This Invitation to Bid (ITB) is issued by the City of Riviera Beach, Florida, through its Utility Special District, for the furnishing and installation of diesel emergency generators at six existing sanitary lift stations within the Riviera Beach Utility Special District wastewater service area. The project scope includes installing two permanent generators (200 kW at Lift Station No. 47 and 80 kW at Lift Station No. 37), each with concrete pads, automatic transfer switches, and electrical connections; furnishing four portable diesel generators (76 kW each) for Lift Stations Nos. 4, 12, 20, and 48, each with concrete pads and electrical connections; fencing and associated appurtenances; proper disposal or abandonment of existing equipment; bypass pumping at one lift station; and all related construction work per approved plans and specifications. Five lift stations are located in Riviera Beach, Florida, and one is located in West Palm Beach, Florida. The pre-bid conference is non-mandatory and scheduled for November 12, 2026, at 1:00 p.m. ET at the Utility Special District Conference Room in Riviera Beach. The deadline for written questions via BidNet Direct is November 19, 2026, at 4:00 p.m. EST. Bids are due on December 10, 2026, at 2:00 p.m. EST via BidNet Direct, with public opening at the same date and time conducted virtually via Microsoft Teams. City Council award is anticipated for January 2027. This is a one-time fixed project with no renewal options; substantial completion is required within 60 calendar days of the Notice to Proceed, and final completion within 90 calendar days. Contract Time is not subject to negotiation, and time is of the essence.
The project is funded in part by the Federal Emergency Management Agency (FEMA) through the Hazard Mitigation Grant Program (HMGP) under Disaster Declaration FEMA-4468-DR-FL, administered by the State of Florida Division of Emergency Management (FDEM) via Subgrant Agreements H0733 (FEMA Project No. 4468-016-R, Lift Station No. 47) and H0750 (FEMA Project No. 4468-030-R, Lift Stations Nos. 4, 12, 20, 37, and 48). Contractors must hold at least one appropriate Florida contractor license (CBC, CGC, CUC, RB, RG, or RU). All pricing on the Bid Cost Proposal is all-inclusive with no escalations permitted; invoices must separately itemize costs by grant agreement for reimbursement tracking. A bid bond of not less than 5% of the total bid amount is required. Performance and payment bonds, each equal to 100% of the contract price, must be furnished by a surety licensed in Florida and listed on the U.S. Department of Treasury Circular 570 before work commences. A 5% retainage is withheld and released according to Florida Statute Section 218.735. Liquidated damages of $500 per calendar day apply for delays in achieving substantial completion beyond contract time. The contractor must perform a minimum of 50% of the work with its own forces and equipment. Commercial General Liability insurance of $1,000,000 per occurrence ($3,000,000 aggregate), Business Automobile Liability of $1,000,000 combined single limit, Workers' Compensation per Florida Statute Chapter 440, and Builder's Risk insurance of 100% of total project cost (deductible not to exceed $25,000) are required. The contract is subject to federal procurement standards under 2 C.F.R. Part 200, including debarment and suspension verification, Byrd Anti-Lobbying Amendment compliance, and prohibition on certain telecommunications equipment. Environmental and historic preservation monitoring, all required permits and clearances, and full compliance with the approved scope and construction plans are mandatory conditions of performance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION INVITATION TO BID (ITB) 27-001
LIFT STATION (LS) GENERATORS – FURNISH AND INSTALL
FEDERALLY FUNDED PROJECT – FEMA HAZARD MITIGATION GRANT PROGRAM (FEMA-4468-
DR-FL)
FDEM Subgrant Agreement No. H0733 (Project 4468-016-R) and No. H0750 (Project 4468-030-R)
Key Event Date / Information
Issue Date Friday, November 6, 2026 via BidNet Direct
Pre-Bid Meeting
NON-MANDATORY
THURSDAY, NOVEMBER 12, 2026, AT 1:00 PM ET
UTILITY SPECIAL DISTRICT
CONFERENCE ROOM
600 W BLUE HERON BLVD
RIVIERA BEACH, FL 33404
Deadline for Written Questions Thursday, November 19, 2026, 4:00 PM EST via BidNet Direct
Bid Due Date and Time Thursday, December 10, 2026, 2:00 PM EST via BidNet Direct
Public Opening Thursday, December 10, 2026, 2:00 PM EST
Anticipated City Council Award January 2027
Procurement Contact
LaTonya Ammons Procurement Department City of Riviera Beach lammons@rivierabeach.org
The City reserves the right to modify or alter the following procurement schedule as needed.
Table of Contents
I. NOTICE TO BIDDERS
II. PRE-BID CONFERENCE / SITE WALK-THROUGH
III. ELECTRONIC BID OPENING
IV. DEFINITIONS
V. SCOPE OF WORK
VI. INSTRUCTIONS TO BIDDERS / BIDDING REQUIREMENTS
VII. INSURANCE REQUIREMENTS
VIII. FEDERAL CONTRACT PROVISIONS
ADDITIONAL ATTACHMENTS AND REQUIRED FORMS:
ATTACHMENT “A” – Bidder’s Required Forms
• Authorized Signatories – REQUIRED
• Conflict of Interest Disclosure Form – REQUIRED
• General Certifications (12 Certifications-One Signature Page) – REQUIRED
• Human Trafficking Affidavit (Notarized) – REQUIRED
• Litigation Statement – REQUIRED
• Public Entity Crimes Sworn Statement (Notarized) – REQUIRED
• Required References – REQUIRED
ATTACHMENT “B” – City of Riviera Beach Terms and Conditions ATTACHMENT “C” – Bid Cost Proposal ATTACHMENT “D” – Technical Specifications ATTACHMENT “E” – Contract for Construction ATTACHMENT “F” – E-verify Certification Form – REQUIRED ATTACHMENT “G” – Bid Bond Form (Notarized) – REQUIRED ATTACHMENT “H” – Request for Approved Equal Form ATTACHMENT “I” – Federal Required Forms
• Anti-Kickback Affidavit (NOTARIZED) - REQUIRED
• Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Bidder
- REQUIRED
• Certification Regarding Lobbying- REQUIRED
• Standard Form LLL, Disclosure of Lobbying Activities – If Applicable
• Certification Regarding Covered Telecommunications Equipment or Services - REQUIRED
• Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion –
Subcontractor (submitted after award, before the subcontractor begins work)
I. NOTICE TO BIDDERS
NOTICE IS HEREBY GIVEN THAT SEALED BIDS will be received on the above referenced Project by City of Riviera Beach, hereinafter “City” for the Scope of Work set forth below. No bids will be received after this date and time.
FEDERALLY FUNDED PROJECT. This Project is funded in part by a federal award from the U.S. Department of Homeland Security, Federal Emergency Management Agency (FEMA), under the Hazard Mitigation Grant Program (HMGP), Assistance Listing No. 97.039, Disaster FEMA- 4468-DR-FL, administered by the State of Florida, Division of Emergency Management (FDEM), under Subgrant Agreement No. H0733 (FEMA Project No. 4468-016-R, Lift Station No. 47) and Subgrant Agreement No. H0750 (FEMA Project No. 4468-030-R, Lift Station Nos. 4, 12, 20, 37, and 48). This ITB is issued in accordance with the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, 2 C.F.R. Part 200, including the procurement standards at 2 C.F.R. §§ 200.317 through 200.327. The successful Bidder will be required to comply with the Federal Grant Project Requirements in Section V.V and the Federal Contract Provisions in Section VIII of this ITB. These federal requirements are not negotiable.
City of Riviera Beach utilizes BidNet as its exclusive electronic solicitation platform. Registration is free and is required to view solicitation documents, get updates, and submit responses. Bids must be submitted in BidNet and presented in accordance with this solicitation's instructions and within the stated time constraints.
Bidding documents, including drawings and specifications, Plan Holders List, Bid Form and Addendum(s) will be uploaded in BidNet, when available. The address is:
https://www.bidnetdirect.com/florida/cityofrivierabeach
All communications regarding this solicitation will be directed only to the Procurement Contact listed on the cover page of this solicitation. Failure to use this single point of contact may cause your bid to be rejected. Any answers or clarifications affecting the cost will be addressed to all Bidders in an addendum. Under no circumstances will verbal interpretations or clarifications be given to individual contractors.
AT THE TIME OF SUBMITTAL OF A SEALED BID, AND AT ALL TIMES DURING THE
PERFORMANCE OF THIS CONTRACT, BIDDER WILL BE AN APPROPRIATELY LICENSED
CONTRACTOR IN THE STATE OF FLORIDA TO PERFORM THE WORK AS IDENTIFIED IN
THE INVITATION FOR BID; ALL PROPOSED SUBCONTRACTORS WILL BE
APPROPRIATELY LICENSED AS CONTRACTORS IN THE STATE OF FLORIDA FOR
PERFORMING THE PORTION OF THE WORK FOR WHICH THEY ARE RESPONSIBLE.
II. PRE-BID CONFERENCE / SITE WALK-THROUGH
A non-mandatory pre-bid conference will be held Thursday, November 12, 2026, at 1:00 P.M., Eastern Time.
City of Riviera Beach Utility Special District Conference Room
600 W Blue Heron Blvd Riviera Beach, FL 33404
All bidders are invited to attend. The scope of work and technical aspects of the project will be discussed. Any perceived or apparent omission or discrepancy in the Bid Documents and any questions may be presented, however, oral statements or instructions will not constitute an amendment to the Invitation for Bid.
Any questions or discrepancies in Bid documents will only be addressed upon receipt of official written questions.
III. ELECTRONIC BID OPENING
Bids must be submitted in BidNet Direct and presented in accordance with this solicitation's instructions and within the stated time constraints.
All City of Riviera Beach solicitations will be opened electronically via the Bidnet Direct website (https://www.bidnetdirect.com/florida/cityofrivierabeach) at the date and time indicated in the solicitation. This meeting will be conducted virtually via the Microsoft Teams Platform. Bidders may attend this meeting on a computer, laptop, cell phone, or any other device with Wi-Fi access. At the opening, the City will announce the name of each Bidder and the price submitted in each Bid, and will make that information available upon request, in accordance with Section 255.0518, Florida Statutes.
Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2681985006234727?p=tQTBTndODPdN8Tym6v
Meeting ID: 268 198 500 623 472 7 Passcode: ZR3S4X7K
Dial in by phone
+1 872-242-8933,,276177085# United States, Chicago Find a local number
Phone conference ID: 276 177 085#
Get the app now and be ready when your first meeting starts: https://www.microsoft.com/en-us/microsoft-teams/download-app
IV. DEFINITIONS
The following terms, when used in this Invitation to Bid (ITB) and in any resulting Contract for Construction, shall have the meanings set forth below. These definitions apply throughout all sections of the ITB and all Contract Documents unless the context clearly requires otherwise. Where a term appears in all capitals in the Contract for Construction (e.g., “CITY,” “CONTRACTOR”), it shall have the same meaning as the defined term below. This ITB is expressly incorporated into and made a part of the resulting Contract for Construction by reference. The order of precedence among the Contract Documents is set forth in Article 42 (Contract Documents and Controlling Provisions) of the Contract.
Addendum. A written modification, clarification, or supplement to this ITB issued by the City prior to the Bid Due Date. All Addenda are incorporated into and made part of the Contract Documents. In the event of conflict, Addenda issued later in time shall control over earlier Addenda.
Bid. The complete and properly executed response submitted by a Bidder in response to this ITB, including all required forms, certifications, attachments, and the Bid Cost Proposal, submitted in accordance with the requirements set forth herein.
Bid Bond. The bid security submitted by the Bidder with its Bid, as required by Section VI of this ITB.
Bid Cost Proposal (Bid Sheet). The pricing schedule submitted by the Bidder as part of the Bid, setting forth all-inclusive unit and/or lump sum prices for the Work described in the Scope of Work.
Prices offered on the Bid Cost Proposal are all-inclusive and constitute complete compensation for the Work.
Bidder. Any individual, firm, partnership, corporation, joint venture, or other legal entity that submits a Bid in response to this ITB. Upon award and execution of the Contract, the successful Bidder becomes the Contractor.
City. The City of Riviera Beach, a municipal corporation organized and existing under the laws of the State of Florida, whose principal address is 600 West Blue Heron Blvd., Riviera Beach, FL 33404, acting by and through its City Council and authorized representatives. As used in the Contract for Construction, “CITY” and “City” refer to the same party.
City Representative / Contract Administrator. The City employee or designee assigned to administer and oversee the day-to-day performance of the Contract on behalf of the City, currently the Executive Director of the City of Riviera Beach Utility Special District or the designated Construction Administrator identified in Section V.D. The City Representative is authorized to review and approve invoices, issue written notices, and provide direction on routine Contract matters, but is not authorized to amend or modify the Contract except as permitted under the Contract Documents.
Cone of Silence. The prohibition on oral communication between a Bidder or its representatives and City officials, employees, or evaluation personnel regarding a pending solicitation, as established by Section 2-166 of the City’s Code of Ordinances, beginning at the Bid Due Date and continuing until the City Council awards or approves a contract, rejects all Bids, or otherwise takes action that ends the solicitation process. Written correspondence with the Procurement Contact is permitted at all times. The full Cone of Silence provision is set forth in Attachment “B,” Section E.
Contract. The written agreement executed between the City and the Contractor governing performance of the Work, together with all incorporated Contract Documents, including this ITB and all Addenda, the Contractor’s Bid, the Scope of Work (Exhibit A), the Schedule of Payments (Exhibit B), and any duly executed Contract Amendments. This ITB is expressly incorporated into and made a part of the Contract by reference.
Contract Documents. The complete set of documents governing performance of the Work: (1) the Contract for Construction; (2) this ITB and all Addenda; (3) the Contractor’s Bid; (4) the Scope of Work (Exhibit A); (5) the Schedule of Payments (Exhibit B); (6) construction plans and specifications;
(7) the Federal Contract Provisions set forth in Section VIII of this ITB; and (8) any duly executed Contract Amendments. In the event of conflict, the order of precedence set forth in Article 42 of the Contract shall govern, except that the Federal Contract Provisions shall control over any conflicting provision of the other Contract Documents.
Contract Price. The total compensation payable by the City to the Contractor for full and complete performance of the Work in accordance with the Contract Documents, as set forth in the Bid Cost Proposal and Schedule of Payments (Exhibit B). The Contract Price is all-inclusive.
Contract Time. The number of calendar days allotted for the Contractor to achieve Substantial Completion of the Work, as specified in the Contract, commencing upon the date of the Notice to Proceed. Time is of the essence under the Contract in all respects.
Contractor. The individual, firm, partnership, corporation, joint venture, or other legal entity that has been awarded the Contract and is responsible for performing the Work in accordance with the Contract Documents. As used in the Contract for Construction, “CONTRACTOR” and “Contractor” refer to the same party. The Contractor is an independent contractor and not an employee, agent, or servant of the City.
Contingent Fee. Any fee, commission, percentage, gift, or other consideration paid or agreed to be paid by a Bidder or Contractor to any person, company, corporation, or firm, other than a bona fide employee working solely for the Bidder or Contractor, that is contingent upon or resulting from the award of a City contract.
Days. Unless otherwise specified, “days” means calendar days. “Business days” or “working days” means Monday through Friday, excluding City-observed holidays.
E-Verify. The federal electronic employment eligibility verification system (E-Verify.gov) that employers use to confirm the employment eligibility of newly hired workers, as required by Section 448.095, Florida Statutes.
FDEM or Division. The State of Florida, Division of Emergency Management, the pass-through entity that administers the HMGP subgrants funding this Project on behalf of FEMA.
Federal Contract Provisions. The federal contract clauses and certifications required by 2 C.F.R. §
200.327 and Appendix II to 2 C.F.R. Part 200, by FEMA, and by the Grant Agreements, as set forth in Section VIII of this ITB and Attachment “I.”
FEMA. The Federal Emergency Management Agency, U.S. Department of Homeland Security, the federal awarding agency for the HMGP funds supporting this Project.
Final Acceptance. The City’s written determination that all Work has been completed in conformance with the Contract Documents, all punch list items resolved, all required documentation and releases delivered, and the City has issued written notice of final acceptance to the Contractor.
Grant Agreements. FDEM Subgrant Agreement No. H0733 (FEMA Project No. 4468-016-R, Lift Station No. 47) and FDEM Subgrant Agreement No. H0750 (FEMA Project No. 4468-030-R, Lift Station Nos. 4, 12, 20, 37, and 48), each between FDEM and the City, as modified.
Hazard Mitigation Grant Program (HMGP). The FEMA grant program authorized by Section 404 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. § 5170c, and 44 C.F.R. Part 206, Subpart N (Assistance Listing No. 97.039), which funds a portion of the Work under Disaster Declaration FEMA-4468-DR-FL.
Invitation to Bid (ITB). This solicitation document, including all sections, attachments, exhibits, and incorporated references, issued by the City’s Procurement Department to solicit competitive sealed bids for the construction Work described herein.
Liquidated Damages. A pre-agreed, good-faith pre-estimate of the daily damages the City will suffer as a result of the Contractor’s failure to achieve Substantial Completion within the Contract Time.
Liquidated damages are not a penalty. The applicable daily rate is set forth in Section V (Scope of Work) of this ITB and in the Contract.
Notice to Proceed (NTP). The written notice issued by the City to the Contractor authorizing commencement of the Work and establishing the date from which Contract Time is measured.
Payment Bond. The bond provided by the Contractor pursuant to Section 255.05, Florida Statutes, equal to one hundred percent (100%) of the Contract Price, guaranteeing payment of all obligations to laborers, materialmen, and subcontractors arising under the Contract.
Performance Bond. The bond provided by the Contractor pursuant to Section 255.05, Florida Statutes, equal to one hundred percent (100%) of the Contract Price, guaranteeing faithful performance of all obligations of the Contractor under the Contract Documents, including the correction of defective Work during the warranty period.
Period of Performance. The period during which costs may be incurred and reimbursed under the Grant Agreements, as established in the Grant Agreements and any extension approved by FDEM and FEMA. Work performed or costs incurred outside the Period of Performance are not eligible for grant reimbursement.
Procurement Director. The Director of the City’s Procurement Department, or authorized designee, responsible for administering the solicitation process and serving as the primary point of contact for this ITB through award.
Responsive Bidder. A Bidder that has submitted a Bid that conforms to the requirements of the ITB in all material respects, including submission of all required forms, certifications, and documentation by the Bid Due Date.
Responsible Bidder. A Bidder that has demonstrated the capability, financial resources, experience, integrity, and reliability necessary to perform the Work in accordance with the Contract Documents, as determined by the City in its sole discretion.
Retainage. The portion of each progress payment, not exceeding five percent (5%), withheld by the City and released in accordance with Section 218.735, Florida Statutes.
SBE (Small Business Enterprise). A business entity meeting the City’s small business designation criteria as established in the City’s Procurement Code, Division 2 – Small Business Enterprise Participation Goal.
Scope of Work. The detailed description of construction services, labor, materials, equipment, and deliverables to be provided by the Contractor, as set forth in Section V of this ITB and in Exhibit “A” to the Contract.
Subcontractor. Any individual, firm, partnership, corporation, or other legal entity having a direct contractual relationship with the Contractor to perform any portion of the Work. All Subcontractors are subject to prior written approval by the City. The Contractor remains fully responsible to the City for all acts and omissions of its Subcontractors. No contractual relationship is created between any Subcontractor and the City.
Substantial Completion. The stage of the Work at which the Work is sufficiently complete in accordance with the Contract Documents so that the City can use or occupy the Work for its intended purpose, evidenced by the City’s issuance of a Certificate of Substantial Completion.
Surety. The surety company that issues the Bid Bond, Performance Bond, and Payment Bond on behalf of the Contractor and that meets the qualifications set forth in Section VI of this ITB.
Work. The entire completed construction, or the various separately identifiable parts thereof, required to be furnished and performed by the Contractor under the Contract Documents, including all labor, materials, equipment, tools, supervision, permits, and incidentals necessary to complete the Project in accordance with the Contract Documents. “Work” and “Project” are used interchangeably throughout the Contract Documents and refer to the same undertaking.
V. SCOPE OF WORK
A. BACKGROUND
The City of Riviera Beach (“City”) is located along the Atlantic shores of southeast Florida in Palm Beach County. With a population of more than 38,000 residents, Riviera Beach is home to one of the most impressive beaches in the southeastern United States, boasting an average year-round temperature of 75 degrees.
Along the waterfront in Riviera Beach, residents and tourists enjoy the city’s shops, restaurants, and spectacular attractions. The waterfront marketplace draws in crowds of tourists headed for the cruise ships; the Port of Palm Beach is located in Riviera Beach, and the Margaritaville At Sea cruise ship departs every other day. Riviera Beach is a growing harbor city located along the shores of the Atlantic Ocean in southeast Florida, USA.
The City’s municipal beach is one of the finest in the state. Our beautiful sandy beaches make Riviera Beach an appealing place for sporting events. Our community and visitors provide an interesting, varied mix of young people, families and retirees from just about anywhere.
B. PURPOSE
The City of Riviera Beach, Florida (City) and the City of Riviera Beach Utility Special District (District) are seeking bids from qualified bidders, hereinafter referred to as the Contractor, to provide Lift Station Generator Installations services for the District, in accordance with the terms, conditions, and specifications contained in this Invitation to Bid (ITB). The project involves furnishing all labor, supervisors, equipment, machinery, tools, materials, transportation, etc. for (i) furnishing and installing permanent diesel emergency generators at Lift Station No. 47 (200 kW) and Lift Station No.
37 (80 kW), each with a concrete pad, automatic transfer switch (ATS), and all necessary electrical connections; (ii) furnishing four (4) portable diesel emergency generators (76 kW each) for Lift Station Nos. 4, 12, 20, and 48, each with a concrete pad and all necessary electrical connections; (iii) fencing, associated appurtenances, and proper disposal or abandonment of existing fencing and equipment;
bypass pumping at one of the lift stations; and all other elements as indicated on the associated construction plans and specifications. Final generator sizing shall be as shown on the construction plans. The project sites are located at six (6) existing sanitary lift stations located within the City of Riviera Beach Utility Special District wastewater service area at the locations shown on the construction plans, with five (5) of the sanitary lift stations located within Riviera Beach, Florida and one (1) sanitary lift station located one quarter mile southwest of the City of Riviera Beach, in West Palm Beach, Florida.
Federal Funding. The Work is funded in part by FEMA through the Hazard Mitigation Grant Program, administered by FDEM. The Work at Lift Station No. 47 is funded under Grant Agreement H0733 (FEMA Project No. 4468-016-R), and the Work at Lift Station Nos. 4, 12, 20, 37, and 48 is funded under Grant Agreement H0750 (FEMA Project No. 4468-030-R). The Work shall be performed in accordance with the scope of work approved by FDEM and FEMA, the construction plans and specifications, the Federal Grant Project Requirements in Section V.V, and the Federal Contract Provisions in Section VIII.
Contractors submitting a bid must hold at least one of the following licenses:
• Certified Building Contractor (CBC)
• Certified General Contractor (CGC)
• Certified Utility and Excavation (CUC)
• Registered Building Contractor (RB)
• Registered General Contractor (RG)
• Registered Utility and Excavation (RU)
Project Installation Locations:
1. Lift Station No. 4: 1270 Avenue P, Riviera Beach, Florida 33404
2. Lift Station No. 12: 1439 W 23rd Street, Riviera Beach, Florida 33404
3. Lift Station No. 20: 7513 Central Industrial Dr., West Palm Beach, Florida 33404
4. Lift Station No. 37: 5543 Caribbean Blvd., West Palm Beach, Florida 33407
5. Lift Station No. 47: 6522 N Haverhill Road, West Palm Beach, Florida 33407
6. Lift Station No. 48: 1340 W 3rd Street, West Palm Beach, Florida 33404
The Contractor must obtain and pay for all licenses required for the duration of the project and must comply with all laws, ordinances, regulations, and code requirements applicable. Allowing the license to lapse at any time during the duration of the project will cause for the termination of the contract. The license must be effective at the time the bid is submitted.
C. CONTRACT PERIOD
This is a one-time fixed project.
There are no renewal options for this project. All prices, terms, and conditions shall remain fixed for the initial period of the contract. There will be no allowable price escalations throughout any contract period(s), unless otherwise specified in this document.
D. CONSTRUCTION ADMINISTRATOR
Joshua Niemann, USD Executive Director, and Richard Gallant, Assistant Executive Director are this project's designated Contract Administrator / Project Manager. Director Niemann can be reached at jniemann@rivierabeach.org or (561) 845-4053, or Mr. Richard Gallant rgallant@rivierabeach.org or 561- 515-6733. The Contractor will work with the Utility Special District and the designated Contract Administrator to complete this project.
E. CONSTRUCTION ADMINISTRATOR RESPONSIBILITIES:
1. The Construction Administrator / Designee shall serve as a liaison, coordinate, and approve all work under the contract.
2. The Construction Administrator / Designee shall attempt to resolve field-level and technical disputes. Any dispute not resolved at that level shall be handled under Attachment “B,” Section I (Dispute Resolution).
3. The Construction Administrator / Designee shall perform performance evaluations regularly.
4. The Construction Administrator / Designee shall schedule and conduct contractor performance evaluations, document findings, and review and approve all invoices for work performed or items delivered for payment.
F. CONTRACTOR RESPONSIBILITIES:
1. The project includes acquiring all tools, equipment, materials, and other supplies, including but not limited to fuel, power, water, and communication devices required to complete the project. The work also includes the performance of all labor, work, and other operations required to complete this project
2. The Contractor shall protect and maintain all surfacing and improvements during the entire construction process. Protection measures shall include, but are not limited to, the installation of fencing, barriers, or other preventative measures as required to secure the work site and prevent unauthorized access prior to final acceptance by the City.
3. The Contractor shall be responsible for any and all damage resulting from improper use, damage, or vandalism before the City accepted the project.
4. For contract close, the Contractor shall submit the following:
a. Product list including product name, product number, contact information, and application method for all materials used on the project.
b. Warranty letter.
c. Submittal documents, including manufacturer’s instructions, field reports, and testing certificates.
d. Maintenance schedule and recommendations.
e. Progress reports identifying project status, percent completion, and scheduled time of completion, and submitted to the City Designee.
f. All grant closeout documentation required under Section V.V (Federal Grant Project
Requirements).
5. This selected Contractor must use effective project management practices while working on this project, including, but not limited to, clear communication with the City and other parties involved in this project, management of time and resources, and documentation of all services and communication.
6. The Contractor shall maintain all certifications, licenses, bonds, and certificates of insurance for the duration of this project until final acceptance is received.
7. The contractor shall be responsible for protecting all personnel against hazards and/or injuries caused by their operations at the work site.
8. The Contractor shall correct any and all damage caused by their operations to the City’s satisfaction at no additional cost to the City.
9. The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and providing reasonable protection to prevent damage to properties surrounding the work site and injury or loss to employees, materials, and equipment in connection with the work performance herein.
10. The Maintenance of Traffic (MOT) (if needed): The Contractor shall closely follow the directions provided throughout this document and shall be in conformance with the applicable sections of the FDOT Road Design Standards Index 600.
11. The Contractor shall supervise and direct the work, using the Contractor’s best skill and attention. The Contractor shall work with the Contract Administrator / Project Manager to oversee the development of the project means, methods, techniques, sequences, procedures, and coordination of all portions of the work under this agreement.
12. The Contractor shall enforce strict discipline and good order amongst its employees and other persons under this contract. The Contractor shall be responsible to the City for acts and omissions of its employees, subcontractors, and other agents performing portions of the work for or on behalf of the Contractor or any of its subcontractors.
13. The Contractor shall be responsible for protecting all existing utilities, irrigation, drainage structures, pipes, and signs within the limits of this project site. These shall remain in place and be in working condition during and after the completion of this project.
14. The Contractor shall assess the conditions at this site, notify the designated Project Manager in writing of any discrepancies, conflicts, or omissions promptly upon discovery, and make necessary recommendations to resolve identified issues
15. Reporting Dangerous Conditions / Situations: The Contractor shall notify the Contract Administrator / Designee of any and all encounters with unsafe and dangerous conditions and/or unusual situations occurring at the work sites while working on this project.
G. PERMITS
The Contractor shall procure and pay for all permits and licenses, charges, and fees, and give all notices necessary and incidental to the lawful prosecution of the work. The Contractor shall include the cost for all permits in the contractor’s base proposal.
The contractor shall possess and keep in force all licenses, business permits, and other permits required to perform the services of this Agreement.
NOTE: Contractor shall not commence any work without obtaining all required permits.
Any change in the Contractor’s licenses or permits shall be reported to the City within ten (10) Business Days of the change. Failure to obtain and maintain all permits and licenses required to perform the Work, including any permit or license the City may later require, shall constitute an event of default.
H. PROJECT DURATION
The projected timeline for the Work begins upon the Contractor’s receipt of the Purchase Order (PO) and Notice to Proceed (NTP). The Contract Time is set forth below and is not subject to negotiation.
Time is of the essence for the Contractor’s work performance. The Contractor is expected to complete this project as expeditiously as possible. The work to be performed under this contract shall commence upon issuance of a Notice to Proceed (NTP). No Contract Time extensions will be allowed for holidays or vacations. At a minimum, the selected Contractor must adhere to the following schedule as set by the City:
1. The Contractor recognizes that TIME IS OF THE ESSENCE. The Work shall commence within 10 calendar days of the date of the Notice to Proceed.
2. The Work shall be Substantially Completed within sixty (60) Calendar Days after the date the Contract Time commences to run, as provided in the Notice to Proceed.
3. The Work shall be finally completed on the Final Completion Date and ready for final payment per this Agreement within ninety (90) Calendar Days after the date when the Contract Time commences to run as provided in the Notice to Proceed.
4. Preliminary Project Schedule - Within 10 days after Notice of Award and as a condition precedent to executing the Contract, before commencement of any work, the Contractor shall submit their preliminary project schedule to the City for review and approval. The schedule shall be written in sufficient detail to show the chronological relationship of all major aspects of the project, including procurement of materials, scheduling of equipment, construction, and installation phases, with a level of detail.
5. Grant Period of Performance. The Work is funded under Grant Agreements that have a fixed Period of Performance, and costs incurred outside the Period of Performance are not eligible for reimbursement. Final Completion, including delivery of all closeout documentation required under Section V.V, shall be achieved no later than thirty (30) days before the expiration of the Period of Performance under the Grant Agreements, as stated in the Notice to Proceed. No extension of the Contract Time beyond that date will be granted unless the City confirms in writing that FDEM and FEMA have approved a corresponding extension of the Period of Performance.
I. LIQUIDATED DAMAGES
The parties acknowledge that time is of the essence under the Contract, and that the City will suffer damages if the Contractor fails to achieve Substantial Completion within the Contract Time. Because the actual damages resulting from such delay would be difficult or impossible to determine with precision, the parties agree that the liquidated damages rate set forth herein represents a reasonable, good-faith pre-estimate of the City's actual damages and is not a penalty.
Upon failure of the Contractor to achieve Substantial Completion within the Contract Time, as the same may be extended in accordance with the Contract Documents, the Contractor shall be liable to the City for liquidated damages in the amount of five hundred dollars ($500.00) per calendar day for each day that Substantial Completion is delayed beyond the Contract Time.
The City may deduct accrued liquidated damages from any monies due or to become due to the Contractor under the Contract, or may collect such amounts from the Contractor or its surety.
Assessment of liquidated damages shall not release the Contractor from any other obligation under the Contract, including the obligation to achieve Final Completion.
J. WEATHER
1. The Time of Completion for this project has been calculated assuming that the weather conditions will be average to moderate. If, in the opinion of the City’s Contract Administrator / Designee, the weather escalates to a point where the work delays on the project are more than the Contractor could have reasonably anticipated or controlled, the Contract Administrator / Designee will make the necessary arrangements to extend the time of completion for the Work once the request has been made for such extensions by the Contractor.
2. If adverse weather conditions are the basis of a Claim(s) for additional time, such Claim(s) shall be documented by data substantiating that weather conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the project's scheduled activities.
3. The Contractor will be required to promptly notify the City’s Contract Administrator / Designee in writing of any such delays to the work, explaining its efforts to mitigate the effects of such delays. Any notification received by the Contract Administrator / Designee more than five business days after the delay will not be considered. No extension of time shall be granted for delay(s) resulting from typical weather conditions prevailing in the applicable area(s) as defined by the average of the last ten (10) years of weather data recorded with the City and the appropriate jurisdiction(s).
K. DELIVERY, STORAGE, AND HANDLING
The Contractor shall coordinate delivery and arrange storage of materials (if needed). Storage space may be limited. Components sensitive to damage in a harsh environment shall be stored off-site and delivered as required. The Contractor shall provide all necessary protective covering to prevent damage to surrounding work areas. The Contractor shall be responsible for the on-site security of tools, equipment, and materials.
L. PERSON OF CONTACT
The Contractor shall provide contact information for Primary and Secondary staff within the company who will be responsible for responding to the City's request for support services during the term of this agreement. Contact information shall include the name of the Contact(s), email address, Website Information, Phone Number, and Fax Number.
M. RESTORATION OF PROPERTY
Property - whether public or private - if damaged during construction or removed for the convenience of the work; ALL such property shall be repaired and/or replaced by the Contractor at his/her own expense in a manner acceptable to the City’s Contract Administrator, before final acceptance of the work. Restoration of specific items (such as benches, shelters, traffic signs, street signs, fences, sod, etc.) shall be performed promptly for reasons of public safety, health, and welfare.
N. STORAGE SITES
The Contractor shall furnish, at his/her own expense, suitably secure area(s) for storing any equipment and materials to be left on-site (where approved). The location of such area(s) shall be approved by the appropriate governing jurisdiction and/or property owner. The Contractor shall maintain these areas clean and orderly, causing a minimum nuisance to the surrounding areas/community.
O. CONTRACTOR AND SUBCONTRACTOR UNIFORM/BADGING
The Contractor employees assigned to this contract must wear a professional uniform with the company name permanently affixed to it. Uniforms shall comply with all safety provisions from the Florida Department of Transportation, OSHA, and the City.
P. CONTRACTOR AND SUBCONTRACTOR VEHICLES
The Contractor’s company vehicles shall be distinctly labeled with the company name and shall only be parked in designated spaces provided by the City.
Q. DAMAGE REIMBURSEMENT
The Contractor shall be solely responsible for and shall reimburse the City any and all costs and/or expenses of any kind or nature relating to the correction of any damage to any City property resulting from the installation, maintenance, or replacement of mounted equipment and infrastructure.
R. WARRANTY
The Contractor shall furnish all pertinent warranty information, including manufacturers’ warranties and effective dates, as they become available, for all new equipment. All materials, parts, components, equipment, and labor work performed shall be fully warranted and guaranteed for a minimum of One (1) year from the date of completion of services and acceptance by the City. Parts and equipment shall be replaced during the warranty period and have a warranty matching that of the original part from date of replacement. Repair or replacement of defects occurring in labor or product(s) within the warranty period shall be performed and provided at no additional cost to the City.
S. CLEAN UP
All usable materials and debris shall be removed from the premises at the end of each workday and disposed of appropriately. Upon final completion, the Contractor shall thoroughly clean up all areas where work has been involved as mutually agreed with the associated location Contract Administrator / Designee.
T. WORK ACCEPTANCE
1. Services to be performed under this agreement will be inspected by an authorized representative of the Special Utility District to determine acceptance of work, appropriate invoicing, and warranty conditions.
2. The City shall complete any necessary inspection and testing of work for compliance with the scope of services and technical specifications within five (5) business days of notification of completion by the Contractor.
3. The City shall provide written notice of acceptance or rejection within five (5) business days of completion of inspection. The Contractor may not submit a final invoice unless and until the City provides written notice of final acceptance.
U. INVOICING AND PAYMENT
Under this Contract, the Contractor shall submit detailed, itemized invoices identifying all labor, materials, equipment, and services performed. Invoices must reference the applicable Purchase Order number and be submitted in accordance with the Schedule of Payments set forth in Exhibit B of the Contract for Construction. Because the Work is funded under two separate Grant Agreements, each invoice shall separately itemize costs for Lift Station No. 47 (Grant Agreement H0733) and for Lift Station Nos. 4, 12, 20, 37, and 48 (Grant Agreement H0750). Each invoice shall clearly show the dates of services performed, a description of the services performed, the location of the services performed, the cost of the services performed, and the name of the service provider, and shall be accompanied by any other supporting documentation the City requires to obtain reimbursement from FDEM. Each payment application after the first shall include evidence that subcontractors and suppliers have been paid for Work included in prior payments.
Payment applications shall be submitted monthly, on AIA Document G702/G703 or an equivalent form approved by the City, in accordance with Article 3 of the Contract for Construction and Section 01152 of the Technical Specifications (Attachment “D”).
Note: Payment Retainage applies to this agreement at a rate of 5%. Retainage will be released in accordance with Section 218.735, Florida Statutes. Within thirty (30) calendar days after Substantial Completion (or such longer period as that section allows), the City and the Contractor will develop a single list of the items required to render the Work complete, satisfactory, and acceptable, with the estimated cost to complete each item. Within twenty (20) business days after the list is created, and upon the Contractor’s proper payment request, the City will pay the remaining Contract balance, including all retainage previously withheld, less an amount equal to one hundred fifty percent (150%) of the estimated cost to complete the items on the list. The amount so withheld will be paid upon completion of the listed items and satisfaction of the conditions for Final Payment set forth in the Contract for Construction.
V. FEDERAL GRANT PROJECT REQUIREMENTS
The City must comply with the Grant Agreements as a condition of receiving federal funds for the Work. In addition to all other requirements of the Contract Documents, the Contractor shall comply with the following:
1. Approved Scope of Work. The Contractor shall perform the Work in accordance with the scope of work approved by FDEM and FEMA and the sealed engineering plans and specifications. Any change, addition, or supplement that alters the approved scope, including other work not funded by FEMA but performed at substantially the same time, requires prior written approval of FDEM and FEMA, regardless of its effect on cost, and may require renewed environmental and historic preservation review. The Contractor shall not perform any such work until the City issues a written Change Order after those approvals are obtained.
2. Flood Protection. Permanent generators, automatic transfer switches, and electrical components shall be protected against a 500-year (0.2 percent annual chance) flood event, either by implementing specific protective measures or by being located outside the Special Flood Hazard Area (SFHA), and shall comply with applicable National Flood Insurance Program (NFIP) requirements.
3. Wind Protection and Codes. Generators, automatic transfer switches, and electrical components shall be protected against wind with a rated enclosure and appropriate anchoring based on location requirements under the ASCE 7 standards in effect at the time of permitting. All installations shall comply with the Florida Building Code or Miami-Dade specifications, and all materials shall be certified to exceed the wind and impact standards of current local codes. Each permanent installation shall provide sufficient space to maintain and fuel the generator and shall comply with National Electrical Code working clearance requirements.
4. Portable Generators. The four (4) portable generators shall be delivered to the City’s designated storage location, currently 909 Avenue U, Riviera Beach, Florida 33404, or another location designated in writing by the City. The Contractor shall provide delivery documentation identifying each unit by make, model, serial number, and storage location, together with product data sheets demonstrating compliance with the protection requirements of the Grant Agreements.
5. Permits and Clearances. The Contractor shall obtain all required federal, State, and local permits and approvals before starting any Work and shall comply with them throughout performance. Failure to obtain required permits and clearances may jeopardize federal funding for the Project.
6. Environmental and Historic Preservation. The Contractor shall monitor all ground-disturbing activities. If any potential archaeological resources are discovered, the Contractor shall immediately stop work in that area, secure the site, and notify the Contract Administrator, who will notify FDEM and FEMA. Work in that area shall not resume until the City gives written authorization. If human remains are discovered, the Contractor shall also comply with Section 872.05, Florida Statutes. Construction vehicles and equipment shall be maintained in good working order to minimize pollutant emissions.
7. Notice of Significant Developments. The Contractor shall notify the Contract Administrator in writing as soon as it becomes aware of delays or adverse conditions that may raise costs or delay completion, and of favorable conditions that may allow lower costs or earlier completion.
8. Eligible Work. The City will pay only for Work performed after issuance of the Notice to Proceed and within the Period of Performance. The Contractor shall not begin any Work before receiving the Notice to Proceed.
9. Inspections. The Contractor shall cooperate with all inspections by the local building official, the City, the City’s Engineer of Record, FDEM, and FEMA, including final inspections, and shall correct all deficiencies identified at no additional cost to the City.
10. Subcontract Documentation. Before any subcontractor performs Work, the Contractor shall submit an executed debarment and suspension certification for that subcontractor. The Contractor shall deliver a copy of each executed subcontract to the
City within five (5) days of its execution so that the City can provide it to FDEM within ten (10) days, as the Grant Agreements require.
11. Licenses. The Contractor shall provide with its Bid copies of its Florida contractor license(s) and a current, valid business tax receipt for the type of services to be performed, and shall provide the same for each subcontractor before that subcontractor performs Work.
12. Closeout Documentation. Before Final Completion, and as a condition of final payment, the Contractor shall deliver:
a. copies of all permits and the recorded Notice of Commencement;
b. local building official inspection reports and final approvals;
c. final electrical designs, specifications, and drawings used to complete the Work;
d. signed and sealed as-built drawings;
e. product specifications and data sheets for all products installed or furnished, demonstrating compliance with the flood and wind protection requirements of this Section;
f. the portable generator delivery and storage documentation described in Paragraph 4;
g. a summary of all scope of work changes, if any;
h. all information the City’s Engineer of Record requires to issue a certified letter of completion affirming that the Work conforms to the approved drawings, specifications, scope, and applicable codes; and
i. final releases of lien and evidence that all subcontractors and suppliers have been paid in full.
VI. INSTRUCTIONS TO BIDDERS / BIDDING REQUIREMENTS
The following information and instructions are given for the purpose of guiding Bidders in properly preparing their bid responses and are standard for Construction Invitations to Bid (CITB) solicitations as issued by the City. These directions and instructions have equal force and weight with the scope of services, specifications, and strict compliance, which is required with all these provisions. The City may delete, modify, or supersede any of these standard instructions for a particular contract to the Contractor or in the line item. It is the Bidder’s sole responsibility to become familiar with the scope of services, City requirements, and systems prior to submitting a bid. The solicitation package, exhibits, attachments, addendums, and the successful bid response will be included in any Agreement between the Contractor and the City.
In addition to the documents in Attachment “A” – Bidder’s Required Forms, Bidders are required to complete any additional project specific requested forms. Failure to submit the required forms will deem the Bidder Non-Responsive.
A. ELIGIBILITY
No bid response will be accepted from, nor will any contract be awarded to, any person who is in arrears to the City of Riviera Beach upon any debt or contract or who has defaulted, as surety or otherwise, upon any obligation to the City, or who is deemed irresponsible or unreliable by the City Council of Riviera Beach.
Pursuant to 2 C.F.R. § 200.319(b), any firm that developed or drafted the specifications, requirements, statements of work, or construction plans for this Project, and any affiliate of such firm, is excluded from competing under this ITB. No Bid will be accepted from, and no contract will be awarded to, any Bidder that is suspended, debarred, or otherwise excluded from participation in federally funded transactions, as shown in the federal System for Award Management (SAM.gov).
B. RESPONSIBILITY
No variation in price or conditions will be permitted based upon a claim of ignorance. Submission of a bid response will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, equipment, materials, and labor required. Bidders shall satisfy themselves by personal investigation regarding the conditions affecting the Work and its cost. No information derived from maps, plans, specifications, or from the Engineer, City Manager, or their assistants shall relieve the Contractor from any risk or from fulfilling all Contract terms.
C. QUESTIONS
Prospective bidders must submit any questions regarding this solicitation electronically in BidNet by the Deadline for Written Questions shown on the cover page. Only questions submitted via BidNet will be accepted and addressed. Responses to questions received during the solicitation time period are posted on the website at https://www.bidnetdirect.com/florida/cityofrivierabeach in an addendum.