This is a Scope of Work document prepared by Henry County Parks and Recreation for the Richard Craig Park Athletic Complex Renovation project, specifically detailing the conversion of four existing tennis courts into eight dedicated pickleball courts at Richard Craig Park in McDonough, Georgia. The project encompasses complete demolition and turnkey reconstruction, requiring a qualified contractor to provide all labor, materials, equipment, supervision, utility locating, demolition, site preparation, construction, fencing, court surfacing, signage, and related services. The scope includes demolition of existing tennis court infrastructure, construction of eight new regulation pickleball courts with playing dimensions of 20 feet by 44 feet and recommended playing surface dimensions of 34 feet by 64 feet, installation of commercial-grade black vinyl-coated chain-link perimeter fencing approximately 10 feet high with interior divider fencing, eight complete permanent pickleball net systems meeting USA Pickleball specifications, comprehensive signage package, vegetation clearing along designated property lines, and site restoration. All work must comply with applicable codes, accessibility requirements, industry standards, and USA Pickleball specifications. The solicitation deadline is 3:00 PM on December 17, 2026, submitted via Henry County's eProcurement Portal at https://procurement.opengov.com/portal/henryga.
The contractor shall submit itemized pricing covering all demolition, private utility locating, vegetation clearing, site preparation, court construction, fencing, equipment, signage, and restoration as a complete turnkey price with no additional costs to the County. Bidders must demonstrate company qualifications and experience with similar athletic court construction and provide proposed construction specifications, materials, layout, and construction schedule. The contract includes a minimum one-year workmanship warranty beginning upon written final acceptance, covering defects resulting from improper construction, materials, or installation, with warranty service requirements including acknowledgment within two business days, inspection within five business days, and corrective work commencement within ten business days. The contractor shall participate in an eleven-month warranty inspection with County representatives and provide final as-built drawings, manufacturer product information, maintenance recommendations, and all required testing and inspection documentation upon project closeout. Final acceptance is contingent upon completion of all construction, vegetation clearing, fencing, signage, equipment installation, site restoration, and required inspections to the satisfaction of Henry County Parks and Recreation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RichardCraig_Baseballl_Fields_Scope.pdf | ||
| 27-27,Richard_Craig_Park_Renovations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HENRY COUNTY PARKS AND
RECREATION
SCOPE OF WORK
Richard Craig Park – Tennis Court Conversion to Pickleball Courts
Project Location: Richard Craig Park
125 S. Zack Hinton Boulevard
McDonough, GA 30253
Existing Facilities: Tennis Courts 13, 14, 15, and 16
Proposed Facilities: Eight (8) New Dedicated Pickleball Courts
Project Type: Complete Demolition and Turnkey Reconstruction
1. PROJECT OVERVIEW
Henry County Parks and Recreation is seeking a qualified contractor to provide all labor, materials, equipment, supervision, utility locating, demolition, site preparation, construction, fencing, court surfacing, signage, and related services necessary to convert four (4) existing tennis courts into eight (8) new dedicated pickleball courts at Richard Craig Park.
The project shall include complete removal of the existing tennis court infrastructure, construction of eight new pickleball courts, installation of new fencing and equipment, vegetation removal along the designated property lines and surrounding court areas, and restoration of all disturbed areas.
All work shall be performed in accordance with applicable codes, accessibility requirements, industry standards, and USA Pickleball specifications.
The contractor shall provide a complete, turnkey facility ready for public use upon final acceptance by Henry County Parks and Recreation.
2. PRECONSTRUCTION AND UTILITY LOCATING
The contractor shall:
1. Conduct an on-site evaluation of the existing tennis courts and surrounding property.
2. Verify all existing dimensions, elevations, drainage patterns, fencing, utilities, and site conditions.
3. Provide a proposed layout showing eight pickleball courts, fencing, gates, pedestrian access, and associated improvements.
4. Contact Georgia 811 and retain a qualified private utility locating company to identify underground utilities throughout the project area.
5. Locate and protect existing irrigation, electrical, water, drainage, communication, and other underground infrastructure.
6. Provide a utility location report or sketch identifying known conflicts.
7. Obtain all applicable permits and approvals before construction.
8. Submit a proposed construction schedule and coordinate all activities with Henry County
Parks and Recreation.
9. Protect all surrounding park facilities, utilities, landscaping, and infrastructure designated to remain.
No excavation or demolition affecting underground infrastructure shall begin until the required utility locating has been completed.
3. DEMOLITION AND REMOVAL
The contractor shall provide complete demolition and removal of the four existing tennis courts and associated infrastructure.
Work shall include:
1. Remove and legally dispose of existing tennis court playing surfaces, pavement, foundations, and unsuitable base materials within the approved demolition limits.
2. Remove all existing tennis net posts, nets, anchors, sleeves, and related equipment.
3. Remove existing perimeter and interior chain-link fencing, including posts, rails, fabric, gates, hardware, and concrete footings.
4. Remove existing signage, abandoned foundations, court accessories, and miscellaneous materials.
5. Remove deteriorated pavement, unstable subgrade, and other unsuitable materials necessary for the new construction.
6. Haul and legally dispose of all demolition materials at an approved disposal facility.
7. Maintain a clean and secure worksite throughout demolition.
Salvage Requirements
All existing benches, trash receptacles, and other reusable County-owned furnishings shall be carefully removed and preserved.
The contractor shall inventory, protect, and deliver salvaged items to an on-site or County-designated location. No reusable County-owned equipment or furnishings shall be discarded without written authorization.
4. VEGETATION CLEARING AND PROPERTY LINE
MAINTENANCE
The contractor shall provide complete vegetation clearing and removal along the designated property lines and surrounding areas associated with the existing tennis courts and proposed pickleball courts.
Work shall include:
1. Remove all trees, shrubs, brush, vines, saplings, weeds, and unwanted vegetation within the County-approved clearing limits along the property lines and surrounding the existing and proposed court facilities.
2. Clear vegetation growing against, through, or over existing fencing and within areas designated for new fencing installation.
3. Remove overhanging limbs and vegetation interfering with court construction, fencing, lighting, drainage, or future court operations.
4. Remove tree stumps, roots, and root systems within the construction footprint that could interfere with new pavement, fencing, foundations, or underground infrastructure.
5. Grind or remove remaining stumps in designated clearing areas to approved depths.
6. Remove accumulated leaves, organic debris, and vegetation waste from the project area.
7. Haul and legally dispose of all clearing debris off-site. Burning or burying vegetation on
County property shall not be permitted.
8. Grade, stabilize, and restore disturbed clearing areas to prevent erosion, washouts, or future drainage issues.
9. Coordinate the protection of any trees or landscape features specifically designated by the
County to remain.
The contractor shall review and confirm the vegetation clearing limits with Henry County Parks and Recreation before beginning work.
Clearing shall extend along the designated property line areas serving both the new pickleball courts and the existing court facilities, as identified during the preconstruction walkthrough.
Vegetation removal outside County-owned property or authorized work limits shall not be permitted without appropriate written approval.
5. SITE PREPARATION, GRADING, AND DRAINAGE
Following demolition and clearing, the contractor shall:
1. Excavate and remove unsuitable soils, roots, debris, and unstable materials.
2. Proof-roll and evaluate the subgrade for soft or unstable areas.
3. Provide all necessary grading, fill, compaction, and aggregate base preparation.
4. Establish proper court elevations and surface slopes to ensure positive drainage.
5. Prevent standing water on completed playing surfaces or around fencing and pedestrian access points.
6. Protect and modify existing drainage infrastructure as necessary for the approved construction.
7. Provide required compaction testing and construction quality control.
8. Stabilize all disturbed areas and prevent erosion or sediment runoff.
All grading and base preparation shall support long-term pavement stability and proper court performance.
6. NEW PICKLEBALL COURT CONSTRUCTION
The contractor shall construct eight (8) new dedicated outdoor pickleball courts.
Court Layout
1. Provide eight regulation pickleball courts within the approved project footprint.
2. Each court shall have regulation playing dimensions of 20 feet by 44 feet.
3. Provide recommended playing surface dimensions of 34 feet by 64 feet per court where feasible, with final dimensions and clearances approved by the County.
4. Provide appropriate safety clearances, player circulation, and separation between courts.
5. Orient courts to minimize sun glare where practical.
6. Submit a final court layout for County approval before construction.
Court Foundation and Pavement
1. Construct a new engineered court foundation using an approved asphalt or post-tensioned concrete system.
2. Provide a properly prepared and compacted aggregate base.
3. Furnish appropriate pavement thicknesses, reinforcement, and structural specifications.
4. Ensure smooth, uniform court surfaces free of significant depressions or irregularities.
5. Provide drainage slopes appropriate for outdoor athletic court construction.
6. Complete all required curing and surface preparation before coating installation.
Sports Surfacing and Striping
1. Apply standard outdoor acrylic tennis court paint suitable for pickleball courts on all eight (8) courts.
2. Properly clean and prepare all court surfaces before applying paint.
3. Apply the required coats of tennis court paint in accordance with manufacturer recommendations.
4. Use contrasting colors for the playing areas and surrounding out-of-bounds areas, with final colors approved by Henry County Parks and Recreation.
5. Install regulation 2-inch-wide pickleball court lines, including baselines, sidelines, service areas, and non-volley zones.
6. Ensure consistent paint coverage, uniform color, clean court lines, and a professional finished appearance throughout all eight courts.
All court surfaces shall be free of peeling, bubbling, uneven paint coverage, and visible defects upon completion.
All court surfaces shall be new and free of visible defects upon completion.
7. NEW FENCING AND GATES
The contractor shall furnish and install new perimeter and interior fencing for the pickleball complex.
Work shall include:
1. Install new commercial-grade, black vinyl-coated chain-link perimeter fencing.
2. Provide perimeter fencing approximately 10 feet high, unless otherwise approved by the
County.
3. Install new interior divider fencing where necessary to separate courts and minimize ball interference.
4. Provide all new fence posts, rails, fabric, bracing, tension components, concrete footings, and hardware.
5. Install new pedestrian access gates at County-approved locations.
6. Provide accessible gates and entrances meeting applicable accessibility requirements.
7. Ensure all fencing is properly tensioned, aligned, anchored, and free of sharp edges.
8. Coordinate fencing installation with court dimensions, drainage, lighting, and pedestrian circulation.
All fencing materials shall be new unless otherwise approved by the County.
8. PICKLEBALL NET SYSTEMS
The contractor shall furnish and install eight (8) complete permanent pickleball net systems.
Each court shall include:
1. New commercial-grade pickleball net posts.
2. Properly installed foundations, anchors, or sleeves.
3. New regulation outdoor pickleball net.
4. Required net tensioning equipment and adjustment hardware.
5. Corrosion-resistant components suitable for year-round outdoor use.
Net systems shall meet USA Pickleball specifications, including 36-inch net height at the sidelines and 34-inch height at the center.
All net systems shall be securely installed and ready for use.
9. COURT IDENTIFICATION AND FACILITY SIGNAGE
The contractor shall furnish and install a complete signage package.
Court Identification
1. Provide eight (8) individual court number signs.
2. Number courts 1 through 8 unless otherwise directed by the County.
3. Install signs in visible locations near each court entrance.
4. Use durable, weather-resistant materials with UV-resistant lettering and graphics.
5. Submit sign designs, dimensions, colors, and proposed locations for County approval.
Rules and Facility Signage
The contractor shall provide:
1. One (1) primary facility identification sign reading "Richard Craig Park Pickleball
Courts."
2. A minimum of two (2) court rules and regulations signs at main entrances.
3. Directional signage identifying court locations and facility access.
4. Accessibility and safety signage where applicable.
Court rules signage shall include County-approved information addressing operating hours, proper footwear, court etiquette, player rotation, prohibited activities, and general facility safety.
All signage shall be approved by Henry County Parks and Recreation before fabrication and installation.
10. ACCESSIBILITY AND PEDESTRIAN ACCESS
The contractor shall:
1. Provide accessible routes connecting the new courts to existing pedestrian pathways.
2. Install or modify sidewalks, entrance transitions, and access points as necessary.
3. Ensure gates and walking surfaces meet applicable ADA requirements.
4. Eliminate exposed foundations, abrupt pavement transitions, and potential tripping hazards.
5. Repair any existing sidewalks, curbs, or pavement damaged during construction.
All completed improvements shall comply with applicable accessibility standards.
11. EXISTING LIGHTING AND ELECTRICAL
INFRASTRUCTURE
The contractor shall:
1. Locate and protect all existing electrical conduits, lighting circuits, poles, fixtures, and controls.
2. Coordinate court layout and fencing installation to avoid existing lighting infrastructure.
3. Identify any electrical conflicts or necessary modifications before construction.
4. Repair any electrical infrastructure damaged by contractor operations.
5. Coordinate required electrical shutdowns or modifications with the County.
Replacement or upgrades to existing sports lighting shall not be included unless specifically authorized by the County.
12. SITE AMENITIES AND FINAL RESTORATION
The contractor shall restore all areas disturbed during construction.
Work shall include:
1. Reinstall salvaged benches and trash receptacles at County-approved locations when directed.
2. Restore disturbed turf, landscaping, drainage areas, and surrounding grounds.
3. Repair any damaged sidewalks, curbs, pavement, irrigation, or other park infrastructure.
4. Complete vegetation removal and cleanup along designated property line areas.
5. Remove construction debris, excess materials, temporary barriers, and equipment.
6. Grade and stabilize all disturbed soil areas.
7. Clean all newly installed playing surfaces, fencing, gates, equipment, and signage.
The completed project shall be delivered in a clean, safe, and fully operational condition.
13. QUALITY CONTROL AND INSPECTIONS
The contractor shall provide appropriate inspections and testing throughout construction.
Required verification shall include:
1. Utility locating and protection.
2. Demolition and vegetation clearing completion.
3. Subgrade preparation and compaction.
4. Court foundation thickness, elevations, and drainage.
5. Court surfacing and line accuracy.
6. Fence installation, gate operation, and structural stability.
7. Regulation court dimensions and net heights.
8. Accessibility and pedestrian circulation.
9. Signage placement and installation.
10. Final restoration and overall workmanship.
Henry County Parks and Recreation reserves the right to inspect the project and require correction of deficiencies before final acceptance.
14. ONE-YEAR WORKMANSHIP WARRANTY
The contractor shall provide a minimum one-year workmanship warranty beginning on the date of written final acceptance by Henry County Parks and Recreation.
The warranty shall cover defects resulting from improper construction, materials, or installation, including:
1. Premature pavement cracking or settlement attributable to defective work.
2. Peeling, bubbling, or delamination of court coatings.
3. Court surface depressions or drainage failures caused by defective construction.
4. Loose fence posts, sagging fabric, defective gates, or hardware failures.
5. Net post instability or defective equipment installation.
6. Defective signage or mounting hardware.
7. Failures of newly constructed pedestrian improvements.
8. Deficiencies in vegetation clearing, stump removal, grading, or site restoration resulting from incomplete or defective work.
Warranty Service Requirements
• The contractor shall acknowledge warranty requests within two (2) business days.
• Safety-related concerns shall receive an initial response within twenty-four (24) hours.
• The contractor shall inspect reported deficiencies within five (5) business days.
• Approved corrective work shall begin within ten (10) business days unless otherwise authorized by the County.
• All covered repairs shall be completed at no additional cost to Henry County.
Eleven-Month Warranty Inspection
The contractor shall participate in a joint inspection with Henry County Parks and Recreation approximately eleven (11) months after final acceptance.
Any identified warranty-related deficiencies shall be documented and corrected within a County-approved period.
All applicable manufacturer warranties extending beyond the first year shall be provided to the
County.
15. FINAL INSPECTION AND PROJECT CLOSEOUT
Before final acceptance, the contractor shall provide:
1. Eight (8) completed and fully playable pickleball courts.
2. New perimeter fencing, interior fencing, and operational gates.
3. Eight complete permanent pickleball net systems.
4. All required court numbering, identification, rules, and directional signage.
5. Completed vegetation clearing along the designated property lines and court areas.
6. Completed drainage and accessibility improvements.
7. Reinstallation or delivery of salvaged County-owned furnishings.
8. Full site restoration and construction cleanup.
9. Required testing and inspection documentation.
10. Final as-built drawings identifying court layouts, fencing, gates, drainage improvements, and utility modifications.
11. Manufacturer product information and maintenance recommendations.
12. Written one-year workmanship warranty and applicable manufacturer warranties.
The contractor shall schedule a final walkthrough with County representatives and correct any outstanding deficiencies before written final acceptance.
16. BID REQUIREMENTS
Contractors shall submit:
1. Company qualifications and experience with similar athletic court construction.
2. Proposed eight-court layout and construction specifications.
3. Proposed foundation, pavement, and sports surfacing materials.
4. Fencing, gates, net systems, and signage specifications.
5. Proposed construction schedule.
6. Itemized pricing for demolition, private utility locating, vegetation clearing, site preparation, court construction, fencing, equipment, signage, and restoration.
7. Any proposed exclusions or exceptions.
8. Written confirmation of the one-year workmanship warranty.
9. All required permits, inspections, labor, materials, and equipment included in the proposed contract price.
The contractor shall provide a complete turnkey price covering all work necessary to deliver a fully functional eight-court pickleball facility.
Final acceptance shall be granted only after all construction, vegetation clearing, fencing, signage, equipment installation, site restoration, and required inspections have been completed to the satisfaction of Henry County Parks and Recreation.