RGBG_Restroom_Generic_Construction_Documents.pdf
PDF 11 MB Posted
- Attached to
- PUBLIC RESTROOM FACILITY
- Solicitation number
- PE-66061-NONST-2027-000000102
- Issued by
- Fulton County, Colquitt City, Georgia
About this file
This document comprises generic construction documents (basis of design) for a Request for Proposals issued by the City of College Park, Georgia for the Roderick Gay Botanical Garden Phase III Public Restroom Facility, a 1,000 gross square foot enclosed restroom building to be constructed at 4355 Global Gateway Connector, College Park, Georgia 30349. The project includes separate Women's (101) and Men's (103) restrooms with a combined total of six water closets, two urinals, and four lavatories; a Utility room (102); a covered entry (100) with a bi-level drinking fountain; site work including ADA-accessible walks; utilities; and landscape restoration. The design-build Contractor shall furnish sealed architectural, structural, plumbing, mechanical, electrical, and civil documents and obtain all permits consistent with the TSW Roderick Gay Botanical Gardens Phase III Restroom Building Concept (dated March 23, 2026) and Prime Engineering site plans. The project features a curved standing-seam metal roof, natural and reclaimed stone veneer exterior on reinforced concrete masonry units, exposed glued-laminated timber supports and knee braces, and an aluminum storefront clerestory. The contract time is 180 calendar days from Notice to Proceed to Substantial Completion, with Final Completion required 30 days thereafter. These generic construction documents were issued with the RFP on November 17, 2026, and are adapted from the City of College Park's Barrett Park Restroom Facility prototype construction documents (June 2023).
The project requires a lump-sum price proposal and includes four Owner allowances totaling $70,000: Utility service connection and impact fees ($25,000), Testing and special inspections ($10,000), Signage and site furnishings ($20,000), and Unforeseen subsurface conditions ($15,000). Unit prices shall be provided for rock excavation, unsuitable soil replacement, additional concrete walk, additional sanitary and water piping, and sodding. Three alternates are available: ductless heat pump comfort cooling and heating, electrified timed locking for restroom doors, and stone accent interior walls. The Contractor must conduct a geotechnical investigation (minimum two borings to 15 feet) under the testing allowance and verify all existing site conditions before final pricing. Work shall comply with applicable codes including the International Building Code (as adopted by Georgia), Georgia State Plumbing Code, NFPA 70 (NEC) with amendments, 2010 ADA Standards, and City ordinances. All work shall be coordinated with the concurrent Botanical Garden contractor, and high-quality construction standards are required with mock-ups of stone veneer and resinous flooring, City-retained testing agencies for special inspections, and comprehensive submittal procedures including 60% and 100% design review phases before permit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 27_72 PUBLIC RESTROOM FACILITY.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF COLLEGE PARK
3667 MAIN STREET
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
COVER SHEET
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
G-001 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
NEW PUBLIC RESTROOM
FACILITY (THIS PROJECT)
G-001
KEY PLAN - RODERICK GAY BOTANICAL GARDEN (FROM PRIME ENGINEERING C-201B)
SCALE: NTS
CITY OF COLLEGE PARK, GEORGIA
RODERICK GAY BOTANICAL GARDEN
PHASE III - NEW PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
GENERIC CONSTRUCTION DOCUMENTS (BASIS OF DESIGN) - ISSUED WITH REQUEST FOR PROPOSALS
NOVEMBER 17, 2026
SHEET INDEX
SHEET TITLE
G-001 COVER SHEET, SHEET INDEX & KEY PLAN
G-002 GENERAL NOTES, CODE SUMMARY, ABBREVIATIONS & SYMBOLS
C-101 SITE LAYOUT PLAN
C-102 GRADING, DRAINAGE & EROSION CONTROL PLAN
C-103 UTILITY PLAN
C-501 SITE DETAILS
S-001 STRUCTURAL GENERAL NOTES & DESIGN CRITERIA
S-101 FOUNDATION PLAN & DETAILS
S-201 ROOF FRAMING PLAN & DETAILS
A-101 FLOOR PLAN, FIXTURE COUNT & PLAN NOTES
A-201 ROOF PLAN & ROOF NOTES
A-301 EXTERIOR ELEVATIONS
A-401 BUILDING SECTIONS & WALL SECTION
A-501 INTERIOR ELEVATIONS & ACCESSIBILITY MOUNTING HEIGHTS
A-601 DOOR, HARDWARE, OPENING, ACCESSORY & SIGNAGE SCHEDULES
P-101 PLUMBING PLANS, SCHEDULES & NOTES
M-101 MECHANICAL (VENTILATION/HEATING) PLAN & SCHEDULES
E-101 ELECTRICAL PLANS, PANEL SCHEDULE & NOTES
PM PROJECT MANUAL - OUTLINE TECHNICAL SPECIFICATIONS (LETTER-SIZE PAGES FOLLOW)
PROJECT DIRECTORY
ROLE ORGANIZATION / CONTACT
Owner City of College Park, 3667 Main Street, College Park, GA 30337
Project sponsor Councilman Roderick D. Gay, MPA - Ward 4
Purchasing City of College Park Purchasing Department (all communications during solicitation)
Concept architect TSW - Restroom Building Concept dated 2026.03.23 (incorporated by reference)
Site civil (garden) Prime Engineering - Sheets C-201B, C-202B, C-203B (Phases 1 & 2)
Design-build team Selected Contractor's GA-registered Architect & Engineers (sealed permit set)
PROJECT DATA
ITEM BASIS OF DESIGN
Building area 1,000 GSF enclosed; approx. 1,280 SF under curved roof
Program Women 101 (4 WC, 2 LAV); Men 103 (2 WC, 2 UR, 2 LAV); Utility 102; Covered Entry 100 w/ bi-level fountain
Construction Natural/reclaimed stone veneer on CMU; alum. storefront clerestory; glulam-supported curved standing-seam roof
Occupancy / type Group A-5 accessory restroom (or B per Building Official); Type V-B; non-sprinklered
Utilities Sewer to Z1.2 SSCO; water from C-203B system; electric by College Park Power (TBD)
Contract time 180 calendar days from Notice to Proceed to Substantial Completion
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
GENERAL NOTES, CODE
SUMMARY & SYMBOLS
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
G-002 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
GENERAL NOTES
1. These Generic Construction Documents (GCDs) were prepared by adapting the City of College Park Barrett Park Restroom Facility prototype construction documents and project manual (06/2023) to the TSW Roderick Gay Botanical Gardens Phase III Restroom Building Concept (2026.03.23) and the Prime Engineering site sheets C-201B, C-202B and C-203B.
2. The GCDs define scope, quality, quantities and design intent for competitive proposals under the City's RFP. They are not sealed and shall not be used for permit or construction. The Contractor (design-build) shall furnish sealed architectural, structural, plumbing, mechanical, electrical and civil documents and obtain all permits.
3. Where the GCDs, TSW concept and RFP Scope of Work conflict, the most stringent requirement governs; architectural appearance shall follow the TSW concept (curved metal roof, natural stone, exposed wood supports, clerestory). Report conflicts by RFI during the question period.
4. Contractor shall verify all existing conditions, dimensions, grades and utilities in the field before submitting the final price and before construction (RFP Scope Item 6).
5. All work shall comply with the codes in effect in the City of College Park at time of permit, including the International Building, Plumbing, Mechanical, Fuel Gas, Energy Conservation and Fire Codes and NFPA 70 (NEC) with Georgia State Amendments, the 2010 ADA Standards for Accessible Design, and City ordinances.
6. Protect existing trees, landscaping, trails, utilities and garden improvements. Damage shall be repaired at Contractor's expense to pre-construction condition.
7. Coordinate all work, access, staging and schedule with the Botanical Garden contractor and the City's representative (RFP: high degree of coordination required).
8. Substitutions: products named are basis of design followed by "or equal" per City Purchasing Policy. Requests for substitution shall be submitted per Section 01 25 00; no change in architectural appearance without written City approval.
9. Contractor shall maintain a clean, safe, secured site; working hours per City ordinance; no work on Garden event days unless approved.
CODE SUMMARY
CODE ITEM BASIS (TO BE CONFIRMED BY CONTRACTOR'S ARCHITECT)
Occupancy Accessory comfort station to outdoor park/garden: Group A-5 (IBC 303.6) or Group B per Building Official determination
Construction type Type V-B (exposed heavy timber/glulam acceptable); non-sprinklered
Area / height 1,000 GSF, 1 story, < 20 ft - well within allowable area/height
Occupant load Toilet rooms accessory - approx. 10 (100 GSF/occ.)
Egress Each restroom single exit < 49 occupants; exit doors swing per IBC 1010; exterior egress lighting
Plumbing fixtures Provided: 6 WC, 2 UR, 4 LAV, 1 DF (bi-level), 1 service sink - exceeds typical park restroom minimum; see A-101
Accessibility 2010 ADA Standards + ICC A117.1: accessible route from trail, 60" turning space, accessible & ambulatory compartments, accessible urinal & lavatories, bi-level DF
Energy IECC - semi-heated (freeze protection) building; lighting power & controls compliance by Contractor's MEP
Fire protection Portable extinguisher in Utility 102; no fire alarm required
ABBREVIATIONS
AFF - above finished floor
BFP - backflow preventer
CMU - concrete masonry unit
CO - cleanout
DF/ECW - drinking fountain / electric water cooler
EF - exhaust fan
EUH - electric unit heater
FD - floor drain
FFE - finished floor elevation
GAB - graded aggregate base
GLB - glued-laminated beam
GCD - generic construction documents
HB - hose bib / wall hydrant
HM - hollow metal
HSS - hollow structural section
LAV - lavatory
LOD - limits of disturbance
MS - mop sink
NTS - not to scale
RPZ - reduced pressure zone
SSCO - sanitary sewer cleanout
SSMH - sanitary sewer manhole
TMV - thermostatic mixing valve
T&G - tongue and groove
TYP - typical
UR - urinal
VIF - verify in field
WC - water closet
WH - water heater
WWF - welded wire fabric
SYMBOLS LEGEND
G-002
VIEW TITLE
SCALE: AS NOTED
Detail / view number over sheet number
101 Door tag (see A-601)
A Equipment / fixture tag
Sanitary sewer (new)
Domestic water (new)
Electric / communications (new, schematic)
Limits of disturbance / silt fence
Roof overhang above
CMU wall (cut)
Natural / reclaimed stone veneer
ACCESSIBILITY GENERAL NOTES
1. Accessible route: 36" min clear width (6'-0" walk provided), running slope <= 1:20, cross slope <= 1:48, firm stable slip-resistant surface, changes in level <= 1/4" (1/2" beveled 1:2).
2. Doors: 32" min clear opening, 18" pull-side / 12" push-side latch clearances, operable hardware 34"-48" AFF without tight grasping, opening force <= 5 lbf, closing speed >= 5 sec from 90 to 12 degrees.
3. Toilet compartments: wheelchair accessible 60" min wide x 56" min deep (wall-hung WC); ambulatory 35-37" wide x 60" min deep; doors self-closing with pulls both sides.
4. Protruding objects between 27" and 80" AFF shall project max 4" into circulation (hand dryers, fountain - recessed alcove).
5. Signage: tactile/Braille room ID signs on latch side 48"-60" to baseline; ISA at accessible entrances; restroom pictograms per ADA 703.
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
SITE LAYOUT PLAN
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
C-101 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
UNDERLAY: PRIME ENGINEERING SHEET C-201B DETAILED SITE PLAN (SCREENED). NEW WORK SHOWN DARK/COLOR.
NEW PUBLIC
RESTROOM BUILDING
1,000 GSF / FFE 977.50 (BASIS)
CURVED METAL ROOF CANOPY 32'x40' (DASHED)
CONCRETE ENTRY PLAZA (10' DEEP AT ENTRY) & 4' PERIMETER APRON:
5" CONC. ON 4" GAB, BROOM FINISH, MAX 2% SLOPE ANY DIRECTION,
SLOPED AWAY FROM BUILDING
ADA ACCESSIBLE ROUTE: 6'-0" MIN. CONC. WALK CONNECTING PLAZA TO 10' TRAIL
(STA. 62+00 +/- PER C-201B). RUNNING SLOPE <=5% (NOT A RAMP), CROSS SLOPE
<=2%. IF >5% IS REQUIRED, PROVIDE RAMP W/ HANDRAILS PER ADA 405.
EXISTING/PROPOSED 10' TRAIL BY OTHERS (PROTECT IN PLACE).
MATCH TRAIL EDGE ELEVATION; SAW-CUT & REPLACE DAMAGED TRAIL.
EX. TREES / LANDSCAPE: PROTECT WITH TREE-PROTECTION
FENCE AT DRIP LINE; CLEAR ONLY WITHIN LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE (10' BEYOND PAD) - SEE C-102 FOR ES&PC
C-201B PAD PLACEHOLDER (APPROX. 26'x32') - BUILDING CENTERED ON PAD; TSW FOOTPRINT 30'x33'-4" + ROOF 32'x40' EXCEEDS PLACEHOLDER - CIVIL LIMITS ADJUSTED
BLDG. CENTERED ON C-201B PAD; ROTATED 17.7 DEG.
FROM SHEET GRID TO MATCH PAD. ENTRY FACES
TRAIL (NE +/-).
N
TRUE NORTH
PER C-201B
0' 10' 20' 40' 1" = 10'
C-101
SITE LAYOUT PLAN (ENLARGED FROM C-201B)
SCALE: 1" = 10'-0"
SITE LAYOUT NOTES
1. Building location is the area labeled "PROPOSED BATHROOM BUILDING" on Prime Engineering Sheet C-201B, Roderick Gay Botanical Garden Phases 1 & 2.
The building footprint has been placed within that pad, aligned to its rotation.
2. Contractor shall retain a Georgia Registered Land Surveyor to stake the building corners, plaza, walk and utility connections from the State Plane coordinates on C-203B; deliver a stake-out certificate before forming.
3. Basis-of-design finished floor elevation 977.50 is set from existing contours (approx. 974-978) on C-202B. Final FFE shall be set 6" min above adjacent finished grade and to meet accessible-route slopes to the trail; confirm with City before slab placement.
4. All work on the trail system (by others/Phase contract) shall be coordinated with the City's Botanical Garden contractor. Maintain public access around work or provide signed detours.
5. Provide 2 benches, 1 trash/recycling receptacle and 1 bike rack on plaza (City standard, or allowance) - locations to be field-set.
6. Provide accessible route signage and ISA symbol at plaza entry.
SITE QUANTITIES (FOR PROPOSAL CHECK ONLY)
ITEM APPROX. QTY UNIT
Building (enclosed) 1,000 SF
Roof canopy 1,280 SF
Concrete plaza / perimeter apron 761 SF
ADA concrete walk to trail (6' W) 60 SF
Sod / restoration in LOD 3,000 SF
Tree protection fence 250 LF
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
GRADING, DRAINAGE &
EROSION CONTROL PLAN
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
C-102 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
UNDERLAY: PRIME ENGINEERING SHEET C-202B DETAILED GRADING PLAN (SCREENED). NEW WORK SHOWN DARK/COLOR.
FFE 977.50
TW 977.15
977.15
977.05
977.05
977.10
977.42
977.42
2%
5%
5%
5%
DOWNSPOUT TO CONC. SPLASH BLOCK &
12" RIP-RAP APRON (TYP. 4) - DIRECT
FLOW AWAY FROM BLDG & TRAIL
SD1-S TYPE 'S' SENSITIVE SILT FENCE AT LIMITS OF DISTURBANCE
(GSWCC Sd1-S). TREE PROTECTION (Tp) AT DRIP LINES.
Co
CONSTRUCTION EXIT (Co) - USE EXISTING PAVED TRAIL ACCESS;
NO TRACKING OF SEDIMENT ONTO TRAILS. SWEEP DAILY.
PERMANENT STABILIZATION: SOD ALL DISTURBED AREAS WITHIN 7 DAYS OF
FINAL GRADE (Ds4); TEMPORARY SEEDING/MULCH (Ds1/Ds2) IF IDLE >14 DAYS
N
TRUE NORTH
PER C-202B
0' 10' 20' 40' 1" = 10'
C-102
GRADING, DRAINAGE & ES&PC PLAN (ENLARGED FROM C-202B)
SCALE: 1" = 10'-0"
GRADING & DRAINAGE NOTES
1. Existing contours are from Prime Engineering C-202B (2' interval). Contractor shall verify existing grades by survey prior to pricing finalization and setting FFE.
2. Finished grade shall slope away from building at 5% min. for 10' in pervious areas and 2% min. on impervious surfaces (IBC 1804.4). Plaza and walk cross slopes shall not exceed 2.0% (ADA 403.3).
3. Compaction: building pad and slab subgrade 98% Standard Proctor (ASTM D698) top 12", 95% below; walks 95%. Testing by City-approved testing agency (Testing Allowance).
4. Unsuitable soils, rock, or groundwater encountered shall be reported; removal/replacement priced under unit prices (Form of Proposal).
5. Land disturbance is anticipated to be less than 1 acre; however the work is part of the larger Botanical Garden common development. Contractor shall comply with the City's / Phase's NPDES GAR100003 permit and ES&PC plan, inspections and BMP maintenance, and follow the GSWCC Manual for Erosion & Sediment Control in Georgia (current edition).
6. No grading within the 25' State / 50' County stream buffers or 75' impervious-surface setback shown on C-202B.
7. Roof runoff shall be dispersed via splash blocks; connection to the garden storm system (12" PVC drain, C-202B) is NOT included unless directed by the City (unit price).
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
UTILITY PLAN
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
C-103 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
UNDERLAY: PRIME ENGINEERING SHEET C-203B DETAILED UTILITY PLAN (SCREENED). NEW WORK SHOWN DARK/COLOR.
BUILDING SEWER: 6" PVC SDR-26 (ASTM D3034) @ 1.0% MIN (2.0% PREF.),
approx. 19 LF FROM BLDG. TO EXISTING/PROPOSED Z1.2 SSCO
(N 1323617.59, E 2204460.66 PER C-203B). CONNECT TO 6" DIP LINE Z1
(TO Z1 SSMH) - CONVERT END CLEANOUT TO WYE CONNECTION.
VERIFY INVERT AT Z1.2 (C-305 PROFILE) BEFORE SETTING BLDG. INVERT.
2-WAY CLEANOUT 2'-6" FROM BLDG
W/ TRAFFIC-RATED BOX
C-203B WATER STUB FALLS UNDER NEW PLAZA - CUT &
PLUG / RELOCATE CONNECTION TO METER OUTSIDE PLAZA
CONNECT TO WATER SERVICE STUB SHOWN ON C-203B (8" DIP WATER LINE
SYSTEM / 1" SERVICE PER CITY STD.). PROVIDE 1-1/2" METER (SIZE PER
FIXTURE UNITS - CONFIRM W/ CITY WATER) IN TRAFFIC-RATED METER BOX
W/ CURB STOP; IRRIGATION NOT INCLUDED.
1-1/2" TYPE K COPPER OR PE-4710 CTS SERVICE, 30" MIN COVER, approx. 34 LF, TO RPZ BACKFLOW (BFP-1) IN UTILITY 102 (SEE P-101). TRACER WIRE & WARNING TAPE.
EXISTING/PROPOSED 8" DIP WATER LINE (C-203B) - PROTECT
ELECTRIC: 2" SCH 40 PVC + 120/240V 1-PH UNDERGROUND SERVICE
FROM COLLEGE PARK POWER POINT OF SERVICE (LOCATION TBD -
NOT SHOWN ON C-203B). METER ON EAST WALL. FEE/EXTENSION
COST CARRIED AS UTILITY ALLOWANCE. ROUTE SHOWN SCHEMATIC.
PROVIDE (1) 2" EMPTY CONDUIT W/ PULL STRING TO SAME SOURCE FOR
FUTURE CAMERAS/DATA (CITY IT); STUB 5' OUTSIDE BLDG & CAP.
N
TRUE NORTH
PER C-203B
0' 10' 20' 40' 1" = 10'
C-103
UTILITY PLAN (ENLARGED FROM C-203B)
SCALE: 1" = 10'-0"
UTILITY NOTES
1. Utility connection points are taken from Prime Engineering C-203B: sanitary Z1.2 SSCO (end of 6" DIP line Z1 at N 1323617.59, E 2204460.66) and the water service stub/8" DIP water system. Per the RFP Scope (Item 6), the Contractor shall verify locations, sizes, inverts, pressures and connection requirements before submitting the final price.
2. Call Georgia 811 at least 3 business days before excavating. Pothole existing utilities at crossings.
3. All water & sewer work per City of College Park Public Works / Utility standards and the Georgia State Plumbing Code; sewer air test and mandrel test, water pressure test (150 psi, 2 hr) and bacteriological sampling before use.
4. Maintain 10' horizontal / 18" vertical separation between water and sewer; where not possible, sleeve per GA EPD criteria.
5. Electric service: College Park Power to provide primary/transformer; Contractor provides trench, conduit, secondary conductors, meter base and coordination. Pay utility fees through the Utility Allowance.
6. Restore all trenches in trails/plaza to match existing section; restore turf with sod.
7. Record (as-built) locations of all utilities with GPS coordinates in Georgia State Plane West (NAD83) on the as-built survey.
UTILITY SCHEDULE (BASIS)
UTILITY SIZE / MATERIAL APPROX. LF
Sanitary sewer 6" PVC SDR-26 + 2-way CO 19
Domestic water 1-1/2" Type K Cu / PE CTS 34
Electric 2" PVC, 120/240V 1-ph TBD
Comm. (future) 2" PVC empty TBD
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
SITE DETAILS
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
C-501 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
C-501
CONCRETE WALK / PLAZA SECTION
SCALE: 1" = 1'-0"
5" CONC. 4,000 PSI AIR-ENTRAINED, 6x6 W2.9xW2.9 WWF
OR FIBER; BROOM FINISH PERP. TO TRAVEL
4" GAB ON 95% COMPACTED SUBGRADE
CONTROL JOINTS @ 6' O.C. MAX (1/4 DEPTH), EXPANSION JOINTS @ 30' MAX
AND AT BUILDING/TRAIL INTERFACE W/ 1/2" PREMOLDED FILLER + SEALANT.
CROSS SLOPE 1.5% (2.0% MAX). JOINT VERTICAL OFFSET 1/4" MAX (ADA 303).
C-501
WALK-TO-TRAIL TIE-IN
SCALE: NTS
NEW CONC. WALK EX./PROP. 10' TRAIL
SAW-CUT TRAIL EDGE FULL DEPTH; DOWEL #4 x 18" @ 24" O.C. (SMOOTH, GREASED) INTO TRAIL IF CONCRETE; FLUSH TRANSITION (NO LIP > 1/4").
MATCH TRAIL ELEVATION; LANDING 5'x5' @ 2% MAX AT JUNCTION.
C-501
UTILITY TRENCH
SCALE: NTS
PIPE ON 6" #57 STONE BEDDING,
HAUNCH & 12" COVER (CLASS I)
SELECT BACKFILL 95% STD.
PROCTOR IN 8" LIFTS; TRACER
WIRE + DETECTABLE TAPE 12" BELOW
C-501
SEWER CLEANOUT IN PAVED/TURF AREA
SCALE: NTS
TRAFFIC-RATED CI BOX & CAST BRASS
PLUG, 12" CONC. COLLAR
6" PVC RISER, 2-WAY CLEANOUT FITTING
AT BLDG SEWER
C-501
WATER METER BOX & CURB STOP
SCALE: NTS
METER
METER, CURB STOP, DUAL CHECK & BOX PER CITY OF COLLEGE PARK
WATER STANDARD DETAIL (CITY TO FURNISH METER; CONTRACTOR INSTALLS
UNLESS NOTED). TRAFFIC-RATED LID WHERE IN PAVEMENT.
C-501
TREE PROTECTION FENCE
SCALE: NTS
4' ORANGE HIGH-VIS FENCE ON STEEL T-POSTS @ 8' O.C. AT DRIP LINE
(GSWCC Tp). NO STOCKPILES, VEHICLES OR WASHOUT WITHIN. ROOT PRUNE
CLEANLY AT TRENCH EDGES; ARBORIST REVIEW FOR SPECIMEN TREES.
GENERAL
1. Site details are generic and shall be replaced/confirmed by the Contractor's Georgia PE with City of College Park standard details where they exist. GDOT Standard Specifications (current edition) apply to site concrete and aggregates.
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
STRUCTURAL GENERAL
NOTES & DESIGN CRITERIA
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
S-001 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
DESIGN CRITERIA
DESIGN CRITERIA BASIS OF DESIGN VALUE (VERIFY BY CONTRACTOR'S GA PE)
Building code IBC as adopted by Georgia DCA w/ State amendments; ASCE 7 (edition referenced by adopted IBC)
Risk category II
Roof live load 20 psf (reducible); concentrated 300 lb
Ground snow load Pg per ASCE 7 for College Park, GA (approx. 5-10 psf); include drift/unbalanced on curved roof
Wind Vult approx. 115 mph, Exposure C (verify), open-building / overhang uplift; C&C for curved roof & canopy
Seismic Site Class D (default unless geotech); SDC B anticipated - verify
Dead loads Metal roof + nail-base + T&G deck + glulam approx. 15 psf; stone veneer approx. 45 psf of wall
Foundations Allowable soil bearing 2,000 psf ASSUMED - confirm by geotechnical investigation (Testing Allowance)
Frost depth 12" min; bottom of footings 18" min below finished grade
MATERIALS
1. Concrete: ACI 318 / ACI 301. Footings 3,000 psi; slab-on-grade and site concrete 4,000 psi air-entrained 5-7%. Max w/c 0.50 exterior.
2. Reinforcing: ASTM A615 Grade 60; WWF ASTM A1064. Clear cover: 3" earth-formed, 1-1/2" exposed, 3/4" interior slab top.
3. Masonry: ASTM C90 normal-weight CMU, f'm = 2,000 psi; Type S mortar (CMU), Type N (stone veneer); grout ASTM C476 2,500 psi; joint reinforcement ASTM A951 hot-dip galvanized @ 16" o.c.
4. Structural steel: HSS ASTM A500 Gr. C (Fy 50 ksi); plates/shapes A36/A992; anchor rods ASTM F1554 Gr. 36 hot-dip galvanized; all exterior steel hot-dip galvanized + paint.
5. Glued-laminated timber: ANSI A190.1, 24F-V4 DF/DF (or 24F-V3 SP), Architectural appearance grade, wet-use adhesives, sealed; curved members per AITC/APA radius limits.
6. Wood decking: 3x6 (nominal) T&G Southern Pine, Select Dex, KD-19, exposed face clear sealed. Fasteners stainless or hot-dip galvanized.
7. Connectors: Simpson Strong-Tie or equal, ZMAX/HDG or stainless; concealed knife-plate connections preferred at exposed glulam.
DELEGATED DESIGN & SPECIAL INSPECTIONS
1. The structural system shown (stone-veneered reinforced CMU bearing walls, HSS columns in grouted cells, curved glulam ribs, T&G deck, glulam knee braces) is the basis of design reflecting the TSW concept. The Contractor shall provide complete structural design, calculations and drawings sealed by a Georgia-registered PE for permit.
2. Shop drawings: rebar, CMU reinforcing, structural steel, glulam (incl. camber/curvature, connections) and metal roof attachment - submit for review before fabrication.
3. Special inspections per IBC Ch. 17 (as required by Building Official): soils, concrete, masonry (Level 1), anchors/post-installed anchors, structural steel welding/bolting, wood connections. Owner pays testing via Testing & Inspection Allowance; retesting at Contractor's cost.
4. Geotechnical: Contractor shall obtain a geotechnical report (2 borings min. to 15') and incorporate recommendations before foundation design.
5. Temporary bracing of masonry walls (OSHA / SEC Standard Practice for Bracing Masonry Walls) and of glulam ribs until roof diaphragm complete is the Contractor's responsibility.
6. Lateral system: masonry shear walls in both directions; roof deck diaphragm (blocked/screwed T&G + nail-base sheathing) to collectors at clerestory headers - verify by delegated engineer.
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
FOUNDATION PLAN &
DETAILS
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
S-101 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
F2 F2 F2 F2
F2 F2 F2 F2 F2
5" SLAB ON GRADE: 4,000 PSI, 6x6-W2.9xW2.9 WWF (OR #4 @ 18" EW), 15 MIL VAPOR RETARDER, 4" #57 STONE. SLOPE TO FLOOR DRAINS 1/8"/FT;
DEPRESS FOR RESINOUS FLOOR PER MFR. SAWCUT CONTROL JOINTS
WITHIN 12 HRS, MAX 12'x12' PANELS (ALIGN W/ WALLS)
F1 CONT. FOOTING
(TYP. EXT. WALL)
F3 THICKENED SLAB UNDER 8" CMU
CHASE/PARTITION WALLS
FRONT HEADER (GLB) OVER 14' OPENING ABOVE -
COLUMNS F2 AT PIERS (SEE S-201)
S-101
FOUNDATION PLAN
SCALE: 1/4" = 1'-0"
FOOTING SCHEDULE (BASIS OF DESIGN - FINAL BY CONTRACTOR'S PE)
MARK SIZE REINFORCING REMARKS
F1 2'-6" W x 1'-0" D continuous (3) #5 cont. bot.; #4 dowels @ 32" to match CMU verticals Ext. stone/CMU walls
F2 4'-0" x 4'-0" x 1'-6" D pad (5) #5 EW bot.; (4) 3/4" F1554 anchor rods Under HSS columns; integral w/ F1
F3 1'-4" W x 1'-0" D thickened slab (2) #4 cont. + #4 dowels @ 48" Interior 8" CMU walls
SOG 5" slab 6x6 W2.9xW2.9 WWF Over vapor retarder & stone
(3) #5 CONT.
#5 VERT @ 32" GROUTED, LAP W/ DOWEL
STONE VENEER ON
FTG LEDGE, FLASHING
& WEEPS @ BASE
5" SOG, ISOLATION JT @ WALL
S-101
TYPICAL EXTERIOR WALL FOOTING
SCALE: 1/2" = 1'-0"
FOUNDATION NOTES
1. Proof-roll subgrade; undercut soft/organic soils and replace with compacted structural fill (unit price).
2. Footings shall bear on firm natural soil or compacted fill tested by the testing agency before placement.
3. Provide termite pre-treatment (soil-applied or bait system) with 5-year warranty.
4. Underslab plumbing shall be tested before vapor retarder placement.
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
ROOF FRAMING PLAN
& DETAILS
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
S-201 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
GR-1 GR-1 GR-1 GR-1 GR-1
3x6 T&G DECK SPAN
GB-1: 6-3/4" x 21" GLB HEADER SPANNING 14'-0" OPENING, CARRIES CENTER RIB
HSS 6x6x1/4 COLUMN (TYP.) IN GROUTED CMU CELL
TO 10'-0", EXPOSED THROUGH CLERESTORY,
CLAD/PAINTED; KNIFE-PLATE TO RIB
GLULAM KNEE BRACE (TYP. 2) -
EXPOSED ARCHITECTURAL SUPPORT
PER TSW CONCEPT
GR-1: 6-3/4" x 18" CURVED GLULAM RIB, R = 34'-0", @ 7'-2" +/- O.C., CANTILEVERS
4'-8" FRONT / 2'-0" REAR
S-201
ROOF FRAMING PLAN
SCALE: 1/4" = 1'-0" (APPROX.)
ROOF FRAMING SCHEDULE
MARK MEMBER (BASIS OF DESIGN) NOTES
GR-1 6-3/4" x 18" 24F-V4 curved glulam, R=34' 5 ribs; architectural grade; factory sealed
GB-1 6-3/4" x 21" GLB Front header over 14' opening
GB-2 5-1/8" x 12" GLB Rear tie/collector beam at clerestory top
KB-1 5-1/8" x 6" GLB knee brace Exposed; concealed steel connections
C-1 HSS 6x6x1/4 Base plate & (4) 3/4" anchor rods to F2; galv. + paint
DECK 3x6 T&G SYP Exposed below; 2 spans min.; diaphragm nailing per EOR
FRAMING NOTES
1. All members/connections are basis of design and shall be designed by the Contractor's GA PE. Maintain exposed curved-rib appearance of the TSW concept.
2. Provide uplift ties at every rib bearing and continuous load path to foundations.
3. Clerestory storefront is non-structural; deflection of header/beams shall not exceed L/360 at glazing, and storefront head receptors shall accommodate movement.
4. Wood exposed to weather at overhangs shall be protected by roof drip edge; ends of ribs capped with prefinished metal.
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
FLOOR PLAN, FIXTURE
COUNT & PLAN NOTES
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
A-101 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
WOMEN
UTILITY
MEN
COVERED ENTRY
101 102 103
14'-0" COVERED ENTRY OPENING - NO DOOR. STONE PIERS EACH SIDE;
CANTILEVERED ROOF OVERHANG ABOVE (SEE A-201/A-301)
NATURAL & RECLAIMED STONE VENEER
(4") ON 1" AIR SPACE ON 8" REINF.
CMU, TYP. EXT. WALL - SEE A-401
ECW-1 BI-LEVEL DRINKING FOUNTAIN W/
BOTTLE FILLER IN 6" RECESSED STONE
ALCOVE (ADA 307 - NO PROTRUSION >4")
PANEL 'LP' (SEE E-101)
BFP-1 RPZ BACKFLOW (SEE P-101)
WH-1
MS-1
FLOOR DRAIN FD-1 - SLOPE FLOOR
1/8"/FT TO DRAIN WITHIN 4'-0"
BABY CHANGING STATION
(EACH RESTROOM)
HAND DRYERS (2 PER RESTROOM)
RECESSED/LOW-PROFILE <4" PROJ.
WHEELCHAIR ACCESSIBLE
COMPARTMENT 5'-6" W x 5'-2" D MIN.
OUT-SWING SELF-CLOSING DOOR, 32" CLR.
AMBULATORY COMPARTMENT
36" W x 62" D, GRAB BARS BOTH SIDES
UR-1 ACCESSIBLE URINAL (RIM 17" MAX AFF)
W/ PRIVACY SCREENS 18"D x 48"H
60" DIA. TURNING SPACE
(EACH RESTROOM)
30'-0"
8'-0" 14'-0" 8'-0"
1'-1" 10'-7" 0'-8" 5'-4" 0'-8" 10'-7" 1'-1"
30'-0"
1' -1
7'
-0
0' -8
'-6
1' -1
'-4
'-0
R
O O
F
A R
C C
H O
R D
32'-0" ROOF
A-101
FIRST FLOOR PLAN
SCALE: 3/8" = 1'-0" (1,000 GSF ENCLOSED / 1,280 SF UNDER ROOF)
N
TRUE NORTH
(PER C-201B)
0' 2' 4' 8' 16'
PLUMBING FIXTURE COUNT (BASIS OF DESIGN)
ROOM FIXTURE QTY REMARKS
101 WOMEN Water closet (WC-1A accessible) 1 Wall-hung, 17-19" rim, flush valve on open side, grab bars 36" rear / 42" side
101 WOMEN Water closet (WC-1B ambulatory) 1 Elongated, grab bars both sides
101 WOMEN Water closet (WC-1) 2 Wall-hung, standard compartments
101 WOMEN Lavatory (L-1) 2 Wall-hung vitreous china, sensor faucet, ADA knee clearance, insulated traps
103 MEN Water closet (WC-1A accessible) 1 As above
103 MEN Water closet (WC-1B ambulatory) 1 As above
103 MEN Urinal (UR-1) 2 One accessible (17" max rim), 0.125 gpf
103 MEN Lavatory (L-1) 2 As above
100 ENTRY Drinking fountain (ECW-1) 1 Bi-level refrigerated w/ bottle filler
102 UTILITY Mop sink (MS-1) / FD / HB 1 ea Plus WH-1 water heater, BFP-1 RPZ, shelving
ROOM FINISH SCHEDULE
NO. ROOM FLOOR BASE WALLS CEILING
100 COVERED ENTRY Broom-finish conc. w/ sealer - Stone veneer Exposed T&G wood deck
101 WOMEN Resinous (epoxy-quartz) RF-1 Integral cove 6" Glazed CMU / epoxy paint EP-1 to 8'-0"; stone accent Exposed T&G deck, sealed
102 UTILITY Sealed conc. SC-1 Rubber RB-1 Painted CMU EP-1 Exposed deck
103 MEN Resinous (epoxy-quartz) RF-1 Integral cove 6" Glazed CMU / epoxy paint EP-1 to 8'-0"; stone accent Exposed T&G deck, sealed
GENERAL PLAN NOTES
1. Dimensions are to face of CMU / face of stone unless noted. Building footprint 30'-0" x 33'-4" (1,000 GSF) is the basis of design derived from the TSW concept plan (scale 1/8" = 1'-0", 1000 GROSS SF). Contractor's architect shall confirm final dimensions prior to pricing per the RFP.
2. The TSW concept plan shows urinal symbols in the Women's room and four water closets in the Men's room. This basis of design assigns 4 WC to Women and 2 WC + 2 UR to Men (potty-parity). City to confirm by addendum.
3. All toilet rooms, fixtures, accessories, signage and routes shall comply with the 2010 ADA Standards for Accessible Design and ICC A117.1 as adopted by the State of Georgia. See A-501 for mounting heights.
4. Toilet compartments: solid HDPE (polymer) floor-anchored, overhead-braced, 1" thick, continuous stainless hinges, with privacy strips (no sight lines). See A-601.
5. Restroom and utility doors: insulated 16 ga hollow metal, galvanized, with wood-look finish at Utility door per concept; storeroom-function locksets keyed to City system; heavy-duty closers; kick plates.
6. Clerestory: thermally broken aluminum storefront with laminated glass (obscure lower lite where visible from grade) on top of stone walls, 10'-0" to 12'-0" AFF, all four sides. Provide operable/louvered panels for ventilation make-up air (see M-101).
7. Provide 1-hr rated or non-combustible construction only where required by the code review of the Contractor's architect. Construction Type V-B anticipated; non-sprinklered.
8. Provide fire extinguisher (FE, 5 lb ABC) in semi-recessed cabinet in Utility 102.
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
ROOF PLAN &
ROOF NOTES
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
A-201 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
CROWN OF ARC
SLOPE (ARC)
R = 34'-0"
SLOPE (ARC)
R = 34'-0"
6" HALF-ROUND ALUM. GUTTER (PREFINISHED) &
4" DIA. DOWNSPOUT TO CONC. SPLASH BLOCK, TYP. 4
24 GA STANDING SEAM METAL ROOF, 16" PANELS,
1-1/2" MECHANICAL LOCK SEAM, FACTORY/FIELD
CURVED TO R=34'-0", KYNAR 500 FINISH (DARK
BRONZE BASIS); CLIPS @ MFR SPACING FOR WIND
OVER: HIGH-TEMP SELF-ADHERED UNDERLAYMENT,
R-25 POLYISO NAIL-BASE PANELS, VAPOR RETARDER,
3x6 T&G SYP DECKING (EXPOSED BELOW) ON
CURVED GLULAM RIBS - SEE S-201
PREFINISHED FASCIA / RAKE TRIM
(MATCH ROOF)
SNOW/LEAF GUARD & GUTTER SCREENS
FULL LENGTH (WOODED SITE)
32'-0"
'-0
(A
R C
C H
O R
D
A-201
ROOF PLAN
SCALE: 1/4" = 1'-0"
N
TRUE NORTH
(PER C-201B)
ROOF NOTES
1. Curved standing-seam roof shall match the TSW concept profile (barrel arc, front-to-back). No architectural substitution without written City approval (RFP Scope Item 3/15).
2. Roof system shall be designed by the Contractor's Georgia PE for ASCE 7 wind (Risk Category II, Vult = 115 mph basis, Exposure C) incl. uplift at overhangs; provide UL 580 / ASTM E1592 tested assembly.
3. Provide 20-year manufacturer finish warranty, 20-year weathertightness warranty, and 2-year installer warranty.
4. Exposed wood (glulam, decking, siding) shall be architectural appearance grade, factory sealed with UV-resistant penetrating stain; field touch-up all cuts.
5. Roof underside at clerestory: provide continuous bird screen and insect screen at all openings.
6. No roof-mounted mechanical equipment. Exhaust fans discharge through wall louvers in wood-siding band (see M-101).
7. Gutter capacity sized for 100-yr, 5-min rainfall intensity per IPC/Georgia amendments (approx. 7.6 in/hr Atlanta).
8. Lightning protection: not required - provide if recommended by Contractor's risk assessment (Alternate).
ROOF MATERIALS
ITEM BASIS OF DESIGN ACCEPTABLE MFRS (OR EQUAL)
Metal roof panels 24 ga Galvalume, 16" x 1.5" mech. seam, curved Petersen PAC-CLAD, MBCI, Berridge, AEP Span
Underlayment High-temp (260F) self-adhered membrane Grace Ice & Water HT, Carlisle WIP 300HT
Nail-base insulation R-25 polyiso w/ 7/16" OSB top Hunter H-Shield NB, Atlas ACFoam Nail Base
Gutters/downspouts 6" half-round .032 alum., 4" round DS Berger, Englert, roof mfr.
Fascia/trim 24 ga to match roof Roof manufacturer
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
EXTERIOR ELEVATIONS
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
A-301 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
W
O
M
E
N
M
E
N
FIN. FLOOR EL. 100'-0"
(SITE EL. 977.50 BASIS)
TOP OF STONE 110'-0"
TOP OF CLERESTORY 112'-0"
ROOF CROWN 118'-3" +/-
A-301
FRONT (ENTRY) ELEVATION - FACES TRAIL (NE +/-)
SCALE: 1/4" = 1'-0"
FIN. FLOOR 100'-0"
TOP OF STONE 110'-0"
TOP OF CLERESTORY 112'-0"
ROOF CROWN 118'-3" +/-
A-301
RIGHT SIDE ELEVATION (MEN 103 SIDE)
SCALE: 1/4" = 1'-0"
FIN. FLOOR EL. 100'-0"
(SITE EL. 977.50 BASIS)
TOP OF STONE 110'-0"
TOP OF CLERESTORY 112'-0"
ROOF CROWN 118'-3" +/-
A-301
REAR ELEVATION
SCALE: 1/4" = 1'-0"
FIN. FLOOR 100'-0"
TOP OF STONE 110'-0"
TOP OF CLERESTORY 112'-0"
ROOF CROWN 118'-3" +/-
A-301
LEFT SIDE ELEVATION (WOMEN 101 SIDE)
SCALE: 1/4" = 1'-0"
NATURAL & RECLAIMED STONE
(SOURCED ON-SITE WHERE
SUITABLE) - SAMPLE PANEL
REQUIRED, SEE SPEC 04 43 00
ALUM. STOREFRONT
CLERESTORY
WOOD SIDING (CEDAR
OR THERMALLY MODIFIED)
CURVED STANDING
SEAM METAL ROOF
EXPOSED GLULAM
KNEE BRACE
ECW-1 DRINKING FOUNTAIN
(BI-LEVEL W/ BOTTLE FILLER)
UTILITY DOOR 102 (WOOD-LOOK FINISH)
ADA TACTILE/BRAILLE
ROOM SIGN + VERTICAL
PYLON SIGN (CONCEPT)
ELEVATION NOTES
1. Elevations are diagrammatic and convey design intent of the TSW concept (curved metal roof, natural stone, exposed wood supports, clerestory). Final proportions per Contractor's architect, subject to City approval.
2. Stone: random ashlar / split-face natural stone, 3-5" bed depth, mortar Type N, raked joints 3/8"-1/2". Contractor shall submit samples and build 4'x4' mock-up for approval before installation.
3. Exterior lighting: concealed LED downlights in roof soffit and wall packs (full cut-off, 3000K, dark-sky) - see E-101.
COLLEGE PARK, GEORGIA 30337
PROJECT:
RODERICK GAY BOTANICAL GARDEN
PHASE III PUBLIC RESTROOM FACILITY
4355 GLOBAL GATEWAY CONNECTOR, COLLEGE PARK, GA 30349
DOCUMENT STATUS:
GENERIC CONSTRUCTION DOCUMENTS
BASIS OF DESIGN FOR RFP
NOT FOR CONSTRUCTION / NOT FOR PERMIT
These documents establish the scope, quantities, quality and design intent for competitive proposals. The selected Contractor shall have final permit/construction documents prepared and sealed by Georgia-registered design professionals (architectural, structural, MEP, civil) consistent with these documents and the TSW concept design dated 2026.03.23.
REFERENCE DOCUMENTS:
TSW Restroom Building Concept, 2026.03.23 Prime Engineering C-201B Detailed Site Plan Prime Engineering C-202B Detailed Grading Plan Prime Engineering C-203B Detailed Utility Plan Barrett Park Restroom Facility prototype CDs & Project Manual (06/2023) - adapted RFP Scope of Work memo - Councilman R. D. Gay
REVISIONS
NO. DATE DESCRIPTION
0 11/17/2026 ISSUED WITH RFP (BASIS OF DESIGN)
SHEET TITLE:
BUILDING SECTIONS &
WALL SECTION
DATE: NOVEMBER 17, 2026
PROJECT NO.: CP-RGBG-RR-2026
SCALE: AS NOTED (36x24 SHEET)
A-401 HALF-SIZE PRINTS (18x12) ARE 1/2 NOTED SCALEGENERIC CONSTRUCTION DOCUMENTS - BASIS OF DESIGN FOR PROPOSALS - VERIFY ALL CONDITIONS IN FIELD - DIMENSIONS ARE BASIS OF DESIGN; CONTRACTOR'S SEALED DOCUMENTS GOVERN FOR CONSTRUCTION
WOMEN 101COVERED
ENTRY 100
FF 100'-0"
T/STONE 110'-0"
T/CLERESTORY 112'-0"
CROWN 118'-3"+/-
CURVED GLULAM RIB (BEYOND), T&G DECK, NAIL-BASE INSUL., STANDING SEAM
HSS COLUMN IN GROUTED
CMU CELL TO RIB BEARING
5" CONC. SLAB W/ 6x6 W2.9 WWF ON 15 MIL VAPOR RETARDER ON 4" #57 STONE
A-401
BUILDING SECTION A (FRONT-TO-REAR THROUGH WOMEN 101)
SCALE: 1/4" = 1'-0"
WOMEN 101 UTIL.
MEN 103
6-3/4" x 18" CURVED GLULAM RIBS @ 7'-3" O.C. (5 TOTAL) - DELEGATED DESIGN
CHASE WALLS STOP @ 10'-0"; OPEN ABOVE
FOR VENTILATION/DAYLIGHT. PROVIDE
PRIVACY: WALLS 8'-0" MIN TO TOP
A-401
BUILDING SECTION B (SIDE-TO-SIDE)
SCALE: 1/4" = 1'-0"
(ROOF ASSEMBLY ABOVE - SEE SECTION A)
4" NATURAL/RECLAIMED STONE VENEER, TYPE N MORTAR,
SS ADJUSTABLE TIES @ 16" O.C. EA. WAY
1" AIR SPACE W/ MORTAR NET; THRU-WALL FLASHING &
WEEPS @ 24" O.C. AT BASE & ABOVE OPENINGS
8" CMU, #5 VERT @ 32" O.C. GROUTED, HORIZ. JOINT REINF.
@ 16" O.C., BOND BEAM @ TOP; FLUID-APPLIED WRB ON CMU
INTERIOR: GLAZED CMU OR HIGH-PERFORMANCE EPOXY
COATING EP-1 (RESTROOMS)
5" SLAB, RESINOUS FLOOR RF-1 W/ 6" INTEGRAL COVE
CONT. FTG 2'-6" W x 1'-0" D, (3) #5 CONT., BOTTOM
18" MIN BELOW FINISH GRADE ON APPROVED BEARING
STONE CAP / PREFINISHED METAL COPING, SLOPED
THERMALLY BROKEN ALUM. STOREFRONT CLERESTORY
(LAMINATED GLASS / LOUVER PANELS)
FINISH GRADE: 6" MIN. BELOW FF,
SLOPE 5% AWAY FOR 10'-0"
A-401
TYPICAL EXTERIOR WALL SECTION
SCALE: 1/2" = 1'-0"
SECTION NOTES
1. Heights are basis of design from TSW elevations (3/16" = 1'-0"): stone to 10'-0", clerestory 10'-0" to 12'-0", roof crown approx. 18'-3" AFF.
2. Structural members shown are schematic. Final sizes, connections and foundations by Contractor's Georgia-registered structural engineer (delegated design, sealed calculations required for permit).
3. Restrooms are naturally lit by clerestory; restroom ceilings are the exposed underside of roof…
This is the start of the file's text. The full file is on GovTribe.