SENSITIVE BUT UNCLASSIFIED (SBU)
FOR OFFICIAL USE ONLY
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS
DOCUMENT TO UNAUTHORIZED PERSONS IS PROHIBITED
Do not remove this notice
Properly destroy documents when no longer needed
Lobby Guard and Stair Rail Alterations Sioux City Federal Building (SCFB)
320 6th Street, Sioux City, IA 51101-1210 Building No. IA00087ZZ Project No. RIA34546
100% Construction Documents Submittal
Project Manual
April 3, 2020
Architect substancearchitecture
1300 Walnut Street Suite 201 Des Moines, Iowa 50309
Tel: 515-243-4407 Fax: 515-243-4692
Substance No. 280-36.17
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS
DOCUMENT TO UNAUTHORIZED PERSONS IS PROHIBITED
LOBBY GUARD AND STAIR RAIL ALTERATIONS GSA Project No. RIA34546
Sioux City Federal Building (IA00087ZZ)
320 6th Street, Sioux City, IA 51101-1210_______________________________________________________
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
SEALS AND SIGNATURES 00 00 05 - 1
SECTION 00 00 05
SEALS AND SIGNATURES
ARCHITECTURAL:
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly licensed architect under the laws of the State of Iowa.
Paul Mankins IOWA REG. #03313 (Printed or typed name) License Renewal Date: 06/30/2019
Dated: ______ (Signature)
Pages covered by this seal: Project Manual sections as identified in the Table of Contents by A.
END OF CERTIFICATIONS PAGE
320 6th Street, Sioux City, IA 51101-1210_______________________________________________________
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
SEALS AND SIGNATURES 00 00 05 - 2
THIS PAGE
INTENTIONALLY
LEFT BLANK
320 6th Street, Sioux City, IA 51101-1210_______________________________________________________
PROPERTY OF THE UNITED STATES GOVERNMENT
TABLE OF CONTENTS 00 01 10 - 1
DOCUMENT 00 01 10
TABLE OF CONTENTS
Lobby Guard and Stair Rail OSHA, NFPA Mods
Division Section Title *Seal
DIVISION 00 - BIDDING REQUIREMENTS, CONTRACT FORMS, CONDITIONS OF THE CONTRACT
00 00 05 ....... SEALS AND SIGNATURES A
00 01 10 ....... TABLE OF CONTENTS A
Additional sections prepared by GSA, including bidding requirements, contract conditions, and forms.
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 ....... SUMMARY GSA
01 14 00 ...... WORK RESTRICTIONS GSA
01 29 00 ...... PAYMENT PROCEDURES GSA
01 31 00 ...... PROJECT MANAGEMENT AND COORDINATION GSA
01 32 00 ...... CONSTRUCTION PROGRESS DOCUMENTATION GSA
01 33 00 ...... SUBMITTAL PROCEDURES GSA
01 33 00A .... Table of Submittals A
01 40 00 ...... QUALITY ASSURANCE AND CONTROL GSA
01 42 00 ...... REFERENCES GSA
01 50 00 ...... TEMPORARY FACILITIES AND CONTROLS GSA
01 59 30 ...... SECURITY PROCEDURES GSA
01 59 50 ...... SAFETY AND HEALTH GSA
01 60 00 ...... PRODUCT REQUIREMENTS GSA
01 70 00 ...... EXECUTION REQUIREMENTS GSA
01 73 10 ...... CUTTING AND PATCHING GSA
01 73 50 ...... FIRE PREVENTION PRECAUTIONS FOR HOT WORK GSA
01 74 19 ....... CONSTRUCTION NONHAZARDOUS WASTE MGT. & DISPOSAL GSA
01 77 00 ...... CLOSEOUT PROCEDURES GSA
01 81 13 ...... SUSTAINABLE DESIGN REQUIREMENTS GSA
DIVISION 02 – SITEWORK
02 41 19 ....... SELECTIVE DEMOLITION A
DIVISION 03 – CONCRETE
NOT USED
DIVISION 04 – MASONRY
NOT USED
DIVISION 05 – METALS
05 50 00 ....... METAL FABRICATIONS A
05 73 13 ....... GLAZED DECORATIVE METAL RAILINGS A
DIVISION 06 – WOOD AND PLASTIC
NOT USED
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 92 00 ....... JOINT SEALANTS A
DIVISION 08 – OPENINGS
NOT USED
DIVISION 09 – FINISHES
TABLE OF CONTENTS 00 01 10 - 2
09 91 23 ....... INTERIOR PAINTING A
DIVISION 10 – SPECIALTIES
NOT USED
DIVISION 11 – EQUIPMENT
NOT USED
DIVISION 12 – FURNISHINGS
NOT USED
DIVISION 13 – SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 – CONVEYING EQUIPMENT
NOT USED
DIVISION 21 – FIRE SUPPRESSION
NOT USED
DIVISION 22 – PLUMBING
NOT USED
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
NOT USED
DIVISION 26 – ELECTRICAL
NOT USED
DIVISION 27 – COMMUNICATIONS
NOT USED
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
NOT USED
DIVISION 31 – EARTHWORK
NOT USED
DIVISION 32 – EXTERIOR IMPROVEMENTS
NOT USED
DIVISION 33 – UTILITIES
NOT USED
*Seal:
A = Architect: Substance LLC M = Mechanical Engineer: (not used) E = Electrical Engineer: (not used) S = Structural Engineer (not used) O = Owner: .. GSA
B
ID
D O
C U
M E
N T
S
S U
B M
IT
A
P P
R O
V
N E
E D
E D
B Y
M A
T E
R
N E
E D
E D
Y
C O D E
D A
T E
S U
B M
IT
T
O
G
V E
R N
M E
N T
C O D E
D A
T E
D iv
S u b c o n tr a c to r L is t
D iv
C o n s tr u c ti o n S c h e d u le
D iv
S c h e d u le o f V a lu e s
D iv
S c h e d u le o f S u b m it ta ls
D iv
C o m p a ra b le
P ro d u c t R e q u e s ts
S u b s ti tu ti o n s
D iv
R e c o rd
D ra w in g s
D iv
M a in te n a n c e S to c k
D iv
S p e c ia l T o o l, K e ys
E tc
D iv
R e c o rd
F in is h S c h e d u le
D iv
O p e ra ti o n a n d
M a in te n a n c e M a n u a ls
S
E L E
C T
IV
E
D E
M O
L
IT
IO
N
Q u a lif ic a ti o n d a ta
S
E L E
C T
IV
E
D E
M O
L
IT
IO
N
P ro p o s e d p ro te c ti o n m e a s u re s
S
E L E
C T
IV
E
D E
M O
L
IT
IO
N
S c h e d u le o f d e m o a c ti v it ie s
S
E L E
C T
IV
E
D E
M O
L
IT
IO
N
In v e n to ry
S
E L E
C T
IV
E
D E
M O
L
IT
IO
N
S ta te m e n t o f re fr ig e ra n t re c o v e ry
S
E L E
C T
IV
E
D E
M O
L
IT
IO
N
W a rr a n ti e s e xi s ti n g w a rr a n ti e s
S
E L E
C T
IV
E
D E
M O
L
IT
IO
N
In v e n to ry
M
E T
A L F
A B
R
IC
A T
IO
N
S S h o p
D ra w in g s
M
E T
A L F
A B
R
IC
A T
IO
N
S W e ld in g
C e rt if ic a te s
M
E T
A L F
A B
R
IC
A T
IO
N
S P a in t C o m p a ti b iit y
C e rt if ic a te s
G
L A
Z E
D D
E C
O R
A T
IV
M
T A
L R
A
IL
IN
G
S P ro d u c t d a ta
G
L A
Z E
D D
E C
O R
A T
T A
L R
A
IL
IN
G
S S h o p
D ra w in g s
G
L A
Z E
D D
E C
O R
A T
T A
L R
A
IL
IN
G
S S a m p le s f o r v e ri fi c a ti o n
G
L A
Z E
D D
E C
O R
A T
T A
L R
A
IL
IN
G
S D e s ig n C a lc u la ti o n s S u b m it ta l
G
L A
Z E
D D
E C
O R
A T
T A
L R
A
IL
IN
G
S Q u a lif ic a ti o n d a ta
J O
IN
T
S E
A L A
N T
S P ro d u c t d a ta
J O
IN
T
S E
A L A
N T
S S a m p le s f o r in it ia l s e le c ti o n c h o lo r c h a rt s
J O
IN
T
S E
A L A
N T
S P ro d u c t te s t re p o rt s
J O
IN
T
S E
A L A
N T
S P re c o n s tr u c ti o n c o m p a ti b ili ty a n d a d h e s io n t e s t re p o rt s
J O
IN
T
S E
A L A
N T
S M o c k u p s
J O
IN
T
S E
A L A
N T
S W a rr a n ti e s
IN
T E
R
IO
R P
A
IN
T
IN
G P ro d u c t d a ta
IN
T E
R
IO
R P
A
IN
T
IN
G S a m p le s
IN
T E
R
IO
R P
A
IN
T
IN
G P ro d u c t lis t
IN
T E
R
IO
R P
A
IN
T
IN
G R e c o rd d o c u m e n ts s e t o f c o lo r s a m p le s /f o rm u la s
IN
T E
R
IO
R P
A
IN
T
IN
G E xt ra m a te ri a ls
IN
T E
R
IO
R P
A
IN
T
IN
G M o c k u p s
G O
V E
R N
M E
N
A C
T
IO
N
A C
T
N O
S P
E C
S E
C T
IO
N
T R
A N
S M
IT
N O
IT
S U
B M
IT
T
A L
D E
S C
R
IP
T
IO
N
T Y
P E
C L
A S
S
IF
IC
A
T
IO
N
A N
D P
A R
A G
R A
P H
N U
M B
E R
R E
V
IE
W E
R S
P E
C
S E
C T
IO
N
N A
M E
R E
M A
R K
S
S U
B M
IT
T
A L
R E
G
IS
T E
R
C O
N T
R A
C T
N U
M B
E R
B u ild in g
I A
Z
Z G
S A
R
IA
P R
O J E
C T
N U
M B
E R
T
IT
L E
A N
D L
O C
A T
IO
N
L o b b y
G u a rd a n d
S ta ir R a il
A lt e ra ti o n s
S io u x
C it y
F e d e ra l B u ild in g
C O
N T
R A
C T
O R
S C
H E
D U
L E
D A
T E
S C
O N
T R
A C
T O
R A
C T
IO
N
C o d e s (u s e a ll th a t a p p ly
R
R e v ie w d
R
R e v ie w e d a s N o te d
N R
N o t R e v ie w
R e v is e a n d
R e s u b m it
S
S u b m it C o rr e c te d C o p ie s
C
C o m m e n ts
A tt a c h e d
P a g e o f
:1
P
M
/1
/2
ID
D O
C U
M E
N T
S
S U
B M
IT
A
P P
R O
V
N E
E D
E D
B Y
M A
T E
R
N E
E D
D
Y
C O D E
D A
T E
S U
B M
IT
G
V E
R N
M E
N T
C O D E
D A
T E
G O
V E
R N
M E
A C
T
IO
N
A C
T
N O
S P
E C
S E
C T
IO
N
T R
A N
S M
IT
N O
IT
S U
B M
IT
T
A L
D E
S C
R
IP
T
IO
N
T Y
P E
C L
A S
S
IF
IC
A
T
IO
N
A N
D P
A R
A G
R A
P H
N U
M B
E R
R E
V
IE
W E
R S
P E
C
S E
C T
IO
N
N A
M E
R E
M A
R K
S
S U
B M
IT
T
A L
R E
G
IS
T E
R
C O
N T
R A
C T
N U
M B
E R
B u ild in g
I A
Z
Z G
S A
R
IA
P R
O J E
C T
N U
M B
E R
T
IT
L E
A N
D L
O C
A T
IO
N
L o b b y
G u a rd a n d
S ta ir R a il
A lt e ra ti o n s
S io u x
C it y
F e d e ra l B u ild in g
C O
N T
R A
C T
O R
S C
H E
D U
L E
D A
T E
S C
O N
T R
A C
T O
R A
C T
IO
N
C o d e s (u s e a ll th a t a p p ly
R
R e v ie w
R e v ie w e d a s N o te d
N R
N o t R e v ie w
R e v is e a n d
R e s u b m it
S
S u b m it C o rr e c te d C o p ie s
C
C o m m e n ts
A tt a c h e d
P a g e o f
:1
P
M
/1
/2
SELECTIVE DEMOLITION 02 41 19 - 1
SECTION 02 41 19
SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building elements.
2. Protection of existing items to remain.
B. Related Requirements: Sections listed below bear particular relevance to demolition procedures.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to GSA ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For demolition firm; for refrigerant recovery technician.
B. Proposed Protection Measures: Submit report, including drawings, that indicates the measures proposed for protecting individuals and property, for dust control; for water control related to cutting existing concrete; and for noise control. Indicate proposed locations and construction of barriers.
C. Schedule of Selective Demolition Activities: Indicate the following:
SELECTIVE DEMOLITION 02 41 19 - 2
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure GSA's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Coordination of GSA's continuing occupancy of portions of existing building and of GSA's partial occupancy of completed Work.
D. Inventory: Submit a list of items to be removed and salvaged and deliver to GSA prior to start of demolition.
E. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
F. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.7 FIELD CONDITIONS
A. GSA will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so GSA's operations will not be disrupted.
B. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Hazardous Materials:
1. Paint being drilled through most likely contains lead. All workmen must wear protective clothing, (including hair), goggles and respirators with proper filters
2. A report on the presence of hazardous materials is on file for review and use.
3. FOLLOW ALL APPROPRIATE REGULATIONS PROVIDED BY THE EPA REGIONAL
OFFICE AND/OR THE STATE OFFICE OF ENVIRONMENTAL PROTECTION.
4. No food or drink shall be allowed near any work station so as to prevent contamination from paint, paint chips or paint dust which may contain lead and other toxic substances.
5. Protective clothing shall be removed at the end of each day and kept at the site to prevent workers from taking dust and paint chips to other parts of the site or to their homes.
6. Wash hands and face often, especially before eating and at the end of the day.
D. Storage or sale of removed items or materials on-site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
SELECTIVE DEMOLITION 02 41 19 - 3
1.8 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding.
B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.
1.9 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with GSA's operations.
PART 2 - PRODUCTS
2.1 PEFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review record documents of existing construction provided by GSA. GSA does not guarantee that existing conditions are same as those indicated in record documents.
C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to Architect.
E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs.
1. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video of conditions that might be misconstrued as damage caused by salvage operations.
2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
SELECTIVE DEMOLITION 02 41 19 - 4
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Comply with requirements for access and protection specified in Section 015000
"Temporary Facilities and Controls."
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."
C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.
5. Maintain adequate ventilation when using cutting torches.
SELECTIVE DEMOLITION 02 41 19 - 5
6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
7. Remove structural framing members and lower to ground or slab below by method suitable to avoid free fall and to prevent ground or slab impact or dust generation.
8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
9. Dispose of demolished items and materials promptly.
B. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to GSA.
4. Transport items to GSA's storage area designated by GSA.
5. Protect items from damage during transport and storage.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Cutting and Patching at Existing Gypsum Board Walls: Where required due to removal of existing construction abutting existing construction to remain, patch holes and repair gypsum wall surfaces to receive new base and paint coatings. Comply with Section 09 29 00 “Gypsum Board.”
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain GSA's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Section 017419 "Construction Waste Management and Disposal."
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off GSA's property and legally dispose of them.
SELECTIVE DEMOLITION 02 41 19 - 6
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.8 SELECTIVE DEMOLITION SCHEDULE
A. Existing Construction to Be Removed: Refer to Drawings for location and extent.
B. Existing Items to Be Removed and Salvaged: Refer to Drawings for items indicated “remove and salvage, deliver to /Owner GSA.”
C. Existing Items to Be Removed and Reinstalled: Refer to Drawings for items indicated “save for” or “reinstallation.”
D. Existing Items to Remain: Refer to Drawings for items indicated “to remain,” “to remain in place,” “protect,” or “do not disturb.”
END OF SECTION 02 41 19
METAL FABRICATIONS 05 50 00 - 1
SECTION 05 50 00
METAL FABRICATIONS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Steel framing and supports for applications where framing and supports are not specified in other Sections.
2. Custom steel plate fabrications used in conjunction with stair railings.
B. Related Sections:
1. Division 09 Sections for field-applied coatings.
1.3 COORDINATION
A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible with one another.
B. Coordinate installation of metal fabrications that are anchored to or that receive other work.
Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.
1.4 ACTION SUBMITTALS
A. Shop Drawings: Show fabrication and installation details. Include plans, elevations, sections, and details of metal fabrications and their connections. Show anchorage and accessory items.
1.5 INFORMATIONAL SUBMITTALS
A. Welding certificates.
B. Paint Compatibility Certificates: From manufacturers of topcoats applied over shop primers, certifying that shop primers are compatible with topcoats.
1.6 QUALITY ASSURANCE
A. Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Welding Qualifications: Qualify procedures and personnel according to the following:
1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."
METAL FABRICATIONS 05 50 00 - 2
1.7 FIELD CONDITIONS
A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.
PART 2 - PRODUCTS
2.1 METALS
A. Metal Surfaces, General: Provide materials with smooth, flat surfaces unless otherwise indicated. For metal fabrications exposed to view in the completed Work, provide materials without seam marks, roller marks, rolled trade names, or blemishes.
B. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M.
2.2 FASTENERS
A. General: Select fasteners for type, grade, and class required.
B. Anchor Bolts: ASTM F 1554, Grade 36, of dimensions indicated; with nuts, ASTM A 563 (ASTM A 563M); and, where indicated, flat washers.
C. Anchors, General: Anchors capable of sustaining, without failure, a load equal to six times the load imposed when installed in unit masonry and four times the load imposed when installed in concrete, as determined by testing according to ASTM E 488/E 488M, conducted by a qualified independent testing agency.
D. Post-Installed Anchors: Torque-controlled expansion anchors.
1. Material for Interior Locations: Carbon-steel components zinc plated to comply with
ASTM B 633 or ASTM F 1941 (ASTM F 1941M), Class Fe/Zn 5, unless otherwise indicated.
2.3 MISCELLANEOUS MATERIALS
A. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79 and compatible with topcoat.
B. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187/D 1187M.
2.4 FABRICATION, GENERAL
A. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation.
B. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch (1 mm) unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.
C. Form exposed work with accurate angles and surfaces and straight edges.
METAL FABRICATIONS 05 50 00 - 3
D. Weld corners and seams continuously to comply with the following:
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.
E. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws, and similar items.
F. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads.
2.5 MISCELLANEOUS FRAMING AND SUPPORTS
A. General: Provide steel framing and supports not specified in other Sections as needed to complete the Work.
B. Fabricate units from steel shapes, plates, and bars of welded construction unless otherwise indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent construction.
1. Furnish inserts for units installed into existing work.
C. Prime miscellaneous framing and supports where indicated.
2.6 MISCELLANEOUS STEEL TRIM
A. Unless otherwise indicated, fabricate units from steel shapes, plates, and bars of profiles shown with continuously welded joints and smooth exposed edges. Miter corners and use concealed field splices where possible.
B. Provide cutouts, fittings, and anchorages as needed to coordinate assembly and installation with other work.
C. Provide with integrally welded steel strap anchors for embedding in concrete or masonry construction.
D. Prime miscellaneous steel trim where indicated to be field-painted.
2.7 FINISHES, GENERAL
A. Finish metal fabrications after assembly.
B. Finish exposed surfaces to remove tool and die marks and stretch lines, and to blend into surrounding surface.
2.8 STEEL AND IRON FINISHES
A. Shop prime iron and steel items unless otherwise indicated.
METAL FABRICATIONS 05 50 00 - 4
1. Shop prime with universal shop primer.
2. Coordinate shop primer with specified finish coatings.
B. Preparation for Shop Priming: Prepare surfaces to comply with SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning."
C. Shop Priming: Apply shop primer to comply with SSPC-PA 1, "Paint Application Specification No. 1: Shop, Field, and Maintenance Painting of Steel," for shop painting.
1. Stripe paint corners, crevices, bolts, welds, and sharp edges.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing metal fabrications. Set metal fabrications accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels.
B. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations.
C. Field Welding: Comply with the following requirements:
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.
D. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-place construction. Provide threaded fasteners for use with concrete and masonry inserts, toggle bolts, through bolts, lag screws, wood screws, and other connectors.
E. Provide temporary bracing or anchors in formwork for items that are to be built into concrete, masonry, or similar construction.
F. Corrosion Protection: Coat concealed surfaces that come into contact with grout, concrete, masonry, wood, or dissimilar metals with the following:
1. Heavy coat of bituminous paint.
END OF SECTION 05 50 00
GLAZED DECORATIVE METAL RAILINGS 057313 - 1
SECTION 05 73 13
GLAZED DECORATIVE METAL RAILINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Post-supported railings with glass infill.
2. Illuminated decorative railings.
B. Related Requirements:
1. Section 0550000 “Metal Fabrications” for additional support items if needed and steel plate components associated with the stair modifications but not part of the railing itself.
1.3 DEFINITIONS
A. Railings: Guards, handrails, and similar devices used for protection of occupants at open-sided floor areas and for pedestrian guidance and support, visual separation, or wall protection.
1.4 COORDINATION AND SCHEDULING
A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written instructions to ensure that shop primers and topcoats are compatible.
B. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver items to Project site in time for installation.
1.5 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.6 ACTION SUBMITTALS
A. Product Data: For the following:
GLAZED DECORATIVE METAL RAILINGS 057313 - 2
1. Manufacturer's product lines of railings assembled from standard components.
2. Grout, anchoring cement, and paint products.
B. Shop Drawings: Include plans, elevations, sections, and attachment details.
C. Samples for Verification: For each type of exposed finish required.
1. Sections of each distinctly different linear railing member, including handrails, top rails, posts, and balusters.
2. Each type of glass required.
3. Fittings and brackets.
D. Design Calculations Submittal: For installed products indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
1.7 INFORMATIONAL SUBMITTALS
A. Qualification Data: For professional engineer.
1.8 QUALITY ASSURANCE
A. Installer Requirements: Installed by manufacturer or manufacturer certified installer.
B. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for fabrication and installation.
1. Build mockups as one section of rail.
2. Build mockups for each form and finish of railing consisting of two posts, top rail, infill area, and anchorage system components that are full height and are not less than 24 inches (600 mm) in length.
3. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.9 FIELD CONDITIONS
A. Field Measurements: Verify actual locations of walls and other construction contiguous with railings by field measurements before fabrication and indicate measurements on Shop Drawings.
B. Verify holding capacity of existing substrate which railing will be fastened to.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations: Obtain each type of railing from single source from single manufacturer.
GLAZED DECORATIVE METAL RAILINGS 057313 - 3
B. Basis-of-Design Product: Subject to compliance with requirements, provide VIVA Railings, LLC; VIEW or comparable product by one of the following:
1. Blum, Julius & Co., Inc.
2. Morse Industries.
C. Product Options: Drawings indicate size, profiles, and dimensional requirements of railings and are based on the specific system indicated. See Section 016000 "Product Requirements."
1. Do not modify intended aesthetic effects, as judged solely by Architect, except with Architect's approval. If modifications are proposed, submit comprehensive explanatory data to Architect for review.
2. Support: Round Standoffs.
3. Top Rail: U-Cap cross section shape, minimal sightlines, finish to match buttons (ECM).
4. Infill Panel: Laminated glass.
2.2 PERFORMANCE REQUIREMENTS
A. General: In engineering railings to withstand structural loads indicated, determine allowable design working stresses of railing materials based on the following:
1. Stainless Steel: 60 percent of minimum yield strength.
2. Glass: 25 percent of mean modulus of rupture (50 percent probability of breakage), as listed in "Mechanical Properties" in AAMA's Aluminum Curtain Wall Series No. 12, "Structural Properties of Glass."
B. Structural Performance: Railings, including attachment to building construction, shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:
1. Top Rails of Guards:
a. Uniform load of 50 lbf/ft. (0.73 kN/m) applied in any direction.
b. Concentrated load of 200 lbf (0.89 kN) applied in any direction.
c. Uniform and concentrated loads need not be assumed to act concurrently.
2. Infill of Guards:
a. Concentrated load of 50 lbf (0.22 kN) applied horizontally on an area of 1 sq. ft.
(0.093 sq. m).
b. Infill load and other loads need not be assumed to act concurrently.
3. Glass-Supported Railings: Support each section of top rail by a minimum of three glass panels or by other means so top rail will remain in place if any one panel fails.
2.3 METALS, GENERAL
A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.
B. Brackets, Flanges, and Anchors: Same metal and finish as supported rails unless otherwise indicated.
GLAZED DECORATIVE METAL RAILINGS 057313 - 4
1. Provide cast-stainless steel wall brackets with flange tapped for concealed anchorage with vertical and horizontal adjustment capability.
2.4 STAINLESS STEEL
A. Castings: ASTM A 743/A 743M, Grade CF 8 or CF 20.
B. Sheet, Strip, Plate, and Flat Bar: ASTM A 666 or ASTM A 240/A 240M, Type 304.
C. Bars and Shapes: ASTM A 276, Type 304.
2.5 GLASS AND GLAZING MATERIALS
A. Safety Glazing: Glazing shall comply with 16 CFR 1201, Category II.
B. Laminated Glass: ASTM C 1172, Condition A (uncoated), Type I (transparent flat glass), Quality-Q3 with two plies of glass and interlayer.
1. Kind: LT (laminated tempered).
2. Glass Color: Clear.
3. Interlayer: SGP; 0.035 inch (0.89 mm) thick.
a. Interlayer Color: Clear.
4. Glass Plies for Glass Infill Panels: Thickness required by structural loads, but not less than 0.24 inch (6 mm) each.
C. Safety Glazing Labeling: Permanently mark glass with certification label of the SGCC or another certification agency acceptable to authorities having jurisdiction. Label shall indicate manufacturer's name, type of glass, thickness, and safety glazing standard with which glass complies.
D. Glazing Accessories for Structural Glazing: Setting blocks, shims, and related accessories as recommended or supplied by railing manufacturer for installing structural glazing in metal subrails.
E. Glazing Gaskets for Glass Infill Panels: Glazing gaskets and related accessories recommended or supplied by railing manufacturer for installing glass infill panels in post-supported railings.
2.6 FASTENERS
A. Fastener Materials: Unless otherwise indicated, provide the following:
1. Stainless-Steel Components: Type 304 stainless-steel fasteners.
2. Dissimilar Metals: Type 304 stainless-steel fasteners.
B. Fasteners for Anchoring to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction indicated and capable of withstanding design loads.
C. Provide concealed fasteners for interconnecting railing components and for attaching railings to other work unless otherwise indicated.
GLAZED DECORATIVE METAL RAILINGS 057313 - 5
1. Provide hex or hex socket or hex button machine screws for exposed fasteners unless otherwise indicated.
D. Post-Installed Anchors: Fastener systems with working capacity greater than or equal to the design load, according to an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC193 or ICC-ES AC308.
1. Material for Interior Locations: Carbon-steel components zinc plated to comply with ASTM B 633 or ASTM F 1941 (ASTM F 1941M), Class Fe/Zn 5, unless otherwise indicated.
2.7 MISCELLANEOUS MATERIALS
A. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187/D 1187M.
2.8 FABRICATION
A. General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage, but not less than that required to support structural loads.
B. Assemble railings in the shop to greatest extent possible to minimize field splicing and assembly. Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. Use connections that maintain structural value of joined pieces.
C. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch (1 mm) unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.
D. Form work true to line and level with accurate angles and surfaces.
E. Fabricate connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate. Locate weep holes in inconspicuous locations.
F. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items.
G. Mechanical Connections: Connect members with concealed mechanical fasteners and fittings.
Fabricate members and fittings to produce flush, smooth, rigid, hairline joints.
H. Form changes in direction as follows:
1. As detailed.
I. Close exposed ends of hollow railing members with prefabricated end fittings.
J. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and anchors to interconnect railing members to other work where indicated.
K. Provide inserts and other anchorage devices for connecting railings to concrete or masonry work. Fabricate anchorage devices capable of withstanding loads imposed by railings.
Coordinate anchorage devices with supporting structure.
GLAZED DECORATIVE METAL RAILINGS 057313 - 6
2.9 GLAZING PANEL FABRICATION
A. General: Fabricate to sizes and shapes required; provide for proper edge clearance and bite on glazing panels.
1. Clean-cut or flat-grind edges at butt-glazed sealant joints to produce square edges with slight chamfers at junctions of edges and faces.
2. Grind smooth exposed edges, including those at open joints, to produce square edges with slight chamfers at junctions of edges and faces.
B. Structural Glass Balusters: Factory-bond glass to top-rail channels in railing manufacturer's plant using glazing cement to comply with manufacturer's written specifications, unless field glazing is standard with manufacturer.
C. Structural Balusters: Provide laminated, tempered glass panels.
2.10 GENERAL FINISH REQUIREMENTS
A. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipment.
B. Appearance of Finished Work: Noticeable variations in same piece are not acceptable.
Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
C. Provide exposed fasteners with finish matching appearance, including color and texture, of railings.
2.11 STAINLESS-STEEL FINISHES
A. Surface Preparation: Remove tool and die marks and stretch lines, or blend into finish.
B. Electroplated Coating: Satin Brass.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Contractor to examine substrates, to verify holding capacity and that locations of attachment have been clearly marked for Installer. Locate reinforcements and mark locations if not already done.
B. Installation Tolerances: Correct conditions out-of-tolerance to meet railing manufacturer’s requirements.
GLAZED DECORATIVE METAL RAILINGS 057313 - 7
3.2 INSTALLATION, GENERAL
A. Fit exposed connections together to form tight, hairline joints.
B. Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in location, alignment, and elevation; measured from established lines and levels and free of rack.
1. Do not weld, cut, or abrade surfaces of railing components that have been coated or finished after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting.
2. Set posts plumb within a tolerance of 1/16 inch in 3 feet (2 mm in 1 m).
3. Align topcaps so variations from level for horizontal members and variations from parallel with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet (5 mm in 3 m).
C. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.
D. Adjust railings before anchoring to ensure matching alignment at abutting joints.
E. Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for securing railings and for properly transferring loads to in-place construction.
3.3 RAILING CONNECTIONS
A. Nonwelded Connections: Use mechanical or adhesive joints for permanently connecting railing components. Seal recessed holes of exposed locking screws using plastic cement filler colored to match finish of railings.
3.4 INSTALLING GLASS PANELS
A. Glass-Supported Railings: Install assembly to comply with railing manufacturer's written instructions.
1. Attach glass to building structure, using button components.
2. Adjust spacing of glass panels so gaps between panels are equal before securing in position.
3. Erect glass railings under direct supervision of manufacturer's authorized technical personnel.
3.5 FIELD QUALITY CONTROL
A. Testing Agency: Contractor will engage a qualified testing agency to perform tests and inspections and to prepare test reports
B. Extent and Testing Methodology: Testing agency will randomly select completed railing assemblies for testing that are representative of different railing designs and conditions in the completed Work. Test railings according to ASTM E 894 and ASTM E 935 for compliance with performance requirements.
GLAZED DECORATIVE METAL RAILINGS 057313 - 8
C. Remove and replace railings where test results indicate that they do not comply with specified requirements unless they can be repaired in a manner satisfactory to Architect and comply with specified requirements.
D. Perform additional testing and inspecting, at Contractor's expense, to determine compliance of replaced or additional work with specified requirements.
3.6 CLEANING
A. Clean aluminum and stainless steel by washing thoroughly with water and soap, rinsing with clean water, and wiping dry.
B. Clean copper alloys according to metal finisher's written instructions in a manner that leaves an undamaged and uniform finish matching approved Sample.
C. Clean and polish glass as recommended in writing by manufacturer. Wash both exposed surfaces in each area of Project not more than four days before date scheduled for inspections that establish date of Substantial Completion.
3.7 PROTECTION
A. Protect finishes of railings from damage during construction period with temporary protective coverings approved by railing manufacturer. Remove protective coverings at time of Substantial Completion.
B. Restore finishes damaged during installation and construction period so no evidence remains of correction work. Return items that cannot be refinished in the field to the shop; make required alterations and refinish entire unit, or provide new units.
END OF SECTION 057313
JOINT SEALANTS 07 92 00 - 1
SECTION 07 92 00
JOINT SEALANTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and provisions of Division 00 and Division 01 apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Sealants and joint backing.
1.3 PRECONSTRUCTION TESTING
A. Preconstruction Compatibility and Adhesion Testing: Submit to joint-sealant manufacturers, for testing indicated below, samples of materials that will contact or affect joint sealants.
1. Use ASTM C 1087 or manufacturer's standard test method to determine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of joint sealants to joint substrates.
2. Submit not fewer than four pieces of each kind of material, including joint substrates, shims, joint-sealant backings, secondary seals, and miscellaneous materials.
3. Schedule sufficient time for testing and analyzing results to prevent delaying the Work.
4. For materials failing tests, obtain joint-sealant manufacturer's written instructions for corrective measures including use of specially formulated primers.
5. Testing will not be required IF joint-sealant manufacturers submit joint preparation data that are based on previous testing, not older than 24 months, of sealant products for adhesion to, and compatibility with, joint substrates and other materials matching those submitted.
B. Preconstruction Field-Adhesion Testing: Before installing sealants, field test their adhesion to Project joint substrates as follows:
1. Locate test joints where indicated on Project or, if not indicated, as directed by Architect.
2. Conduct field tests for each application indicated below:
a. Each kind of sealant and joint substrate indicated.
3. Notify Architect seven days in advance of dates and times when test joints will be erected.
4. Arrange for tests to take place with joint-sealant manufacturer's technical representative present.
a. Test Method: Test joint sealants according to Method A, Field-Applied Sealant
Joint Hand Pull Tab, in Appendix X1 in ASTM C 1193 or Method A, Tail Procedure, in ASTM C 1521.
1) For joints with dissimilar substrates, verify adhesion to each substrate separately; extend cut along one side, verifying adhesion to opposite side.
Repeat procedure for opposite side.
5. Report whether sealant failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. For sealants that fail adhesively, retest until satisfactory adhesion is obtained.
6. Evaluation of Preconstruction Field-Adhesion-Test Results: Sealants not evidencing adhesive failure from testing, in absence of other indications of noncompliance with
JOINT SEALANTS 07 92 00 - 2
requirements, will be considered satisfactory. Do not use sealants that fail to adhere to joint substrates during testing.
1.4 SUBMITTALS
A. Product Data: For each joint-sealant product indicated.
B. Samples for Initial Selection: Manufacturer's color charts consisting of strips of cured sealants showing the full range of colors available for each product exposed to view.
C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, indicating that sealants comply with requirements.
D. Preconstruction Compatibility and Adhesion Test Reports: From sealant manufacturer, indicating the following:
1. Materials forming joint substrates and joint-sealant backings have been tested for compatibility and adhesion with joint sealants.
2. Interpretation of test results and written recommendations for primers and substrate preparation needed for adhesion.
1.5 QUALITY ASSURANCE
A. Source Limitations: Obtain each kind of joint sealant from single source from single manufacturer.
B. Mockups: Install sealant in mockups of assemblies specified in other Sections that are indicated to receive joint sealants specified in this Section. Use materials and installation methods specified in this Section.
1.6 PROJECT CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:
1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer or are below 40 deg F (5 deg C).
2. When joint substrates are wet.
3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.
4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.
1.7 WARRANTY
A. Special Manufacturer's Warranty: On manufacturer's standard form; in which joint-sealant manufacturer agrees to furnish joint sealants to repair or replace those that do not comply with performance and other requirements specified in this Section within specified warranty period.
1. Warranty Period, Latex and Acoustical: Manufacturer’s standard term, but not less than
5 years from date of Substantial Completion.
2. Warranty Period, Silicone: Manufacturer’s standard term, but…