This is a Request for Information (ROI) issued by the Southeastern Pennsylvania Transportation Authority (SEPTA) dated May 13, 2026, regarding sinkhole remediation work on the Norristown High Speed Line (NHSL). The project involves drilling and pumping limited mobility grout to prevent further surface subsidence of railroad tracks in an area with karst topography near Lane Enterprises, where similar grouting work was previously conducted in 2022. The scope of work includes surveying and laying out drill hole locations, drilling pipe into soil/rock and injecting grout material, movement monitoring of tracks and surrounding infrastructure, track protection from equipment damage, site cleanup and restoration, and RWP (Roadway Worker Protection) training for untrained personnel or those with lapsed certifications. Interested contractors are requested to notify Michael Piselli to attend a meeting on Friday, May 15, 2026, at 11:00 AM at the SEPTA Substation near Hughes Park (coordinates: 40.085561, -75.352290), with the actual work location at approximate coordinates 40.087987, -75.352999. The work schedule is to be determined but will involve weekdays and potential weekends in 2026.
By participating in this ROI, contractors unconditionally agree that SEPTA may use, modify, and publish any information or materials submitted without obligation to engage or compensate contractors in any manner. The ROI specifies that surveying of track elevations must occur at the beginning and end of each pumping shift to ensure track stability, as referenced in Specification Section 02346 3.07 for Movement Monitoring. This letter does not constitute a contract award or commitment to reimburse for preparation or participation costs. Contact for the opportunity is Michael Piselli, Manager of Contract Administration in SEPTA's Procurement & Supply Chain Management, reachable at 215-580-8364 or mpiselli@septa.org.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 13, 2026
To Whom It May Concern:
Subject: SEPTA NHSL Sinkhole Remediation – Request of Information (ROI)
SEPTA will conduct a review to gain market insight with the goal of finalizing specifications for the SEPTA NHSL sinkhole remediation. This work will be conducted on SEPTA NHSL tracks near Lane Enterprises, an area known for karst topography with previous Limited Mobility Grouting work in 2022.
SEPTA kindly requests interested contractors to review the information below project information and notify Michael Piselli of your interest to meet on Friday May 15th, 2026 at 11:00 am.
Meeting location: SEPTA Substation near Hughes Park, coordinates: 40.085561, -75.352290
Michael Piselli, Manager, Contract Administration SEPTA Procurement & Supply Chain Management Office: 215-580-8364 mpiselli@septa.org
In participation in this ROI, the contractor is unconditionally agreeing to the following; i) SEPTA shall be authorized to use any information or material submitted, referenced, or presented during this ROI; (ii) SEPTA shall be authorized to modify and publish anything provided; and (iii) SEPTA shall not be obligated to engage or otherwise compensate contractors in any manner.
Purpose: Develop/Review work area, scope, access, and quantities Schedule: to be determined, weekdays and potential weekends in 2026 Coordinates of actual work location, approximate: 40.087987, -75.352999
Draft Summary of Work:
1. DESCRIPTION OF WORK
A. This Contract is to drill and pump limited mobility grout to prevent further surface subsidence of the railroad tracks on the Norristown High Speed Line (NHSL) of the Southeastern Pennsylvania Transportation Authority (SEPTA) Suburban Transit Division (STD). This is a sinkhole prone area.
B. The Work of this Contract includes:
a. Surveying and laying out the primary locations of the drill holes in advance.
b. Drilling pipe into soil / rock and injecting grout material.
c. Movement monitoring of the track, surrounding ground, structures, utilities and any other facilities that might be impacted by the Work. Surveying of track elevations at the beginning and end of each shift when pumping to ensure that the track does not move. See Specification Section 02346 3.07, Movement Monitoring.
d. Protection of the track from damage caused by equipment.
e. Clean-up and restoration of the work areas.
mailto:mpiselli@septa.org
f. RWP training for all untrained personnel and those whose SEPTA RWP training has lapsed.
Training classes will be made available
This letter shall not be interpreted as an award of a contract or a commitment to reimburse for any costs in the preparations or participation of this ROI.
Thank you for your interest in SEPTA.
Sincerely, Michael Piselli, Manager, Contract Administration SEPTA Procurement & Supply Chain Management