- REQUEST FOR PROPOSAL (RFP) - FOR THE RAPID SPACECRAFT ACQUISITION IV (RAPID IV) ON-RAMP III
- Solicitation number
- 80GSFC19R0016-Rev4
About this file
This document contains verification questionnaires for the RAPID IV RFP #80GSFC19R0016 Rev 4 solicitation issued by the National Aeronautics and Space Administration Goddard Space Flight Center. To qualify for award, offerors must demonstrate experience as a prime contractor on at least two successful spacecraft developments, including spacecraft and observatory design, build and testing, integration and testing, shipment to launch site, launch vehicle integration and testing, pre-launch operations, launch support, on-orbit checkout, and on-orbit acceptance review. The verification questionnaires require offerors to provide details on past performance including customer and contract information, roles and responsibilities performed, and dates of performance for two relevant contracts in order to verify eligibility for award. Completed questionnaires are due to Cynthia White at Cynthia.L.White@nasa.gov by October 17, 2023.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RAPID IV RFP #80GSFC19R0016 Rev 4
SECTION L, EXHIBIT 1
RAPID IV
RFP
SPACECRAFT VERIFICATION
QUESTIONNAIRES
Date: 09/15/23
RAPID IV RFP 80GSFC19R0016 Rev 4 Spacecraft Verification Questionnaires
Exhibit 1
The National Aeronautics and Space Administration Goddard Space Flight Center Rapid IV contract award is limited to spacecraft offerors that can demonstrate contractor responsibility on a minimum of two successful spacecraft developments, as an aerospace company.
To be considered successful, the spacecraft development shall include, at a minimum, spacecraft design, build & test; observatory Integration and Test (I&T); customer specified observatory-level testing; shipment of the observatory to the launch site; launch vehicle I&T support; pre-launch operations support and launch support; successful on-orbit spacecraft checkout; on-orbit checkout support of instrument(s)/payload; and on-orbit acceptance review. Any Offeror who has not successfully performed and have been directly responsible as a contractor for all of the previously mentioned tasks for each of two spacecraft developments shall not be considered a qualified contractor.
PLEASE RETURN THE VERIFICATION QUESTIONNAIRE BY OCTOBER 17, 2023 VIA
EMAIL TO CYNTHIA WHITE AT Cynthia.L.White@nasa.gov.
mailto:Cynthia.L.White@nasa.gov
I. Contractor Information
Name of Company Being Verified:
Address:
Point of Contact:
Phone: Proposal Number
II. Customer Information
A.
Agency/Company Name:
Address:
Contracting Officer/Company Representative Name:
Number: Email Address:
Technical Representative Lead Name:
Number:
Email Address:
B.
Mission Name or Designation:
Contract Number:
Contract Type:
Total Original Contract Value:
Present or Final Contract Value:
C.
Date of Contract:
Period of Performance (including options):
From: To:
Launch Date:
On-orbit Checkout Date:
III. Contractor Verification
The contractor demonstrated the following contractor responsibilities on a successful spacecraft *development, which included the following:
During the contract performance being verified, this firm was the:
Prime
Significant Subcontractor
Team Member
Other
Spacecraft design Build and test **Observatory Integration and Test (I&T) Customer Specific observatory-level testing Shipment of the observatory to the launch site
Launch vehicle I&T support Pre-launch operations support and launch support
Successful on-orbit spacecraft checkout On-orbit checkout support of instrument(s)/payload
On-orbit acceptance review
* Development implies design, fabrication, assembly and testing.
** Observatory implies spacecraft with flight instruments integrated.
Verifier’s Name Title
Verifier’s Signature Date
| Prime |
| ADP33.tmp |
| SECTION L, EXHIBIT 1 |
File details come from the government source that posted it. Updated .