This document is a Recruiting Facilities Program Construction Specifications Bid Proposal Worksheet, version 2021-10-15, used for detailed cost breakdown of construction project elements for a military recruiting facility. The comprehensive worksheet includes granular line items across multiple construction categories such as HVAC/Mechanical, Plumbing, Electrical, Communications, Safety & Fire Equipment, Architectural Finishes, Signage, Security Systems, and associated administrative costs. Each line item is set at a quantity of 1 and priced at $1.00, with a grand total bid proposal of $64.00, though this appears to be a template or placeholder pricing structure.

The worksheet emphasizes two critical requirements: (1) all information must include appropriate requirements from the USACE construction specifications appendix, and (2) the entire bid proposal worksheet must be completed in full, with a warning that failure to do so may result in the offer being rejected by the United States Army Corps of Engineers (USACE). The detailed categories cover everything from interior and exterior lighting to security systems, restroom fixtures, window treatments, perforated window graphics, and even includes line items for overhead, profit, insurance, and taxes.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Category Quantity $ - Each Sub-Total Comments HVAC / Mechanical 1 1.00$ 1.00$ Plumbing:

General 1 1.00$ 1.00$ Water Fountain 1 1.00$ 1.00$ Restroom (1) 1 1.00$ 1.00$ Restroom (2) 1 1.00$ 1.00$ Janitorial Closet 1 1.00$ 1.00$ Wet Pantry (if applicable) 1 1.00$ 1.00$ Other (define) 1 1.00$ 1.00$ Electrical:

General 1 1.00$ 1.00$ Interior Lighting 1 1.00$ 1.00$ Exterior Lighting 1 1.00$ 1.00$ Exterior Signage 1 1.00$ 1.00$ Emergency Lighting 1 1.00$ 1.00$ Roller Shades 1 1.00$ 1.00$ Other (define) 1 1.00$ 1.00$ Communications:

General 1 1.00$ 1.00$ Conduit 1 1.00$ 1.00$ CAT-6 Wiring 1 1.00$ 1.00$ Other (define) 1 1.00$ 1.00$ Safety & Fire Equipment 1 1.00$ 1.00$ Archetectural Finishes-Fixtures-Supplies:

Ceilings 1 1.00$ 1.00$ Walls 1 1.00$ 1.00$ Soundproofing 1 1.00$ 1.00$ Paint:

Common Area (Gov't Controlled) 1 1.00$ 1.00$ Army 1 1.00$ 1.00$ Porcelain Tile (wall / floor) 1 1.00$ 1.00$ Vinyl Composition Tile (VCT) 1 1.00$ 1.00$ Luxury Vinyl Tile (Air & Army Natl Guard) 1 1.00$ 1.00$ Carpet:

Army 1 1.00$ 1.00$ Base Cove (to include tiled areas) 1 1.00$ 1.00$ Fragment Retention Film 1 1.00$ 1.00$

Recruiting Facilities Program Construction Specifications Bid Proposal Worksheet

Version: 2021-10-15 (REV 1)

IMPORTANT NOTES:

2) The entire bid proposal worksheet MUST be filled out in its entirety. Failure to fill out this bid proposal worksheet may result in the overall offer being rejected by USACE.

1) All information supplied by the lessor/contractor on this bid proposal worksheet MUST include ALL appropriate requirements from the construction specifications Appendix provided by the USACE Representative.

Mini-Blinds 1 1.00$ 1.00$ Windows 1 1.00$ 1.00$ Doors 1 1.00$ 1.00$ Trim Work (chair rail, etc.) 1 1.00$ 1.00$ Roller Shades 1 1.00$ 1.00$ Fixed Panel Shade(s) 1 1.00$ 1.00$ Secondary Exit Door Security Hardware 1 1.00$ 1.00$ Restroom Fixtures 1 1.00$ 1.00$ Perforated Window Wrap(s):

JRFC (Joint) Graphic 1 1.00$ 1.00$ Army 1 1.00$ 1.00$ Shelving 1 1.00$ 1.00$ Desk-Top(s) 1 1.00$ 1.00$ Other (define) 1 1.00$ 1.00$ Signage:

Interior Signage:

Army 1 1.00$ 1.00$ Restroom(s) 1 1.00$ 1.00$ Other (define) 1 1.00$ 1.00$ Exterior Signage:

Army 1 1.00$ 1.00$ Video Intercom Entry Control System 1 1.00$ 1.00$ Other (define) 1 1.00$ 1.00$ Marquee / Pylon Signage 1 1.00$ 1.00$ Security Systems:

Video Intercom Entry Control System:

General/System (main parts/wiring/etc.) 1 1.00$ 1.00$ Door Station(s) 1 1.00$ 1.00$ Desk Stations (master + sub-masters) 1 1.00$ 1.00$ CCTV System:

General/System (NVR /Wiring / Etc.) 1 1.00$ 1.00$ Cameras 1 1.00$ 1.00$ TV Monitor(s) - (office displays) 1 1.00$ 1.00$ Security Closet 1 1.00$ 1.00$ Other (define) 1 1.00$ 1.00$ Permits Fees (all necessary, including low voltage if applicable) 1 1.00$ 1.00$ Architectural / Design Costs 1 1.00$ 1.00$ Other Items (define):

Overhead and Profit 1 1.00$ 1.00$ Insurance 1 1.00$ 1.00$ Tax 1 1.00$ 1.00$ Lessor Management (if applicable) 1 1.00$ 1.00$

BID PROPOSAL - GRAND TOTAL 1 1.00$ 64.00$