RLI27-007_-_Utilities_Field_Engineering_&_Professional_Services.pdf

PDF 341 KB Posted

Attached to
Utilities Field Engineering & Professional Services
Solicitation number
RLI27-007
Issued by
Broward County, Florida

About this file

This Request for Letters of Interest (RLI 27-007) is issued by the City of Pompano Beach, Florida, seeking Statements of Qualifications from qualified professional engineering firms to provide utilities field engineering and professional services on a continuing-contract, as-needed basis. The City seeks to establish a pool of multiple qualified firms capable of supporting the Utilities Department in planning, evaluation, investigation, modeling, design, permitting, rehabilitation, replacement, expansion, operation, maintenance, emergency response, regulatory compliance, construction, and asset management of field infrastructure. Primary systems covered include wellfields and raw water transmission, potable water distribution, reclaimed water distribution, wastewater collection and conveyance, lift stations, force mains, gravity sewer, and stormwater infrastructure. The solicitation explicitly excludes serving as the City's primary continuing contract for water or wastewater treatment-process design, though incidental services at treatment or pumping facilities may be authorized when directly related to field-system operation. Responses must be submitted electronically through the OpenGov eBid System, with a non-mandatory virtual pre-submittal meeting available. The contract term is five years with no renewal options. No minimum quantity of work or minimum compensation is guaranteed, and the City anticipates awarding contracts to multiple firms based on qualifications, anticipated workload, breadth of required specialties, and the City's best interests.

Professional services procured under this agreement shall comply with Section 287.055, Florida Statutes (the Consultants' Competitive Negotiation Act, or CCNA), and are subject to statutory thresholds for individual projects, currently $7.5 million for construction-cost thresholds and $500,000 for study activities, with adjustments applicable annually beginning July 1, 2025. The City will select firms based on qualifications using a 100-point evaluation matrix addressing professional personnel and team qualifications (20 points), relevant utilities field infrastructure experience, past performance, and litigation history (25 points), technical approach and understanding (25 points), availability, responsiveness, and workload (10 points), project management, schedule, cost control, and QA/QC (10 points), asset management, GIS, modeling, and innovation (5 points), and City factors including local vendor preference (5 points). Minimum qualifications include Florida authorization, a Florida-licensed Professional Engineer with at least five years of relevant municipal utility field infrastructure experience, demonstrated experience with active municipal water, wastewater, reclaimed-water, and stormwater systems, ability to design improvements within operating utility systems while maintaining service continuity, multidisciplinary service capabilities, demonstrated QA/QC programs, capacity to manage multiple simultaneous work authorizations, and knowledge of applicable Florida permitting requirements. The City's Local Business Program provides preference scoring of up to 5 points for Tier 1 vendors (Pompano Beach businesses employing Pompano Beach residents) and 2.5 points for Tier 2 vendors (Broward County businesses meeting specific staffing or subcontracting requirements). Compensation shall not be considered in the qualifications ranking; the City will negotiate fees, hourly rates, multipliers, and other compensation during subsequent competitive negotiations under CCNA. Financial statements, professional licenses, and certifications must accompany submissions, and proposals remain valid for a minimum of 120 days from the closing date.

View the file

Other files

File Type Posted
RLI27-007_-_Submittal_Checklist.pdf PDF
SAMPLE_AGREEMENT_TEMPLATE_-_CCNA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR LETTERS OF INTEREST

RLI 27-007

Utilities Field Engineering & Professional Services

RLI 27-007 Page 2 of 33

RLI 27-007 - UTILITIES FIELD ENGINEERING & PROFESSIONAL SERVICES

The City of Pompano Beach (the “City”) invites qualified professional engineering firms to submit

Statements of Qualifications for as-needed Utilities Field Engineering & Professional Services under continuing contracts.

The City anticipates entering into continuing contracts with multiple qualified firms.

The Cone of Silence shall take effect once this solicitation is released to the General Public and shall remain in effect until the City Commission has taken final action to approve or reject an award. The

“Cone of Silence” shall terminate upon the City’s award or approval of a contract, rejection of all proposals or responses, or any other formal action that concludes the solicitation or other procurement process. For confirmation of the official termination date of the Cone of Silence, contact the Purchasing

Agent of record. During the Cone of Silence period, Respondents to this solicitation, or persons acting on their behalf, including lobbyists, shall not communicate, directly or indirectly, regarding any aspect of this solicitation with any member of the City Commission, the City Clerk, the City Manager’s Office, any Evaluation Committee member, or any other City of Pompano Beach employee, except in writing to the Procurement and Contracts Department staff as expressly permitted in this solicitation. Violation of the Cone of Silence may be grounds for rejection of a Proposal or other appropriate action as permitted by City ordinance.

Any firm or lobbyist for a firm is prohibited from having any communications concerning any solicitation for a competitive procurement with any member of the City Commission, City Clerk, City Manager’s

Office, any Evaluation Committee Member, or any other City of Pompano Beach employee after

Procurement and Contracts releases a solicitation to the General Public. All communications must go through the eBid System (OpenGov) or the Purchasing Agent assigned to this solicitation, Cynthia

Gomez, at 954-786-4166, or cynthia.gomez@copbfl.com. No other member of the City Commission, City Clerk, City Manager’s Office, any Evaluation Committee Member, or any other City of Pompano

Beach employee should be contacted concerning this RLI. Any information that amends any portion of this RLI received by any method other than an Addendum issued to the RLI is not binding on the City of

Pompano Beach.

Firms must be registered on the City’s eBid System to view the solicitation documents and respond to this

Solicitation. The complete solicitation document can be downloaded for free from the eBid System as a

PDF at https://procurement.opengov.com/portal/copbfl/projects/325025. The City is not responsible for the accuracy or completeness of any documentation the firm receives from any source other than the eBid

System. The firm is solely responsible for downloading all required documents.

mailto:cynthia.gomez@copbfl.com https://procurement.opengov.com/portal/copbfl/projects/325025

RLI 27-007 Page 3 of 33

Non-Mandatory Pre-Submittal Meeting

The pre-submittal meeting will be held virtually. Attendance is optional. See the OpenGov project page for meeting details.

Table of Contents

1. Solicitation Overview and Intent

2. Background and Objectives

3. Contract Structure and CCNA Requirements

4. Scope of Professional Services

5. System-Specific Scope

6. Specialized, Advanced & Emerging Technical Services

7. Planning, Design, Permitting and Construction Services

8. Emergency and Time-Sensitive Engineering Support

9. Deliverables and City Standards

10. Minimum Qualifications

11. Recommended Team Disciplines

12. Statement of Qualifications - Required Response Format

13. Evaluation and Selection Process

14. Evaluation Criteria and Scoring Matrix

15. Work Authorization Process

16. Contract Administration and Performance

17. Special Requirements

18. City Contract and Procurement Provisions

19. Attachments and Exhibits

RLI 27-007 Page 4 of 33

1. Solicitation Overview and Intent

The City of Pompano Beach (City) is seeking Statements of Qualifications from qualified professional engineering firms to provide professional and engineering services related to Utilities Field Engineering

& Professional Services on a continuing-contract, as-needed basis.

The intent is to establish a pool of highly qualified firms capable of supporting the Utilities Department in the planning, evaluation, investigation, modeling, design, permitting, rehabilitation, replacement, expansion, operation, maintenance, emergency response, regulatory compliance, construction, and asset management of the City's field infrastructure. The City may award contracts to multiple firms. No minimum quantity of work or minimum compensation is guaranteed.

The primary systems covered by this solicitation are wellfields and raw water transmission, potable water distribution, reclaimed water distribution, wastewater collection and conveyance, lift stations, force mains, gravity sewer, and stormwater infrastructure, together with all related appurtenances, structures, electrical and control systems, and supporting field assets.

This solicitation is intended primarily for field infrastructure and field operations. It is not intended to serve as the City's primary continuing contract for water or wastewater treatment-process design.

Incidental services at treatment or pumping facilities may be authorized when directly related to field-system operation, conveyance, interconnection, metering, controls, emergency response, or successful delivery of an assigned field infrastructure project.

2. Background and Objectives

The City of Pompano Beach (the “CITY”) is located in Broward County, Florida, and encompasses approximately 25 square miles. The CITY serves a year-round population of approximately 113,691 residents, increasing to nearly 150,000 during the peak seasonal period. The CITY owns and operates municipal utility systems providing potable water, wastewater collection and conveyance, reclaimed water, and stormwater management services to customers within the CITY and portions of neighboring jurisdictions, including Lighthouse Point and Lauderdale-by-the-Sea.

The CITY’s potable water system includes lime softening and nanofiltration treatment facilities, two wellfields and their raw water transmission mains, associated storage and pumping facilities, and approximately 290 miles of transmission and distribution mains. The wastewater collection system consists of approximately 259 miles of gravity sewers and force mains, and 82 lift stations. The CITY’s field infrastructure also includes associated operational, equipment, maintenance, and storage buildings and structures that support utility system operations. Wastewater collected by the CITY is conveyed to the Broward County North Regional Wastewater Treatment Plant for treatment under an interlocal agreement.

The Western wellfield includes 10 active Biscayne wells with associated well houses and approximately

6 miles of raw water transmission mains ranging from 8 to 48 inches in diameter. The Eastern wellfield includes 14 active Biscayne wells with associated well houses and approximately 4 miles of raw water transmission mains ranging from 10 to 36 inches in diameter. Existing raw water transmission piping primarily consists of ductile iron and prestressed concrete cylinder pipe (PCCP), with possible cast iron piping in the Eastern wellfield.

RLI 27-007 Page 5 of 33

The CITY also operates a 7.5 million gallons per day (MGD) reclaimed water treatment facility, with an associated distribution system serving municipal facilities, landscaped areas, parks, and residential customers, including customers in Lighthouse Point and designated areas within Broward County’s service territory.

The CITY’s stormwater management system includes drainage infrastructure throughout public rights-of-way and municipal properties, consisting of catch basins, manholes, drainage pipes, exfiltration trenches, control structures, retention areas, outfalls, pump stations and interconnected canals. These facilities support flood mitigation, drainage conveyance, and water quality management.

Given the extent, age, complexity, and ongoing operational demands of these systems, the CITY requires qualified professional and engineering firms to provide ongoing technical and engineering services to support the planning, assessment, design, rehabilitation, replacement, expansion, maintenance, regulatory compliance, and operational reliability of its utility field infrastructure.

Through this Request for Letters of Interest (RLI), the CITY intends to establish continuing professional services agreements with qualified firms capable of supporting its Utilities Department across potable water distribution, reclaimed water distribution, wastewater collection and conveyance, lift stations, and stormwater infrastructure. Services may include infrastructure evaluations, hydraulic modeling, asset management, capital improvement planning, engineering design, permitting, construction administration, emergency engineering support, and related professional services, as authorized by the CITY.

The objectives of this continuing contract include:

• Provide responsive, multidisciplinary professional engineering and technical services for planned and unplanned utility infrastructure needs.

• Improve the reliability, efficiency, redundancy, resiliency, and lifecycle performance of the City's utility systems, including wellfields, transmission and distribution networks, wastewater collection systems, lift stations, stormwater infrastructure, and associated buildings and facilities.

• Support system-wide master planning, hydraulic and hydrologic modeling, capacity assessments, long-range capital improvement programming, and identification and pursuit of grant, loan, and other infrastructure funding opportunities.

• Advance proactive infrastructure condition assessment, leak detection, asset management, risk-based rehabilitation and replacement, preventive maintenance planning, and standardized asset evaluation methodologies.

• Provide engineering support throughout project development and implementation, including planning, design, permitting, procurement, construction administration, inspection, commissioning, and closeout.

• Strengthen emergency engineering and operational support for infrastructure failures, water main breaks, sanitary sewer overflows, lift station failures, flooding, utility conflicts, and other critical incidents.

• Integrate GIS, asset management systems, field investigations, survey/SUE, modeling, operational data, and emerging technologies to improve infrastructure management and decision-making.

• Support regulatory compliance, development and implementation of utility-related programs, and technical assistance with City ordinances, policies, procedures, and infrastructure standards.

RLI 27-007 Page 6 of 33

• Deliver practical, constructible, and cost-effective solutions that minimize service disruptions, protect public health and safety, and support sustainable utility operations.

3. Contract Structure and CCNA Requirements

3.1 Continuing Professional Services Contract

Services will be procured and administered in accordance with Section 287.055, Florida Statutes, the

Consultants’ Competitive Negotiation Act (CCNA), and applicable City procurement requirements.

Individual assignments will be authorized through written Work Authorizations or other City-approved instruments.

Each Work Authorization issued under this Agreement shall comply with the then-current limitations and requirements applicable to continuing contracts under Section 287.055, Florida Statutes, as amended from time to time. At the time a Work Authorization is issued, the City shall apply the statutory thresholds and any applicable annual adjustments then in effect. Nothing in this Agreement shall authorize a Work

Authorization exceeding the limits permitted under the Consultants’ Competitive Negotiation Act

(CCNA).

For reference, as of the date of this solicitation, Section 287.055, Florida Statutes, establishes a $7.5 million base estimated construction-cost threshold for an individual project under a continuing contract, subject to the annual statutory adjustment beginning July 1, 2025, and a $500,000 limit for study activities.

These amounts are provided for reference only; the City shall use the applicable statutory limits in effect when each Work Authorization is issued.

In the event of any conflict between a dollar amount stated in this solicitation, the Agreement, or related procurement documents and the applicable statutory limit in effect at the time a Work Authorization is issued, the then-current statutory limit shall govern.

3.2 Qualifications-Based Selection

The City will select firms based on qualifications. The City will request, accept, and consider proposed fees, hourly rates, multipliers, and other proposed compensation for this contract only during competitive negotiations under Section 287.055(5), Florida Statutes.

3.3 Multiple Awards / No Guaranteed Work

The City anticipates that multiple firms may be selected. The number of firms awarded will be determined by the City based on the quality of responses, anticipated workload, breadth of required specialties, and the City's best interests. Award of a continuing contract does not guarantee any Work Authorization, minimum dollar value, or equitable distribution of fees.

3.4 Contract Term

The contract term shall be for five years. There are no renewal options.

4. Scope of Professional Services

The Consultant shall provide professional engineering and related services for projects of varying size, complexity, urgency, and delivery stage. Services may include the following, as applicable to an individual Work Authorization:

RLI 27-007 Page 7 of 33

• Field investigation, data collection, records review, problem definition, and engineering evaluation.

• Planning, feasibility studies, alternatives analyses, system-wide and system-specific master plans and updates, capacity and demand forecasts, capital improvement programs, conceptual design, and basis-of-design development.

• Structural Engineering Support: Structural assessment, design, rehabilitation, repair, and improvements of utility-related buildings and structures, including lift station buildings, well houses, electrical and generator enclosures, equipment shelters, roofing systems, foundations, supports, and associated infrastructure.

• Hydraulic, hydrologic, pump-system, transient, capacity, operational, and other engineering analyses.

• Leak detection, water-loss investigations, condition assessment, failure investigation, root-cause analysis, risk assessment, and rehabilitation/replacement recommendations.

• Surveying and mapping, subsurface utility engineering (SUE), utility designation, geotechnical investigations, environmental assessments, and materials testing.

• Preliminary and final design, technical specifications, bid documents, cost estimates, schedules, and permitting.

• Utility coordination, easement/right-of-way support, conflict resolution, maintenance-of-traffic coordination, and constructability reviews.

• Bid-phase assistance, construction administration, construction engineering and inspection (CEI), resident project representation, startup/commissioning, certification, and closeout.

• Emergency and time-sensitive engineering support.

• GIS, asset management, data development, record-drawing reconciliation, and field verification.

• Regulatory compliance support, technical memoranda, reports, presentations, public outreach support, and interagency coordination.

• Grant and loan funding support, including identification of eligible programs, funding applications, supporting technical documents, coordination with funding agencies, and post-award technical assistance.

• Staff augmentation for professional, technical, field, GIS, CAD, project management, development review, or related functions when authorized and consistent with the professional-services contract.

• Ordinance and Policy Development Support: Technical assistance with the evaluation, development, revision, and implementation of utility-related ordinances, resolutions, policies, procedures, and regulatory programs, including preparation of supporting documentation, stakeholder coordination, and assistance with City Commission review and adoption.

5. System-Specific Scope

5.1 Wellfields, Raw Water Transmission, and Potable Water Distribution

Engineering services under this section may address the Western and Eastern wellfields, active production wells, raw water transmission mains, associated valves, appurtenances and structural housing, and potable water transmission and distribution infrastructure.

• Transmission and distribution mains, service lines, interconnections, crossings, and extensions.

RLI 27-007 Page 8 of 33

• Wellfield and raw water transmission infrastructure, including assessment, investigation, hydraulic evaluation, rehabilitation, replacement, improvements, and coordination of work within active wellfields.

• Valves, valve assemblies, hydrants, fittings, restraints, air-release/vacuum assemblies, meters, meter assemblies, backflow devices, blow-offs, sampling points, and related appurtenances.

• Water-main rehabilitation, replacement, relocation, looping, upsizing, redundancy, and reliability improvements.

• Assessment of existing ductile iron, PCCP, and potentially cast-iron raw water pipelines, including pipe condition, failure mechanisms, material-specific risks, and appropriate rehabilitation or replacement alternatives.

• Hydraulic modeling, model calibration, pressure-zone analysis, fire-flow analysis, system capacity evaluation, water age/quality evaluations where applicable, and operational scenario analysis.

• Critical valve and isolation analyses; identification of isolation boundaries and opportunities to reduce customers affected by outages.

• Pressure and flow monitoring; evaluation of pressure deficiencies, pressure differentials, transient conditions, and operational impacts.

• Assessment, design, rehabilitation, and improvements of well house buildings, storage facilities, and associated structures, including architectural, structural, mechanical, electrical, and building code requirements.

• Development of leak detection programs, targeted surveys of high-risk pipelines, evaluation of apparent and real losses, and coordination with City staff to minimize impacts to active systems.

• Leak detection and water-loss investigation services for raw water, potable water, and reclaimed water pipelines, as applicable, including acoustic and non-acoustic methods, field surveys, leak localization, verification, prioritization, and reporting of findings and recommended corrective actions.

• Emergency water-main failure investigation, repair design/support, temporary service, isolation strategy, restoration, and post-event engineering analysis.

• Distribution-system flushing, disinfection, bacteriological testing, return-to-service, and regulatory coordination considerations associated with capital projects.

• Metering and advanced metering infrastructure interfaces where engineering services are required.

• Utility relocation and conflict coordination associated with roadway, drainage, development, or other public/private projects.

5.2 Reclaimed Water Transmission and Distribution

• Reclaimed water transmission and distribution mains, services, meters, valves, fittings, crossings, and appurtenances.

• System extensions, infill, looping, rehabilitation, replacement, relocation, and customer connection projects.

• Hydraulic modeling, capacity analysis, pressure evaluation, operational analysis, and service-area expansion studies.

RLI 27-007 Page 9 of 33

• Planning and design to improve reclaimed-water utilization, reliability, customer connections, and potable-water offsets.

• Cross-connection-control considerations, identification/marking requirements, and coordination with potable-water infrastructure.

• Interjurisdictional connections, service-area interfaces, and coordination with neighboring agencies where required.

• Trenchless installations, subaqueous crossings, HDD, and other specialized construction methods.

5.3 Wastewater Collection and Conveyance

• Gravity sewer mains, service laterals, cleanouts, manholes, drop structures, and associated appurtenances.

• Force mains, valves, air-release/vacuum assemblies, discharge piping, fittings, crossings, and associated appurtenances.

• Lift stations, wet wells, pumps, piping, valves, electrical systems, motor controls, instrumentation, telemetry/SCADA interfaces, generators/emergency power, odor/corrosion control, site improvements, and associated housing and inventory buildings.

• Gravity sewer and force-main rehabilitation, replacement, upsizing, relocation, lining, and trenchless renewal.

• Lift-station rehabilitation, replacement, capacity upgrades, reliability improvements, and standardization.

• Assessment, design, rehabilitation, and improvements of lift station buildings, storage facilities, and associated structures, including architectural, structural, mechanical, electrical, and building code requirements.

• Collection-system hydraulic modeling, flow monitoring, pump/system curves, capacity analysis, wet-weather evaluation, and operational scenario analysis.

• Inflow and infiltration investigations, CCTV review/program development, smoke testing, manhole inspections, defect coding, and rehabilitation prioritization.

• Sanitary sewer overflow investigation, corrective-action engineering, root-cause evaluation, regulatory support, and prevention measures.

• Emergency bypass pumping and onsite / temporary generator planning, temporary conveyance, force-main failure response, and continuity-of-service planning.

• Evaluation and mitigation of odor, corrosion, fats, oils, grease, rags, sediment, debris, and other operational issues affecting wastewater collection-system performance, including grease trap and interceptor assessments, inspections, maintenance requirements, and development, implementation, and regulatory compliance support for Fats, Rags, Oils, and Grease (FROG) control programs.

5.4 Stormwater, Drainage and Flood Mitigation

• Stormwater pipes, culverts, inlets, catch basins, manholes, exfiltration systems, swales, outfalls, control structures, tidal/check valves, pump stations, and related appurtenances.

RLI 27-007 Page 10 of 33

• Assessment, planning, design, rehabilitation, renovation, and improvements of stormwater pump station buildings, equipment enclosures, storage facilities, and associated operational support structures, including architectural, structural, mechanical, electrical, and applicable building code requirements.

• Drainage rehabilitation, replacement, retrofit, capacity improvements, and system extensions.

• Hydrologic and hydraulic modeling, basin/sub-basin analysis, flood studies, level-of-service evaluations, and alternatives analysis.

• Evaluation of rainfall, high groundwater, tailwater, king tides, coastal/tidal influence, storage, conveyance, pump capacity, outfall capacity, sea-level rise, and resiliency.

• Water-quality treatment, pollutant-load reduction, NPDES/MS4 support, TMDL/BMAP-related engineering where applicable, and retrofit opportunities.

• Flood mitigation, pumped drainage, offline storage, backflow prevention, low-impact development, green infrastructure, and other resilient stormwater strategies.

• FEMA/floodplain engineering support and Community Rating System-related technical support when assigned.

• Emergency flooding investigations, temporary mitigation, post-event assessments, and corrective-action recommendations.

6. Specialized, Advanced & Emerging Technical Services

6.1 Condition Assessment and Asset Management

The Consultant shall provide condition assessment and asset management services to support the City's infrastructure reliability, preventive maintenance, risk-based rehabilitation and replacement planning, and long-term capital investment decisions. Services may include:

Asset inventory development, verification, and validation.

Condition assessments, asset criticality evaluations, probability-of-failure and consequence-of-failure analyses, and risk scoring.

Remaining useful life assessments, lifecycle-cost analyses, and rehabilitation or replacement recommendations.

Development of risk-based infrastructure rehabilitation, renewal, and replacement programs.

Capital Improvement Program (CIP) prioritization, project bundling, renewal forecasting, and budget planning support.

Development and refinement of asset management procedures, levels of service, performance measures, and data quality improvement strategies.

Development and standardization of condition assessment methodologies, asset criticality criteria, and risk-scoring frameworks, including consistent rating scales, evaluation criteria, supporting documentation, and reporting formats to ensure uniformity and comparability across consultants, asset classes, and utility systems.

RLI 27-007 Page 11 of 33

Development of asset-specific inspection and preventive maintenance programs, including standardized job plans, recommended inspection and maintenance frequencies, procedures, resource requirements, and documentation standards.

Integration of asset management information with the City's GIS and asset management systems, including inspection findings, condition assessments, risk ratings, maintenance recommendations, and job plans. Information shall be linked to the appropriate asset identification numbers to support ongoing maintenance, rehabilitation, replacement, and capital improvement planning.

6.2 GIS, Data and Digital Delivery

• GIS field verification and data collection.

• Record-drawing reconciliation and asset attribution.

• GPS/GNSS data acquisition and development of GIS-compatible datasets.

• Integration of engineering deliverables with City GIS/asset-management standards.

• CAD/BIM/3D/PDF deliverables when required.

• Data dashboards, field applications, or analytical tools when authorized.

6.3 Surveying, Mapping and SUE

• Boundary, topographic, route, design, construction, and record surveys.

• Right-of-way and easement mapping, legal descriptions, and sketches.

• SUE designation and location at appropriate quality levels.

• Utility conflict matrices and coordination.

• LiDAR, 3D laser scanning, bathymetry, and specialized field technologies when appropriate.

6.4 Geotechnical, Structural and Materials

• Geotechnical investigations for buried utilities, roads, structures, pump/lift stations, and trenchless installations.

• Settlement, vibration, groundwater, dewatering, trench, shoring, foundation, and soil-stability evaluations.

• Structural evaluation/design for vaults, manholes, pump/lift station structures, drainage structures, walls, slabs, supports, and related facilities.

• Construction materials sampling/testing and specialty inspections.

6.5 Trenchless and Specialized Construction

• Horizontal directional drilling (HDD).

• Pipe bursting.

• Sliplining and close-fit lining.

• Cured-in-place pipe (CIPP) and other lining systems.

• Jack-and-bore, auger boring, microtunneling, or other trenchless methods.

• Subaqueous and major roadway/waterway crossings.

RLI 27-007 Page 12 of 33

• Evaluation and selection of trenchless methods based on pipe condition, diameter, material, capacity, alignment, access, geotechnical conditions, crossing length, risk, constructability, and surrounding infrastructure.

7. Planning, Design, Permitting and Construction Services

7.1 Planning and Preliminary Engineering

Master Planning and Funding Support

Services may include preparation, evaluation, and periodic updates of potable water distribution, reclaimed water, wastewater collection and conveyance, lift station, and stormwater master plans;

hydraulic and hydrologic modeling; infrastructure capacity, condition, and level-of-service assessments;

growth and resiliency scenarios; alternatives evaluation; risk-based project prioritization; and short- and long-range capital improvement programming.

• Feasibility and alternatives analyses.

• Conceptual layouts and preliminary engineering reports.

• Capacity and operational analyses.

• Cost-benefit and lifecycle analyses.

• Preliminary opinions of probable construction cost and project schedules.

• Identification of permitting, property, easement, utility-conflict, environmental, and constructability constraints.

• Grant, loan, and funding assistance, including opportunity identification, eligibility assessments, funding strategies, State Revolving Fund (SRF) and other program applications, engineering reports, cost estimates, supporting exhibits, agency coordination, and technical support for award, administration, reporting, and compliance when assigned.

7.2 Design Development and Stage-Gate Reviews

When appropriate, the City may require formal design reviews at approximately 30%, 60%, 90%, and final design. At each stage the Consultant shall verify, as applicable, technical feasibility, field conditions, operational impacts, property/easement availability, permitting pathway, utility conflicts, constructability, maintenance access, cost, schedule, risk, and readiness to advance.

• Design calculations and basis-of-design documentation.

• Construction plans and technical specifications.

• Engineer's opinion of probable construction cost at required milestones.

• Bid schedules and measurement/payment provisions.

• Maintenance-of-traffic and phasing requirements as applicable.

• Shutdown, bypass, tie-in, temporary-service, and continuity-of-operations plans.

• Independent QA/QC and constructability reviews.

• Value engineering and alternatives to reduce lifecycle cost or disruption without compromising performance.

RLI 27-007 Page 13 of 33

7.3 Permitting and Regulatory Coordination

The Consultant shall identify required permits early and coordinate, as applicable, with agencies having jurisdiction, which may include FDEP, SFWMD, Broward County, Broward County Environmental

Permitting Division, FDOT, FEMA, USEPA, other municipalities, railroads, utilities, and other entities.

The specific permitting pathway will be established by Work Authorization.

7.4 Bid and Construction Phase

• Bid document support, responses to bidder questions, addenda, bid evaluation, and recommendation support.

• Preconstruction conferences and construction administration.

• Submittal, shop drawing, product data, substitution, and test-result review.

• RFI responses, supplemental sketches, field directives, and interpretation of contract documents.

• Change-order and contractor-proposed change evaluation, including scope, cost, schedule, responsibility, and technical merit.

• Field observation, resident project representation, CEI, daily documentation, quantity verification, and progress reporting when assigned.

• Coordination of geotechnical/material testing and quality assurance.

• Review of pay applications, schedules, progress, and closeout documentation.

• Startup, testing, commissioning, training, punch lists, final inspection, certification, record drawings, O&M documentation, and project closeout.

8. Emergency and Time-Sensitive Engineering Support

Because this contract supports active field operations, the City may issue urgent assignments requiring rapid mobilization. Respondents shall describe their ability to provide timely professional support during normal business hours and, when specifically authorized, after-hours, weekends, holidays, and declared emergencies.

• Water-main breaks and loss-of-pressure events.

• Force-main failures, SSOs, sewer blockages, and bypass requirements.

• Lift-station failures and emergency pumping/power needs.

• Flooding, drainage failures, outfall restrictions, and storm-related damage.

• Sinkholes, voids, pavement failures, utility conflicts, and unforeseen subsurface conditions.

• Emergency isolation, temporary piping, bypass, stabilization, repair design, and restoration.

• Field documentation, water-loss/flow/capacity analysis, operational risk evaluation, root-cause analysis, and after-action engineering recommendations.

• Regulatory technical support and documentation associated with emergency events when requested.

9. Deliverables and City Standards

Deliverables will be defined in each Work Authorization and may include:

• Technical memoranda, reports, studies, models, calculations, and presentations.

RLI 27-007 Page 14 of 33

• Survey/SUE deliverables, geotechnical reports, environmental documentation, and field investigation records.

• Construction plans, specifications, bid packages, addenda, and permit packages.

• Cost estimates, project schedules, risk registers, decision logs, and alternatives matrices.

• GIS datasets, CAD files, PDF, model files, databases, photographs, and other editable/native electronic files.

• Construction reports, inspection documentation, submittal/RFI logs, change documentation, pay-application recommendations, and testing records.

• Record drawings, asset data, certifications, startup/commissioning records, O&M information, and closeout packages.

All deliverables shall comply with the City's then-current standards

(https://www.pompanobeachfl.gov/government/engineering/standard-details), naming conventions, coordinate systems, CAD/GIS requirements, cybersecurity/data requirements, accessibility requirements, records-retention requirements, and document-control procedures identified in the applicable Work

Authorization.

10. Minimum Qualifications

At a minimum, the prime Consultant shall demonstrate the following. Failure to meet a mandatory qualification may render a response non-responsive, subject to the City's solicitation terms and applicable law.

1. Authorization to transact business and provide the proposed professional services in the State of

Florida.

2. A Florida-licensed Professional Engineer designated as the Contract/Program Manager or Engineer of

Record, with at least five (5) years of demonstrated professional engineering experience relevant to municipal utility field infrastructure in Florida.

3. Recent experience with active municipal water, wastewater collection/conveyance, reclaimed-water, and/or stormwater systems.

4. Demonstrated ability to design improvements within operating utility systems while maintaining continuity of service.

5. Ability to provide multidisciplinary services through the prime firm and/or clearly identified subconsultants.

6. Demonstrated quality assurance/quality control program.

7. Capacity to manage multiple simultaneous Work Authorizations and respond to urgent field needs.

8. Knowledge of applicable Florida utility, environmental, stormwater, right-of-way, and construction permitting requirements.

9. Required professional licenses and certifications for the disciplines proposed, maintained throughout the contract term.

https://www.pompanobeachfl.gov/government/engineering/standard-details

RLI 27-007 Page 15 of 33

11. Recommended Team Disciplines

Respondents shall identify the individuals or subconsultants proposed to provide the following capabilities. A single individual may fulfill more than one role if appropriately qualified.

Discipline / Role Expected Capability

Contract / Program Manager

Overall contract accountability, work authorization management, multidisciplinary team coordination, client communication, schedule and budget oversight, QA/QC, and responsiveness.

Water Distribution Engineer

Wellfield infrastructure, raw water transmission, potable water transmission and distribution, hydraulic analysis, leak detection, pipeline condition assessment, rehabilitation, replacement, and design within active utility systems.

Wastewater Collection / Lift

Station Engineer

Gravity sewers, force mains, lift stations, pumping systems, inflow and infiltration (I/I), collection-system hydraulic analysis, rehabilitation, capacity improvements, and regulatory compliance support.

Stormwater / Drainage Engineer

Hydrologic and hydraulic (H&H) analysis, stormwater infrastructure, flood mitigation, drainage master planning, coastal and tidal influences, water quality improvements, and infrastructure resiliency.

Hydraulic / Hydrologic Modeler

Development, calibration, validation, and application of water, wastewater, and stormwater models; capacity assessments; operational evaluations;

master planning; and infrastructure improvement recommendations.

Electrical / I&C / SCADA

Engineer

Electrical power distribution, instrumentation and control systems, Supervisory Control and Data Acquisition (SCADA) system design, integration, programming, configuration, troubleshooting, and modernization; PLCs, telemetry, remote monitoring, communications networks, system automation, cybersecurity considerations, emergency power, and related improvements for wellfields, water distribution, reclaimed water, lift stations, pump stations, stormwater facilities, and associated utility infrastructure.

Structural Engineer

Structural assessment, rehabilitation, and design of utility and drainage structures, equipment enclosures, buildings, foundations, supports, and associated infrastructure.

Geotechnical Engineer

Subsurface investigations, buried utility installations, trenchless construction, dewatering, foundation design, soil stability, and geotechnical risk assessments.

Survey / SUE Lead

Boundary, topographic, and utility surveys; subsurface utility designation and location; mapping; easement and right-of-way support; utility conflict identification; and construction verification.

RLI 27-007 Page 16 of 33

Discipline / Role Expected Capability

GIS / Asset Management

Specialist

Asset inventory development and validation; GIS integration; condition assessment, criticality and risk scoring; standardized inspection and preventive maintenance programs; asset-specific job plans; data management; and integration with the City's GIS and asset management systems.

Construction / CEI Lead

Construction administration, engineering inspection, quality assurance, materials testing, project documentation, schedule and cost monitoring, regulatory coordination, construction certification, and project closeout.

Environmental / Permitting

Specialist

Environmental assessments, permitting, regulatory compliance, and agency coordination involving potable water, wastewater collection, reclaimed water, and stormwater systems. Experience with NPDES/MS4 requirements, collection system operation and maintenance programs, inflow and infiltration (I/I) investigations, sanitary sewer overflow prevention and corrective actions, and applicable FDEP, SFWMD, and Broward County requirements.

Grant / Funding Lead

Identification and evaluation of federal, state, and regional funding opportunities; grant and loan application preparation; State Revolving Fund

(SRF) assistance; funding strategies; preparation of technical and financial documentation; coordination with funding agencies; and post-award grant administration, reporting, and compliance support.

12. Statement of Qualifications - Required Response Format

Submit the Statement of Qualifications electronically through OpenGov. Include a title page with the RLI number and title, firm name, address, contact name, telephone number, and date. Include a table of contents identifying each tab and its page number, then organize the response in the order below. Complete the required OpenGov response fields, upload the required files, acknowledge posted addenda, and submit the response by the deadline shown in the OpenGov project schedule.

Tab 1 - Cover Letter and Executive Summary

Identify the prime firm, office responsible for the contract, proposed Contract/Program Manager, authorized representative, contact information, and a concise statement of interest and understanding.

Confirm acceptance of the RLI requirements and identify any exceptions only as permitted by the City.

Tab 2 - Firm Profile and Minimum Qualifications

Provide firm history, Florida authorization, office locations, organizational structure, number and types of professional/technical personnel, required licenses, and evidence that the minimum qualifications are satisfied.

RLI 27-007 Page 17 of 33

Tab 3 - Proposed Team and Professional Personnel

Provide an organization chart and resumes for key personnel. For each person identify role, office location, professional registration/certification, years with firm, relevant experience, current workload, anticipated availability, and participation in cited projects. Identify all subconsultants and their specialties.

Tab 4 - Relevant Utilities Field Infrastructure Experience

Provide a minimum of ten (10) projects completed or substantially completed within the preceding seven

(7) years that best demonstrate the proposed team's experience. Collectively, examples should demonstrate water distribution, wastewater collection/conveyance and lift stations, reclaimed water, stormwater/flood mitigation, rehabilitation, active-system construction, and construction-phase services. At least five (5) examples should be Florida projects.

Tab 5 - Technical Approach and Understanding

Describe the firm's understanding of municipal field infrastructure and its approach to accepting and completing Work Authorizations. Address field verification, alternatives development, design stage-gates, operational continuity, constructability, permitting, cost estimating, schedule control, risk management, QA/QC, construction support, closeout, and lessons learned.

Tab 6 - Availability, Responsiveness and Workload

Describe the team's current/projected workload, capacity to absorb assignments, local/regional availability, field mobilization capability, ability to manage concurrent assignments, and approach to urgent/emergency requests.

Tab 7 - Project Management, Schedule, Budget and QA/QC

Describe project controls, internal communication, scope management, schedule management, cost estimating and cost control, change management, document control, independent technical review, and

QA/QC procedures.

Tab 8 - Asset Management, GIS, Modeling, Innovation and Funding Identification

Describe the proposed team's experience with utility system master planning, CIP development, grant and loan funding identification, preparation of funding applications, SRF documentation, and post-award technical assistance.

Describe capabilities in GIS, asset management, hydraulic/hydrologic modeling, condition assessment, risk-based renewal, trenchless technology, digital field tools, data integration, and practical innovations that improve reliability, efficiency, constructability, or lifecycle cost.

Tab 9 - Past Performance, References and City Workload

Provide a minimum of three (3) client references for relevant municipal projects; disclose relevant performance issues as required by the solicitation; identify recent/current City of Pompano Beach professional-services contracts and Work Authorizations; and provide information needed for the City to consider equitable distribution of work under CCNA.

RLI 27-007 Page 18 of 33

Tab 10 - Required Certifications and Forms

Submit all certifications, acknowledgments, and forms required by the City's final solicitation package.

Submit the Firm Information Page and applicable Local Business Program forms identified in the

OpenGov project.

Tab 11 - Reviewed and Audited Financial Statements

Proposers shall be financially solvent and appropriately capitalized to serve the City for the duration of the agreement. Provide the firm’s most recent audited financial statements, or the permitted substitutes below. Upload the financial statements as a separate file titled “FINANCIAL STATEMENTS” and mark it “CONFIDENTIAL.” Use the designated financial statements upload field in OpenGov.

Financial statements provided shall not be older than twelve (12) months before the date of filing this solicitation’s response. The financial statements must be reviewed and submitted with any accompanying notes and supplemental information. The CITY of Pompano Beach reserves the right to reject financial statements in which the financial condition shown is twelve (12) months or more before the submittal date.

The CITY is a public agency subject to Chapter 119, Florida’s Public Records Law, and must provide the public with access to public records; however, financial statements that are required as submittals to prequalify for a solicitation will be exempt from public disclosure.

The CITY reserves the right to request additional information to ensure the Proposer is financially solvent.

It has sufficient financial resources to perform the agreement/contract and shall provide proof of its financial solvency. At its sole discretion, the CITY may ask for additional evidence of financial solvency, including additional documents post-proposal opening and prior to evaluation, demonstrating the

Proposer’s ability to perform the resulting agreement/contract and provide the required materials and/or services.

A combination of two (2) or more of the following may substitute for audited financial statements:

• Bank letters/statements for the past three (3) months

• Balance sheet, profit and loss statement, cash flow report

• IRS returns for the last two (2) years

• Letter from CPA showing profits and loss statements (certified)

NOTE:

Financial statements required as submittals to prequalify for a solicitation will be exempt from public disclosure; however, financial statements submitted to prequalify for a solicitation and not required by the

CITY may be subject to public disclosure.

Tab 12 - Litigation

List all active and settled litigation over the past five (5) years arising out of the firm’s performance. State the current status or outcome of each matter. If there is none, state “None.”

12.1 Required Project Sheet Information

• Project name and location.

RLI 27-007 Page 19 of 33

• Owner and owner reference/contact information.

• Dates and current status.

• Construction value and professional-services fee, if permitted/requested by the City.

• Concise scope and relevance to this RLI.

• Prime/subconsultant role and specific services performed.

• Key proposed team members who worked on the project and their roles.

• Major technical/operational constraints and how they were addressed.

• Original versus final construction cost and schedule, with explanation of material variances when available.

• Applicable permits/funding sources and construction delivery method.

12.2 Compensation Information During Negotiations

Respondents shall download, complete, and submit the City-provided Position Classifications and

Maximum Hourly Rates spreadsheet through the OpenGov vendor questionnaire. The completed spreadsheet shall identify applicable position classifications and maximum hourly rates for the prime consultant and all proposed subconsultants. Rates shall be fully burdened, including salary, overhead, and profit. The submitted rate schedule is required for City review and informational purposes; it will not be scored or considered in the qualifications ranking. The City may use the information during subsequent negotiations with selected firms.

13. Evaluation and Selection Process

The City will evaluate responsive Statements of Qualifications in accordance with CCNA and the City’s procurement procedures. The City will conduct discussions as required by CCNA and may require presentations or interviews, request clarifications, and evaluate references and performance information as permitted by the solicitation.

The City intends to select/rank multiple firms based on qualifications. Compensation shall not be considered in the qualifications ranking. The City will negotiate compensation and contractual terms in accordance with CCNA and City procedures.

The City reserves the right, subject to applicable law and the final solicitation terms, to reject responses, request clarification, waive minor irregularities, verify information, conduct reference checks, and make multiple awards in the City's best interests.

Tie Breaker

In case there is a tie for the highest-ranked Proposers, the recommendations shall be made by giving preference to the following items in this order:

1. Maintenance of a Drug-Free Workplace in accordance with the requirements of 287.087, F.S.

2. Local Business Program Participation

3. Closest Proximity/Location to the Project site

4. Coin Toss

RLI 27-007 Page 20 of 33

Technicalities

Failure to respond, provide detailed information, or provide requested proposal elements may result in reduced points in the evaluation process or a determination that the Proposal is non-compliant, and may be deemed a technicality or a material deviation, depending on the nature and extent of the omission.

The Procurement and Contracts Department shall conduct an administrative review of all Proposals to determine compliance with the submission requirements and minimum qualifications of this RLI.

Proposals determined by the Procurement and Contracts Department to be non-compliant may be rejected and shall not be forwarded to the Evaluation Committee for scoring or ranking. If more than one Proposal is determined to be compliant, the Procurement and Contracts Department shall present any identified omissions, deficiencies, irregularities, or technical deviations to the Evaluation Committee.

The Evaluation Committee shall consider and rely upon the compliance determinations made by the

Procurement and Contracts Department and may recommend rejection of any Proposal containing a material deviation from the requirements of this RLI or may recommend waiver of minor irregularities or technicalities when determined to be in the best interest of the City. The City reserves the right to determine whether any omission, deficiency, or deviation is material or minor and whether waiver is in the best interest of the City.

If only one compliant response is received or remains after the administrative review, the City may reject, cancel, or reissue the solicitation.