behalf of the City; or performing any part of the contract on the premises of the City)
1. Workers Compensation – Workers Compensation coverage on a statutory basis for the State of Georgia with an Employer’s Liability limit of $1,000,000. The increased Employer’s Liability limit may be provided by an Umbrella or Excess Liability policy.
2. Automobile Liability – Automobile liability coverage for owned, hired, and non-owned vehicles in the amount of $1,000,000 combined single limit.
3. Commercial General Liability – Coverage to be provided on “occurrence” not “claims made” basis. The coverage is to include Contractual liability, Per Project Limit of Liability, losses caused by Explosion, Collapse and Underground (“XCU”) perils, the “City of College Park, Georgia” is to be added as an Additional Insured and Products and Completed Operations coverage is to be maintained for three (3) years following completion of work.
LIMITS OF LIABILITY
$1,000,000 Per Occurrence
$1,000,000 Personal and Advertising
$50,000 Fire Damage*
$5,000 Medical Payments*
$1,000,000 General Aggregate
$1,000,000 Products/Completed Operations per Occurrence and Aggregate
*These are automatic minimums
4. Umbrella and/or Excess Liability – The umbrella or Excess Liability Policy may be used to combine with underlying policies to obtain the limits required. The Management of the City may elect to require higher limits.
5. Owners Protective Liability – The City Management may in its discretion require Owners Protective Liability in some situations.
RFP – ROOF REPLACEMENT - 061522 Page 24
CONTRACTS FOR UP TO $100,000
A. For public works contracts, surety performance and payment bonds in the City’s discretion where the contract amount is greater than $20,000.00.
B. Insurance Required (only if Contractor or any agent or employee of Contractor will be:
driving a vehicle during the performance of the contract; acting on behalf of the City; or performing any part of the contract on the premises of the City)
1. Workers Compensation – Workers Compensation coverage on a statutory basis for the State of Georgia with an Employers Liability limits of $100,000 each Accident, Disease $100,000 each employee, $500,000 Disease policy limit.
2. Automobile Liability – Automobile liability coverage for owned, hired, and non- owned vehicles in the amount of $500,000 combined single limit.
3. Commercial General Liability – Coverage to be provided on “occurrence” not “claims made” basis. The coverage is to include Contractual liability, Per Project Limit of Liability, losses caused by Explosion, Collapse and Underground (“xcu”) perils, the “City of College Park, Georgia” is to be added as an Additional Insured and Products and Completed Operations coverage is to be maintained for three (3) years following completion of work.
LIMITS OF LIABILITY
$1,000,000 per Occurrence
$1,000,000 Personal and Advertising
$50,000 Fire Damage*
$5,000 Medical Payments*
$1,000,000 General Aggregate
$1,000,000 Products/Completed Operations per Occurrence and Aggregate
*These are automatic minimums
4. Owners Protective Liability – The City Management may in its discretion require Owners Protective Liability in some situations.
Before the start of any work, the Contractor shall furnish to the City:
A. Certificates of Insurance manifesting that the applicable above mentioned requirements have been met, all certificates to contain:
1. The name of the Insurance Company
2. Policy Number
3. Policy inception and expiration dates
4. Name and address of insured
RFP – ROOF REPLACEMENT - 061522 Page 25
5. Name and address of agent
6. Limits of liability
7. Type of insurance coverage
8. Any amendment that expands or reduces standard Insurance Service Office (ISO) policy coverage.
9. Statement that the policy applies to the project number or job concerned.
10. Attach copy of Endorsement that shows that each of the policies have been amended to provide thirty (30) days’ notice to certificate holders prior to termination or non-renewal and that the General Liability Policy has been endorsed to show certificate holder as additional insured.
B. An endorsement incorporating the Hold Harmless Agreement assumed by the Contractor under the terms of this Contract;
The Contractor shall be wholly responsible for securing Certificates of Insurance coverage as set forth above from all Subcontractors who are engaged in this work.
RFP – ROOF REPLACEMENT - 061522 Page 26
Form of Proposal
To: The City of College Park College Park, GA 30337
I/We the undersigned hereby offer and agree to supply and deliver the service(s) as outlined in the Request for Proposal documents. The signatures(s) below dignify the I/We have read and agree with the procedures outlined in the Request for Proposal documents.
Proposal Submitted By:
Company Name
Address
City, State, Zip
Phone
Website
Print/Type Name
Signature
Title
Date
RFP – ROOF REPLACEMENT - 061522 Page 27
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Conference Information | — | |
| Bid Open Details | — | |
| Award Information | — |
On GovTribe
Work with this file