This scope of work document pertains to the Ronny G. Beard Memorial Stadium Lighting Project, a capital improvement project by the Claiborne Parish School District in Homer, Louisiana. The project encompasses comprehensive engineering design, complete removal of existing stadium lighting fixtures, procurement and supply of new high-efficiency LED floodlights and related equipment, installation of new electrical wiring and control systems, and civil site work to ensure code compliance and ADA requirements for the high school athletic facility. The scope additionally includes full system testing, alignment, and final commissioning to verify proper field illumination. The project location is Ronny G. Beard Memorial Stadium (Homer Pelicans) at 1008 N. Main Street, Homer, Louisiana 71040. The solicitation opened on September 25, 2026, with a bid submission deadline of October 29, 2026.
The document does not specify pricing terms, contract duration, renewal options, set-asides, incumbent contractors, or detailed funding sources and amounts. No information regarding site visits, bidder's conferences, or award dates is provided in this scope of work document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The scope of work for the Ronny G. Beard Memorial Stadium Lighting Project by the Claiborne Parish School District in Homer, Louisiana, covers the complete design, supply, and installation of a new athletic lighting system .
Project Scope of Work
Engineering Design: Comprehensive planning, layout, and electrical engineering design for the stadium.
Fixture Removal: Removal and teardown of existing stadium lighting fixtures.
Procurement: Supply and acquisition of new high-efficiency LED floodlights and related equipment.
Electrical Installation: Installation of new wiring, control systems, and associated electrical infrastructure.
Civil Work & Compliance: Performing necessary ground/site work to ensure code compliance, safety standards, and ADA requirements for high-school athletic facilities.
Testing & Commissioning: Full system testing, alignment, and final commissioning to verify proper field illumination.
Key Details
Owner / Agency: Claiborne Parish School District (Louisiana)
Location: Ronny G. Beard Memorial Stadium (Homer Pelicans), 1008 N. Main St., Homer, LA 71040
Project Timeline / Key Dates: Opened on September 25, 2026, with a closing/submission deadline of October 29, 2026.
Bid Bana… +1
Bid Banana
10/26/26, 10:28 AM Ronny G. Beard Memorial Stadium Lighting Project claiborne parish scope of work - Google Search https://www.google.com/search?q=Ronny+G.+Beard+Memorial+Stadium+Lighting+Project+claiborne+parish+scope+of+work&sca_esv=a729b046d76… 1/1 https://bidbanana.thebidlab.com/bid/GZgGO8oblN2YAxFyEY1t https://bidbanana.thebidlab.com/bid/GZgGO8oblN2YAxFyEY1t