APPENDIX C

C5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

Applicable Pre Haul Road Maintenance Specifications

Road Termini

Miles T802 T803 T804 T805 T806 T807 T808 T809 T810 From To

3N01 3N94 2N14 0.544 D

3N01 2N14 3N01W 16.05 D

3N10 3N26 3N11Y 1.60 D C

3N11Y 0 0.41 0.41 D C

3N16Y 0 1.49 1.49 C C C C C

3N17 0 5.12 5.12 C C C C C

3N21 0 1.84 1.84 C C C C C

3N21B 0 0.67 0.67 C C C C C

3N22Y 0 0.62 0.62 C C C C C

3N25 0 1.43 1.43 C C C C C

3N26 0 4.15 4.15 C C C C C

3N26A 0 0.48 0.48 C C C C C

3N28 0 2.28 2.28 C C C C C

3N29 0 9.84 9.84 C C C C C

3N29A 0 0.71 0.71 C C C C C

3N29C 0 1.05 1.05 C C C C C

3N29D 0 0.34 0.34 C C C C C

3N32Y 0 1.98 1.98 C C C C C

3N94 3N21 3N01 1.72 C C C C

4N09 3N29 4N25 0.51 C C C C

4N09 3N11Y 3N01 1.53 D C

4N25 4N09 4N26 5.26 D C

4N26 4N26

HWY

6.54 D

Applicable During Haul Road Maintenance Specifications

Termini

Miles T802 T803 T804 T805 T806 T807 T808 T809 T810 From To

3N01 3N94 2N14 0.544 D C

3N01 2N14 3N01W 16.05 D

3N10 3N26 3N11Y 1.60 D C C

3N11Y 0 0.41 0.41 D C C

3N16Y 0 1.49 1.49 C C C C C C

3N17 0 5.12 5.12 C C C C C C

3N21 0 1.84 1.84 C C C C C C

3N21B 0 0.67 0.67 C C C C C C

3N22Y 0 0.62 0.62 C C C C C C

3N25 0 1.43 1.43 C C C C C C

3N26 0 4.15 4.15 C C C C C C

3N26A 0 0.48 0.48 C C C C C C

3N28 0 2.28 2.28 C C C C C C

3N29 0 9.84 9.84 C C C C C C

3N29A 0 0.71 0.71 C C C C C C

3N29C 0 1.05 1.05 C C C C C C

3N29D 0 0.34 0.34 C C C C C C

3N32Y 0 1.98 1.98 C C C C C C

3N94 3N21 3N01 1.72 C C C C C

4N09 3N29 4N25 0.51 C C C C C

4N09 3N11Y 3N01 1.53 D C

4N25 4N09 4N26 5.26 D C

4N26 4N26

HWY

Applicable Post Haul Road Maintenance Specifications

Termini

Miles T802 T803 T804 T805 T806 T807 T808 T809 T810 From To

3N01 3N94 2N14 0.544 D

3N01 2N14 3N01W 16.05 D

3N10 3N26 3N11Y 1.60 D C

3N11Y 0 0.41 0.41 D C

3N16Y 0 1.49 1.49 C C C C C

3N17 0 5.12 5.12 C C C C C

3N21 0 1.84 1.84 C C C C C

3N21B 0 0.67 0.67 C C C C C

3N22Y 0 0.62 0.62 C C C C C

3N25 0 1.43 1.43 C C C C C

3N26 0 4.15 4.15 C C C C C

3N26A 0 0.48 0.48 C C C C C

3N28 0 2.28 2.28 C C C C C

3N29 0 9.84 9.84 C C C C C

3N29A 0 0.71 0.71 C C C C C

3N29C 0 1.05 1.05 C C C C C

3N29D 0 0.34 0.34 C C C C C

3N32Y 0 1.98 1.98 C C C C C

3N94 3N21 3N01 1.72 C C C C

4N09 3N29 4N25 0.51 C C C C

4N09 3N11Y 3N01 1.53 D C

4N25 4N09 4N26 5.26 D C

4N26 4N26

HWY

Notes:

C = Contractor Performance Item

The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards

D = Deposit to Forest Service

O = Optional Contract Line Item

NFSR = National Forest Service Road

CR = County Road

JCT = Junction

MP = Milepost

EOR = End of Road

ILLUSTRATION OF ROAD STRUCTURE TERMS

Road Maintenance T-Specifications for

Timber Sale Contracts

To be used with Timber Sale Contract Form 2400-6(T), 2400-13(T), C(T)5.31#, 2400-33(T)

No. Specification Title

T-800 Definitions

T-801 Slide and Slump Repair

T-802 Ditch Cleaning

T-803 Surface Blading

T-804 Surfacing Repair

T-805 Drainage Structures

T-806 Dust Abatement

T-807 Roadway Vegetation

T-808 Miscellaneous Structures

T-809 Waterbars

T-810 Barriers

T-811 Surface Treatment

SPECIFICATION T-800 DEFINITIONS

Wherever the following terms or pronouns are used in Specifications T-801 through T-811, the intent and meaning shall be interpreted as follows:

800-1.1 - Agreement. Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.

These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.

It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.

800-1.2 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.

800-1.3 - Base Course. Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.

800-1.4 - Berm. Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.

800-1.5 - Borrow. Select Material taken from designated borrow sites.

800-1.6 - Crown, Inslope, and Outslope. The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.

800-1.7 - Culverts. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.

800-1.8 - Drainage Dip. A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.

800-1.9 - Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, down-drains, downpipes, and the like.

800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.

800-1.11 - Lead-off Ditches. A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.

800-1.12 - Material. Any substances specified for use in the performance of the work.

800-1.13 – Pre-haul Maintenance. Road maintenance work which the Purchaser determines must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use, provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C/CT5.4.

Pre-haul Maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T- Specifications.

800-1.14 - Roadbed. The portion of a road between the intersection of Subgrade and side-slopes, excluding that portion of the ditch below Subgrade.

800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Purchaser on specific roads.

800-1.16 - Roadside. A general term denoting the area adjoining the outer edge of the Roadway.

800-1.17 - Roadway. The portion of a road within the limits of excavation and embankment.

800-1.18 - Shoulder. That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.

800-1.19 - Slide. A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated raveling.

800-1.20 - Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.

800-1.21 - Slump. A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.

800-1.22 - Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.

800-1.23 - Subgrade. Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.

800-1.24 - Surface Course. The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.

800-1.25 - Surface Treatment Plan. A table which lists the roads and surface treatments to be applied.

800-1.26 - Traveled Way. That portion of Roadway, excluding Shoulders, used for the movement of vehicles.

800-1.27 - Turnouts. That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.

800-1.28 - Water Source. A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.

800-1.29 - Waterbar. A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway.

A Waterbar is not designed to be traversable by logging trucks.

SPECIFICATION T-801 SLIDE AND SLUMP REPAIR

DESCRIPTION

1.1 Slide removal is the removal from Roadway and disposal of any Material, such as soil, rock, and vegetation that cannot be routinely handled by a motor-grader during Ditch Cleaning, T-802, and Surface Blading, T-803 Operations.

Slump repair is the filling of depressions or washouts in Roadway which cannot be routinely filled by a motor grader during Surface Blading, T-803 Operations.

Slide removal and Slump repair includes excavation, loading, hauling, placing, and compacting of waste or replacement Material and the development of disposal or borrow areas.

REQUIREMENTS

3.1 Slide Material, including soil, rock and vegetative matter which encroaches into the Roadway, shall be removed. The slope which generated the Slide Material shall be reshaped during the removal of the Slide Material with the excavation and loading equipment. Slide Material deposited on the fillslope and below the Traveled Way will not be removed unless needed for slope stability or to protect adjacent resources.

Surface and Base Courses shall not be excavated during Slide removal operations.

Slide Material which cannot be used for other beneficial purposes shall be disposed of at disposal sites shown on Sale Area Map. Material placed in disposal sites will not require compaction unless compaction is shown on Road Maintenance Plan.

3.2 When filling Slumps or washouts, Material shall be moved from agreed locations or borrow sites shown on Sale Area Map, placed in layers, and compacted by operating the hauling and spreading equipment uniformly over the full width of each layer.

Existing aggregate surfacing shall be salvaged when practical and relayed after depressions have been filled.

Damaged aggregate base, aggregate surfacing, and bituminous pavement shall be repaired under Specification T-804 Surfacing Repair.

The repaired areas of the Slump shall conform to the cross-section which existed prior to the Slump and shall blend with the adjacent undisturbed Traveled Way.

3.3 The maximum volume of Purchaser responsibility for Slide and Slump repair is shown on Road Maintenance Plan. Greater volumes of Slide and Slump repair not qualifying as Catastrophic Damage are Forest Service responsibility.

T-801-1

SPECIFICATION T-802 DITCH CLEANING

1.1 Ditch cleaning is removing and disposing of all Slough Material from Roadway ditches to provide a free-draining waterway.

REQUIREMENTS

3.1 Ditch cleaning shall be repeated during the year as often as necessary to facilitate proper drainage.

3.2 All Slough Material or other debris which might obstruct water flow in the Roadway ditch shall be removed.

Material removed from the ditch, if suitable, may be blended into existing native road surface or Shoulder or placed in designated Berms in conjunction with Surface Blading T-803 operations.

Material removed from ditches that is not by Agreement blended into existing roads or placed in Berms shall be loaded and hauled to the disposal site shown on Sale Area Map.

3.3 Roadway backslope or Berm shall not be undercut.

T-802-1

SPECIFICATION T-803 SURFACE BLADING

1.1 Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the Crown, Inslope or Outslope of the Traveled Way, Turnouts, and Shoulder;

repairing Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.

REQUIREMENTS

3.1 Surface blading shall be performed before, during, and after Purchaser's use as often as necessary to facilitate traffic and proper drainage.

3.2 The surface blading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.

3.3 Water, taken from Water Sources designated on Sale Area Map, shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface Material.

3.4 On native surfaced roads, Material generated from backslope Sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads this Material shall not be blended with Surface or Base Course Material unless agreed otherwise.

3.5 Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed otherwise.

Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section.

3.6 Drainage Dips and Lead-off Ditches shall be cleaned and maintained to reasonably blend with existing line, grade, and cross-section.

3.7 Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.

3.8 Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way.

The oversized Material shall be disposed of by side-casting, unless shown otherwise on Sale Area Map. Side-casting into streams, lakes, or water courses will not be permitted.

T-803-1

3.9 Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.

3.10 Material resulting from work under this specification, plus any accumulated debris, shall be removed from bridge decks and the deck drains opened.

T-803-2

SPECIFICATION T-804 SURFACING REPAIR

1.1 Surfacing repair is repairing potholes or small soft areas in the Traveled Way. It includes area preparation and furnishing and placing all necessary Materials, and other work necessary to repair the surface.

MATERIALS

2.1 Material used in the repair of soft areas on aggregate or native surfaced roads may be acquired from approved commercial sources, Forest Service Borrow areas shown on Sale Area Map, or Borrow sources agreed

to. The quality and quantity of the imported Material used in the repair will be limited to that needed to provide a stable Traveled Way for hauling and to minimize damage to the road and adjacent resources. The quantity of imported surface repair Material used in the appraisal estimate will be shown on Road Maintenance Plan.

However, the magnitude of the work may vary depending on Purchaser's hauling schedule and ground conditions.

2.2 Material used in the repair of bituminous pavements may be acquired from local commercial sources. If a mixing table is required, the location shall be approved by the Forest Service. The bituminous mixture to be used by the Purchaser shall be approved by the Forest Service. The Purchaser's share of the quantity of bituminous mixture used in the appraisal estimate will be shown on Road Maintenance Plan. However, Purchaser's share of the work may vary depending on Purchaser's hauling schedule, ground conditions, other traffic, etc.

REQUIREMENTS

3.1 Work under this specification shall be performed in a timely manner to reduce further deterioration of the Traveled Way.

3.2 Soft spots on aggregate or native surfaces shall be repaired by placing the imported Surface Course on top of the soft spot. Layers of imported Material shall be placed until a firm surface is produced.

3.3 Bituminous Pavement Repairs. The areas to receive bituminous pavement repairs will be marked on the road surface by the Forest Service just prior to Purchaser performing the work.

3.4 Potholes (deep patch). Surface Course and Base Course Materials shall be excavated to a depth necessary to reach firm, suitable Material. The minimum depth of excavation shall be 2 inches and the maximum depth of excavation shall be to the top of the Subgrade.

The edges of the prepared hole shall be extended to form a vertical face in unfractured asphalt surfacing. The prepared hole shall generally be circular or rectangular in shape, dry, and cleaned of all loose Material.

Prepared potholes shall be patched or barricaded immediately.

T-804-1

The faces of the prepared hole shall be tacked with a slow-setting emulsified asphalt.

The bituminous mixture shall be placed in layers not exceeding a compacted depth of 2 inches. Each layer shall be compacted thoroughly with hand or mechanical tampers or rollers. Compaction shall not be done with equipment wheels.

Upon completion, the compacted patch in the pothole shall be flush, with a tolerance or approximately ¼ inch to ½ inch above the level of the adjacent pavement.

3.5 Skin Patches. Bituminous mixture shall be distributed uniformly with feathered edges in layers not to exceed 2 inches compacted depth. When multiple layers are ordered, joints shall be offset at least 6 inches between layers.

Each layer shall be compacted by two passes with a 7-10 ton steel roller or comparable vibratory roller.

3.6 Asphalt Berm. Damaged segments of Berm shall be removed and the exposed ends beveled at approximately 45 degrees from vertical. The Berm foundation shall be cleaned and patched as necessary. The foundation and joining surfaces shall be coated with a slow-setting emulsified asphalt. Asphalt mix shall be placed and compacted to conform with the shape and alignment of the undamaged segment.

3.7 Disposal. All Materials removed from potholes, patches, and Berms shall be disposed of at disposal sites shown on Sale Area Map.

T-804-2

SPECIFICATION T-805 DRAINAGE STRUCTURES

1.1 This work consists of maintaining Drainage Structures and related items such as inlet and outlet channels, existing riprap, trash racks, and drop-inlets.

MATERIALS

2.1 All Materials used in the maintenance of Drainage Structures shall conform by type and specification to the Material in the structure being maintained.

REQUIREMENTS

3.1 Drainage Structures and related items shall be cleared of all foreign Material which has been deposited above the bottom of the structure and all vegetative growth which interferes with the flow pattern. Material removed that cannot be incorporated into maintenance work shall be hauled to a disposal site shown on Sale Area Map.

3.2 If outlet or inlet riprap was installed by Purchaser as a construction item or existed prior to Purchaser's haul, it shall be maintained in good condition including the replacement of riprap if necessary to previous line, grade, and cross-section.

3.3 Perform maintenance to insure the proper functioning of the head walls, aprons, inlet assemblies, overside drains, riprap, trash racks, and other facilities related to the Drainage Structure.

T-805-1

SPECIFICATION T-806 DUST ABATEMENT

1.1 This work shall consist of preparing Traveled Way and furnishing and applying Materials to abate dust.

MATERIALS

2.1 The roads requiring dust abatement, type of dust abatement Material to be used, the rates of application, and frequency of applications will be shown on Dust Abatement Plan. The Dust Abatement Plan may be changed by written Agreement.

2.2 Water. The locations of Water Sources are shown on Contract Area Map.

Operating Guidelines:

1. Operations are restricted to one hour after sunrise to one hour before sunset.

2. Pumping rate shall not exceed 350 gallons per minute.

3. The pumping rate shall not exceed ten percent of the stream flow.

4. Seek streams and pools where water is deep and flowing, as opposed to streams with low flow and small isolated pools.

5. Pumping shall be terminated when the tank is full. The effect of single pumping operations, or multiple pumping operations at the same location, shall not result in obvious draw-down of either upstream or downstream pools.

6. Each pumping operations shall use a fish screen. The screen face should be oriented parallel to flow for best screening performance. The screen shall be designed and used such that it can be submerged with at least one-screen-height clearance above and below the screen.

7. Operators shall keep a log on the truck containing the following information:

a. Operator’s Name

b. Date

c. Time

d. Pump Rate

e. Filling Time

f. Screen Cleaned (Y or N)

g. Screen condition

h. Comments

Screen Construction Criteria:

1. Surface Area:

a. The total (unobstructed) surface area of the screen shall be at least 2.5 square feet, based on the upper limit of pumping of 350 gpm. Larger surface areas are recommended where debris buildup is anticipated, and where stream depth is adequate to keep the screen submerged at approximately mid-depth.

2. Screen Mesh:

a. Screen Mesh must be in good repair and present a sealed, positive barrier effectively preventing entry of the “design fish” into the intake. The design fish in this case is an immature (20-30mm) salmon or steelhead fry.

b. The screen mesh size shall be: round openings – maximum 3/32 inch diameter (.09 inch)

c. Square openings – maximum 3/32 inch diagonal (.09 inch)

d. Slotted openings – maximum 1/16 inch width (.07 inch)

T-806-1

3. Screen Design:

a. Water drafting screens maybe off-the-shelf products, but they are often custom-made devices appropriate to the scale and duration of pumping operation. To keep the screen supported and correctly positioned in the water column, adjustable support legs are advised. Screen geometry can be configured either as rectangular or cylindrical, e.e. as a shallow “box-shape” or tubular.

b. The intake structure shall be designed to promote uniform velocity distribution at all external mesh surfaces. This can be accomplished with a simple internal baffle devise that distributes the flow evenly across the entire surface of the screen. In order to accomplish this, the designer needs to understand the hydraulic characteristics of these devices. There is a tendency for most of the intake water to enter the screen near the hose end, so a typical internal baffle would consist of a pipe (or manifolded set of pipes) which have variable porosity holes at predetermine spacing. We recommend starting near the hose end with approximately 5 – 10% average open area, and gradually increasing the porosity toward the length of the screen. At a point where screen length exceeds three times the diameter of the suction hose, the baffling effect tends to diminish rapidly. At this point the baffle porosity may approach 100%. A successful baffle system will functionally distribute flow to all areas of the screen. A poorly designed screen may result in high velocity “hot spots”, which could lead to fish impingement on the screen face.

c. Hydraulic testing of prototype screen designs is recommended where the application is on-going and extensive.

4. Screen Structure:

a. The screen frame must be strong enough to withstand the hydraulic forces it will experience.

However, the structural frames, braces, and other elements that block the flow, change flow direction, or otherwise decrease the screen surface area should be minimized.

5. Screen Cleaning:

a. The screen shall be cleaned as often as necessary to prevent approach velocity from exceeding

0.33 feet per second. Operators should withdraw the screen and clean it after each use, or as necessary to keep screen face free of debris. Pumping should stop of screen cleaning when approximately fifteen percent or more of the screen area is occluded by debris. A suitable brush shall be on board the truck for this cleaning operation.

b. If the operator notes (1) impingement of any juvenile fish on the screen face or (2) entrainment of any fish through the screen mesh, he/she should stop operations and notify the Department of

Fish & Game and/or NMFS hydraulic engineering staff:

National Marine Fisheries Service

Engineering Section

777 Sonoma Avenue, Suite 325

Santa Rosa, CA 95404

(707) 575-6050

T-806-2

2.3 Dust abatement Materials shall meet the requirements of the following subsections of Forest Service

Specifications for Construction of Roads and Bridges or attached Special Project Specifications.

Emulsified Asphalt 702

Blotter Material 703.12

Magnesium or Calcium Chloride Brine 723.01

Calcium Chloride Flake 723.02

Lignin Sulfonate 723.03

2.4 Testing of Materials. Certification and sampling of bituminous Materials lignin sulfonate, and magnesium chloride shall be in accordance with subsections 105.04 or 723.04 of Forest Service Specifications for

Construction of Roads and Bridges.

REQUIREMENTS

3.1 General. Dust abatement Materials shall be applied to the road surface as necessary to control road surface loss, provide for road user safety, and minimize damage to adjacent resources.

3.2 Compaction. When the methods listed below specify compaction, Traveled Way shall be compacted by an 8 to 10 ton pneumatic, steel-wheeled or equivalent vibrating roller making 2 passes over the full Traveled Way and

Shoulder width, unless compaction is not required on the Dust Abatement Plan (C/CT5.31.

3.3 Preparation to Dust Abatement Materials Other Than Water. The following applies to all methods of preparation:

Bituminous residue shall be scarified and pulverized to produce loosened Material not exceeding 4 inches in greatest dimension.

Traveled Way shall be bladed in accordance with T-803.

Prior to applying DO-6BA, DO-6PA, or DO-8, the top 2 inches of Traveled Way shall contain not less than 80 percent nor more than 120 percent of optimum moisture as determined by AASHTO T-99, Method C. Prior to applying other bituminous Material, Traveled Way shall have a moisture content between 1 and 3 percent.

If surface dusting prevents the bituminous Material from penetrating, a light application of water shall be applied just prior to applying the bituminous Material.

Lignin Sulfonate and magnesium chloride shall be applied when the top 1 inch of Traveled Way contains not less than 3 percent moisture, nor more than 120 percent of optimum moisture as determined by AASHTO T-99, Method C.

Moisture content will be determined in accordance with AASHTO T-217 OR T-239.

One or more of the following methods shall be used, as specified in the Dust Abatement Plan (CT5.31).

Method 1. Compact Traveled Way and apply the dust abatement Material.

T-806-3

Method 2. Develop a layer of loose Material approximately 1 inch in depth for the full width of Traveled Way.

Apply the dust abatement Material to this loose Material and compact after penetration. If traffic makes maintenance of the loose Material difficult, 1 inch of the Material may be bladed into a windrow along the Shoulder. The specified moisture content shall be maintained in the windrow and the top 1 inch of Traveled Way. The windrow shall be bladed to a uniform Material. When the dust abatement Material has penetrated, Traveled Way shall be compacted.

Method 3. Blade 1 inch of Material from Traveled Way into a windrow along the Shoulder. Maintain the specified moisture content in the windrow and the top inch of Traveled Way. Apply half the dust abatement Material. When the dust abatement Material has penetrated, the windrow shall be bladed to a uniform depth across dust abatement Traveled Way, and the remaining dust abatement Material shall be applied. Traveled Way shall be compacted.

Method 4. Develop a layer of loose Material approximately 2 inches in depth for the full width of Traveled Way. Apply half the dust abatement Material to the loose Material. Blade the top 2 inches into a windrow along the Shoulder. Apply the remaining dust abatement Material to Traveled Way and the Berm.

Spread the Berm evenly across Traveled Way and compact.

3.4 Preparation for Dust Abatement with Water. Traveled Way shall be prepared in accordance with Specification T-803 Surface Blading when required.

3.5 Application Tolerance. Dust abatement Materials other than water shall be applied within 0.05 gallons per square yard of the rate specified.

3.6 Mixing Requirements. DO-6BA, DO-6PA, and DO-8 shall be thoroughly circulated in the distributor within 1 hour of application.

3.7 Weather Limitations. Dust abatement Materials shall not be applied when it is raining.

Bituminous Material shall be applied when the surface temperature of Traveled Way is 50 degrees Fahrenheit or higher.

Lignin sulfonate and magnesium chloride shall be applied when the atmospheric temperature is 40 degrees Fahrenheit or higher.

3.8 Blotter Material. Blotter Material shall be spread in a sufficient quantity to prevent tire pickup.

T-806-4

SPECIFICATION T-807 ROADWAY VEGETATION

1.1 This work includes removal of brush and trees from within the Roadway limits.

REQUIREMENTS

3.1 Vegetative matter within the Roadway which impedes vehicular travel or interferes with road maintenance operations, such as surface blading and ditch and culvert cleaning shall be removed. Downed timber meeting utilization standards shall be cut in appropriate lengths and decked along the Roadside in locations where the Traveled Way or sight distances will not be impaired.

3.2 Vegetative matter removed from the Roadway shall be treated by the specified method shown on Sale Area Map and as required by C/CT6.7.

T-807-1

SPECIFICATION T-808 MISCELLANEOUS STRUCTURES

1.1 Maintenance of miscellaneous structures includes cattleguards, gates, and other similar structures that have been previously installed to insure safe and efficient operation of the road.

MATERIALS

2.1 Any Materials needed in the maintenance of miscellaneous structures shall be similar in type and quality to the Material in the structure being maintained.

REQUIREMENTS

3.1 Cattleguards. Loose rails shall be welded or bolted back in place.

Excess Material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open.

3.2 Gates. Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly.

Brush and debris shall be removed from within the swinging radius.

T-808-1

SPECIFICATION T-809 WATERBARS

1.1 This work consists of installing or removing Waterbars in the Roadbed.

REQUIREMENTS

3.1 Waterbars shall be installed on roads shown on Road Maintenance Plan in accordance with the attached drawings and at locations designated or staked on the ground.

All Material excavated shall be used in the installation of the Waterbar. Bermed Material shall be compacted by operating heavy equipment over the length and width of the Berm.

3.2 Waterbars shall be removed on roads shown on Road Maintenance Plan by blading the Berm into the adjacent depression to form a smooth transition along the Traveled Way. The length and width of the fill Material shall be compacted by the equipment performing the work.

3.3 Waterbars may be required to be installed between seasons of use and then removed when haul is resumed.

Waterbar installation may also be required when use of a road has been completed.

T-809-1

SPECIFICATION T-810 BARRIERS

1.1 This work shall consist of furnishing, installing, or removing barriers. Gates are not included.

MATERIALS

2.1 Materials for barriers shall meet the requirements as shown on attached drawings.

REQUIREMENTS

3.1 Barriers shall be installed in accordance with the attached drawings.

The location of barriers to be removed or installed is shown on Sale Area Map. Installation or removal may occur as often as road use is terminated and resumed.

T-810-1

SPECIFICATION T-811 SURFACE TREATMENT

1.1 This work shall consist of applying a chip seal, sand seal, or fog seal to the Traveled Way.

Chip seals may consist of single or double applications of bituminous Material and cover aggregate.

MATERIALS

2.1 The roads requiring surface treatments, the type of seal coat to be applied, the rate of application, and type and grade of bituminous Material, and the rate of application and grading of cover aggregate will be shown on Surface Treatment Plan (CT5.4).

2.2 Emulsions used for fog seals shall be diluted with an equal amount of water and shall be applied at the diluted application rate shown on Surface Treatment Plan (CT5.4).

2.3 Seal coat Materials shall meet the requirements of the following subsections of Forest Service Specifications for Construction of Roads and Bridges or attached Special Project Specifications:

Bituminous Materials Asphalt Cement 702.01 Liquid Asphalts 702.02 Emulsified Asphalt 702.03 Application Temperatures 702.04

Cover Aggregate 703.11 Blotter Material 703.12 Water for Diluting 725.01

2.4 The cover aggregate shall be surface damp at the time of application when using emulsified asphalt and dry when using an asphalt cement or liquid asphalt. Excess water on the aggregate surface will not be permitted.

MAINTENANCE REQUIREMENTS

3.1 Traffic. Traffic shall be maintained in accordance with C/CT6.33.

3.2 Weather Limitations. Fog seal and chip seal shall not be applied when the weather is foggy or rainy.

Seal coats requiring cover aggregate shall not be applied when the temperature of the surface being treated is below 70 degrees Fahrenheit in the shade.

Fog seal coats shall not be applied when the surface temperature is below 40 degrees Fahrenheit in the shade.

T-811-1

3.3 Equipment. The following equipment or its equivalent shall be used:

A distributor truck equipped to spread the Material uniformly at the designated rate, within the temperature range specified and within 0.04 gallons per square yard of the rate specified. The distributor shall be equipped with a thermometer and a hand hose with spray nozzle.

A rotary power broom and/or blower.

When cover aggregates are applied: A pneumatic tire roller, 8-ton minimum weight with all tires equally inflated to a pressure of at least 90 pounds per square inch. Rollers shall be equipped with devices for applying water to the tires.

Self-propelled aggregate spreader supported by at least four wheels equipped with pneumatic tires on two axles, situated so that at no time will the tires contact the uncovered bituminous Materials. The aggregate spreader shall be equipped with positive controls so that the required amount of Materials will be deposited uniformly over the full width.

Trucks with spreading attachments shall not be used.

3.4 Preparation of Surface. Immediately before applying the bituminous Material, the surface to be sealed shall be cleaned of all foreign and loose Material.

3.5 Application of Bituminous Material. Bituminous Material shall be applied in a uniform, continuous spread.

The distributor shall be moving forward at proper application speed at the time the spray bar is opened. Skipped areas or deficiencies shall be corrected prior to the application of cover aggregate.

The spread of bituminous Material shall not be more than 6 inches wider than the width to be covered by the cover aggregate. Operations shall not proceed if the bituminous Materials are allowed to cool, set up, dry, or otherwise impair retention of cover aggregate.

Fog seal shall be allowed to penetrate and dry before traffic is permitted on the sealed portion.

The surfaces of structures and trees adjacent to the area being treated shall be protected to prevent their being spattered or marred.

3.6 Application of Cover Aggregate and Blotter. Immediately following the application of the bituminous Material, cover aggregate shall be spread at the specified rate. Joints between adjacent applications of cover aggregate shall be approximately in the center of two-lane roads.

The aggregate spreader shall not be operated at speeds which cause the aggregate to roll over after striking the bituminous Material. The cut-off of aggregate shall be complete, and any excess aggregate shall be removed from the surface prior to resuming operations. Immediately after the cover aggregate has been spread, any piles, ridges, and uneven distribution shall be corrected.

T-811-2

Cover aggregate may be applied by hand in areas inaccessible to spreading equipment.

Rolling shall begin immediately after spreading the cover aggregate and shall consist of a minimum of two complete coverages.

After rolling, traffic shall be controlled to a maximum speed of 15 miles per hour for a period of 4 hours.

The day following the final application of cover aggregate, any concentrations of loose cover aggregate shall be redistributed without disturbing the embedded aggregate. Four days after the final application of cover aggregate, all excess cover aggregate shall be removed. During this period, any bituminous Material that comes to the surface shall be covered with additional cover aggregate or approved blotter Material.

3.7 Blotter Material for fog seals shall be spread in sufficient quantity to prevent tire pickup.

T-811-3

Traffic Control Plan Required for Integrated Resource Service Contracts

Contractor shall furnish, install, and maintain all temporary traffic controls (TTC) which provide the user with adequate warning of hazardous or potentially hazardous conditions, associated with the Contractor/Purchaser operations. The following are specific requirements that must be met on this contract during all phases of operations for road construction or maintenance as well as logging.

1. All required warning signs are to meet specifications as outlined in the "2012 CA Manual on Uniform Traffic

Control Devices for Street and Highways" (see Attachments). For all contract related activities, this means:

a. All signs shall have an orange retro-reflective background with black letters.

b. Signs shall be diamond shaped and be a minimum of 30 " X 30" in size, (see Item #9 below.)

c. Lettering shall be a minimum of 4 inches in height, (larger lettering for larger signs.)

d. Letters are to be stencil painted or press-on and not hand-written.

e. Signs must be Retro-reflective or Illuminated if any TTC is in place for more than one daylight period.

f. TTC zone signs used at night shall maintain retro-reflectivity at or above the minimum levels shown on

Table 2A-3 in the manual.

2. Truck warning signs shall be posted on all roads that give access to the public onto the haul route. These signs shall be posted prior to usage by the trucks.

3. Equipment working or road construction signs shall also be posted as stipulated in item 2 above for road construction or maintenance.

4. When falling operations are occurring, signs shall be posted at both ends of the area being worked. Any time a tree is being felled that could reach the roadway, either a flagman shall regulate traffic or the road shall be blocked until the tree is on the ground. All debris will be removed from roadway.

5. All signs shall be moved and placed in the current areas of operation. They shall not be left posted in areas of no activity unless they are covered during the periods of inactivity.

6. All warning signs shall be posted in highly visible locations and at a height easily seen by motorist. At times, this may mean that signposts will be necessary.

7. All warning signs shall be posted prior to the beginning of any operation.

8. All KO roads are to be continuously kept open unless otherwise agreed in writing.

9. Sign size is dictated by traffic volume and speed. A 30"x30" sign may be used on low traffic volume of < 400 vehicles per day with maxi mum speed of 35 MPH. A 36"x36" sign will be used on conventional road where traffic volume is >400 vehicles with speed greater than 35 MPH. Highway/Freeway sign size will be 48"x48"for speeds greater than 45 MPH.

10. On the attached sign drawings, the ''Text 4C" represents 4inch tall text with a C stroke width. The stroke width for C series is 31/64". The Standard Highway Sign book contains other series sizes.

California MUTCD 2012 Edition Page 1119 (FHWA’s MUTCD 2009 Edition, as amended for use in California)

CHAPTER 6G. TYPE OF TEMPORARY TRAFFIC CONTROL ZONE ACTIVITIES

Section 6G.01 Typical Applications

Support:

01 Each TTC zone is different. Many variables, such as location of work, highway type, geometrics, vertical and horizontal alignment, intersections, interchanges, road user volumes, road vehicle mix (buses, trucks, and cars), and road user speeds affect the needs of each zone. The goal of TTC in work zones is safety with minimum disruption to road users. The key factor in promoting TTC zone safety is proper judgment.

02 Typical applications (TAs) of TTC zones are organized according to duration, location, type of work, and highway type.

Table 6H-1 is an index of these typical applications. These typical applications include the use of various TTC methods, but do not include a layout for every conceivable work situation.

03 Well-designed TTC plans for planned special events will likely be developed from a combination of treatments from several of the typical applications.

Guidance:

04 For any planned special event that will have an impact on the traffic on any street or highway, a TTC plan should be developed in conjunction with and be approved by the agency or agencies that have jurisdiction over the affected roadways.

05 Typical applications should be altered, when necessary, to fit the conditions of a particular TTC zone.

Option:

06 Other devices may be added to supplement the devices shown in the typical applications, while others may be deleted.

The sign spacings and taper lengths may be increased to provide additional time or space for driver response.

Support:

07 Decisions regarding the selection of the most appropriate typical application to use as a guide for a specific TTC zone require an understanding of each situation. Although there are many ways of categorizing TTC zone applications, the four factors mentioned earlier (work duration, work location, work type, and highway type) are used to characterize the typical applications illustrated in Chapter 6H.

Section 6G.02 Work Duration Support:

01 Work duration is a major factor in determining the number and types of devices used in TTC zones. The duration of a TTC zone is defined relative to the length of time a work operation occupies a spot location.

Standard:

02 The five categories of work duration and their time at a location shall be:

A. Long-term stationary is work that occupies a location more than 3 days.

B. Intermediate-term stationary is work that occupies a location more than one daylight period up to 3 days, or nighttime work lasting more than 1 hour.

C. Short-term stationary is daytime work that occupies a location for more than 1 hour within a single daylight period.

D. Short duration is work that occupies a location up to 1 hour.

E. Mobile is work that moves intermittently or continuously.

Support:

03 At long-term stationary TTC zones, there is ample time to install and realize benefits from the full range of TTC procedures and devices that are available for use. Generally, larger channelizing devices, temporary roadways, and temporary traffic barriers are used.

Standard:

04 Since long-term operations extend into nighttime, retroreflective and/or illuminated devices shall be used in long-term stationary TTC zones.

Guidance:

05 Inappropriate markings in long-term stationary TTC zones should be removed and replaced with temporary markings.

Chapter 6G – Type of Temporary Traffic Control Zone Activities January 13, 2012 Part 6 – Temporary Traffic Control

Temporary Traffic Control (Parts 1 & 6) Page 177 of 320

California MUTCD 2012 Edition Page 1120 (FHWA’s MUTCD 2009 Edition, as amended for use in California)

Support:

06 In intermediate-term stationary TTC zones, it might not be feasible or practical to use procedures or devices that would be desirable for long-term stationary TTC zones, such as altered pavement markings, temporary traffic barriers, and temporary roadways. The increased time to place and remove these devices in some cases could significantly lengthen the project, thus increasing exposure time.

Standard:

07 Since intermediate-term operations extend into nighttime, retroreflective and/or illuminated devices shall be used in intermediate-term stationary TTC zones.

Support:

08 Most maintenance and utility operations are short-term stationary work.

09 As compared to stationary operations, mobile and short-duration operations are activities that might involve different treatments. Devices having greater mobility might be necessary such as signs mounted on trucks.

Devices that are larger, more imposing, or more visible can be used effectively and economically. The mobility of the TTC zone is important.

Guidance:

10 Safety in short-duration or mobile operations should not be compromised by using fewer devices simply because the operation will frequently change its location.

Option:

11 Appropriately colored or marked vehicles with high-intensity rotating, flashing, oscillating, or strobe lights may be used in place of signs and channelizing devices for short-duration or mobile operations. These vehicles may be augmented with signs or arrow boards.

Support:

12 During short-duration work, it often takes longer to set up and remove the TTC zone than to perform the work. Workers face hazards in setting up and taking down the TTC zone. Also, since the work time is short, delays affecting road users are significantly increased when additional devices are installed and removed.

Option:

13 Considering these factors, simplified control procedures may be warranted for short-duration work. A reduction in the number of devices may be offset by the use of other more dominant devices such as high- intensity rotating, flashing, oscillating, or strobe lights on work vehicles.

Support:

14 Mobile operations often involve frequent short stops for activities such as litter cleanup, pothole patching, or utility operations, and are similar to short-duration operations.

Guidance:

15 Warning signs and high-intensity rotating, flashing, oscillating, or strobe lights should be used on the vehicles that are participating in the mobile work.

Option:

16 Flags and/or channelizing devices may additionally be used and moved periodically to keep them near the mobile work area.

17 Flaggers may be used for mobile operations that often involve frequent short stops. Support:

18 Mobile operations also include work activities where workers and equipment move along the road without stopping, usually at slow speeds. The advance warning area moves with the work area.

Guidance:

19 When mobile operations are being performed, a shadow vehicle equipped with an arrow board or a sign should follow the work vehicle, especially when vehicular traffic speeds or volumes are high. Where feasible, warning signs should be placed along the roadway and moved periodically as work progresses.

20 Under high-volume conditions, consideration should be given to scheduling mobile operations work during off-peak hours.

21 If there are mobile operations on a high-speed travel lane of a multi-lane divided highway, arrow boards and/or Portable Changeable Message Signs should be used.

Chapter 6G – Type of Temporary Traffic Control Zone Activities January 13, 2012 Part 6 – Temporary Traffic Control

Temporary Traffic Control (Parts 1 & 6) Page 178 of 320

NOVEMBER 2012

Text layout—WARNING SIGN (&7) (2-LINE)

Dimensions (inches)

Sign

Number

Message

L

A

Spacing

Text

(upper case)

Border

Inset

&711-10A LOGGING

/0%2!4)/.3

30 2 2 4C d s

36 3 5# d s

&711-10B LOG

425#+3

30 2 2 6D d s

36 3 7$ d s

Notes

Center text on vertical and horizontal centerlines.

4EXTˆ!3! 3ERIES AS NOTED.

For larger sizes, refer to the “Standard Highway Signs” book.

Colors

Black legend and border.

2ETROREFLECTIVE ORANGE BACKGROUND.

References

For sign guidelines, see chapter 4, section 4.6.2.

&OR MANUFACTURING SPECIFICATIONS, SEE CHAPTERS 14 AND 14!.

Chapter 4B Temporary Traffic Control Sign Drawings

I G N A N D O U I D I N O H & O V I C s - 4B-1

LOG

FW11-10b

FW11-10a

.OVEMBER 2012

Text layout—WARNING SIGN (&7) (3-LINE)

Spacing

&711-10D (%!69 425#+

42!&&)#

Center text on vertical and horizontal centerlines.

2ETROREFLECTIVE ORANGE BACKGROUND.

For sign guidelines, see chapter 4, section 4.6.3.

&OR MANUFACTURING SPECIFICATIONS, SEE CHAPTERS 14 AND 14!.

Chapter 4B Temporary Traffic Control Sign Drawings

4B-2 I G N A N D O U I D I N O H & O V I C s -

TRUCK

FW11-10d

Rock Creek Stewardship IRSC Stanislaus National Forest

Page 31 of 31 MiWok/Summit Ranger District

Revised 2.16.2021

NOVEMBER 2012

Text layout—WARNING SIGN (&7) (4-LINE)

Spacing

&711-10C

,/' 425#+3

%.4%2).' 2/!$

Center text on vertical and horizontal centerline.

RETROREFLECTIVE ORANGE BACKGROUND.

For sign guidelines, see chapter 4, section 4.6.2.

&OR MANUFACTURING SPECIFICATIONS, SEE CHAPTERS 14 AND 14!.

Chapter 4B Temporary Traffic Control Sign Drawings

I G N A N D O U I D I N O H & O V I C s - 4B-3

LOG

TRUCKS

ROAD

FW11-10c

File details come from the government source that posted it. Updated .