This is a Rough Order of Magnitude (ROM) pricing template for a pre-solicitation market research inquiry issued by the U.S. Air Force Air Combat Command (ACC). The ROM estimates costs for carpet, furniture, and asbestos abatement services at an Air Force facility, organized into two priority levels with optional CLINs for expanded scope.

Priority 1 consists of eight CLINs covering: carpet tile materials (264 square yards), carpet tile installation labor, adhesive materials (18 gallons), cove base materials (582 linear feet), cove base installation labor, miscellaneous removal/installation materials, complete asbestos abatement services including ACM removal, concrete subfloor preparation, EPA notification, air clearance sampling, and hazardous waste manifest submission, and furniture removal and storage services for approximately 1,530 square feet of space. Priority 2 presents identical services with optional CLINs for an expanded scope, including additional carpet tile materials (266 square yards) and cove base (618 linear feet). The document notes this ROM is for market research purposes only and not an official solicitation, with all pricing fields currently showing zero as placeholders pending contractor input. Respondents are directed to reference the Draft Performance Work Statement (PWS) for detailed service requirements and are invited to provide suggestions regarding appropriate NAICS and PSC codes. The point of contact is Teresa Romig at teresa.romig@us.af.mil or (530) 634-3405.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

9 CONS
Rough Order Magnitude (ROM)
9 RW B2161 Carpet/Furniture/Asbestos
*Disclaimer: Information below is a cost estimate. This does not depict actual cost of work to be performed. It is an estimate ONLY.
POC: Teresa Romig / PKB
Email/Phone: teresa.romig@us.af.mil / (530) 634-3405
Priority 1
CLINSITEM/SERVICEUNIT OF MEASUREQTYCOSTTOTAL
CLIN 0001Carpet Tile Materials Supply of carpet tiles meeting the specifications outlined in the Statement of Need (SON)Square Yard264$ - 0
CLIN 0002Carpet Tile Installation Labor. All labor required specifically for the installation of carpet tiles, excluding material costs.Square Yard$ - 0
CLIN 0003Adhesive Materials Supply of adhesive compatible with the specified carpet tiles and suitable for the existing subfloor. Must meet all applicable regulations and standardsGallon18$ - 0
CLIN 0004Cove Base Materials. Supply of cove base meeting the specifications outlined in the Statement of Need (SON).Linear Foot582$ - 0
CLIN 0005Cove Base Installation Labor. All labor required specifically for the installation of cove base, excluding material costsLinear Foot$ - 0
CLIN 0006All other materials needed to complete carpetremoval/installation.Lot1$ - 0
CLIN 0007Asbestos Abatement. Complete asbestos abatement services as described in the SON, including: Removal of ACM in designated areas; Preparation of concrete subfloor; Submission of required plans, certifications, and notifications (including EPA notification); Removal and disposal of all asbestos-containing materials according to regulations; Air clearance sampling and reporting; Hazardous waste manifestsubmissionLot1$ - 0
CLIN 0008Furniture Removal and Storage. Removal, storage, and reinstallation of all furniture within the designated area (approx. 1530 sq ft) as described in the SON. This includes: Packing and protection of furniture items; Transporting furniture to and from the designated storage location; Secure storage of furniture during the project; Returning furniture to its original location andconfiguration.Lot1$ - 0
Overall Total$ - 0
Priority 2
CLINSITEM/SERVICEUNIT OF MEASUREQTYCOSTTOTAL
CLIN 1001 Optional CLINCarpet Tile Materials Supply of carpet tiles meeting the specifications outlined in the Statement of Need (SON)Square Yard266$ - 0
CLIN 1002 Optional CLINCarpet Tile Installation Labor. All labor required specifically for the installation of carpet tiles, excluding material costs.Square Yard$ - 0
CLIN 1003 Optional CLINAdhesive Materials Supply of adhesive compatible with the specified carpet tiles and suitable for the existing subfloor. Must meet all applicable regulations and standardsGallon18$ - 0
CLIN 1004 Optional CLINCove Base Materials. Supply of cove base meeting the specifications outlined in the Statement of Need (SON).Linear Foot618$ - 0
CLIN 1005 Optional CLINCove Base Installation Labor. All labor required specifically for the installation of cove base, excluding material costsLinear Foot$ - 0
CLIN 1006 Optional CLINAll other materials needed to complete carpetremoval/installation.Lot1$ - 0
CLIN 1007 Optional CLINAsbestos Abatement. Complete asbestos abatement services as described in the SON, including: Removal of ACM in designated areas; Preparation of concrete subfloor; Submission of required plans, certifications, and notifications (including EPA notification); Removal and disposal of all asbestos-containing materials according to regulations; Air clearance sampling and reporting; Hazardous waste manifestsubmissionLot1$ - 0
CLIN 1008 Optional CLINFurniture Removal and Storage. Removal, storage, and reinstallation of all furniture within the designated area (approx. 1530 sq ft) as described in the SON. This includes: Packing and protection of furniture items; Transporting furniture to and from the designated storage location; Secure storage of furniture during the project; Returning furniture to its original location andconfiguration.Lot1$ - 0
Overall Total$ - 0