RMAC 24-6 Tech. Requirements Automated Packout.pdf

PDF 275 KB Posted

Attached to
Sole Source Automated Bomblet Packout System
Solicitation number
W31P4Q-24-Q-0016
Issued by

About this file

This document is a Technical Requirements attachment for a federal contract opportunity regarding an Automated Bomblet Packout System. The key details are:

The contractor shall provide an Honest John Bomblet Automated Packout Capability that can automatically pack out 4,800 bomblets weighing 0.3 lbs each and 1.7" in diameter from a single warhead chamber. This equipment must meet the specific technical requirements outlined in the attachment.

The related federal contract opportunity is a Sole Source solicitation (W31P4Q-24-Q-0016) issued by the Army Contracting Command-Redstone for the purchase of one (1) Automated bomblet packout system and delivery to Anniston Army Depot. The solicitation is only open to Manufacturing Technology LLC of Birmingham, Alabama. Quotes are due by 3:00 PM local time on August 5, 2024 and will be evaluated on technical capability, price, and delivery.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RMAC 24-6 TECHNICAL REQUIREMENTS

1.0 Description of Requirement:

The contractor shall provide the following items as specified in the table below:

Item Number Part Description Quantity 1 Honest John Bomblet Automated Packout Capability 1

Additionally, this equipment must meet the requirements stated below:

• The equipment shall be capable of automatically packing out the 4800 bomblets contained within the Honest John Warhead.

• The bomblets are 1.7” diameter balls weighing 0.3 lbs each.

• The packout equipment shall be capable of packing out 1600 bomblets from a single warhead chamber in <30 minutes or packout all 4800 bomblets in < 90 minutes.

• The tooling shall be capable of picking up the bomblets from a flat surface without dropping them.

• The tooling shall be capable of manipulating and placing the egg trays in the packout area.

• Lead time shall be <120 days.

• Equipment shall be turnkey and installed by the contractor.

• The packout equipment shall place 30 bomblets in each tray in less than 1 minute.

• Overall footprint of the system must fit in the allotted 6 ft x 6 ft area with egress on all sides.

• The packout equipment shall have sensors to prevent over accumulation and e-stops.

• The packout equipment may run as either electric, pneumatic or hydraulic.

• Contractor must be able to install equipment at a GOV owned depot.

• Installation must include wiring of the equipment to any controllers.

• The contractor shall be capable of net 30 payment.

• Contractor must be within an 8 hour drive of Anniston Army Depot for response time if needed.

2.0 :

Travel is not required in the performance of this contract.

3.0 Deliverables:

The above items shall be delivered to the following:

7 Frankford Avenue Anniston, Al. 36201

BLDG 380

ATTN: Torrence Sims