RFR DCR Arboriculture and Forestry Field Supplies (3).docx
DOCX document 118 KB Posted
- Attached to
- DCR 916 Arborist and Forestry Field Supplies
- Solicitation number
- BD-24-1020-DCRCU-DC250-91909
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Request for Response (RFR) issued by the Commonwealth of Massachusetts Executive Office of Energy & Environmental Affairs Department of Conservation and Recreation for the purchase of various field tools and supplies used for arboriculture and forestry work. The RFR seeks bids for a contract with an initial one-year term and two one-year renewal options, with an estimated value of $150,000 per year. The procurement is focused on products such as tree climbing ropes, tree marking paint, safety equipment, specialized saws and pruners, soil sampling equipment, and other forestry and arborist supplies. The deadline for submitting questions is September 18, 2023, and bid responses are due by October 2, 2023, with an estimated contract start date of October 17, 2023.
The RFR includes provisions for the Massachusetts Small Business Purchasing Program, allowing for awards to eligible small businesses located in the Commonwealth. Pricing will be based on the bidder's submitted catalog, with an opportunity to renegotiate pricing 30 days prior to the initial and renewal contract end dates. The RFR also requires awarded contractors to work with the agency to develop an environmental plan focused on initiatives such as energy efficiency, sustainable manufacturing practices, and recycling programs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Commonwealth Terms and Conditions for Information Technology Contracts 7-1-20.pdf | ||
| Updated EFT form.pdf | ||
| promptpaydiscountform.docx | DOCX document | |
| CASL_Form.rtf | RTF text file | |
| COMMBUYS create-a-quote-v1~4.docx | DOCX document | |
| Mass W-9 Form April 2022.pdf | ||
| busreffm.doc | DOC document | |
| Standard Contract Form Instructions and Contractor Certifications 7-1-20.pdf | ||
| eppform~5.docx | DOCX document | |
| Standard Contract Form 7-1-20.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE COMMONWEALTH OF MASSACHUSETTS
Executive Office of Energy & Environmental Affairs Department of Conservation and Recreation
10 Park Plaza Suite 6620 Boston, MA 02116
Request for Response (RFR)
Document Title: Arborist and Forestry Field Supplies
COMMBUYS Bid#:BD-24-1020-DCRCU-DC250-91909
Agency Document Number: DCR 916
12/11/2023
Please Note: This is a single document associated with a complete Bid (also referred to as Solicitation) that may be found on COMMBUYS (https://www.commbuys.com/bso/). Bidders are responsible for reviewing and adhering to all information, forms, and requirements for the entire Bid, which are incorporated into the Bid. Bidders also may contact the OSD Help Desk at OSDHelpDesk@mass.gov or by phone at 1-888-MA-STATE (627-8283). The OSD Help Desk is staffed from 8:00 p.m. to 5:00 p.m. Monday through Friday, Eastern Time, except during federal, state, and Suffolk county holidays.
RFR Introduction and General Description Procurement Scope and Description The Commonwealth of Massachusetts Department of Conservation and Recreation is soliciting Bidders for the purchase of various field tools and supplies used for arboriculture and forestry work.
Applicable Procurement Law This Bid is issued under the following law(s):
· MGL c. 7, § 22; c. 30, § 51, § 52; and 801 CMR 21.00 (Goods and Services) Number of awards The target maximum number of Contractors is fifteen. This is a target number; the Strategic Sourcing Services Team (SSST) may award more or fewer Contracts if it is in the best interests of the Commonwealth to do so.
Adding Contractors after initial Contract award If, over the life of the Contract, the SSST determines that additional Contractors should be added, these may first be drawn from qualified companies that responded to this Bid but were not awarded contracts. If necessary to meet the requirements of the Commonwealth, the Bid may be reopened to obtain additional Responses.
Eligible Entities Any contract resulting from this Bid will be open for use by the Issuing Entity and the following other entities:
· Department of Agricultural Resources
· Department of Fish and Game
· Department of Environmental Protection Acquisition Method(s) The acquisition method to acquire goods and/or services from this Bid is Outright Purchase.
Performance and Payment Timeframes Which Continue Beyond Duration of the Contract.
All term leases, rentals, maintenance, or other agreements for services entered into during the duration of this contract and whose performance and payment timeframes extend beyond the duration of this contract shall remain in effect for performance and payment purposes no longer than 6 months after final contract end date. No new leases, rentals, maintenance, or other agreements for services may be executed after the contract has expired. Any contract termination or suspension pursuant to this section shall not automatically terminate any leases, rentals, maintenance, or other agreements for services already in place unless the department also terminates said leases, rentals, maintenance, or other agreements for service, which were executed pursuant to the main contract.
Contract Duration Comment by Glasgow, Karim (DCR): The max duration of a contract was recently reduced to five years The expected duration of this contract is as follows:
| Contract Duration |
| Number of Options |
| Number of Years/Months |
Initial Duration
1 Year
| Renewal Options |
| 2 |
| 1 Years |
Total Maximum Contract Duration
3 Years
No goods may be ordered and no new leases, rentals, maintenance, or other agreements for services may be executed after the Contract has expired.
Estimated Value of the Contract The estimated value of purchase(s) resulting from this Bid is $150,000 per year. The Commonwealth makes no guarantee that any commodities or services will be purchased from any Contract resulting from this Bid. Any estimates or past procurement volumes referenced in this Bid are included only for the convenience of Bidders and are not to be relied upon as any indication of future purchase levels.
Estimated Procurement Calendar
| EVENT |
| DATE |
| Bid Release Date |
| 8/21/2023 |
| Deadline for Submission of Questions through COMMBUYS “Bid Q&A” |
| 9/18/2023, 4 pm |
| Official Answers for Bid Q&A published (Estimated) |
| 9/25/2023 |
| Bid Amendment Deadline / Online Quote submission begins. Bid documents will not be amended after this date. |
| 9/25/2023 |
| Deadline for Quotes/Bid Responses (“Bid Opening Date/Time” in COMMBUYS) |
| 10/2/2023 |
| Notification of Apparent Successful Bidder(s) (Estimated) |
| 10/10/2023 |
| Estimated Contract Start Date |
| 10/17/2023 |
| Re-opening of solicitation for rolling enrollment |
| 11/29/2023 |
| New Deadline for Quotes/Bid Responses (“Bid Opening Date/Time” in COMMBUYS) |
| 1/30/2024 5:00:00 PM |
Times are Eastern Standard/Daylight Savings (US), as displayed on the COMMBUYS system clock displayed to Bidders after logging in. If there is a conflict between the dates in this Procurement Calendar and dates in the Bid’s Header, the dates in the Bid’s Header on COMMBUYS shall prevail. Bidders are responsible for checking the Bid record, including Bid Q&A, on COMMBUYS for Procurement Calendar updates.
Written questions via the Bid Q&A on COMMBUYS The “Bid Q&A” provides the opportunity for Bidders to ask written questions and receive written answers from the SSST regarding this Bid. Bidders’ questions must be submitted through the Bid Q&A found on COMMBUYS (see below for instructions) and prior to the Deadline for Submission of Questions stated in the Estimated Procurement Calendar. The issuing department reserves the right not to respond to questions submitted after this date. It is the Bidder’s responsibility to verify receipt of questions.
Please note that questions submitted to the SSST using any other medium (including those that are sent by mail, fax, email, or voicemail, etc.) will not be answered. To reduce the number of redundant or duplicate questions, Bidders are asked to review all questions previously submitted to determine whether the Bidder’s question has already been posted.
Bidders are responsible for entering content suitable for public viewing since all questions are accessible to the public. Bidders must not include information that could be considered personal, security sensitive, inflammatory, incorrect, collusory, or otherwise objectionable, including information about the Bidder’s company or other companies. The SSST reserves the right to edit or delete submitted questions that raise any of these issues or that are not in the best interest of the Commonwealth or this Bid.
All answers are final when posted. Any subsequent revisions to previously provided answers will be dated.
It is the responsibility of the prospective Bidder and awarded Contractor to maintain an active registration in COMMBUYS and to keep current the email address of the Bidder’s contact person and prospective contract manager, if awarded a contract, and to monitor that email inbox for communications from the Purchasing Department, including requests for clarification. The Purchasing Department and the Commonwealth assume no responsibility if a prospective Bidder’s/awarded Contractor’s designated email address is not current, or if technical problems, including those with the prospective Bidder’s/awarded Contractor’s computer, network, or internet service provider (ISP), cause email communications sent to/from the prospective Bidder/Awarded contractor and the Purchasing Department to be lost or rejected by any means, including email or spam filtering.
Locating Bid Q&A Log into COMMBUYS, locate the Bid, acknowledge receipt of the Bid, and scroll down to the bottom of the Bid Header page. The “Bid Q&A” button allows Bidders access to the Bid Q&A page.
Amendment Deadline The SSST reserves the right to make amendments to the Bid after initial publication. It is each Bidder’s responsibility to check COMMBUYS for amendments, addenda, or modifications to this Bid, and any Bid Q&A records related to this Bid. The SSST and the Commonwealth accepts no responsibility and will provide no accommodation to Bidders who submit a Quote based on an out-of-date Bid or on information received from a source other than COMMBUYS.
Specifications Additional required terms appear in the Appendices to this RFR.
Bidder Qualifications Functional description Vendors will supply various products associated with forestry and arboriculture work including but not limited to tree climbing ropes and supplies, tree marking paint, flagging tape, DBH tape, safety equipment specifically related to forestry work, specialized saws, pruners, and other tools specific to arboriculture, biochar, tree watering bags, soil sampling equipment including tensiometers, infrared thermometers, hypsometers, clinometers, temperature and humidity sensors, data loggers, and other specialized measurement tools, specialized marking tools and supplies, cruiser vests for forestry field work, tree tags, sawmill supplies and blades, etc.
Performance measures Ability to supply product in a reasonable time frame. Quotes to be obtained for specific purchases as required.
Small Business Purchasing Program Program Background The Massachusetts Small Business Purchasing Program (SBPP) was established pursuant to Executive Order 523 to increase state contracting opportunities with small businesses having their principal place of business within the Commonwealth of Massachusetts. Pursuant to the SBPP, it is the intention of the issuing department to award this Small Procurement to one or more SBPP participating business(es) as described below.
SBPP Award Preference While all businesses, no matter the size or principal place of business, may submit responses to this solicitation, should an SBPP participant respond and meet the best value criteria as described in this solicitation, the SBPP participant shall be awarded the contract. The Strategic Sourcing Services Team (SSST) will not evaluate submissions from non-SBPP participants unless no SBPP Bidder meets the SSST’s best value evaluation criteria.
SBPP Participation Eligibility To be eligible to participate in this procurement as an SBPP participant, an entity must meet the following criteria, and be marked as an SBPP registered business in COMMBUYS:
1. Have its principal place of business in the Commonwealth of Massachusetts;
2. Been in business for at least one year;
3. Employ a combined total of 50 or fewer full-time equivalent employees in all locations, or employees work less than a combined total of 26,000 hours per quarter; and
4. Have gross revenues, as reported on appropriate tax forms, of $15 million or less, based on a three-year average.
Non-profit firms also must be registered as a non-profit or charitable organization with the MA Attorney General’s Office and be up to date with all filings required by that office and be tax exempt under Section 501(c) of the Internal Revenue Code.
SBPP Compliance Requirements It is the responsibility of the Bidder to ensure that their SBPP status is current at the time of submitting a response and throughout the life of any resulting contract. Misrepresentation of SBPP status will result in disqualification from consideration, and may result in debarment, contract termination, and other actions. To learn more about the SBPP, including how to apply, visit the SBPP webpage, http://www.mass.gov/sbpp.
Program Resources and Assistance Bidders and Contractors seeking assistance regarding SBPP may visit the SBPP webpage or contact the SBPP Help Desk at sbpp@mass.gov.
Environmental Specifications Executive Order 515, Establishing an Environmental Purchasing Policy Products and services purchased by state agencies must comply with Executive Order 515, issued October 27, 2009. Under this Executive Order, Executive Departments are required to reduce their impact on the environment and enhance public health by procuring environmentally preferable products and services (EPPs) whenever such products and services perform to satisfactory standards and represent best value, consistent with 801 CMR 21.00. In line with this directive, all contracts, whether departmental or statewide, must comply with the specifications and guidelines established by OSD and the EPP Program. EPPs are products and services that help to conserve natural resources, reduce waste, protect public health and the environment, and promote the use of clean technologies, recycled materials, and less toxic products. Questions concerning the EO or the appropriate specifications may be directed to OSD’s EPP Procurement Program, www.mass.gov/epp. The Order may be seen at https://www.mass.gov/executive-orders/no-515-establishing-an-environmental-purchasing-policy.
Environmental plan Beginning the first year of the Contract and throughout the life of the Contract, awarded Bidders must agree to work with the SSST to examine the feasibility of implementing an environmental plan. The objective of this requirement is to actively encourage suppliers to incorporate sustainable practices throughout their business operations and further market such practices to Contract users. Such a plan may include, but not be limited to, the following:
· Implementing energy efficiency initiatives at the corporate level in line with Executive Order 484, such as lighting retrofits, purchase of energy from renewable sources, use of bio-heat fuel, and other energy reduction technologies.
· Encouraging environmental initiatives at the corporate and/or manufacturing level for the purpose of reducing the impact of manufacturing on the environment; such as clearly identifying recycled content of packaging on the packaging, providing product life cycle assessments, working toward the elimination of ozone-depleting chemical usage in the manufacturing or refining process (where applicable), and conducting internal environmental auditing related to pollution control.
· Adopting standards and/or obtain certifications, where applicable, for product development and manufacturing processes such as, but not limited to. LEED, ISO 14001, Cradle to Cradle (C2C) Protocol, Green Seal, Environmental Choice, and others.
· Using alternative fuel vehicles for delivery or transportation purposes and/or vehicles equipped with diesel emission control devices and operating such vehicles with guidance on anti-idling initiatives.
· Working with the SSST to develop and distribute information and/or materials to Commonwealth customers about the Awarded Bidder’s/Contractor’s environmental practices and initiatives throughout the term of the Contract.
· Developing a plan to implement the recycling of materials used or produced in normal business operations.
· The SSST may award points to Bidders who provide evidence that measures and initiatives such as these are in place within their operations, and/or for written proposals submitted with their Quote detailing a commitment to action contingent upon receipt of a Contract award. (See the Additional Environmentally Preferable Products / Practices form on COMMBUYS).
Compensation Structure/Pricing Compensation will be based solely on the pricing submitted by the Bidder and accepted by the SSST.
Bidders are required to provide a pricing list or catalog of arboriculture or forestry supplies offered. Catalogs must be provided at no cost.
Please provide the amount of any discount offered on field supplies ordered in quantities.
Prices are to be quoted FOB Destination, with shipping included.
Delivery will be to various location within the Commonwealth of Massachusetts, on an as needed basis.
Prices may be renegotiated 30 days prior to the initial contract end date and 30 days prior to each additional contract end date.
Pricing will be published on COMMBUYS.
Other Terms Reporting Contractors are responsible for compliance with all contract reporting requirements required by this contract.
Alternatives Contractors may propose alternatives for equivalent, better, or more cost-effective performance than specified under the Contractor’s original Quote at any time during the life of the Contract.
Audit During the term of this Agreement and for a period of six years thereafter, the Massachusetts Department of Conservation and Recreation, its auditors, the Operational Services Division, the Office of the Inspector General, or other authorized representatives shall be afforded access at reasonable times to Contractor’s accounting records, including sales information on any system, reports or files, to audit all records relating to goods sold or services performed pursuant to this Agreement. If such an audit indicates that Contractor has materially overcharged Department of Conservation and Recreation, then the Contractor shall remit the overcharged amount and be responsible for payment of any costs associated with the audit.
Evaluation criteria Bidders must submit responses that meet all the submission requirements outlined in the RFR in order for responses to be considered for evaluation, scoring, and Contract award.
Bidder scores will be used to rank Bidders and will determine which Bidders will proceed to subsequent stages of the evaluation and/or enter negotiations with the Commonwealth to receive a Contract award.
Additional information may be requested for evaluation purposes.
Mandatory requirements Mandatory Specifications must be met for a Bid to be evaluated and may be used to disqualify Bidders. In addition, certain mandatory specifications have desirable components that may be evaluated by the SSST. The SSST reserves the right, in its discretion, to determine if non-compliance with a Mandatory Specification is insignificant or may be easily corrected.
Bid sections that include terms such as: “must,” “shall,” “will,” and “required” are mandatory. Failure to meet the requirements of a mandatory specification without providing an alternate that is acceptable to the evaluators may result in the disqualification of a Bidder's proposal.
All proposals must include a detailed description of a proposed program which includes the requirements detailed in the bidder qualifications section. Proposals shall follow a narrative statement of project approach to outline project approach, personnel, organizational structure, and trainings that will be offered over the duration of the program. Proposals will include a budget that details all costs associated with implementing this program. Submissions must also include a statement of qualifications and experience of the firm/organization and the principal staff that will be assigned or hired for this program, along with each of their resumes. Proposals must include one reference using the required reference form. Proposals must include proof of liability insurance at a minimum amount of $1 million.
Desirable specifications Desirable specifications will be scored according to the Evaluation Criteria.
RFR specifications prefaced with language such as: “desirable,” “could,” ”may,” ”should,” “preferably,” “prefers,” “suggested,” and ”requested” identify a desirable or discretionary item or factor that is considered by the Purchaser to be “desirable.” The Purchaser has listed all desirable specifications which will receive points in the evaluation criteria.
DCR believes that everyone has a role to play in preserving and enhancing our park system and is therefore seeking proposals which leverage money from additional sources. Therefore, proposals should outline the name(s) of additional partners, the amount contributed and timeline for funding (when available) as well as any partner expectations that must be built into program.
Alternatives A Quote that fails to meet any material term or condition of the Bid, including the submission of required attachments, may lose points or be deemed unresponsive and disqualified. Unless otherwise specified, Bidders may submit Quotes proposing alternatives that provide equivalent, better, or more cost-effective performance than achievable under the stated Bid specifications. These alternatives may include related commodities or services that may be available to enhance performance during the period of the Contract. The Quote should describe how the alternative achieves substantially equivalent or better performance than those described in the Bid specifications.
The SSST will determine if a proposed alternative method of performance achieves substantially equivalent or better performance. The goal of this Bid is to provide the best value of commodities and/or services to achieve the goals of the procurement.
Evaluation Components The following components will be some of the criteria considered by the SSST when evaluating each Quote:
Proposals will be evaluated by the following criteria:
· Ability of goods and services offered to meet forestry and arboriculture field work requirements
· Product availability
· Competitive discount pricing for increased quantities
· SBPP eligibility
· Availability of Prompt Payment Discounts
Respondents must submit responses that meet all the submission requirements of the RFR. Only responsive proposals that meet the submission requirements will be evaluated, scored, and ranked by the evaluation team according to the evaluation criteria. Additional information may be requested for evaluation purposes.
HOW TO SUBMIT A quote
All Bidders may begin creating and compiling Quote materials as soon as the Bid and all attachments are in the Sent document status in COMMBUYS. Bidders are instructed not to submit Quotes before the Bid Amendment Deadline has been reached (see Estimated Procurement Calendar).
Quote Submission Method Online Quote Submission via COMMBUYS is required.
All Bidders must submit Quotes online using tools available only to Sellers registered in COMMBUYS. COMMBUYS provides Seller registration functionality at no charge. To register, go to www.COMMBUYS.com and click on the “Register” link on the home or landing page. Bidders who are awarded a contract resulting from this Bid, if any, will be required to maintain an active COMMBUYS account for the duration of the Contract, by reviewing their registration information regularly and maintaining its accuracy.
COMMBUYS Quote Submission Training and Instructions The following resources are provided to assist Bidders in submitting Quotes:
· Appendix 5: Instructions for Vendors Responding to Bids Electronically through COMMBUYS, which is part of this document;
· Training sessions focused on online Quote submission, if offered, are noted in the Estimated Procurement Calendar;
· An online job aid on How to Create a Quote
· Webcast video on How to Find Bids (Solicitations) and Submit Quotes (Responses) through COMMBUYS.
COMMBUYS Support Technical assistance is available during the procurement process. Every effort is made to respond to inquiries within one business day.
Website: Go to www.mass.gov/osd/commbuys to access COMMBUYS resources, including new bid postings, job aids, and training schedules for buyers, among others.
Email: Send inquiries to the OSD Help Desk at OSDHelpDesk@mass.gov Telephone: Call the OSD Help Desk at 1-888-MA-STATE (1-888-627-8283). The Help Desk is staffed from 8:00 a.m. to 5:00 p.m., Monday through Friday Eastern Time, except on federal and state holidays.
Bidders are advised that COMMBUYS will be unavailable during regularly scheduled maintenance hours of which all users will be notified.
Bid Opening Date/Time All Bids must be posted in COMMBUYS before the specified date, month, year, and time displayed as the Bid Opening Date/Time in the Header Information section of the Bid in COMMBUYS. Times are Eastern Time. All Bidders are advised to allow adequate time for Bid submission by considering potential online submission impediments such as Internet traffic, Internet connection speed, file size, and file volume. OSD is not responsible for delays encountered by Bidders or their agents, or for a Bidder’s local hardware failures, such as computers or related networks, associated with bid compilation or submission. Bids submitted via COMMBUYS are time stamped by the COMMBUYS system clock which is considered the official time of record. COMMBUYS will not accept Bids submitted after the Bid Opening Date/Time deadline.
Quote Contents Bidders must comply with the requirements below.
RFR Submission Checklist Strategic Sourcing Services Teams seek to reduce the number of Bidder disqualifications based on incomplete submissions. Therefore, Bidders must complete and submit the RFR Submission Checklist and all documents referenced in the Checklist.
Electronic Signatures Quotes submitted via COMMBUYS must be signed electronically by the Bidder or the Bidder’s Agent by accepting the terms and conditions of the bid on the “Terms & Conditions” tab of the Bid in COMMBUYS. By selecting “Save & Continue” on the “Terms and Conditions” tab after accepting the terms and conditions of the bid, the submitter attests that she/he/they is an agent of the Bidder with authority to sign on the Bidder’s behalf, and that she/he/they has read and assented to each document’s terms.
Acceptable Forms of Signature Effective June 15, 2021, for all 1) CTR forms, including the Standard Contract Form, W-9s, Electronic Funds Transfer (EFT) forms, ISAs, and other CTR-issued documents and forms, or 2) documents related to state finance and within the statutory area of authority or control of CTR (i.e. contracts, payrolls, and related supporting documentation), CTR will accept signatures executed by an authorized signatory in any of the following ways: 1. Traditional “wet signature” (ink on paper); 2. Electronic signature that is either: a. Hand drawn using a mouse or finger if working from a touch screen device; or b. An uploaded picture of the signatory’s hand drawn signature; 3. Electronic signatures affixed using a digital tool such as Adobe Sign or DocuSign. If using an electronic signature, the signature must be visible, include the signatory’s name and title, and must be accompanied by a signature date. Please be advised that typed text of a name not generated by a digital tool such as Adobe Sign or DocuSign, even in computer-generated cursive script, or an electronic symbol, are not acceptable forms of electronic signature.
Limits and Restrictions File Size Limits COMMBUYS will not accept files that approach or exceed 10 MB. If a large file fails to upload, the Bidder must save the contents as multiple files. Note the naming conventions used above and add _Part 1, _Part 2, etc. at the end of the file name. If a large file fails to upload, bidders must break up the file and append _Part1, _Part2 to the end of the Description and File Name.
File Format Restrictions All scanned documents must be in .pdf or .gif format and must be scanned in such a way that they may be read on a computer monitor and printed on 8 1/2” x 11” paper, unless otherwise specified. Forms provided for the Bidder to complete, except for the forms requiring ink signatures, must be completed and sent via email to the Commonwealth Contract Manager in their original formats. These Forms should not be scanned and submitted as PDFs or other file types.
Withdrawing a Quote Prior to Bid Opening Date/Time Quotes may be withdrawn using the “Withdraw Quote” button offered under the Summary tab of a submitted Quote in COMMBUYS.
After Bid Opening Date/Time Quotes may not be withdrawn after the Bid Opening Date/Time. If the Bidder wants to remove a Quote from consideration, contact the Strategic Sourcing Services Lead for guidance.
Additional Quote Terms Prohibition regarding contract terms Bidders must not, as part of their Quote, propose additional contractual terms, or supplemental or clarifying language pertaining to contractual terms, even if the proposed additions/clarifications are not in conflict with the Commonwealth Terms and Conditions, the Standard Contract Form, or other documents comprising this RFR. Contracting Departments expect that all Statewide Contracts incorporate the same terms and conditions and only those terms and conditions. Contractors who wish to propose additional non-conflicting contractual terms, or supplemental or clarifying language, may do so ONLY on a case-by-case basis, negotiated for each specific engagement and memorialized in the Project Statement of Work.
Bidder Response Form All specifications of this RFR that are not mandatory such as those specifically identified as “optional,” “desirable,” or in other terms indicating that the specification is not mandatory must have a response within the Bidder Response Form (or equivalent) provided on COMMBUYS for this Bid to be evaluated. Most items within the Bidder Response Form will be scored to determine the apparent successful bidders. The SSST does not want and will not read, consider, or evaluate a line by line response to this RFR.
Appendix 1 – REQUIRED FOR ALL rfrs General Procurement Information Alterations Bidders may not alter (manually or electronically) the Bid language or any Bid component files, except as directed in the RFR. Modifications to the body of the Bid, specifications, terms and conditions, or which change the intent of this Bid are prohibited and may disqualify a Bid.
Ownership of Submitted Quotes The SSST shall be under no obligation to return materials submitted by a Bidder in response to this Bid. All materials submitted by Bidders become the property of the Commonwealth of Massachusetts and will not be returned to the Bidder. The Commonwealth reserves the right to use any ideas, concepts, or configurations that are presented in a Bidder’s Quote, whether or not the Quote is selected for Contract award.
Quotes stored on COMMBUYS in the encrypted lockbox are the file of record. Bidders retain access to a “read-only” copy of this submission via COMMBUYS, as long as their account remains active. Bidders also may retain a traditional paper copy or electronic copy on a separate computer, or network drive or separate media, such as CD or DVD, as a backup.
Prohibitions Bidders are prohibited from communicating directly with any employee of the procuring Department or any member of the SSST regarding this RFR except as specified in this RFR, and no other individual Commonwealth employee or representative is authorized to provide information or respond to questions or inquiries concerning this RFR. Bidders may contact the individual listed in contact information section of the Header Information this Bid in the event that this RFR is incomplete, or information is missing. Bidders experiencing technical problems accessing information or attachments stored on COMMBUYS should contact the OSD Help Desk (see the document cover page for contact information).
In addition to the certifications found in the Commonwealth’s Standard Contract Form, by submitting a Quote, the Bidder certifies that the Quote has been arrived at independently and has been submitted without any communication, collaboration, or without any agreement, understanding, or planned common course of action with any other Bidder of the commodities and/or services described in the RFR.
Terms and Requirements Pertaining to Awarded Contracts Commonwealth Tax Exemption Invoices or invoices submitted to Massachusetts government entities must not include sales tax.
Contractor’s Contact Information It is the Contractor’s responsibility to keep the Contractor’s Contract Manager information current. If this information changes, the Contractor must notify the Contract Manager by email immediately, using the address located in the Header Information of the Purchase Order or Master Blanket Purchase Order on COMMBUYS. The Contractor’s COMMBUYS account also must be updated to reflect the new information.
The Commonwealth assumes no responsibility if a Contractor’s designated email address is not current, or if technical problems, including those with the Contractor’s computer, network, or internet service provider (ISP), cause email communications between the Bidder and the SST to be lost or rejected by any means, including email or spam filtering.
Publicity Any Contractor awarded a contract under this Bid is prohibited from selling or distributing any information collected or derived from the Contract, including lists of participating Eligible Entities, Commonwealth employee names, telephone numbers, addresses, or other information except as specifically authorized by the SSST.
Appendix 2 - RFR - Required Specifications
Revision Date: June 6, 2016
In general, most of the required contractual stipulations are referenced in the Standard Contract Form and Instructions and the Commonwealth Terms and Conditions. However, the following RFR provisions must appear in all Commonwealth competitive procurements conducted under 801 CMR 21.00.
The terms of 801 CMR 21.00: Procurement of Commodities and Services are incorporated by reference into this RFR. Words used in this RFR shall have the meanings defined in 801 CMR 21.00. Additional definitions may also be identified in this RFR. Other terms not defined elsewhere in this document may be defined in OSD’s Glossary of Terms. Unless otherwise specified in this RFR, all communications, responses, and documentation must be in English, all measurements must be provided in feet, inches, and pounds, and all cost proposals or figures in U.S. currency. All responses must be submitted in accordance with the specific terms of this RFR.
COMMBUYS Market Center. COMMBUYS is the official source of information for this Bid and is publicly accessible at no charge at www.commbuys.com. Information contained in this document and in COMMBUYS, including file attachments, and information contained in the related Bid Questions and Answers (Q&A), are all components of the Bid, as referenced in COMMBUYS, and are incorporated into the Bid and any resulting contract.
Bidders are solely responsible for obtaining all information distributed for this Bid via COMMBUYS. Bid Q&A supports Bidder submission of written questions associated with a Bid and publication of official answers.
It is each Bidder’s responsibility to check COMMBUYS for:
· Any amendments, addenda, or modifications to this Bid, and
· Any Bid Q&A records related to this Bid.
The Commonwealth accepts no responsibility and will provide no accommodation to Bidders who submit a Quote based on an out-of-date Bid or on information received from a source other than COMMBUYS.
COMMBUYS Registration. Bidders may elect to obtain a free COMMBUYS Seller registration which provides value-added features, including automated email notification associated with postings and modifications to COMMBUYS records. However, in order to respond to a Bid, Bidders must register and maintain an active COMMBUYS Seller account.
All Bidders submitting a Quote (previously referred to as Response) in response to this Bid (previously referred to as Solicitation) agree that, if awarded a contract: (1) they will maintain an active seller account in COMMBUYS; (2) they will, when directed to do so by the procuring entity, activate and maintain a COMMBUYS-enabled catalog using Commonwealth Commodity Codes; (3) they will comply with all requests by the procuring entity to utilize COMMBUYS for the purposes of conducting all aspects of purchasing and invoicing with the Commonwealth, as added functionality for the COMMBUYS system is activated; (4) Bidder understands and acknowledges that all references to the Comm-PASS website or related requirements throughout this RFR, shall be superseded by comparable requirements pertaining to the COMMBUYS website; and (6) in the event the Commonwealth adopts an alternate market center system, successful Bidders will be required to utilize such system, as directed by the procuring entity. Commonwealth Commodity Codes are based on the United Nations Standard Products and Services Code (UNSPSC).
The COMMBUYS system introduces new terminology, which bidders must be familiar with in order to conduct business with the Commonwealth. To view this terminology and to learn more about the COMMBUYS system, please visit the COMMBUYS Resource Center.
Multiple Quotes. Bidders may not submit Multiple Quotes in response to a Bid unless the RFR authorizes them to do so. If a Bidder submits multiple quotes in response to an RFR that does not authorize multiple responses, only the latest dated quote submitted prior to the bid opening date will be evaluated.
Quote Content. Bid specifications for delivery, shipping, billing, and payment will prevail over any proposed Bidder terms entered as part of the Quote, unless otherwise specified in the Bid.
Appendix 3 - Other Specifications
The OSD Forms/RFR Attachments page contains a variety of optional RFR specifications that may be used at the department’s discretion. If a specification is selected by the department, it is required of the bidder.
APPENDIX 4 - Instructions for Execution and Submission of Commonwealth Standard Forms The purpose of this appendix is to provide guidance to Bidders on the Commonwealth Standard forms to be submitted (in addition to the other forms and documents required) and how they must be executed and submitted. Please note that these instructions are meant to supplement the Instructions found on each of these forms
Forms listed below may be electronically signed by the Bidder, see Acceptable Forms of Signatures. Bidders must, if notified of Contract award, submit the following four (4) forms within the timeframe referenced in the RFR section entitled Acceptable Forms of Signatures: the Commonwealth Standard Contract Form, the Commonwealth Terms and Conditions, the Request for Taxpayer Identification Number and Certification (Mass. Substitute W9 Form) and the Contractor Authorized Signatory Listing.
Commonwealth Standard Contract Form By executing this document, the Bidder certifies, under the pains and penalties of perjury, that it has submitted a Response to this RFR that is the Bidder’s Offer as evidenced by the execution of its authorized signatory, and that the Bidder’s Response may be subject to negotiation by the SSST. Also, the terms of the RFR, the Bidder’s Response, and any negotiated terms shall be deemed accepted by the Department and included as part of the Contract upon execution of this document by the State Purchasing Agent or his designee.
If the Bidder does not have a Vendor Code beginning with “VC” or does not know their Vendor Code, the Bidder should leave the Vendor Code field blank. The Bidder should NOT enter a Vendor Code assigned prior to May 2004, as new Vendor Codes have been assigned to all companies since that time.
Commonwealth Terms and Conditions/Commonwealth IT Terms and Conditions If the Bidder has executed and filed the appropriate Commonwealth Terms and Conditions form pursuant to another RFR or Contract, a copy of this form may be included in . If the Bidder’s name, address, or Tax ID Number have changed since the Commonwealth Terms and Conditions form was executed, a new Commonwealth Terms and Conditions form is required. The Commonwealth Terms and Conditions are hereby incorporated into any Contract executed pursuant to this RFR.
This form must be unconditionally signed by one of the authorized signatories (see Contractor Authorized Signatory Listing, below), and submitted without alteration. If the provisions in this document are not accepted in their entirety without modification, the entire Proposal offered in response to this Solicitation may be deemed non-responsive.
The company’s correct legal name and legal address must appear on this form and must be identical to the legal name and legal address on the Request for Taxpayer Identification and Certification Number (Mass. Substitute W9 Form).
Request for Taxpayer Identification Number and Certification (Mass. Substitute W9 Form) If a Bidder previously submitted a Request for Taxpayer Identification and Certification Number (Mass. Substitute W9 Form) and has received a valid Massachusetts Vendor Code, an original W-9 form is not required. A copy of the form as filed may be included. If the Bidder’s name, address, or Tax ID Number have changed since the Mass. Substitute W9 Form was executed, a new Mass. Substitute W9 Form is required. The information on this form will be used to record the Bidder’s legal address and where payments under a State Contract will be sent. The company’s correct legal name and legal address must appear on this form and must be identical to the legal name and legal address on the Commonwealth Terms and Conditions. Please do not use the U.S Treasury’s version of the W9 Form.
Contractor Authorized Signatory Listing In the table entitled “Authorized Signatory Name” and “Title,” type the names and titles of those individuals authorized to execute contracts and other legally binding documents on behalf of the Bidder. Bidders are advised to keep this list as small as possible, as Contractors will be required to notify the Procurement Manager of any changes. If the person signing in the signature block at the bottom of the first page of this form also will serve as an “Authorized Signatory,” that person’s name must be included in the typed table.
Regarding the next paragraph, which begins “I certify that I am the President, Chief Executive Officer, Chief Fiscal Officer, Corporate Clerk, or Legal Counsel for the Contractor…,” if your organization does not have these titles, cross them out and handwrite the appropriate title above the paragraph.
The second page of the form (entitled “Proof of Authentication of Signature”) states that the page is optional. However, the “optional” aspect of the form is that Commonwealth Departments are not required to use it. In the case of Statewide Contracts, however, this page is required, not optional. The person signing this page must be the same person signing the Standard Contract Form, the Commonwealth Terms and Conditions, and the RFR Checklist.
Please note that in two places where the form states “in the presence of a notary,” this should be interpreted to mean “in the virtual presence of a notary or corporate clerk/secretary.” Either a notary or corporate clerk/secretary may authenticate the form; only one is required.
Organizations whose corporate clerks/secretaries authenticate this form are not required to obtain a Corporate Seal to complete this document.
Current Environmentally Preferable Products / Practices Form In line with the Commonwealth’s efforts to promote products and practices which reduce our impact on the environment and human health, Bidders are encouraged to provide information regarding their environmentally preferable/sustainable business practices as they relate to this Contract wherever possible. Bidders must complete this form and submit it with their RFR Response.
Prompt Payment Discount Form Download this form and complete as directed below; include with online submission. Ink signature is not required.
Pursuant to the Prompt Payment Discount terms set forth in the RFR Required Specifications for Contracts and on the Prompt Payment Discount Form itself, all Bidders must execute this form. After entering the “Bidder Name” and “Date of Offer for Prompt/Early Payment Discount,” the Bidder must identify the prompt payment discount(s) terms by indicating the “Percentage Discount off of the Proposed Pricing” and the “Turn-around-time for Payments.” In the event of a hardship that prevents the Bidder from offering a prompt payment discount, the Bidder must document this fact and provide supporting information. If awarded a contract, the final negotiated prompt payment discounts should be reflected on the Commonwealth Standard Contract Form.
Business Reference Form Download this form and complete as directed below; include with online submission. Ink signature is not required.
Bidders must provide all requested information on this form for required references. This RFR requires one professional reference. In completing this form, note that the “Bidder” is the name of the company submitting a Quote in response to this RFR and the “RFR Name/Title” and the “Agency Document Number” may be found on the cover of the RFR document and in the Short Description field in the Header Information of the Bid record in COMMBUYS. Also, please note that: “Reference Name” is the name of the organization (if not applicable, then name of the individual) that is providing the reference; “Contact” is the name of the individual inside the organization that will provide the reference; and the “Address,” “Phone #,” and “Fax/Internet Address” are those of the “Contact” so that the SSST may reach her/him/them.
RFR DCR 916 / COMMBUYS Bid# BD-24-1020-DCRCU-DC250-91909 Page 33 Document Sensitivity Level: High during development; Low once published.