This document is a Statement of Work (SOW) for the delivery of rock products to Mountain Home Air Force Base (MHAFB) and surrounding ranges in Idaho.
The SOW requires the contractor to provide all personnel, equipment, tools, materials, supervision, and other services necessary to deliver aggregate materials to MHAFB and surrounding range complexes. It specifies the delivery requirements, price list, payment process, hours of operation, security and traffic regulations, environmental controls, and detailed technical specifications for concrete, asphalt, and various aggregate products. Appendices include product lists with unit pricing and aggregate gradation tables.
The related federal contract opportunity is for a Blanket Purchase Agreement to provide these rock product services to MHAFB. The solicitation is being issued by the 366th Financial Acquisition Squadron of the Department of the Air Force's Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND1 - Q0003 - Rock Product Delivery.pdf | ||
| COMBO - FY24 Rock Product BPA.pdf | ||
| FY24 Rock Product BPA Price List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work For Rock Products
Mountain Home Air Force Base (MHAFB), Idaho
Table of Contents
| 1.0 DESCRIPTION OF SERVICES | 3 |
| 2.0 REQUIREMENTS | 3 |
| 2.1 DELIVERY | 3 |
| 2.3 PRICE LIST | 3 |
| 2.4 PAYMENT | 3 |
| 3.0 GOVERNMENT FURNISHED EQUIPMENT AND SERVICES | 3 |
| 4.0 GENERAL INFORMATION | 3 |
| 4.1 HOURS OF OPERATION | 3 |
| 4.2 HOLIDAYS. | 3 |
| 4.4 SECURITY REQUIREMENTS | 4 |
| 4.5 TRAFFIC LAWS | 4 |
| 4.6 WEAPONS, FIREARMS, AND AMMUNITION | 4 |
| 4.7 REPORTING REQUIREMENTS | 4 |
| 4.8 CONTRACTOR EMPLOYEES | 4 |
| 4.9 PROGRAM MANAGEMENT | 5 |
| 5.0 ENVIRONMENTAL CONTROLS | 5 |
| 5.1 | 5 |
| 5.2 APPROVALS | 5 |
| 5.3 NOTIFICATION OF ENVIRONMENTAL SPILLS | 5 |
| 5.4 DISPOSAL | 6 |
| 5.5 HAZARDOUS WASTE POC | 6 |
| APPENDIX A - SPECIFICATIONS DATA | 7 |
| Concrete | 7 |
| Asphalt | 7 |
| Aggregates | 9 |
| APPENDIX B - TABLES | 11 |
| APPENDIX C - PRODUCT LIST | 15 |
1.0 DESCRIPTION OF SERVICES. This Agreement is for the delivery of aggregate materials to MHAFB and surrounding range complexes. The Contractor shall provide all personnel, equipment, tools, materials, supervision, other items, and services necessary to perform delivery of materials in accordance with the Statement of Work (SOW).
2.0 REQUIREMENTS. The Contractor shall deliver and adhere to the following upon completion of any BPA Call:
2.1 DELIVERY. Delivery dates shall be coordinated with the program manager and be within the period of performance stated in the Blanket Purchase Agreement (BPA) Call.
2.2 MAPS. Base maps will be made available upon request and any time deliveries are made outside of the base perimeter.
2.3 PRICE LIST. The Contractor shall provide a final price list to the CO at award. The price list shall be good for 1 year from the date signed. Any price adjustments required prior to the 1-year expiration date shall be approved by the CO.
2.4 PAYMENT. Payment shall be made through use of the Defense Finance and Accounting System’s (DFAS) Wide Area Workflow (WAWF). Billing period shall be for a calendar month beginning on the first day of the month and ending on the last day of each month unless otherwise specified by the authorized caller or Contracting Officer (CO).
3.0 GOVERNMENT FURNISHED EQUIPMENT AND SERVICES. The Government will not provide any services or equipment. Water and sewer may be provided on a case-by-case basis with pre-authorization by the CO or the authorized caller. All other supplies shall be provided by the Contractor.
4.0 GENERAL INFORMATION
4.1 HOURS OF OPERATION. Normal business hours at MHAFB are Monday through Friday, 7:30 am to 4:30 pm., excluding holidays. Normal business hours for ranges are 08:30 am to 6:30 pm. However, the Government can be flexible on the hours of operation to accommodate deliveries. All BPA calls will be made by the Government in advance prior to any requirement outside of these hours or during holidays.
4.2 HOLIDAYS. When the holiday is on a Saturday, the preceding Friday will be the federal holiday. When the holiday is on a Sunday, the following Monday will be the federal holiday. Asterisks (*) indicate dates change each year.
4.3 LIST OF FEDERAL HOLIDAYS
| 1 January | New Year’s Day |
| 3rd Monday in January* | Martin Luther King’s Day |
| 3rd Monday in February* | President’s Day |
| Last Monday in May* | Memorial Day |
| 19 June | Juneteenth |
| 4 July | Independence Day |
| 1st Monday in September | Labor Day |
| 2nd Monday in October* | Columbus Day |
| 11 November | Veteran’s Day |
| 4th Thursday in November* | Thanksgiving |
| 25 December | Christmas |
4.4 SECURITY REQUIREMENTS. All personnel employed by the Contractor in the performance of this agreement, or any subsequent contracts are representatives of the Contractor entering the Government installation and shall abide by all security regulations of the installation.
4.4.1. The Contractor shall obtain personal identification passes for all employees requiring entry onto MHAFB, Idaho. The Contractor shall submit a SFS Form 30 through the authorized caller or CO to the Security Forces Pass and Registration Office 2 weeks prior to the start date of the contract. Employees must have a valid vehicle registration, proof of insurance, and driver’s license.
4.4.2. The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for Contractor use.
4.5 TRAFFIC LAWS. The Contractor and its employees shall comply with all base traffic regulations.
4.6 WEAPONS, FIREARMS, AND AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately-owned vehicle while on MHAFB.
4.7 REPORTING REQUIREMENTS. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified information.
4.8 CONTRACTOR EMPLOYEES. The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor, by the Contracting Officer, as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest unless such person seeks and receives approval in accordance with DOD 5500.7 and the Joint Ethics Regulation. If prior military, the employee must have been discharged under honorable conditions with no administrative discharge actions taken against them.
4.8.1 CONTRACTOR APPEARANCE. Employees are expected to comply with reasonable dress and grooming standards based on comfort, productivity, health, and types of positions occupied. Attire shall be in good repair and shall not be considered offensive, disruptive, or unsafe. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats bearing the company name or logo. The coloring or design of the items selected should be such that the items identify personnel easily and quickly for reasons of safety, security, and personal protection. The Government is authorized to restrict base access to any Contractor employee or prospective Contractor employee who is identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population.
4.9 PROGRAM MANAGEMENT. The Contractor shall, without any additional expense to the Government, be responsible for obtaining any necessary licenses and permits and for complying with any applicable Federal, State, and municipal laws, codes, and regulations in connection with the performance of work as outlined in this SOW. The Contractor shall be liable for all personnel injuries and equipment damage that result from their negligence or failure to follow safety and health guidelines. The Contractor shall take proper safety and health precautions to protect work, the workers, the public, and the property of others, to include appropriate insurance.
5.0 ENVIRONMENTAL CONTROLS
5.1 MATERIALS (SOIL, AGGREGATE, SPOILS, CONSTRUCTION, AND DEMOLITION DEBRIS). Evaluate excess environmental media and construction debris generated during the demolition of housing units or other wooden structures for the presence of chlordane or other pesticides prior to onsite reuse or final disposal at a permitted landfill. Waste materials generated from MHAFB projects must be taken to an appropriate licensed disposal facility (TSDF or Landfill), offsite reuse is not authorized. Do not transport soil off the project site unless approval has been obtained from the Contracting Officer after coordination with CEIE/Environmental Office. The definition of "project site" is the immediate vicinity of the construction/demolition activities within the project boundaries.
All soils brought onto MHAFB that will be used as un-encapsulated surface fill material must be approved by the Contracting Officer. If testing is required, test results must be provided to CEIE/Environmental Office for approval/disapproval of material prior to coming on to MHAFB.
All materials must also be approved by CEIE/Environmental Office and the Contracting Officer prior to being taken off-base for disposal at a permitted landfill or if being reused on base. If testing is required, test results must be provided to CEIE/Environmental Office for waste characterization determination of soils prior to onsite reuse or disposal.
All non-hazardous materials shall be disposed of in a permitted off-base landfill in accordance with all applicable local, state, and federal laws.
MHAFB required analytical analysis of soils includes Method 8260/5035 for Volatile Organic Compounds (VOCs), Method 8270 for Semi-volatile Organic Compounds (SVOCs), Methods 6010/7470 for RCRA (8) Metals, Method 8081 for Pesticides, and Method 8082 for PCBs to demonstrate non-contaminated before being accepted for use on the project site. Determination of the number of samples must be made by an environmental professional. An environmental professional must have: a state issued certification or license and three years of relevant full-time work experience; or a Baccalaureate degree or higher in science or engineering and five years of relevant full-time work experience; or ten years of relevant full-time work experience.
5.2 HAZARDOUS MATERIAL (HAZMAT) INVENTORY AND SAFETY DATA SHEETS (SDS). SDS are required as specified in Federal Standard No. 313 for all potentially hazardous materials. SDSs must be submitted by the Contractor within ten calendar days following contract award to the CO for a determination of whether a product is a HAZMAT and what additional requirements may be applicable/necessary.
5.3 APPROVALS. Approval is required before bringing any HAZMATS onto the installation. The Government (HAZMART personnel) shall inventory all chemicals the Contractor brings on to MHAFB or any property under the control of MHAFB. Products which meet the criteria of “Hazardous Waste” must be bar coded and tracked until permanently removed from Government property. The inventory shall be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.
5.4 NOTIFICATION OF ENVIRONMENTAL SPILLS. If a spill occurs, the person discovering the spill shall make every effort to stop the product flow, when possible, warn personnel, shut off ignition sources, contain the spill, make notifications, and begin cleanup. If the spill is considered an emergency and there is a potential life, health, fire, or other safety hazard, the MHAFB Fire Department shall be notified IMMEDIATELY. Responsible units and activities shall clean up small spills safely and within their capabilities to do so. Generally, a spill of only a few gallons shall be recovered by the responsible unit or activity using absorbent materials or a spill kit located by the site. Recovered product and contaminated materials shall be packaged and staged for disposal in accordance with the installations hazardous waste procedures. Contact the Environmental Office (208-828-6351) for guidance. The liability for the spill or release of such substances rests solely with the Contractor and its agent.
5.5 DISPOSAL. Do not dispose of hazardous waste on Government property. Do not discharge any waste to a sanitary sewer, storm drain, or to surface waters or conduct waste treatment or disposal on Government property without written approval of the CO and Environmental Office.
5.6 HAZARDOUS WASTE POC. Consult with the Hazardous Waste Program Manager (366 CES/CEIE) at 208-828-1684/6351 prior to disposal of any waste.
APPENDIX A - SPECIFICATIONS DATA
Concrete
Redi-Mixed, 3,000 PSI-Curb Mix
· Max aggregate of 1/2”, coarse
· Water/Cement ratio of 0.5
· Air Content (%): 6.5 +/- 1.5
· Portland cement shall be AASHTO M 85 Type I or II. Concrete that is in contact with water, storm water, or wastewater must be AASHTO M 85 Type II. Do not use Portland cement containing more than 0.6% total alkali!
Redi-Mixed, 3,500 PSI
· Max aggregate of 3/4”, coarse
· Water/Cement ratio of 0.4
· Air Content (%): 6.5 +/- 1.5
· Portland cement shall be AASHTO M 85 Type I or II. Concrete that is in contact with water, storm water, or wastewater must be AASHTO M 85 Type II. Do not use Portland cement containing more than 0.6% total alkali!
Redi-Mixed, 3,500 PSI, Fiber Reinforced
· Max aggregate of 3/4”, coarse
· Water/Cement ratio of 0.4
· Air Content (%): 6.5 +/- 1.5
· 3-pound polypropylene fiber admixture per cubic yard of concrete
· Portland cement shall be AASHTO M 85 Type I or II. Concrete that is in contact with water, storm water, or wastewater must be AASHTO M 85 Type II. Do not use Portland cement containing more than 0.6% total alkali!
Redi-Mixed,4000 PSI
· Max aggregate of 3/4 “ coarse
· Water/Cement ratio of 0.45
· Air Content (%) 5-8% Max
· 3- pound polypropelene fiber admixture per cubic yard of concrete.
· Portland cement shall be AASHTO M 85 Type I or II. Concrete that is in contact with water, storm water, or waste water must be AASHTO M 85 Type II. Do not use Portland cement containing more than 0.6% total alkali.
Asphalt
Hot Mix 3/8”
· Fine and coarse fragments of crushed stone or crushed gravel. May include sand, finely crushed stone, crusher screenings, or similar filler material. Crushed material consisting of hard, durable particles or fragments of stone, free of flat, elongated, or soft pieces, dirt, or other objectionable material. Percent of wear not to exceed 35% per AASHTO T 96: Los Angeles Abrasion Test.
· Design method can be either Hveem Method or Marshall Method. Refer to Table II for “Hveem Mix Requirements” and Table III for “Marshall Mix Requirements”.
· Note: This is NOT airfield specifications!
Hot Mix 1/2”
· Fine and coarse fragments of crushed stone or crushed gravel. May include sand, finely crushed stone, crusher screenings, or similar filler material. Crushed material consisting of hard, durable particles or fragments of stone, free of flat, elongated, or soft pieces, dirt, or other objectionable material. Percent of wear not to exceed 35% per AASHTO T 96: Los Angeles Abrasion Test.
· Design method can be either Hveem Method or Marshall Method. Refer to Table II for “Hveem Mix Requirements” and Table III for “Marshall Mix Requirements”.
· Note: This is NOT airfield specifications!
Hot Mix 3/4”
· Fine and coarse fragments of crushed stone or crushed gravel. May include sand, finely crushed stone, crusher screenings, or similar filler material. Crushed material consisting of hard, durable particles or fragments of stone, free of flat, elongated, or soft pieces, dirt, or other objectionable material. Percent of wear not to exceed 35% per AASHTO T 96: Los Angeles Abrasion Test.
· Design method can be either Hveem Method or Marshall Method. Refer to Table II for “Hveem Mix Requirements” and Table III for “Marshall Mix Requirements”.
· Note: This is NOT airfield specifications.
*NOTE* Tables I-IV are non-airfield specifications.
Airfield Hot Mix
· 75 Blow Marshall Design
· Provided aggregates shall consist of crushed stone, crushed gravel, crushed slag, screenings, natural sand, and mineral filler, as required. The portion of material retained on the No. 4 sieve is coarse aggregate. The portion of material passing the No. 4 sieve and retained on the No. 200 sieve is fine aggregate. The portion passing the No. 200 sieve is defined as mineral filler.
· Coarse aggregates shall consist of sound, tough, durable particles, free from films that would prevent coating and bonding with asphalt material and free from organic matter and other deleterious substances.
· Fine aggregate shall consist of clean, sound, tough, durable particles free from coating of clay, silt, or any objectionable material and containing no clay balls.
· If mineral filler is used, it shall be non-plastic material meeting the requirements of ASTM D242/D242M.
· See Table V for “Aggregate Gradations (Airfield Specific)”.
Aggregates
Road Mix, 3/4” Minus (Type I)
· Fine and coarse fragments of crushed stone/gravel. Crushed material consisting of hard, durable particles or fragments of stone must be free of flat, elongated, or soft pieces, dirt, or other objectionable material.
· Wear not to exceed 35% at 500 revolutions per AASHTO T 96: Los Angeles Abrasion Test.
· The percentage of aggregate retained on the No. 4 sieve having at least one fractured face as determined by AASHTO T35 to be 60 percent for untreated base and 75 percent for treated base and road mix.
· Portion of the fine aggregate passing the No. 200 sieve to be less than 60% of that portion passing the No. 40 sieve.
· Refer to Table VIII for “Crushed Aggregate Gradations”
Road Mix, 2” Minus (Type II)
· Fine and coarse fragments of crushed stone/gravel. Crushed material consisting of hard, durable particles or fragments of stone must be free of flat, elongated, or soft pieces, dirt, or other objectionable material.
· Wear not to exceed 35% at 500 revolutions per AASHTO T 96: Los Angeles Abrasion Test.
· The percentage of aggregate retained on the No. 4 sieve having at least one fractured face as determine by AASHTO T35 to be 60 percent for untreated bas and 75 percent for treated base and road mix.
· Portion of the fine aggregate passing the No. 200 sieve to be less than 60% of that portion passing the No. 40 sieve.
· Refer to Table VIII for “Crushed Aggregate Gradations”.
6” Pit Run Gravel
· Uncrushed, hard, durable gravel or fragments of stone from approved source. May include sand, stone dust or similar filler material. Screen out or crush down oversize material to meet gradation requirements.
· Percent of wear not more than 50% at 500 revolutions on material retained on the No. 4 sieve per AASHTO T 96: Los Angeles Abrasion Test.
· Refer to Table VII for “Uncrushed Aggregate Gradations”.
Washed, 3/4” Drainage
· For standards/specifications, 1” minus used.
· Uncrushed, hard, durable gravel or fragments of stone from approved source.
· Screen out or crush down oversize material to meet gradation requirements. Percent of wear not to exceed 50% at 500 revolutions on material retained on No. 4 sieve per AASHTO T 96: Los Angeles Abrasion Test.
· Refer to Table VII for “Uncrushed Aggregate Gradations”.
Washed, 3/4” Drain, Crushed (For use in concrete mixture)
· Crushed stone, gravel, or blast-furnace slag having hard, strong, durable pieces reasonably free from adherent coatings. All aggregate must be furnished from one source.
· Soundness: Total corrected percentage loss less than 12% by weight based on five cycles of the sodium sulfate soundness test (AASHTO T-104).
· Percentage of Wear: Total percentage of wear to be less than 40% per AASHTO T-96: Los Angeles Method.
· Refer to Table IX for “Coarse Aggregate Gradation for Concrete”.
Screened 2” (Drain/River Rock)
· Note: Use Size 3 inch for guidelines/specifications.
· Uncrushed, hard, durable gravel or fragments of stone from approved source. Screen out or crush down oversize material to meet gradation requirements. Percent of wear not to exceed 50% at 500 revolutions on material retained on the No. 4. Sieve per AASHTO T 96.
· Refer to Table VII for “Uncrushed Aggregate Gradations”.
Airfield Crushed Aggregate, 1 1/2” or 3/4” Minus
· Aggregates provided shall consist of crushed stone or slag, gravel, shell, sand, or other sound, durable, approved materials processed or blended naturally. Aggregates should be sound and durable, free from lumps and balls of clay, organic matter, objectionable coatings, and other foreign material.
· Material retained in the No. 4 sieve shall have a percentage wear not to exceed 50 percent after 500 revolutions when tested as specified in ASTM C131.
· The portion of any blended component and of the completed course passing the No. 40 sieve shall be either non-plastic or hall have a liquid limit not greater than 25 and a plasticity index not greater than 5.
Top Soil
· Top Soil Type S1: Excavated material, up to 18 inches below stripped surface, free of rocks larger than 3 inches, roots, refuse, brush, or other debris.
Sand
· May include sand, stone dust or similar filler material
· Screen out or crush down oversize material to meet gradation requirements. Percent of wear not to exceed 50% at 500 revolutions on materials retained on the No. 4 sieve per AASHTO T 96: Los Angeles Abrasion Test.
· Refer to Table VII for “Uncrushed Aggregate Gradations”.
APPENDIX B - TABLES
Table I. Blended Aggregate Gradations for Plant Mix Percentages by Weight Passing Square Mesh Sieves
| Sieve Size |
| Nominal Maximum Size |
| 3/4 in. |
| 1/2 in. |
| 3/8 in. |
Percent Passing
| 1 in. |
| 100 |
| 3/4 in. |
| 90-100 |
| 100 |
| 1/2 in. |
| 90 max |
| 90-100 |
| 100 |
| 3/8 in. |
| 52-80 |
| 90 max |
| 90-100 |
No. 4
90 max
| No. 8 |
| 23-49 |
| 28-58 |
| 32-67 |
No. 30
No. 50
| No. 200 |
| 2.0-8.0 |
| 2.0-10.0 |
| 2.0-10.0 |
Table II. Hveem Mix Requirements
| Class of Mix |
| Min. Stability |
| Min. Film Thickness |
| Air Voids % |
| Min. Immersion Compression % |
| I |
| 37 |
| 6 micron |
| 3-5 |
| 85 |
| II |
| 35 |
| 6 micron |
| 3-5 |
| 85 |
| III |
| 30 |
| 6 micron |
| 3-5 |
| 85 |
| IV |
| Not to be used for permanent work |
1. Class I mix may be used in place of all other mix classes.
2. Class II mix may be used in place of Class III or IV mixes.
3. Class III mix may be used in place of Class IV mix.
Table III. Marshall Mix Requirements
| Number of Compaction Blows, Each Specimen End |
| 50 |
| Stability, Min. |
| 1200 |
| Flow |
| 8-18 |
| Air Voids, % |
| 3-5 |
Table IV. Hveem and Marshall Requirements
| Nominal Maximum Aggregate Size |
| 3/4 Inch |
| 1/2 Inch |
| 3/8 Inch |
| Voids in Mineral Aggregate (VMA), % |
| 13.0 |
| 14.0 |
| 15.0 |
| Voids Filled with Asphalt (VFA), % |
| 65-78 |
| 65-78 |
| 65-78 |
Table V. Aggregate Gradations (Airfield Specific)
| Sieve Size, inch |
| Gradation 1 Percent Passing by Mass |
| Gradation 2 Percent Passing by Mass |
| Gradation 3 Percent Passing by Mass |
| 1 |
| 100 |
| --- |
| --- |
| 3/4 |
| 76-96 |
| 100 |
| --- |
| 1/2 |
| 68-88 |
| 76-96 |
| 100 |
| 3/8 |
| 60-82 |
| 69-89 |
| 76-96 |
| No. 4 |
| 45-67 |
| 53-73 |
| 58-78 |
| No. 8 |
| 32-54 |
| 38-60 |
| 40-60 |
| No. 16 |
| 22-44 |
| 26-48 |
| 28-48 |
| No. 30 |
| 15-35 |
| 18-38 |
| 18-38 |
| No. 50 |
| 9-25 |
| 11-27 |
| 11-27 |
| No. 100 |
| 6-18 |
| 6-18 |
| 6-18 |
| No. 200 |
| 3-6 |
| 3-6 |
| 3-6 |
Table VI. Airfield Specific Marshall Method Mix Design Criteria Mix Design Criteria
| Test Property |
| 75 Blows or Mix Gyrations |
| Stability, lbs., Min. (NA for Superpave) |
| *1800 |
| Flow, 0.01 in., (NA for Superpave) |
| 8-16 |
| Air Voids, % |
| 3-5 |
% Voids in Mineral Aggregate (VMA), (Min.)
| Gradation 1 |
| 13.0 |
| Gradation 2 |
| 14.0 |
| Gradation 3 |
| 15.0 |
| TSR, Min. % |
| 75 |
Table VII. Uncrushed Aggregate Gradations Percentages By Weight Passing Square Mesh Sieves
| Sieve Size |
| Nominal Maximum Size |
| 8 in. |
| 6 in. |
| 3 in. |
| Drain Rock 3 in. |
| 1 in. |
| Sand |
| Filler Sand |
| 8 in. |
| 100 |
6 in.
3 in.
| 100 |
| 100 |
1 in.
| 25-60 |
| 100 |
3/8 in.
0-4
| 100 |
| 100 |
| No. 4 |
| 15-65 |
| 15-60 |
| 25-60 |
| 25-60 |
| 85-100 |
| 95-100 |
No. 16
45-80
No. 50
10-30
No. 100
2-10
| No. 200 |
| 0-12 |
| 0-12 |
| 0-12 |
| 0-2 |
| 0-12 |
| 2-10 |
| 0-4 |
Footnote: Drain Rock shall have a minimum of 35% Air Voids as determined by AASHTO T 19 Bulk Density (“Unit Weight”) and Voids in Aggregate, Jugging Procedure.
· Portion of fin aggregate passing the No. 200 sieve to be less than 60% of that portion passing the No. 40 sieve.
Table VIII. Crushed Aggregate for Base Gradations Percentages By Weight Passing Square Mesh Sieves
| Sieve Size |
| Nominal Maximum Size |
| 2 in. (Type II) |
| 3/4 in. (Type I) |
Percent Passing
| 2 1/2 in. |
| 100 |
| 2 in. |
| 90-100 |
1 1/2 in.
| 1 in. |
| 55-83 |
| 100 |
3/4 in.
90-100
3/8 in.
| No. 4 |
| 30-60 |
| 40-65 |
No. 8
30-50
| No. 30 |
| 10-25 |
| No. 200 |
| 0-8 |
| 3-9 |
Table IX. Coarse Aggregate Gradation for Concrete
| Sieve Size |
| Percent Passing |
| (1 1/2 in.) Minus |
| (3/4 in.) Minus |
| (1/2 in.) Minus |
| 2 in. |
| 100 |
| 100 |
| 100 |
| 1 1/2 in. |
| 95-100 |
| 100 |
| 100 |
| 1 in. |
| --- |
| 100 |
| 100 |
| 3/4 in. |
| 35-70 |
| 95-100 |
| 100 |
| 1/2 in. |
| --- |
| --- |
| 95-100 |
| 3/8 in. |
| 10-30 |
| 20-55 |
| 50-70 |
| No. 4 Mesh |
| 0-5 |
| 0-10 |
| 0-10 |
| No. 8 Mesh |
| 0 |
| 0-5 |
| --- |
| No. 200 Mesh |
| --- |
| --- |
| 0-2 |
APPENDIX C - PRODUCT LIST
| Description |
| Unit |
| Price Per Unit |
Concrete
| 3000 psi, Curb Mix |
| 50 CY |
| 3500 psi |
| 100 CY |
| 3500 psi, Fiber Reinforced |
| 100 CY |
| Concrete - 6 Bag, Fiber Mesh |
| 400 CY |
Asphalt
| Hot Mix 3/8" |
| 200 TN |
| Hot Mix 1/2" (1/2" PG58-28 W/RAP) |
| 600 TN |
| Hot Mix 3/4" (19mm ACHD SP-3 PG 58- 28) |
| 200 TN |
Aggregates
| Road Mix 3/4" Minus |
| 5400 TN |
| Washed 2" Minus |
| 400 TN |
| 6" Pit Run Gravel |
| 27000 TN |
| Washed 3/4" Drainage |
| 200 TN |
| Washed 3/4" Drain Crushed |
| 200 TN |
| Screened 2" |
| 200 TN |
| Screened 2" Aggregate Crushed |
| 200 TN |
| Airfield Crushed Aggregate 1.5" or 3/4" Minus |
| 200 TN |
| Top Soil |
| 300TN |
| Sand |
| 300 TN |