Road Blading Solicitation 1284LL23Q0035.pdf

PDF 1 MB Posted

Attached to
Forest Roads Blading Task Order Requirements Contracts Federal contract opportunity
Solicitation number
1284LL23Q0035
Issued by
Department of Agriculture Forest Service R1-Northern Region

View the file

Other files for this federal contract opportunity

Other files attached to Forest Roads Blading Task Order Requirements Contracts, newest first.
File Type Posted
SF 30 Amendment 001 1284LL23Q0035.pdf PDF
WD1995-0228 ID Dec22.pdf PDF
WD1976-1342 MT Dec22.pdf PDF
Past Performance Sheet.docx DOCX document
ExhibitB_DailyActivity_Report.docx DOCX document
ExhibitA Road Profile.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

COEUR DALENE ID 83815

3232 WEST NURSERY ROAD

SUPERVISORS OFFICE

IDAHO PANHANDLE NATIONAL FORESTS

CODE 16. ADMINISTERED BYCODE

X

X

X

115310

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR0281

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

05/08/2023 1700 PT

04/10/2023

208-765-7318DANIEL SZAMBELAN

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1284LL23Q0035

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 78 1089116OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

Multiple Destinations

15. DELIVER TO

COEUR DALENE ID 83815

3232 WEST NURSERY ROAD

SUPERVISORS OFFICE

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$30.0

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

IDAHO PANHANDLE NATIONAL FORESTS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

This is a solicitation for multiple Indefinite Delivery Requirements Contracts. The Forest Service estimates 15 requirements contracts are needed for Road Grading across the IPNF, KNF, and NPCNF. Contractors may put in an offer on multiple, or only one district. See section E for instructions for submitting an offer. Submit questions to Contract Specialist at daniel.szambelan@usda.gov

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

DANIEL A. SZAMBELAN

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Period of Performance: 06/01/2023 to 04/30/2028

0001 Idaho Panhandle National Forests, 0104 CMRD0423

Delivery Location Code: 0281

IDAHO PANHANDLE NATIONAL FORESTS

SUPERVISORS OFFICE

3232 WEST NURSERY ROAD

COEUR DALENE ID 83815 US

0002 Kootenai National Forest, 0114, CMRD1423

Delivery Location Code: 03J1

USDA FOREST SERVICE

KOOTENAI NATIONAL FOREST

31374 US HIGHWAY 2

LIBBY MT 59923 US

0003 Nez Perce-Clearwater National Forests, 0117, CMRD1723

Delivery Location Code: 0279

USDA FOREST SERVICE

NEZ PERCE CLRWTR SUPERVISORS OFC

903 3RD STREET

KAMIAH ID 83536 US

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

78 2 of

SECTION B – CONTINUATION OF SF-1449

Schedule of Items/Price Schedule

Schedule Notes:

Costs for mobilization and moves between job locations will be considered incidental to the ordered work, therefore the Contractor must consider this expense in the pricing.

The terms Grading and Blading may be used interchangably throughout the package.

Schedule Options. May be exercised by the Government with a Modification to the contract.

Work associated with the Option Items shall be ordered by the Contracting Officer and is anticipated for the cleaning of catchbasins and inlets/outlets, ditches, slides, blading non-road areas such as campgrounds, compaction of roads as well as for spot blading on specified roads or other similar maintenance items as needed.

Road Maintenance, Grading, solicitation 1284LL23Q0035 Continuation of SF1449, Block 27

Block 19-24, schedule of items for ordering year One 2023 Area: Bonners Ferry Ranger District, Idaho Panhandle National Forests

PAY

ITEM

NO.

DESCRIPTION

PA

Y

UNI

T

EST

QTY

UNIT

PRICE

TOTAL

1.1 Road Grading – Bonners Ferry R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2023 $ $

Block 19-24, schedule of items for ordering year two 2024 Area: Bonners Ferry Ranger District, Idaho Panhandle National Forests

PAY

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2024 $ $

Block 19-24, schedule of items for ordering year three 2025 Area: Bonners Ferry Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $

Block 19-24, schedule of items for ordering year four 2026 Area: Bonners Ferry Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Total 2026 $ $

Block 19-24, schedule of items for ordering year five 2027 Area: Bonners Ferry Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Total 2027 $ $

Block 19-24, schedule of items for ordering year one 2023 Area: Priest Lake Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – Priest Lake R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2023 $ $

Block 19-24, schedule of items for ordering year two 2024 Area: Priest Lake Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Priest Lake Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Total 2025 $ $

Block 19-24, schedule of items for ordering year four 2026 Area: Priest Lake Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Priest Lake Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Block 19-24, schedule of items for ordering year one 2023 Area: Sandpoint Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – Sandpoint R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Total 2023 $ $

Block 19-24, schedule of items for ordering year two 2024 Area: Sandpoint Ranger District, Idaho Panhandle National Forests

PAY

PA

Y

UN

IT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Sandpoint Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $ Block 19-24, schedule of items for ordering year four 2026 Area: Sandpoint Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Sandpoint Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Block 19-24, schedule of items for ordering year one 2023 Area: Coeur d’Alene River Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – Coeur d’Alene River R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Coeur d’Alene River Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Coeur d’Alene River Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Coeur d’Alene River Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Coeur d’Alene River Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Block 19-24, schedule of items for ordering year one 2023 Area: St. Joe Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – St. Joe R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: St. Joe Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibratory Roller and Water

Truck MI 50 $ $

OPTION ITEMS

1.5 Grading, Hourly work as needed HR 5 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: St Joe Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $ Block 19-24, schedule of items for ordering year four 2026 Area: St Joe Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: St Joe Ranger District, Idaho Panhandle National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Block 19-24, schedule of items for ordering year one 2023.

Area: Rexford/Fortine Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.1 Road Grading – Rexford/Fortine R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Rexford/Fortine Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Rexford/Fortine Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Rexford/Fortine Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2026 $ $ Block 19-24, schedule of items for ordering year five 2027 Area: Rexford/Fortine Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Block 19-24, schedule of items for ordering year one 2023 Area: Three Rivers Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.1 Road Grading – Three Rivers R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Three Rivers Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.4 Road Grading with Vibatory Roller and Water Truck MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Three Rivers Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $ Block 19-24, schedule of items for ordering year four 2026 Area: Three Rivers Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Three Rivers Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2027 $ $

Continuation of SF1449, Block 27

Block 19-24, schedule of items for ordering year one 2023 Area: Libby Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.1 Road Grading – Libby R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Libby Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Libby Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Libby Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2026 $ $ Block 19-24, schedule of items for ordering year five 2027 Area: Libby Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Block 19-24, schedule of items for ordering year one 2023 Area: Cabinet Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.1 Road Grading – Cabinet R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2023 $ $

Continuation of SF1449

Block 19-24, schedule of items for ordering year two 2024 Area: Cabinet Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.1 Road Grading – Cainet R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Continuation of SF1449

Block 19-24, schedule of items for ordering year three 2025 Area: Cabinet Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $ Block 19-24, schedule of items for ordering year four 2026 Area: Cabinet Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Cabinet Ranger District, Kootenai National Forest

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2027 $ $

Continuation of SF1449, Block 27

Block 19-24, schedule of items for ordering year one 2023 Area: Palouse Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – Palouse R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Palouse Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Palouse Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Palouse Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2026 $ $ Block 19-24, schedule of items for ordering year five 2027 Area: Palouse Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Block 19-24, schedule of items for ordering year one 2023 Area: North Fork Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – North Fork R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2023 $ $

Continuation of SF1449

Block 19-24, schedule of items for ordering year two 2024 Area: North Fork Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Continuation of SF1449

Block 19-24, schedule of items for ordering year three 2025 Area: North Fork Ranger District, Nez Perce-Clearwater National Forests

PAY

DESFCRIPTION

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $ Block 19-24, schedule of items for ordering year four 2026 Area: North Fork Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: North Fork Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Ordering year one 2023 Area: Lochsa-Powell Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – Lochsa-Powell R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Ordering year two 2024 Area: Lochsa-Powell Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Ordering year three 2025

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $ Ordering year four 2026

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2026 $ $ Ordering year five 2027 Area: Lochsa-Powell Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Moose Creek Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – Moose Creek R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Moose Creek Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Moose Creek Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $ Ordering year four 2026 Area: Moose Creek Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Ordering year five 2027 Area: Moose Creek Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Red River Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – Red River R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Red River Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Red River Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Ordering year four 2026 Area: Red River Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2026 $ $ Ordering year five 2027 Area: Red River Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Salmon Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.1 Road Grading – Salmon R.D. MI 50 $ $

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Salmon Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Area: Salmon Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

2.0 Road Grading with attached Packer / Roller MI 50 $ $

Total 2025 $ $ Ordering year four 2026 Area: Salmon Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

Ordering year five 2027 Area: Salmon Ranger District, Nez Perce-Clearwater National Forests

PAY

UNIT

EST

QTY

1.2 Road Grading, with Water Truck MI 50 $ $

1.3 Road Grading with a Vibratory Roller MI 50 $ $

1.6 Water Truck HR 10 $ $

1.7 Dump Truck HR 5 $ $

1.8 Loader/Backhoe HR 5 $ $

1.9 Rock Rake HR 5 $ $

1. Offerors may submit prices for each Area they wish to be considered.

2. For each Area, an Offeror must submit prices for all items within that area, base plus option items.

3. Only those offerors demonstrating the capability (i.e. more than one Grader and Operator), may be considered for multiple awards for multiple Areas.

4. Offerors may qualify their offer to limit the area of consideration for which they will be considered.

An offeror desiring to qualify their offer must complete the following:

My offer is limited to the following Area(s):

Idaho Panhandle National Forests

___ Bonners Ferry Ranger District

___ Priest Lake Ranger District

___ Sandpoint Ranger District

___ Coeur d Alene River Ranger District

___ St Joe Ranger District

Kootenai National Forest

___ Rexford/Fortine Ranger District

___ Three Rivers Ranger District

___ Libby Ranger District

___Cabinet Ranger District

Nez Perce-Clearwater National Forests

___Lochsa-Powell Ranger District

___North Fork Ranger District

___Palouse Ranger District

___Moose Creek Ranger District

___Red River Ranger District

___Salmon Ranger District

My offer is limited to ____ number of Awards (if offeror has the capability of more than one award for multiple areas)

Offeror Signature Date

1.0 PERFORMANCE WORK STATEMENT ROAD GRADING

Idaho Panhandle National Forests Bonners Ferry, Priest Lake, Sandpoint, Coeur d Alene River, and St Joe Ranger Districts;

Boundary, Bonner, Kootenai, Shoshone, Benewah, and Latah Counties in Idaho; Pend Oreille County in Washington

Kootenai National Forest

Rexford/Fortine, Three Rivers, Libby, and Cabinet Ranger Districts;

Lincoln and Sanders Counties in Montana

Nez Perce-Clearwater National Forests

Palouse, North Fork Lochsa-Powell, Moose Creek, Red River, and Salmon Ranger Districts;

Latah, Clearwater, and Idaho Counties in Idaho

1.1 Scope of Contract. Award of this solicitation will result in Firm-fixed Price, Indefinate Delivery Requirements contract, at locations throughout Idaho Panhandle National Forests, Kootenai National Forest, Nez-Perce National Forests. The Government is in need of road maintenance services for Road Grading that will result in the proper mix of aggregates and fines to maintain aggregates on the road way, the elimination of ruts and potholes, maintenance and functionality of ditchlines and water diversion structures, and removal of rocks, limbs and other debris from the road prism while maintaining vegetation that serves to prevent or moderate erosion from runoff. The services covered in this contract include the furnishing of all labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to perform road maintenance on roads specified herein, in compliance with the terms, specifications, conditions, and provisions of this solicitation. This work will include road grading, scarification, clearing debris from ditches, minor road repair, and other related work necessary to meet the objectives. Standard industry practice indicates use of a motor grader with a 12 to 14 foot moldboard blade and scarifier to effectively perform this type of work. Cleaning culvert catch basins and inlets/outlets, ditches, slides and other similar maintenance items. Some roads or road segments may require scarification in conjunction with grading in order to cut out washboards and chuck holes. The equipment used to perform this work shall meet safety standards and shall be in good mechanical condition.

1.2 Work Objective. Successful, quality performance will result in road blading, scarification, clearing debris from ditches, minor road repair and other related work necessary to meet objectives. The Government anticipates a minimum rate of production to be 3-4 miles per day.

1.3 Location and Description.

1.31 The work sites are located on Bonners Ferry, Priest Lake, Sandpoint, Coeur d’Alene River, St. Joe, Ranger Districts of Idaho Panhandle National Forests; Rexford/Fortine, Three Rivers, Libby, Cabinet, Ranger Districts of Kootenai National Forest; Palouse, North Fork, Lochsa- Powell, Moose Creek, Red River, Salmon Ranger Districts of Nez Perce-Clearwater National Forests. The locations and miles of roads and other information pertinent to each road will be identified in the task orders issued prior to starting work. Maps may be requested from the respective Ranger District Offices:

Idaho Pandhandle National Forests.

Bonners Ferry Ranger District, Joe Heisel, (208) 290-6678 joseph.heisel@usda.gov Priest Lake Ranger District, Joe Heisel, (208) 290-6678 joseph.heisel@usda.gov Sandpoint Ranger Districts Joe Heisel, (208) 290-6678 joseph.heisel@usda.gov Coeur d’Alene River Ranger District, Chris Ackerman, (208) 964-3261 chris.ackerman@usda.gov St. Joe Ranger District, Jim Gardner, (208) 245-6043 james.gardner@usda.gov

Kootenai National Forest.

Rexford/Fortine Ranger District, Sean Mitchell, (406) 291-5087 sean.mitchell@usda.gov Three Rivers Ranger District, Ben Thom, (406) 295-7452 benjamin.thom@usda.gov Libby Ranger District, David Haines, (406) 291-0485 david.a.haines@usda.gov Cabinet Ranger District, Mickey Carr, (406) 291-0523 mickey.carr@usda.gov

Nez Perce-Clearwater National Forests.

Palouse Ranger District, Dennis Standridge, (208) 451-4846 dennis.standridge@usda.gov North Fork Ranger District, Dennis Standridge, (208) 451-4846 dennis.standridge@usda.gov Lochsa-Powell Ranger District, Dennis Standridge, (208) 451-4846 dennis.standridge@usda.gov Moose Creek Ranger District, Dennis Standridge, (208) 451-4846 dennis.standridge@usda.gov Red River Ranger District, Dennis Standridge, (208) 451-4846 dennis.standridge@usda.gov Salmon River Ranger District, Dennis Standridge, (208) 451-4846 dennis.standridge@usda.gov

2. CONTRACTOR WORK REQUIREMENTS

2.1 Moving of Equipment and Supplies. The moving of equipment and supplies to the job site and between job sites shall be the contractor's responsibility and is incidental to Pay Items as shown in the Schedule of Items and no separate payment shall be made.

2.2 Replacement of Equipment. Contractor shall provide quality equipment capable of safely performing the work under the terms of the contract. All repairs are the total responsibility of the Contractor.

2.3 Equipment Performance Standards. Contractor shall make equipment available for inspection and approval before use.

The Contractor must satisfy all applicable OSHA and DOT requirements or certifications for the operation of offered equipment. There will be no obligation to make payment for any equipment delivered that does not meet the Technical Specifications.

Equipment provided to conduct work must meet or exceed the following minimum specifications:

mailto:joseph.heisel@usda.gov mailto:joseph.heisel@usda.gov mailto:joseph.heisel@usda.gov mailto:chris.ackerman@usda.gov mailto:james.gardner@usda.gov mailto:sean.mitchell@usda.gov mailto:benjamin.thom@usda.gov mailto:david.a.haines@usda.gov mailto:mickey.carr@usda.gov

(a) Endloader/Backhoe

(1) Minimum 55 SAE net horsepower

(2) Minimum 1 cubic yard loader bucket.

(3) Backhoe bucket must be a minimum of 18 inches wide and have a reach of at least 12 feet

(4) ROPS rollover protection

(5) *Year of manufacture - 2000 or newer

(b) End Dump Truck

(1) Shall measure minimum of 12 cubic yards capacity

(2) Meet all safety standards as set by the State of Idaho and shall be licensed to haul designated materials within the State of Idaho

(3) End dump with latching tailgate and removable tailgate

(4) *Year of manufacture - 2000 or newer

(c) Water Truck

(1) An air gap or positive antisiphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul or if the source is a domestic potable water supply, or the water has been used for tank mixing with any other materials

(2) 3000 to 4500 gallon capacity unit, watertight tank

(3) Single unit with frame mount tank preferred, depending upon accessibility

(4) Self-contained filler pump with minimum 300 GPM capacity

(5) 40 – 50 feet of suction filler hose

(6) Capability to fill from either side

(7) Minimum 12 feet pressurized rear discharge road watering

(8) 6 inch side or rear “dump” for filling port-a-tanks’

(9) Controls in the cab for opening and closing water flow, to prevent ponding and washing at the beginning and ending of work areas

(10) Backup warning device

(11) 50 percent of original tread depth on tires, with available spare on truck

(12) * 2000 model or newer

(d) Vibratory Roller

(1) Drum shall measure be 54 inches wide

(2) Minium 35 SAE net horsepower

(e) Packer/Roller

(1) Packer Roller attached directly to Grader Ripper Bar

(2) Minimum of 10 smooth roller tires mounted to Independent Walk Beams

(3) Minimum packing width = 75”

(4) Minimum weight of 3,000 pounds

*2000 model or newer on all equipment or upon approval of the Contracting Officer.

2.4 Pollution and Erosion Control. During all operations under this contract, the Contractor shall exercise reasonable measures to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored and collected in a sanitary manner and disposed of in a State-approved sanitary landfill.

Oil from crankcases or gear boxes, equipment waste or spilled or excess fuel shall be placed in containers and removed from the work site and disposed of as approved and required by Federal, State and Local laws.

Equipment uses for operations in close proximity to streams or bodies of water will be required to meet more stringent requirements regarding seals and fittings that prevent the leaking of hydraulic fluids, lubricants and fuels. Failure to comply will result in immediate rejection of equipment.

2.5 Grading and Shaping. Performance of Road Maintenance includes grading and shaping the roadbed, including shoulders and turnouts and removing ruts, washes, slough, and other irregularities that prevent normal runoff from the road surface. Where equipment is used to remove excessive, large, or deleterious (damaging) material from the shaped road templet, material to be wasted shall not be placed in a drainage or within 300 feet of a live stream. The end result shall be the restoration and maintenance of the original cross section, grade and drainage of the road. The following standard industry practices will be reviewed during inspections to determine the results will be met.

2.5.1 – Grading to restore surface without loss of aggregate/gravel surfacing or disturbance or loss of road base material. Performance on gravel surfaced road shall be accomplished so the base is not disturbed and no surface material is lost in ditches or over the road shoulders.

Grading of unsurfaced roads shall be performed so no base material is lost. Surface material shall be bladed from one edge of the road to the other in a berm in order to eliminate any segregation prior to spreading. Sections having segregated materials after spreading shall be reprocessed and spread.

Oversized material exceeding 4 inches in size removed by equipment shall be disposed of by sidecasting over the fill slope except within 100 feet each side of culverts, other stream crossings or within 300’ of a perennial stream that is inhabited by fish, 150’ from a perennial steam not inhabited by fish and 100’ from any intermittent stream.

If work operations produce excess material, feather it out or haul it away. Avoid sidecasting in locations where erosion will carry materials into streams. Avoid leaving a berm that channels water down the road unless it is routed into an effective vegetation filter which removes sediment.

No berm or ridge of any material shall be left along either shoulder of the roadbed unless directed by the Contracting Office or designated representative.

2.5.2 – Elimination of ruts, potholes, and washes. These defects shall be repaired by scarifying or cutting to the bottom of such defects to provide for uniform compaction of roadbed material.

Large rock or organic material removed from drainage facilities during cleaning process shall not be used as fill. High grading, or any method which merely fills depressions with loose material, does not eliminate the defect or provide for uniform compaction and is therefore not acceptable.

2.5.3 – Repair of Settlement sections shall be performed where possible by cutting from the roadbed on each end of the settled area and filling into the settled area to provide smooth transitions to adjacent road grades. If this will not accomplish the objective, the COR shall be informed.

2.5.4 - Grading and shaping operations shall not undercut road backslopes.

2.5.5 - Sections of roads constructed without roadside ditch shall be uniformly insloped or outsloped the entire width of the roadbed, unless otherwise specified on each individual task order (i.e. crowning). The inslope or outslope grade shall be a minimum of 2 percent and a maximum of 4 percent unless staked otherwise on the ground.

2.5.6 - Existing drainage dips shall be cleaned and the outslope grade restored to equal or exceed the gradient of the road.

2.5.7 - Sections of roads constructed with a roadside ditch shall be bladed and reshaped to maintain crown at centerline of the roadbed, or insloped except on curves where crown is omitted. Road cross section shall slope uniformly both ways from crown apex to shoulders at a minimum blade of 2 percent and a maximum blade of 4 percent.

2.5.8 - At the conclusion of the grading and shaping operations the roadbed shall be smoothed and dressed to produce a uniform grade and cross section and a surface free of hollows, depressions, and projections above the adjacent roadbed surface. No berm or ridge or any material shall be left along either shoulder of the roadbed unless directed by the COR.

Compacting. Operate rollers and compact as specified: Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases. Make at least three complete passes.

2.6 Drainage Facilities - Cleaning and Repair

2.6.1 - Wood, rocks, and other debris shall be removed from roadside drainage ditches to provide unobstructed flow of water and disposed of on the jobsite as directed by the Contracting Officer's Representative. The backslope of the ditch shall not be undercut by ditch cleaning operations;

and the slope to road shoulder shall be maintained at an approximate ratio of 1V:2H from the bottom of the ditch to the edge of the roadbed. Roadside ditches shall not be excavated to a depth of greater than 2 feet below roadbed grade. Typical depth of roadside drainage ditches below roadbed is one foot. Existing ditch dikes shall be restored, reshaped, and compacted as needed for effective drainage through culverts.

2.6.2 - On aggregate-surfaced roads, material may be bladed across the road provided it is not deposited in ruts, washes, or chuckholes in the road surface. Such material shall be sidecast on stable fill slopes or natural ground out of streambeds, streams, or other waterways. No sidecasting will be permitted on roads paralleling streams where the ground slope from the outside road shoulder to the stream edge is steeper than 1V:2H. On roads without aggregate surfacing, surface soil with rocks less than 3 inches in greatest dimension may be spread evenly over the adjacent roadbed.

2.6.3 - Remove from bridge decks all rock and other material that would create a hazard to traffic or is otherwise detrimental to the traveled surface. Cattleguards shall be left clean between the bottom of the rails and ground beneath. No additional material may be deposited within cattleguards.

2.7 Maintenance of Traffic and Use of Warning Devices. The Contractor shall provide, erect, and maintain all necessary traffic control and devices for the protection of the work and public safety. The traffic control includes areas where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All traffic control methods and devices shall conform with the current edition of the Manual Uniform Traffic Control Devices for Streets and Highways (MUTCD), published by the Federal Highway Administration and applicable safety codes.

2.8 Removal of Obstructions. All fallen trees, limbs, brush, small slides or debris in the travelway or road ditchline shall be removed and scattered outside the travelway and ditchline.

2.9 Damage to Structures. The Contractor shall be held liable and is responsible for any damage caused by his/her personnel or equipment to any existing traffic loops, cattle guards, culverts, signs, and riprap protecting culvert inlets or fill slopes. Repair to these structures shall be at the Contractor's expense. Traffic loops will be marked on the ground with lath and fluorescent pink ribbon.

2.10 Soil Moisture – Retention of Fines. Contractor is responsible to ensure that performance does not reduce the level of fines in the road surface. Therefore, operations may be suspended when soil moisture conditions are not favorable for obtaining a satisfactory result.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .