Lift Station No. 16 Rehabilitation Project Technical Specifications
This technical specification document outlines the comprehensive scope of work for the Lift Station No. 16 Rehabilitation Project in Riviera Beach, Florida, issued by the City of Riviera Beach Utility Special District (RBUSD). The project encompasses the complete demolition and removal of the existing lift station wet well, dry pit, piping, electrical equipment, and associated appurtenances, along with construction of a new submersible pump lift station featuring upgraded mechanical, structural, electrical, and telemetry systems. Major work elements include construction of a new reinforced concrete wet well (approximately 6-foot diameter by 18-foot depth), installation of submersible wastewater pumps with guide rails and discharge piping, connection to the existing 6-inch ductile iron force main, installation of electrical service components including a control panel and RTU system, temporary bypass pumping to maintain continuous service during construction, and comprehensive site improvements including fencing, concrete pads, and pavement restoration. The specifications are organized into 43 divisions covering general requirements, existing conditions, concrete, electrical, earthwork, utilities, and process systems. All work must maintain uninterrupted wastewater service throughout construction, with no service interruptions permitted unless explicitly approved in writing by RBUSD and the Engineer.
The contractor bears full responsibility for all labor, materials, equipment, tools, supplies, temporary utilities, permits, inspections, testing, and construction means necessary to deliver a complete and fully operational lift station at no additional cost to the owner. A critical requirement mandates that the contractor provide and operate temporary bypass pumping systems capable of handling anticipated peak wet weather flows with adequate redundancy and continuous monitoring. The contractor must submit a detailed work sequence and bypass pumping plan prior to construction, with all outage plans requiring submission at least fourteen days in advance and written approval before commencement. Contract price inclusions cover general and administrative costs, professional services, site facilities, materials and equipment, temporary utility and environmental controls, labor, and quality assurance obligations. The contractor's failure to maintain continuous wastewater service, adhere to the approved construction schedule, or comply with permit conditions renders the contractor liable for all resulting costs, including regulatory fines, emergency bypass pumping expenses, third-party claims from sanitary sewer overflows, and additional engineering and administrative costs incurred by RBUSD, with such amounts deductible from progress payments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS FOR
LIFT STATION NO. 16 REHABILITATION PROJECT
BID SUBMITTAL
CITY OF RIVIERA BEACH UTILITY SPECIAL DISTRICT
PROJECT NO. 20245443
CHENMOORE PROJECT NUMBER: 25-0137.00052
PREPARED BY:
GEORGE KRAWCZYK, P.E.
P.E. LICENSE No. 66646
DATE: September 16, 2026
Lift Station No. 16 Rehabilitation Project Technical Specifications
Riviera Beach Utility Special District Project No. 20245443 CMA Project No. 25-0137.052
CITY OF RIVIERA BEACH UTILITY SPECIAL DISTRICT (RBUD)
STANDARD DESIGN SPECIFICATION SECTIONS
TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS
DIVISION 01 – General Requirements
01 11 00 Summary of Work
01 14 00 Work Restrictions
01 20 00 Price and Payment Procedures
01 25 13 Product Substitution Procedures
01 26 63 Change Orders
01 29 00 Measurement and Payment
01 29 73 Schedule of Values
01 31 13 Project Coordination
01 32 16 Construction Progress Schedule
01 32 36 Video Monitoring and Documentation
01 33 00 Submittal Procedures
01 35 29 Health, Safety, and Emergency Response Procedures
01 35 53 Security Procedures
01 42 13 Abbreviations and Acronyms
01 42 19 Reference Standards
01 45 00 Quality Control
01 45 29 Testing Laboratory Services
01 55 26 Traffic Control
01 57 00 Temporary Controls
01 60 00 Product Requirements
01 66 00 Product Storage and Handling Requirements
01 71 13 Mobilization
01 71 23 Field Engineering
01 72 00 Project Record Drawing
01 73 29 Cutting and Patching
01 74 20 Gravity Pipeline Testing
01 75 00 Starting and Adjusting
01 76 10 Protection of Existing Facilities
01 77 00 Closeout Procedures
01 78 23 Operation and Maintenance Data
DIVISION 02 – Existing Conditions
02 00 00 Existing Conditions
02 41 00 Demolition
02 41 13.23 Utility Line Removal
Technical Specifications (Continued)
Riviera Beach Utility Special District Project No. 20245443 CMA Project No. 25-0137.052
DIVISION 03 – Concrete
03 00 00 Concrete
03 11 00 Concrete Forming
03 15 16 Concrete Construction Joints
03 20 00 Concrete Reinforcing
03 30 00 Cast-In-Place Concrete
03 60 00 Grouting
03 70 00 Concrete Repair
DIVISION 07 – Thermal and Moisture Protection
07 90 00 Joint Protection
DIVISION 09 – Finishes
09 96 00.1 Corrosion Barrier System
09 96 10 Painting
DIVISION 16 – Electrical
16 00 00 Electrical General Requirements
16 00 10 Electrical Demolition Equipment
16 00 50 Basic Materials and Methods
16 34 50 Short Circuit Coordination Study Arc Flash
16 90 00 Lift Station Control Panel and RTU System
DIVISION 31 – Earthwork
31 11 00 Clearing and Grubbing
31 20 00 Earth Moving
31 22 13 Rough Grading
31 22 19 Finish Grading
31 23 00 Excavation and Fill
31 23 13 Subgrade Preparation
31 23 19 Dewatering
31 23 33 Trenching and Backfilling
31 25 00 Erosion and Sedimentation Controls
DIVISION 32 – Exterior Improvements
32 01 18 Pavement Repair and Resurfacing
32 10 00 Bases, Ballasts, and Paving
32 12 16 Asphalt Paving
Technical Specifications (Continued)
Riviera Beach Utility Special District Project No. 20245443 CMA Project No. 25-0137.052
32 16 13 Curbs and Gutters
32 16 23 Sidewalks
32 16 33 Driveways
32 17 23 Pavement Markings
32 31 13 Chain Link Fences and Gates
32 90 00 Planting
32 91 13 Soil Preparation
32 92 23 Sodding
DIVISION 33 – Utilities
33 01 12 Sewer Flow Control
33 01 30.13 Sewer and Manhole Testing
33 01 30.16 TV Inspection of Gravity Pipelines
33 01 30.41 Cleaning of Sewers
33 01 30.61 Sewer and Pipe Joint Sealing
33 01 30.71 Rehabilitation of Sewer Utilities
33 05 13 Manholes and Structures
33 95 50 PVC Pressure Piping, Rubber Joints
DIVISION 40 – Process Interconnections
40 05 00 Piping, General
40 05 07 Pipe Supports
40 05 19 Ductile Iron Pressure Pipe
40 60 00 Process Control and Enterprise Management Systems
40 80 00 Cellular Phone Autodialer Alarm System
40 90 00 Process Control and Instrumentation
40 90 40 Programming
40 97 00.1 Variable Frequency Drives
DIVISION 43 – Process Gas and Liquid Handling, Purification, and Storage Equipment
43 25 00.1 Submersible Pumps
43 30 00 Valves, General
43 30 16 Check Valves
43 30 22 Gate Valves
43 60 00 Inside Drop System
APPENDIX
A: Survey (by Engenuity Group, Inc.)
B: Geotech Reports (by Andersen Andre Consulting Engineers, Inc.)
C: Test Holes (Inframap)
UTILITY SPECIAL DISTRICT JULY 2026 SUMMARY OF WORK
LS NO. 16 PAGE 01 11 00 - 1
SECTION 01 11 00 – SUMMARY OF WORK
PART 1 – GENERAL
1.1 THE SUMMARY
The work covered by these Contract Documents includes the furnishing of all labor, materials, equipment, tools, supplies, and incidentals necessary to complete the Lift Station No. 16 Rehabilitation Project located at 1105 W. 9th Street, Riviera Beach, Florida, as shown on the Construction Drawings and specified herein.
The CONTRACTOR shall provide all work required to construct a complete, functional, and fully operational wastewater lift station, including all civil, structural, mechanical, electrical, and instrumentation components, whether or not specifically shown, but necessary for proper operation.
The Project includes demolition and removal of the existing lift station wet well, dry pit, piping, electrical equipment, and associated appurtenances, and construction of a new submersible pump lift station with upgraded mechanical, structural, electrical, and telemetry systems, as depicted in the design plans and associated technical specifications.
All Work shall be performed in accordance with:
• City of Riviera Beach Utility Special District (RBUSD) standards.
• Applicable City, County, State, and Federal codes and regulations.
• Approved Construction Drawings and Technical Specifications.
1.2 CONTRACTOR RESPONSIBILITIES
The CONTRACTOR shall furnish and pay for, without limitation:
• All labor, materials, equipment, tools, and incidentals.
• Temporary utilities, power, water, and services required for construction.
• Permits, inspections, testing, and coordination with regulatory agencies.
• Construction means and methods necessary to maintain uninterrupted wastewater service.
The CONTRACTOR shall test, commission, and place the completed lift station into operation in coordination with RBUSD and the ENGINEER.
All Work not expressly indicated but required for a complete and operable lift station shall be provided at no additional cost to the OWNER.
SEPTEMBER 2026
LS NO. 16 PAGE 01 11 00 - 2
1.3 DESCRIPTION OF WORK
The Work includes, but is not limited to, the following major elements for Lift Station No. 16 Rehabilitation:
• Demolition and removal of existing lift station components including wet well, dry pit, piping, slab, electrical equipment, fencing, and associated appurtenances.
• Construction of a new reinforced concrete wet well (approximately 6-foot diameter by 18-foot depth) including base slab, top slab, access hatches, and structural components as shown in the Contract Drawings.
• Installation of submersible wastewater pumps (Xylem or approved equal), guide rails, base elbows, discharge piping, valves, and fittings.
• Construction and installation of above-ground check valve and bypass assembly and connection to the existing 6-inch ductile iron force main.
• Installation of permanent pump-out assembly.
• Installation and operation of temporary bypass pumping systems to maintain continuous service during construction.
• Installation of new electrical service components including control panel, telemetry (RTU), instrumentation, conduit, grounding, and wiring.
• Installation of 2-inch water service tap, water meter box, backflow prevention assembly, and associated appurtenances.
• Site improvements including fencing, gates, concrete pads, driveways, pavement restoration, grading, and site restoration.
• Testing, startup, training, and commissioning of all mechanical and electrical systems.
The specific configuration and scope of improvements shall conform to the approved design option for Lift Station No. 16 as shown in the Contract Drawings.
1.4 CONTRACT METHOD
The Work shall be constructed under a single construction contract for the Lift Station No. 16 Rehabilitation Project, based on the Contract Drawings, Technical Specifications, and Bid Schedule.
1.5 WORK BY OTHERS
The Owner may have other construction activities occurring within the general vicinity of the Project. The CONTRACTOR shall coordinate with the OWNER and ENGINEER to minimize conflicts and maintain safe access.
LS NO. 16 PAGE 01 11 00 - 3
1.6 WORK SEQUENCE AND CONTINUITY OF SERVICE
Wastewater service interruptions are not permitted unless explicitly approved in writing by RBUSD and the ENGINEER.
The CONTRACTOR shall:
• Maintain uninterrupted wastewater conveyance at all times.
• Provide and operate temporary bypass pumping systems as required.
• Submit a detailed Work Sequence and Bypass Pumping Plan prior to construction.
Construction activities shall be coordinated to prevent overflow, surcharge, or loss of service.
1.7 CONTRACTOR USE OF SITE
The CONTRACTOR’s use of the site shall be limited to areas necessary for construction operations, material storage, and access, as approved by the OWNER.
Use of adjacent private property is prohibited without written authorization from the property owner and RBUSD.
1.8 OUTAGE AND SHUTDOWN REQUIREMENTS
The CONTRACTOR shall not remove from service, de-energize, or modify any existing lift station, force main, electrical service, or control system without prior written approval.
Where shutdowns are required:
• Submit a detailed outage plan at least 14 days in advance.
• Coordinate all shutdowns with RBUSD operations staff.
• Provide all temporary power, controls, alarms, bypass pumping, and staffing necessary to maintain continuous service.
1.9 OWNER OCCUPANCY AND OPERATION
RBUSD may continue to operate portions of the lift station facilities during construction. The CONTRACTOR shall coordinate Work to accommodate ongoing operations and minimize disruptions.
Testing and startup do not constitute final acceptance.
1.10 CONSTRUCTION OF UTILITIES
Utility companies or their CONTRACTORS will provide new or enhanced utilities for this Project.
LS NO. 16 PAGE 01 11 00 - 4
Coordinate with others performing Work associated with this Project.
1.11 PROTECTION OF EXISTING FACILITIES
The CONTRACTOR shall protect all existing utilities, structures, pavements, landscaping, and adjacent improvements.
Any damage caused by construction operations shall be repaired at the CONTRACTOR’S expense.
1.12 REGULATORY REQUIREMENTS
The CONTRACTOR shall comply with all applicable requirements of:
• City of Riviera Beach.
• Palm Beach County Health Department.
• Florida Department of Environmental Protection (FDEP).
• Florida Department of Transportation (FDOT), where applicable.
• South Florida Water Management District (SFWMD), where applicable.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION (NOT USED)
END OF SECTION
UTILITY SPECIAL DISTRICT JULY 2026 WORK RESTRICTIONS
LS NO. 16 PAGE 01 14 00 - 1
SECTION 01 14 00 – WORK RESTRICTIONS
PART 1 – GENERAL
1.1 THE SUMMARY
The Work shall be scheduled, sequenced, and performed in a manner that minimizes disruption to the public and ensures continuous operation of Lift Station No. 16 and the associated wastewater collection system serving the existing tributary service area and downstream 6-inch ductile iron force main.
The CONTRACTOR shall incorporate all construction, sequencing, demolition, force main tie-in, electrical switchover, and bypass pumping operational constraints identified in this Section into the Construction Progress Schedule prepared in accordance with Section 01 32 16.
All Work shall be performed while the existing lift station and downstream collection system remain in service, unless otherwise approved in writing by the OWNER and ENGINEER.
1.2 EXISTING LIFT STATION OPERATIONS
The Work shall be executed while Lift Station No. 16 remains operational until the new wet well, pumps, controls, and force main connections are fully constructed, tested, and approved for startup. At no time shall the operation, reliability, or efficiency of the wastewater collection system be jeopardized as a result of the CONTRACTOR’s activities.
Unless specifically indicated otherwise, the CONTRACTOR shall provide all temporary facilities required to maintain continuous operation, including but not limited to:
• Temporary bypass pumping and piping capable of handling anticipated peak wet weather flows.
• Temporary power and lighting.
• Temporary controls, instrumentation, alarms, and telemetry.
• Temporary security and safety devices.
All such temporary systems shall be fully operational and tested under load conditions prior to impacting existing facilities.
1.3 OPERATION OF EXISTING EQUIPMENT
Operational functions, system adjustments, and shutdowns of existing lift station equipment shall be performed only by RBUSD operations personnel, unless otherwise authorized in writing.
RBUSD operations staff will cooperate with the CONTRACTOR to facilitate construction activities;
however, certain shutdowns or connections including force main isolation, wet well cutover, electrical service transition, and control panel changeover may be restricted to off-peak hours, JULY 2026
LS NO. 16 PAGE 01 14 00 - 2
nights, weekends, or holidays. No additional compensation will be provided for premium time or overtime costs associated with such work.
If required for proper operation or maintenance of the wastewater system, RBUSD may require rescheduling of a previously approved shutdown. The CONTRACTOR shall submit a revised outage request within two (2) calendar days of notification.
1.4 BYPASS PUMPING
Bypassing of untreated or partially treated wastewater to surface waters, storm drainage systems, public right-of-way, or the ground is strictly prohibited.
If accidental bypassing or sanitary sewer overflow (SSO) occurs as a result of the CONTRACTOR’s operations, RBUSD may immediately take action to stop the bypass. All costs incurred by RBUSD including regulatory reporting, cleanup, remediation, fines, and associated legal costs shall be deducted from the CONTRACTOR’s progress payments.
The CONTRACTOR shall be fully responsible for:
• Design, installation, operation, monitoring, and removal of bypass pumping systems.
• Continuous staffing and monitoring during bypass operations.
• Redundancy sufficient to prevent failure including backup pumps and standby power where required.
1.5 COMPLIANCE WITH REGULATORY REQUIREMENTS
The CONTRACTOR shall perform all Work in compliance with applicable Federal, State, and local regulations governing wastewater facilities including FDEP requirements applicable to collection systems and lift stations.
The CONTRACTOR shall take all necessary precautions to ensure that construction activities do not cause regulatory violations, sanitary sewer overflows, force main failures, or unauthorized discharges. Any penalties, fines, legal costs, or remediation expenses incurred by RBUSD as a result of CONTRACTOR actions shall be borne solely by the CONTRACTOR and may be deducted from progress payments.
Temporary facilities, equipment, and labor required to maintain regulatory compliance during construction shall be provided as part of the Work and removed upon completion.
1.6 OUTAGE REQUESTS
Modifications to existing facilities, installation of new equipment, or connections to existing systems including tie-in to the existing 6-inch ductile iron force main and electrical service transition may require temporary outages or operational changes.
In such cases, the CONTRACTOR shall:
LS NO. 16 PAGE 01 14 00 - 3
• Submit a detailed outage plan at least fourteen (14) days in advance.
• Coordinate all outages with the ENGINEER and RBUSD operations staff.
• Obtain written approval prior to beginning any work affecting existing facilities.
Outage plans shall include:
• Description of work requiring the outage.
• Duration of the outage.
• Bypass pumping methods.
• Temporary power, controls, alarms, and instrumentation.
• Staffing and monitoring procedures.
The CONTRACTOR shall not begin any work affecting existing facilities without written approval.
1.7 TEMPORARY CONNECTIONS AND FACILITIES
Temporary connections to existing facilities and the existing 6-inch ductile iron force main shall be carefully planned and fully prepared prior to execution. All necessary equipment, materials, and labor shall be on site before work begins.
Work affecting active systems shall proceed continuously, including nights and weekends if necessary, to minimize outage duration.
Temporary piping, power, controls, and alarms shall:
• Be sized appropriately for the required flow and loads.
• Be constructed of materials suitable for wastewater service.
• Be adequately supported and protected within the public right-of-way along W. 9th Street
• Minimize interference with RBUSD operations and CONTRACTOR activities.
A plan showing the size and location of temporary facilities shall be submitted with the outage plan.
1.8 CONSTRUCTION SEQUENCING
Construction activities shall be sequenced to maintain continuous wastewater service at all times.
The CONTRACTOR shall:
LS NO. 16 PAGE 01 14 00 - 4
• Keep existing facilities in service until new or rehabilitated facilities are fully operational.
• Coordinate demolition, rehabilitation, and installation activities accordingly, including full removal of the existing wet well and dry pit only after bypass systems are fully functional.
• Ensure that no single failure or construction activity results in loss of service.
Safe working conditions shall be maintained at all times, including proper trench protection, guarding of openings, electrical safety measures, signage, traffic control within the right-of-way, and pedestrian protection.
1.9 PERMITS
The CONTRACTOR shall comply with all permit conditions applicable to the Work including right-of-way permits, dewatering permits (if required), and utility coordination approvals.
Proof of satisfaction of permit conditions shall be provided prior to acceptance of the Work by
RBUSD.
1.10 SEQUENCE AND SCHEDULE CONSTRAINTS
The CONTRACTOR is responsible for coordinating and planning construction activities to integrate all known constraints into the Work.
Constraints applicable to this Project include, but are not limited to:
• Continuous operation of Lift Station No. 16.
• Maintenance of access for RBUSD operations and emergency response.
• Coordination with local traffic and right-of-way requirements along W. 9th Street.
• Minimization of impacts to adjacent properties and public streets.
The listing of constraints does not relieve the CONTRACTOR of responsibility for identifying and managing additional constraints necessary to complete the Work within the Contract Time.
1.11 INDEMNIFICATION FOR SCHEDULE DEVIATION
In addition to any other remedies available under the Contract Documents, if the CONTRACTOR fails to achieve Substantial Completion within the Contract Time, or if the CONTRACTOR’s construction activities cause unplanned service interruptions, system failures, regulatory violations, or damage to RBUSD facilities or operations as a result of the CONTRACTOR’s failure to adhere to the approved construction schedule and sequencing plan, the CONTRACTOR shall indemnify, defend, and hold harmless RBUSD, its officers, employees, and agents from and against any and all claims, damages, losses, costs, and expenses, including reasonable attorney’s fees, arising out of
LS NO. 16 PAGE 01 14 00 - 5
or resulting from such schedule deviation or service disruption.
The CONTRACTOR’s indemnification obligations under this section shall include, but are not limited to, costs and liabilities arising from:
• Regulatory fines, penalties, or enforcement actions imposed on RBUSD by any Federal, State, or local regulatory agency resulting from the CONTRACTOR’s failure to maintain continuous wastewater service or comply with permit conditions.
• Emergency bypass pumping, emergency repair, or emergency response costs incurred by
RBUSD due to the CONTRACTOR’s failure to maintain the approved construction sequence or provide the required temporary facilities.
• Third-party claims or damages resulting from sanitary sewer overflows (SSOs), service interruptions, or property damage caused by the CONTRACTOR’s schedule deviation or failure to perform Work in the required sequence.
• Additional engineering, inspection, or administrative costs incurred by RBUSD as a direct result of the CONTRACTOR’s schedule deviation.
The CONTRACTOR shall not be held liable under this section for delays or schedule deviations caused solely by events beyond the CONTRACTOR’s reasonable control, provided that the
CONTRACTOR has provided timely written notice and documentation of such events in accordance with Section 01 26 63 – Change Orders, and provided that the CONTRACTOR has taken all practicable steps to mitigate the impact of such events on the construction schedule.
Nothing in this section shall limit or waive any other right or remedy available to RBUSD under the
Contract Documents, at law, or in equity, including the right to assess liquidated damages as provided in the Agreement.
PART 2 – PRODUCTS (NOT USED)
UTILITY SPECIAL DISTRICT JULY 2026 PRICE AND PAYMENT PROCEDURES
LS NO. 16 PAGE 01 20 00 - 1
SECTION 01 20 00 – PRICE AND PAYMENT PROCEDURES
PART 1 – GENERAL
1.1 THE SUMMARY
The CONTRACTOR shall submit Applications for Payment to the City of Riviera Beach Utility Special District (RBUSD) in accordance with the requirements of the Contract Documents and the payment schedule established in the Agreement and General Conditions.
The Contract Price shall constitute full compensation for furnishing all labor, materials, equipment, supervision, services, and incidentals necessary to complete the Lift Station No. 16 Rehabilitation Project including demolition of the existing wet well and dry pit, installation of the new reinforced concrete wet well, submersible pumps, force main tie-in to the existing 6-inch ductile iron pipe, electrical control panel and RTU upgrades, bypass pumping, and all associated site restoration, in full compliance with the Contract Documents.
1.2 CONTRACT PRICE INCLUSIONS
The Contract Price shall include, without limitation, all costs associated with the following:
A. General and Administrative Costs
• Home office and field office overhead, general conditions, and profit
• Project management, supervision, contract administration, and clerical support
• Technology, communications, software, and recordkeeping systems
B. Professional and Legal Costs
• Professional services, design coordination, legal fees, and consulting services
• Bonds, insurance, permits, licenses, patent fees, and royalties
• All applicable taxes and fees
C. Site Facilities and Temporary Works
• Field offices, storage facilities, construction equipment, vehicles, and small tools
• Temporary power, lighting, communications, potable water, and sanitation
• Temporary safety facilities, fencing, signage, access controls, and protection systems
• Mobilization and demobilization of all temporary facilities
D. Materials and Equipment
LS NO. 16 PAGE 01 20 00 - 2
• Materials and equipment incorporated permanently into the Project
• Materials and equipment stored on site or at approved off-site locations
• Consumable materials used during construction
E. Temporary Utility and Environmental Controls
• Temporary bypass pumping systems sized for anticipated peak wet weather flows and including redundancy and monitoring
• Temporary piping, power, controls, alarms, and monitoring
• Temporary environmental protection measures
F. Labor and Construction Activities
• All CONTRACTOR and Subcontractor labor and supervision
• Startup, testing, commissioning, and initial operation
• Maintenance of systems until acceptance by RBUSD
G. Quality and Closeout Obligations
• Correction of Defective Work
• Cleanup, disposal of surplus materials, and site restoration
• Warranties, extended warranties, and service agreements
• Final demobilization and removal of temporary facilities
Any cost not specifically identified as a separate bid item but required to deliver a complete, functional, and operable lift station including all work necessary to maintain continuous wastewater service during construction shall be included in the Contract Price.
1.3 PAYMENT APPLICATION REQUIREMENTS
Applications for Payment shall be submitted in accordance with the Contract Documents and shall include payment for:
• Completed Work
• Properly stored and documented materials and equipment
LS NO. 16 PAGE 01 20 00 - 3
• Approved Change Orders
Applications shall be prepared using the form provided or required by RBUSD and shall include:
• Typed continuation sheets on 8½" × 11" paper
• An electronic Excel version
• Values consistent with the approved Schedule of Values (Section 01 29 73) and corresponding bid items specific to the Lift Station No. 16 Rehabilitation Project
1.4 CONTRACTOR SUBMITTALS
The CONTRACTOR shall submit:
• A schedule of anticipated Payment Applications, including application numbers, dates, and anticipated amounts
• Updates to the anticipated payment schedule as necessary to reflect actual progress
1.5 PROCEDURES FOR SUBMITTING A PAYMENT APPLICATIONS
Prior to formal submission, the CONTRACTOR shall submit a draft Payment Application for review by RBUSD to confirm agreement on:
• Earned value of lump sum items
• Quantities completed for unit price items
• Values for stored materials supported by invoices
Final Applications shall:
• Be complete and fully populated (no blank fields; use “N/A” where applicable)
• Be sequentially numbered
• Clearly identify the application period
Each Application shall show:
• Earned value of original Contract Work
• Earned value of approved Contract Modifications
• Net set-offs and adjustments
The CONTRACTOR shall execute the required Certification stating that all Work covered has been
LS NO. 16 PAGE 01 20 00 - 4
completed in accordance with the Contract Documents and that payment is due.
1.6 SUBSTANTIATING DATA FOR PROGRESS PAYMENTS
Each Application shall include a cover letter identifying:
• Project name
• Application number, date, and period of coverage
• List of enclosures
Supporting documentation shall include, as applicable:
• Description and identification of stored materials
• Updated Construction Schedule
• Record drawings for piping installed during the payment period including force main connections and underground utilities installed at Lift Station No. 16
One (1) complete copy of substantiating data shall accompany each original Application.
1.7 FINAL PAYMENT
The Application for Final Payment shall:
• Be prepared in the same format as progress payments
• Include a final accounting of the Contract Price
Final payment shall incorporate adjustments for:
• Approved Change Orders
• Quantity adjustments
• Allowances
• Accepted Defective Work
• Liquidated damages, penalties, or bonuses
• Final set-offs and deductions
Final payment is subject to compliance with Section 01 77 00 – Closeout Procedures and completion of all testing, startup, commissioning, and RBUSD acceptance requirements for Lift Station No. 16.
LS NO. 16 PAGE 01 20 00 - 5
1.8 SUBMITTAL PROCEDURE
• Submit Applications for Payment at the times stipulated in the Contract.
• Submit not less than three (3) original copies of each Application.
Upon verification of completeness and accuracy, RBUSD will process the Application for payment in accordance with the Contract Documents.
PART 2 – PRODUCTS (NOT USED)
UTILITY SPECIAL DISTRICT JULY 2026 PRODUCT SUBSTITUTION PROCEDURES
LS NO. 16 PAGE 01 25 13 - 1
SECTION 01 25 13 – PRODUCT SUBSTITUTION PROCEDURES
PART 1 – GENERAL
1.1 THE SUMMARY
This Section establishes the procedures and requirements governing the substitution of products specified for the Lift Station No. 16 Rehabilitation Project including submersible pumps, control panels, RTU systems, electrical components, valves, piping, structural components, coatings, and related appurtenances.
The CONTRACTOR shall furnish and install only those products specified in the Contract Documents, except where substitutions are expressly approved in writing in accordance with this Section.
1.2 RELATED SECTIONS
Section 01 60 00 – Product Requirements
Section 01 77 00 – Closeout Procedures
1.3 CONTRACTOR SUBMITTALS
A. Products List
Within thirty (30) days after Award of the Contract, submit to the Engineer five (5) copies of a complete list of major products proposed for incorporation into the Work for Lift Station No. 16.
The products list shall:
• Be organized by Specification Section number and title
• Identify all major equipment, materials, and systems including, at a minimum, pumps, guide rail systems, discharge piping, check valves, gate valves, control panel assemblies, RTU systems, bypass pumping equipment, and structural components.
For products specified solely by reference standards, include:
• Manufacturer’s name and address
• Trade name and model number
• Applicable reference standards
• Performance and test data
1.4 CONTRACTOR OPTIONS
Where products are specified only by reference standard, the CONTRACTOR may select any
LS NO. 16 PAGE 01 25 13 - 2
product meeting that standard provided it is compatible with the Lift Station No. 16 design, operating parameters, and electrical characteristics shown on the Contract Drawings.
Where multiple acceptable manufacturers or products are listed, the CONTRACTOR may select any listed product that complies fully with the Specifications.
Where products are specified by naming one or more manufacturers with the phrase “or equal,” substitutions shall be requested in accordance with this Section.
Where a single manufacturer and product are specified without an “or equal” designation, no substitutions will be permitted unless the specified product becomes unavailable due to documented circumstances beyond the CONTRACTOR’s control.
1.5 SUBSTITUTIONS
A. General
The Engineer will consider formal substitution requests submitted by the CONTRACTOR within thirty (30) days after Award of the Contract.
After this period, substitution requests will be considered only if:
• The specified product becomes unavailable, or
• Conditions beyond the CONTRACTOR’s control prevent procurement
The burden of proof for equivalency rests entirely with the CONTRACTOR and shall demonstrate full compliance with the functional, hydraulic, electrical, structural, and performance requirements of Lift Station No. 16.
B. Substitution Request Requirements
Each substitution request shall be submitted separately and shall include, at a minimum:
1. Product identification, including manufacturer name and address
2. Manufacturer’s technical literature including:
• Product description
• Reference standards
• Performance and test data
3. Samples, where applicable
4. Documentation of at least five (5) similar installations, including:
LS NO. 16 PAGE 01 25 13 - 3
• Project name and location
• Date of installation
• Owner contact information
5. A detailed, itemized comparison identifying all differences between the specified product and the proposed substitution
6. Analysis of impacts to:
• Construction schedule
• Other Work or Contract Sections
7. Accurate cost comparison, including:
• Product cost
• Installation cost
• Associated redesign or modification costs
8. Identification of any license fees or royalties
9. Availability of maintenance services and replacement parts
10. Written confirmation that the substituted product will not alter hydraulic performance, electrical load characteristics, structural dimensions, wet well geometry, or control system integration for Lift Station No. 16.
C. Substitutions Not Permitted
• Substitutions will not be considered when:
• Indicated only on Shop Drawings or product submittals
• Requested by a subcontractor or supplier directly
• Requiring substantial revision of the Contract Documents
• Resulting in additional cost to RBUSD deemed unwarranted
• Resulting in delay to the Contract Time
• Resulting in modification of approved lift station capacity, pump curves, control logic, telemetry functionality, or structural design criteria
LS NO. 16 PAGE 01 25 13 - 4
D. Engineer Review
• The Engineer will evaluate substitution requests within a reasonable time.
• The Engineer may require additional information to complete the evaluation.
• No substitute product shall be ordered or installed without written acceptance by the Engineer.
• The Engineer shall be the sole judge of equivalency, quality, and suitability, and the
Engineer’s decision shall be final.
RBUSD may require additional performance guarantees or surety for any accepted substitution to ensure compliance with Lift Station No. 16 operational requirements.
E. Costs and Responsibility
Acceptance of a substitution shall not relieve the CONTRACTOR of responsibility for full compliance with the Contract Documents.
Without increase in cost to RBUSD, the CONTRACTOR shall:
• Pay all costs associated with substitution requests
• Pay all costs of inspections, testing, and evaluations
• Reimburse RBUSD for Engineer review costs
• Pay all costs of redesign, rework, and coordination required to implement the substitution
1.6 QUALITY ASSURANCE – CERTIFICATIONS
By submitting a substitution request, the CONTRACTOR certifies that:
• The proposed product is equal to or superior to the specified product in all respects
• Equivalent warranties and guarantees will be provided
• Installation will be fully coordinated with all other Work
• No claims for additional cost or time resulting from the substitution will be made
• Cost data submitted is complete and accurate
• The substituted product will integrate fully with the Lift Station No. 16 mechanical, structural, electrical, and telemetry systems without reduction in performance, reliability, or maintainability
LS NO. 16 PAGE 01 25 13 - 5
Costs excluded from substitution cost comparisons include:
• Costs under separate contracts
• Engineer redesign costs
PART 3 – EXECUTION (NOT USED)
UTILITY SPECIAL DISTRICT JULY 2026 CHANGE ORDERS
LS NO. 16 PAGE 01 26 63 - 1
SECTION 01 26 63 – CHANGE ORDERS
PART 1 – GENERAL
1.1 THE SUMMARY
The CONTRACTOR shall promptly implement the Change Order procedures described in this Section.
The CONTRACTOR shall provide complete written documentation necessary to evaluate proposed changes, including detailed cost and schedule impacts specifically identifying impacts to bypass pumping operations, force main tie-ins, electrical switchover, and Lift Station No. 16 startup sequencing.
The CONTRACTOR shall maintain accurate and detailed records of Work performed on a time-and-material or force account basis and shall provide such records to the Engineer upon request.
The CONTRACTOR shall designate, in writing:
• An individual authorized to accept changes in the Work
• An individual responsible for communicating authorized changes to project personnel
RBUSD shall designate, in writing, the individual authorized to execute Change Orders, Work Change Directives, and Contract Amendments.
1.2 RELATED SECTIONS
• Agreement
• General Conditions
• Supplementary Conditions
• Section 01 20 00 – Price and Payment Procedures
• Section 01 29 00 – Measurement and Payment
• Section 01 32 16 – Construction Progress Schedule
• Section 01 77 00 – Closeout Procedures
• Section 01 33 00 – Submittal Procedures
1.3 DEFINITIONS
Change Order: A written modification to the Contract Documents that adjusts the Contract Sum and/or Contract Time and is executed by RBUSD and the CONTRACTOR.
LS NO. 16 PAGE 01 26 63 - 2
Work Change Directive: A written directive issued by RBUSD authorizing the CONTRACTOR to proceed with a change prior to execution of a Change Order.
Construction Change Authorization: A written authorization issued by RBUSD and the Engineer directing the CONTRACTOR to perform changed Work for subsequent inclusion in a Change Order.
1.4 PRELIMINARY PROCEDURES
A. Owner-Initiated Changes
RBUSD or the Engineer may initiate changes by issuing a written Proposal Request to the CONTRACTOR. Proposal Requests are for evaluation purposes only and do not authorize execution of the Work.
Proposal Requests may include:
• Description and location of the proposed change
• Revised or supplemental drawings and specifications
• Time constraints and overtime authorization, if any
• Proposal validity period
• Identification of impacts to Lift Station No. 16 operations, including bypass pumping or force main connection requirements, if applicable
B. CONTRACTOR-Initiated Changes
The CONTRACTOR may propose changes by submitting written notice to RBUSD and the Engineer, including:
• Description of the proposed change
• Justification for the change
• Impacts to Contract Sum and Contract Time
• Impacts to other Work
• Supporting documentation
• Identification of impacts to continuous wastewater service, bypass pumping, electrical transition, and startup of Lift Station No. 16
1.5 WORK CHANGE DIRECTIVES AND CONSTRUCTION CHANGE AUTHORIZATIONS
RBUSD may issue a Work Change Directive or Construction Change Authorization to direct the
LS NO. 16 PAGE 01 26 63 - 3
CONTRACTOR to proceed with a change prior to execution of a Change Order.
Such directives shall:
• Clearly define the scope of the change
• Identify the method of compensation
• Identify anticipated impacts to Contract Time
• Identify required coordination with Lift Station No. 16 operations and bypass pumping activities, where applicable
The CONTRACTOR shall not proceed with changed Work without written authorization.
1.6 DOCUMENTATION OF PROPOSALS AND CLAIMS
Each proposal or claim shall include sufficient documentation to allow evaluation, including but not limited to:
• Labor hours and rates
• Equipment usage and rates
• Materials, quantities, and unit costs
• Subcontractor and supplier costs
• Overhead and profit
• Justification for time extensions
• Documentation of impacts to bypass pumping duration, force main outage windows, and Lift Station No. 16 operational sequencing
Time-and-material Work shall include:
• Name of authorizing representative
• Dates and times Work was performed
• Detailed labor and equipment logs
• Supporting invoices and receipts
1.7 PREPARATION OF CHANGE ORDERS
Change Orders shall be prepared on RBUSD’s standard forms and shall:
LS NO. 16 PAGE 01 26 63 - 4
• Describe additions and deletions to the Work
• Include revised Contract Documents as needed
• Clearly state adjustments to Contract Sum and Contract Time
• Clearly identify any impacts to Lift Station No. 16 startup, testing, commissioning, and regulatory compliance obligations
Change Orders shall be executed by RBUSD and the CONTRACTOR prior to payment.
1.8 METHODS OF CHANGE
A. Lump-Sum Change Orders
Lump-sum Change Orders shall be based on:
• An approved Proposal Request and CONTRACTOR proposal, or
• A CONTRACTOR-initiated proposal approved by RBUSD
B. Unit Price Change Orders
Unit price Change Orders shall be based on:
• Established unit prices in the Contract, or
• Mutually agreed unit prices
Where quantities cannot be determined in advance, RBUSD may issue a Work Change Directive, with final quantities and costs determined upon completion.
C. Time-and-Material / Force Account Changes
Time-and-material Work shall:
• Be authorized in writing prior to execution
• Be documented in accordance with this Section
• Be evaluated and approved by RBUSD
• Not extend bypass pumping duration or Lift Station No. 16 outage periods without explicit written authorization
LS NO. 16 PAGE 01 26 63 - 5
1.9 CORRELATION WITH CONTRACTOR SUBMITTALS
• Update the Schedule of Values to reflect approved changes
• Update the Construction Schedule to reflect changes in Contract Time
• Incorporate approved changes into Record Documents
• Update sequencing and bypass pumping plans where changes affect Lift Station No. 16 operations
1.10 OWNER EVALUATION AND PAYMENT
RBUSD shall evaluate all change proposals and determine acceptability.
Only RBUSD may approve:
• Work Change Directives
• Change Orders
• Contract Amendments
Work performed prior to written authorization is performed at the CONTRACTOR’s sole risk.
No payment shall be made for changed Work until:
• The Change Order or Contract Amendment is fully executed by RBUSD
• All required documentation supporting impacts to Lift Station No. 16 operations and regulatory compliance has been submitted and accepted
UTILITY SPECIAL DISTRICT SEPTEMBER 2026 MEASUREMENT AND PAYMENT
LS NO. 16 PAGE 01 29 00 - 1
SECTION 01 29 00 – MEASUREMENT AND PAYMENT
PART 1 – GENERAL
1.1 THE SUMMARY
Payment for Work under this Contract shall be made in accordance with the Bid Schedule and Schedule of Values, and shall constitute full compensation to the CONTRACTOR for furnishing all labor, materials, equipment, tools, supervision, permits, fees, testing, temporary facilities, and incidentals necessary to complete the Lift Station No. 16 Rehabilitation Project including demolition of the existing wet well and dry pit, construction of the new reinforced concrete wet well, installation of submersible pumps, connection to the existing 6-inch ductile iron force main, electrical control panel and RTU installation, bypass pumping, and full site restoration, in full compliance with the Contract Documents.
No separate payment shall be made for any item of Work not specifically identified in the Bid Schedule or Schedule of Values. All such costs shall be included in the prices bid for the applicable items including all work required to maintain continuous wastewater service during construction.
1.2 RELATED SECTIONS
• Section 01 20 00 – Price and Payment Procedures
• Section 01 29 73 – Schedule of Values
• Section 01 26 63 – Change Orders
1.3 BASIS OF PAYMENT
Payment items are derived from and shall be consistent with the Engineer’s Opinion of Probable Construction Cost (EOPCC) prepared for the 90% design submittal for the Lift Station No. 16 Rehabilitation Project.
Bid items shall be paid as Day (DY), Lump Sum (LS), Each (EA), Linear Foot (LF), Square Yard (SY), Cubic Yard (CY), or Percentage (%), as indicated in the Bid Schedule.
Each payment item shall include all Work necessary for complete installation, including but not limited to excavation, backfill, restoration, testing, and coordination, bypass pumping where required, and startup/commissioning activities.
1.4 BONDS AND INSURANCE (Item # 1)
Payment for bonds and insurance will be made at the lump sum price named in the Bid Schedule. The CONTRACTOR may request payment for this bid item after the Initial Notice to Proceed has been issued.
Bonds and Insurance are limited to 3.0% of the Total Bid Price. Any amount in excess of 3.0% will be moved to Line Item No. 2, Section 01 71 13, Mobilization. However, the total bid
LS NO. 16 PAGE 01 29 00 - 2
amount will not change. The 3.0% ceiling on Bonds and Insurance is not responsiveness, just an instruction on the amount the CITY will pay for Bonds and Insurance.
1.5 MOBILIZATION AND DEMOBILIZATION (Item # 2)
See Section 01 71 13, Mobilization for payment limitations.
Payment for mobilization will be made at the lump sum price named in the Bid Schedule.
Mobilization is limited to 5.0% of the Total Bid Price. Payment for mobilization will be made in equal monthly amounts during the duration of the original contract time and includes the cost to implement the erosion and sediment controls. The 5.0% ceiling on Mobilization is not responsiveness, just an instruction on the amount the CITY will pay for Mobilization.
1.6 MAINTENANCE OF TRAFFIC (Item # 3)
See Section 01 55 26, Traffic Regulations and all other references to traffic control and maintenance in this document and any regulatory requirements.
Payment for maintenance of traffic will be made at the lump sum price named in the Bid Schedule. Maintenance of Traffic is limited to 5.0% of the Total Bid Price. Payment for maintenance of traffic will be made in equal monthly amounts during the duration of the original contract time and it shall include all signs required per Florida Department of Transportation (FDOT) and soil tracking prevention. The 5.0% ceiling on Maintenance of Traffic is not responsiveness, just an instruction on the amount the CITY will pay for Maintenance of Traffic.
1.7 BYPASS PUMPING OPERATIONS (Item #4)
The work for this item includes preparing and submitting a bypass pumping plan for review and approval by the CITY, furnishing and installing all temporary piping, fittings, pumps, pump fuel, pipe connections, providing power for pump operations, operating and maintaining bypass pumps at a flow rate acceptable to the CITY for the duration of all construction activities, removing all items upon completion of construction operations.
Payment for this item shall be per day as named in the Bid Schedule and shall be based on the original Contract duration.
1.8 PERMITTING AND REGULATORY FEES (Item #5)
The work included in this item consists of regulatory permits which the CONTRACTOR must obtain prior to beginning related construction activities. Payment for this item shall be made at the actual cost of permit fees and any required testing services specifically defined within the permit requirements. CONTRACTOR must provide copies of any receipts and/or invoices to justify these actual costs for reimbursement under this item. CONTRACTOR is responsible for any coordination with regulatory agencies to obtain these permits.
1.9 CONTINGENCY (Item #6)
The work included in this item is related to project work not identified or reasonably anticipated through the Contract Documents, which includes, but is not limited to, the
LS NO. 16 PAGE 01 29 00 - 3
relocation of certain existing utility structures and the removal and disposal of any existing utility infrastructure encountered that are deemed unnecessary by the governing utility company. This is an allowance, and any work to be completed under this item must be specifically approved in writing by the OWNER prior to completing the work, including the mutually agreed upon cost of said work.
1.10 REMOVE AND DISPOSE EXISTING WET WELL (Item #7)
Measurement for payment to remove and dispose of existing wet well will be based upon the lump sum of such structures actually removed and disposed of, all in accordance with the Contract Documents.
Payment for removing and disposing of existing wet well named in the Bid Schedule which price shall constitute full compensation for the excavation, removing and disposing of such structure, including backfilling trench, concrete slab, and all restoration work.
1.11 REMOVE AND DISPOSE EXISTING DRY WELL (Item #8)
Measurement for payment to remove and dispose of existing dry well will be based upon the lump sum of such structures actually removed and disposed of, all in accordance with the Contract Documents.
Payment for removing and disposing of existing dry well named in the Bid Schedule which price shall constitute full compensation for the excavation, removing and disposing of such structure, including backfilling trench, concrete slab, and all restoration work.
1.12 REMOVE AND DISPOSE EXISTING PIPE UP TO 8" (Item #9)
Measurement for payment for removing and disposing of existing pipe up to 8 inches in diameter, including both gravity and pressure pipe, as indicated in the Drawings, will be made per linear foot of pipe removed and disposed of, measured along the centerline of the pipe, as named in the Bid Schedule, all in accordance with the requirements of the Contract Documents.
Payment for removing and disposing of existing pipe up to 8 inches in diameter, including both gravity and pressure pipe, will be made at the unit price per linear foot, as named in the Bid Schedule, which price shall constitute full compensation for removing and disposing of existing pipe regardless of pipe material, size up to 8 inches, or installation condition, with no additional compensation provided based on the type of pipe material encountered. Pipe materials may include, but are not limited to, PVC, HDPE, DIP, steel, or other plastic or metal pipe materials. This work shall also include, but not be limited to, all excavation, dewatering, saw cutting, removal of pipe and associated fittings and appurtenances where applicable, proper handling and disposal of removed materials off-site, trench stabilization in accordance with the State of Florida Trench Safety Act, backfilling, grading, compacting, density testing, restoration of disturbed areas not included under separate pay items, and other items or activities necessary for the complete removal and proper disposal of existing pipe.
LS NO. 16 PAGE 01 29 00 - 4
1.13 ABANDON-IN-PLACE (FLUSH AND GROUTING) EXISTING 12" VCP SANITARY SEWER (Item #10)
Measurement for payment to abandon and grout existing 4" VCP sanitary sewer will be based upon the number of linear feet of such pipe actually abandoned and grouted of as determined by measurement along the centerline of the pipe in place, all in accordance with the requirements of the Contract Documents.
Payment for abandoning and grouting of existing 4" VCP sanitary sewer will be made at the unit price per linear foot of pipe as named in the Bid Schedule. Payment shall constitute full compensation for the proper and legal disconnection, grouting (if necessary), plugging, capping and abandoning such pipe, including pumping out and disposing of existing water, backfilling trench and all restoration work. All coordination needed for sanitary sewer connection abandonment shall be responsibility of the CONTRACTOR and is included in the scope of this item.
1.14 REMOVE AND DISPOSE EXISTING FENCE (Item #11)
Measurement for payment for removal and disposal of existing fence, as indicated in the Drawings or as directed by the Engineer, will be made per linear foot of fence removed, measured along the horizontal alignment of the existing fence line, all in accordance with the requirements of the Contract Documents and as named in the Bid Schedule.
Payment for removal and disposal of existing fence shall be made at the unit price per linear foot, as named in the Bid Schedule, which price shall constitute full compensation for the removal, handling, and lawful disposal of existing chain-link fence systems, including fence fabric, posts, rails, concrete footings, gates, gate hardware, barbed wire, and any existing privacy or opaquer fence accessories, as applicable.