1781777_Statement_of_Work.pdf
PDF 205 KB Posted
- Attached to
- Teleconference System - Microphone Upgrade Federal contract opportunity
- Solicitation number
- RFQ-RML-D-1781777
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Fishers_Lane_Mic_Upgrade_AsBuilt 1 .pdf | ||
| Question_and_Answer.pdf | ||
| 1781777_Brand_Name.pdf | ||
| FAR_52_212_5.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5601 Fishers Lane Microphone Upgrade for Resource Libraries Statement of Work (SOW)
February 9, 2016
Department of Health and Human Services National Institutes of Health
National Institute of Allergy and Infectious Diseases
RFQ ID No.
NIH 5601 Fishers lane for the
National Institute of Allergy and Infectious Disease, (NIAID) 5601 Fishers Lane
Rockville, MD 20852
Statement of Work
(SOW)
February 09, 2016
Table of Contents
1 GENERAL
1.1 BACKGROUND
1.2 OBJECTIVE
1.3 TYPE OF CONTRACT
1.4 OVERVIEW
1.5 SPECIFICATION STANDARDS
1.6 SCOPE OF WORK
1.7 SCHEDULING
1.8 TECHNICAL REQUIREMENTS
1.9 DELIVERABLES
1.10 PROJECT CONDITIONS
1.11 CHANGES
1.12 FINAL INSPECTION AND TESTING
1.13 WARRANTY
1.14 INSTRUCTION OF NIAID PERSONNEL
2 PRODUCTS
2.1 MANUFACTURERS
2.2 GENERAL
2.3 CONFERENCE ROOM FUNCTIONALITY
2.4 A/V INFRASTRUCTURE CABLING AND PATHWAYS
2.5 RESOURCE LIBRARY STANDARD EQUIPMENT REQUIREMENTS
2.6 CABLES AND WIRING
3 EXECUTION
3.1 INSTALLATION
3.2 LABELING
3.3 MICROPHONE SUSPENSION
3.4 CONTRACTOR COMMISSIONING
3.5 CONTRACTOR DIGITAL MEDIA TESTING AND COMMISSIONING
3.6 PRE-INSTALLATION MEETING
3.7 APPLICABLE FEDERAL STANDARDS
Intentionally Left Blank
PART 1 - GENERAL
1.1 BACKGROUND
The National Institutes of Health (NIH), a part of the U.S. Department of Health and Human Services, is the nation’s medical research agency – making important discoveries that improve health and save lives. NIH is made up of 27 Institutes and Centers, each with a specific research agenda. Among the 27 NIH Institutes and Centers, the National Institute of Allergy and Infectious Diseases (NIAID) conducts and supports basic and applied research to better understand, treat, and ultimately prevent infectious, immunologic, and allergic diseases.
The Office of Cyber Infrastructure and Computational Biology (OCICB) manages technologies supporting NIAID biomedical research programs. The office provides a spectrum of management, technologies development, applications/software engineering, bioinformatics support, and professional development. OCICB works closely with NIAID intramural, extramural, and administrative staff to provide technical support, liaison, coordination, and consultation on a wide variety of ventures. These projects and initiatives are aimed at ensuring ever-increasing interchange and dissemination of scientific information within the federal government and among the worldwide scientific network of biomedical researchers.
The NIAID has approved the upgrade and renovation of Microphones for seventeen (17) Resource Libraries for use with the audio and video teleconferencing rooms, located at 5601 Fishers Lane in Rockville, Maryland. Those rooms are as follows:
1F100 3F100 4F100 5F100 6F100 7F100 8F100 9F100 2C100 3C100 4C100 6C100 7C100 8C100 9C100 4H100 8H100
1.2 OBJECTIVE
The OCICB requires immediate assistance with the implementation of 3 ceiling mounted microphone arrays in each of the Resource Libraries as well as the associated equipment, cabling, and programming updates, which are required in order to integrate the new microphones and the control of the audio as required for them to operate in the conventional Video Conference and the PC based Lync conferencing capabilities. The existing table microphones, switches, logic boxes, and cables, will be removed and turned over to the owner. The holes were the microphones are currently located will be plugged with black grommets glued in place to minimize the chance of them being removed and lost.
1.3 TYPE OF CONTRACT CONTEMPLATED
The Government intends to award a single, Firm Fixed priced purchase order.
1.4 OVERVIEW
A. Statement of Work: the work of this section includes, but is not necessarily limited to the following:
1. Provide and install complete and operational ClearOne, Three Element 360 degree Ceiling Microphone element in White as outlined in these specifications and related drawings and documentation requirements as set forth in this documentation.
2. It is the responsibility of the Contractor to provide all wiring, plates, connections, equipment, rigging, all support means and miscellaneous equipment for complete and operational System(s) even if specified in this or other related documents or not.
3. Provide for the coordination, provision, installation, inspection, testing, instruction, and warranties of the installed microphone system.
4. Provide all facilities, materials, equipment, transportation, and necessary labor for the microphone system.
5. Ensure all equipment provided by the Contractor is installed per manufacturer’s specifications and warranted by the Contractor for a period of one year from the date of acceptance of each room.
6. Reprogram the code on the Crestron touch panels to integrate the ClearOne microphones.
B. Definitions:
1. “Contracting Officer’s Representative” (COR) – Government employee appointed by the Contracting Officer to assist in the technical monitoring or administration of the contract.
2. “Contractor” – Installer who has been awarded the contract to perform the work under this requirement.
3. The term “shall” is mandatory, the term “will” is informative, and the term “should” is advisory.
4. “Provide and install” – To supply, install, and connect up complete and ready for safe and regular operation. “Indicated”, “shown”, or “noted” – As indicated, shown, or noted on drawings or specifications.
5. “Equivalent”, “similar”, or “equal” – Of equipment manufacturer, equal in materials, size, color, design, and efficiency of specified product, conforming to equipment manufacturers.
6. “Reviewed”, “satisfactory”, “accepted”, “approved”, “directed” – As reviewed, satisfactory, accepted, approved, or directed by the COR.
7. “Professional grade” – Equipment that is intended for commercial, not residential, use and is rated for continuous duty.
8. “User-friendly controls” – Controls that are designed and laid out for ease of use in a logical, easily recognizable, format that utilizes industry standard symbols wherever applicable.
9. “Labels” – All labels on audio-visual equipment and racks shall be self-adhering black laminate with white engraved letters.
10. “Government-furnished equipment” (GFE) – Hardware and/or software that is furnished by the government to the contractor for installation in, for use with, or in support of this requirement.
1.5 SPECIFICATION STANDARDS
A. Below is a listing of specification standards, tests, or recommended installation methods and procedures or applicable installation or safety codes.
1. National Electrical Code (NEC)
2. National Electrical Manufacturer’s Association (NEMA)
3. Underwriters Laboratories (UL)
4. Electronics Industries Association (E.I.A.)
5. American National Standards Institute (ANSI)
6. Audiovisual System Engineering, by Davis and Davis Second Edition.
7. Handbook for Sound Engineering Third Edition by Glen Ballou
8. Video Engineering by Arch Luther, Andrew Inglis
9. Basic Television and Video Systems Sixth Edition, by Bernard Grob, Charles
Herndon
10. BICSI/INFOCOMM AV Design Reference Manual.
11. IEEE standards for advanced audio and video coding 1857-2013.
1.6 SCOPE OF WORK
The Contractor as an independent Contractor and not an agent of the Government shall:
A. Provide and implement three (3) ClearOne ceiling mounted microphone arrays in each of the Resource Libraries as well as the associated equipment and cabling. Bill of Materials Brand Name parts that must be utilized (See Attachment 1)
B. Provide programming updates, which are required in order to integrate the new microphones and the control of the audio as required for them to operate in the conventional Video Conference and the PC based Lync conferencing capabilities.
C. Provide equipment that, where required, shall conform to the applicable requirements of the Underwriters Laboratories, Inc., local codes, the National Electrical Code and any other governing codes. Such items shall bear a label or mark indicating their conformance to the above requirements.
D. Restore finish hardware to original condition including painting, ceiling and wall modifications. The holes where the microphones are currently located will be plugged with black grommets glued in place to minimize the chance of them being removed and lost.
E. Work shall be in compliance with all applicable standards listed above and all governing codes and regulations of the authorities having jurisdiction and the Contract Documents.
F. All software affiliated with the equipment, including but not limited to, the audio digital signal processor (DSP), Control System, etc. is the property of NIAID and will be provided on labeled CDs for archival purposes.
G. Supply all control software, programming service codes, programming notes, files interactive source codes, all media and associated software, touch panel design, all passwords, licenses, dangles and “keys” or other associated control or programming items at no additional cost to NIAID.
H. All existing equipment that is no longer required will be dismantled and placed in an area selected by Federal project manager for disposal and/or removal.
1.7 SCHEDULING
A. The contractor shall submit a final schedule to the COR for approval within thirty
(30) calendar days before starting installation. The schedule shall show sequence of work for each room from start of work to final inspection and testing. This schedule shall be submitted on Microsoft Project, both paper and electronic format, with deliverables. The COR shall approve or reject this schedule within five working days of receipt.
B. It shall be the responsibility of the contractor to coordinate the installation of the system(s) to be compatible with the work of the other trades. The contractor shall attend all designated progress meetings if there are any delays preventing the completion of work on time and provide continuous on-site project management.
C. Hours of operation for 5601 Fishers Lane is Monday thru Friday 06:00 until 17:00.
Closed on weekends and all Federal Holidays.
D. It shall be the responsibility of the contractor to arrange with the COR a mutual and feasible time for Acceptance Testing, based upon completion of each room.
1.8 TECHNICAL REQUIREMENTS
A. A mandatory pre-installation meeting, as outlined in Section 3.6, will be utilized to allow the contractor to see the current jobsite conditions.
B. The Contractor shall be experienced in the provision of systems similar in complexity to those required for this project and Contractor shall provide documentation demonstrating the below minimum criteria when submitting an offer:
1. The primary business of the Contractor/Installer shall be the installation of audio or video systems.
2. Be an authorized reseller and authorized service provider for the products furnished.
3. Maintain a fully staffed installation crew and service crew for maintenance and installation of the specified system(s).
4. Have at least one office located within 50 miles of the installation site staffed with certified service, engineering and programming personnel.
5. Provide a fulltime project manager for the duration of the project. This project manager shall be dedicated to this project.
6. Provide a 24/7/365 Call center for support for the duration of the project.
7. Contractor is required to perform a physical site survey to ensure familiarity and understanding of the physical site and access to the site during the submission of quotes.
C. Corporate Certifications
The Prime Contractor shall be the holder and provide proof of the following minimum corporate certifications dependent upon the solution proposed:
1. Microsoft Gold Level AV Integrator
2. Crestron DME Engineers (A Minimum of three (3) personnel)
3. Biamp Tesira, and Audioflex
1.9 DELIVERABLES
A. Provide the following for approval n o l a t e r t h a n thirty days after award date and prior to commencement of work:
1. A complete list of all products to be incorporated within the work with all quantities listed. Each product shall be listed with specification section references in Microsoft Excel format showing Item Number, Item Description, Manufacturer, Part Number, Quantity, and Price. This shall be generated from this document and related drawings.
2. Complete functional diagrams of each system required for a complete and operational system with descriptive narratives of any deviations from the specified system design.
3. All shop drawings as defined in the section.
4. Suspended loudspeaker rigging design with a Professional Engineer’s certification as described in Section 3.5.
B. Shop Drawings:
1. Shall not be smaller than 24”x36” and shall be sized as appropriate for thorough understanding of system(s).
2. Shall be scaled appropriately but not less than 1/8” =1’.
3. Shall show detailed schematic wiring diagrams showing interconnection of
Contractor- provided components and fabricated products, wiring and cabling diagrams depicting cable types, and device designators. Each component shall have a unique designator and use same designator throughout the project.
4. Shall show location of all equipment in racks, consoles, or on tables, with complete dimensions, wire routing, and cabling within housing.
5. Shall show all A.C. power outlet locations and terminal strip locations within each equipment rack including all sequencing as required for proper start-up and shut down.
6. Shall show plans and sections of the building and adjacent grounds with the location of all installed equipment such as loudspeakers, racks, consoles, plates/panels, antennas, (etc.).
7. Shall show patch panel layouts and labeling strips, including color schemes, as necessary.
8. Shall show full fabrication detail of custom enclosures and millwork indicating dimensions, material, finish, and openings for equipment.
9. Shall show all speaker mounting details including hardware types and load capacity.
10. Shall show all structural information with design calculations and a copy of the PE’s certifications for each item/drawing.
11. Shall provide complete drawings for all fabricated plates and panels.
Drawings shall include dimensional locations of components, component type, engraving information, plate color information, and a complete bill of materials for each plate and sample plates per type.
12. Shall show complete labeling schemes for all cabling and equipment components for project. Include font size and styles along with a sample cable label and equipment label. All labeling shall be consistent within the project scope.
13. Shall show a complete wire schedule showing source and destination and indicating conduit location and sizing. Provide conduit sizing and layout coordination information.
C. Deliverables Format:
1. Each deliverable shall be in three-ring binders no larger than 3” spines and sized for 150% of material enclosed. Use multiple volumes if necessary and PDF on CD or flash drive.
2. Arrange product data in alphanumeric order by system type and room.
3. Separate major groupings with labeled binder tabs.
4. Index product data sheets by manufacturer and model or part number.
5. Reference addendum numbers as applicable.
6. Reference specification section, part, article, paragraph, and/or drawing reference as applicable.
7. Each deliverable shall include a complete table of contents with the following information:
1. Project title and number.
2. Deliverable number.
3. Date of submission.
1.10 PROJECT CONDITIONS
A. Verify conditions on the job site applicable to this work. Notify COR in writing of discrepancies, conflicts, or omissions promptly upon discovery.
B. If conditions exist on the jobsite which make it impossible to install work as shown on the drawings or detailed in the specifications, recommend solutions and submit drawings showing how the work may be installed to the COR for approval.
C. The Contractor shall secure and protect all Contractor-owned property and equipment brought into Government facilities during performance of work under this contract. The Government shall not be held liable for loss of or damage to Contractor-owned property or equipment brought into Government facilities. The Contractor shall remove any Contractor-owned property deemed inappropriate by the Government, for any reason, from the Government facility in which it is found.
D. Under no circumstances are Contractor personnel permitted to use Government equipment, software, or supplies for purposes other than performance of this contract.
1.11 CHANGES
A. Any changes to the terms and conditions of the resulting contract shall be made only by written agreement between the contracting officer and contractor per FAR 52.212-4(c).
Any contract change directed by a government official, other than the contracting officer, is unauthorized.
1.12 FINAL INSPECTION AND TESTING
A. Upon completion of installation of each building and Contractor commissioning (as outlined in Section 3.7), the Contractor shall perform system(s) inspection and testing.
B. To assist the customer, the Contractor shall provide a minimum of one person for inspection and two persons for testing who are familiar with all aspects of the system(s).
C. The process of testing the system(s) may necessitate moving and/or adjusting certain components such as speaker aiming, transformer tap values, software adjustments, DSP adjustments.
D. Testing will include operation of each system and any components deemed necessary.
Provide required test equipment, tools, and materials required to perform necessary repairs and/or adjustments.
E. In the event that further adjustments or work is required during testing, the
Contractor shall continue his work until the system(s) is (are) acceptable at no addition to the contract price.
F. All Control Systems shall be fully tested prior to Final Testing. Once the Control
Programming is finalized all source code, programming, and touch panel software shall be burned on to a CD ROM and delivered to NIAID. All Control System programming (including source, files, touch panel design), and DSP is the property of NIAID.
G. The Digital Audio Console shall be fully programmed and tested prior to Final Testing.
Once the programming is “finalized” all presets and console configuration shall be stored on a USB drive and burned onto a CD ROM and delivered to NIAID. Console input and outputs should be labeled for ease of operation and clarity.
H. Contractor shall supply, to the COR, all DSP and control layouts for review and comment and authorization prior to installation. Contractor shall provide any necessary adjustments to software as deemed by the COR for a period of one year following final acceptance.
1.13 WARRANTY
A. All equipment provided by the Contractor shall be installed per manufacturer’s specifications and warranted by the Contractor for a period of one (1) year from the date of completion of each room to meet all performance requirements outlined herein.
B. During the warranty period, no charges shall be made for any labor, equipment, or transportation to maintain performance and functions.
C. Final Acceptance shall be achieved when: (1) the equipment is installed in accordance with this SOW, and the Contractor provides written certification that all aspects of installation meet the specifications; (2) all of the Contractor’s equipment and materials are removed from the work site; (3) all associated debris has been removed from the site and disposed of properly by the Contractor; (4) the Government has approved the complete AV system(s) through final acceptance and testing. The final inspection and testing shall be performed by the Government when notified by the Contractor that the work is complete. Work not meeting the requirements of this SOW shall be diligently reworked by the Contractor, at the Contractor’s expense, until approval is achieved.
D. Provide a 24/7/365 Call center for support for the duration of the project.
E. The Contractor shall be present at the first use of the system (scheduled by the NIAID), and one additional event as requested by the NIAID for no additional charge.
1.14 INSTRUCTION OF NIAID PERSONNEL
A. After final inspection and completion, provide instruction to NIAID’s training team personnel on the operation and maintenance of the system(s).
B. Collaborate with NIAID’s training team to co-create a detailed instruction manual for each room system.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Electronic component models shall be commercially available for at least one year prior to offer, or be approved by the COR.
B. All equipment and material shall be new (OEM).
C. All equipment must be UL listed or built to UL standards, where required.
2.2 GENERAL
A. All equipment shall be professional grade and rated for continuous duty. Basic guidelines have been prepared with manufacturer names, makes, and model numbers included as minimum performance requirements. These must be satisfied, unless a variance (separate document) is submitted and approved by the COR.
B. All like components shall be from the same manufacturer for usability.
C. System(s) shall be installed and configured for simplicity of operation, with user-friendly controls.
D. Product quantity is as required for complete and operable system(s). If any quantities are given, the Contractor shall provide at least the given amount. Some of the products listed under this section may not be required to fulfill the work as outlined.
E. Regardless of the length or completeness of the descriptive paragraphs listed herein, each device shall meet published manufacturer’s specifications.
F. Remove all manufacturer’s nameplates or logos from product, such as found on speaker(s), within the public sight lines or spaces.
G. Paint all wall and ceiling mounted speaker grilles and enclosures as directed by the COR.
H. The Contractor is responsible for providing a fully operational system. The following equipment list is for design intent purposes.
I. Any/all electronic and information technology (EIT) procured through this effort must meet the applicable accessibility standards at 36 CFR 1194. 36 CFR 1194 implements Section 508 of the Rehabilitation Act of 1973, as amended, and is viewable at http://www.section508.gov.
J. In compliance with Executive Order 13123, the Contractor shall offer equipment that is ENERGY STAR® compliant, whenever available. For product groups where ENERGY STAR® labels are not yet available, the Contractor shall offer products that are in the upper 25 percent of energy efficiency as designated by the Federal Energy Management Program (FEMP).
2.3 CONFERENCE ROOM FUNCTIONALITY
The ClearOne microphone will integrate and operate with the existing audio and video equipment.
2.4 AV INFRASTRUCTURE CABLING AND PATHWAYS
Communication pathways shall be cable trays, ladder trays, and conduit, used for placement of fiber and/or copper cables and A/V equipment infrastructure for the facility. The AV pathways will have separation between AV cables with varying signal types. All power cables shall be placed in a separate pathway.
Additional local pathways or conduit will be specified within designated rooms.
Connectivity will be needed from the main cable infrastructure pathway to the local A/V equipment rack and from the local A/V rack to the A/V device locations (junction boxes) within the room.
2.5 RESOURCE LIBRARY Standard requirement
A. Microphone (Ceiling)
1. Type: Unidirectional condenser.
2. Frequency response: 100 Hz - 12kHz
3. Polar pattern: Cardioid
4. Impedance: 200 Ω
5. S/N ratio: 60 dBA, 1kHz @ 1Pa.
6. Sensitivity: 114 mV/Pa
7. Ceiling tile pass-through mounting assembly Max cable length from array to mixer: 300 ft. (91.44m)
2.6 CABLES AND WIRING
A. All audio cable shall be stranded copper.
B. Shielded cables located in raceways shall have aluminum foil shield with drain wire.
C. Where cables are run exposed in return plenum space, provide plenum rated cable.
D. Where cables are routed through cable tray, provide tray rated cable of equal gauge.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Electronic equipment shall be permanently mounted in equipment racks.
B. Follow ANSI standards as a minimum.
C. Provide shaft locks or security covers on non-user operated equipment having front panel access.
D. Install XLR-type connectors wired as follows: Pin 2 High, Pin 3 Low, and Pin 1 Shield.
E. Permanently install all equipment to be firmly mounted and held in place. Provide necessary equipment supports to hold and support loads with at least a 5:1 safety factor.
F. Coordinate bracing or blocking as required for proper mounting and safety.
3.2 LABELING
A. Provide logical and legible cable and wiring labels permanently attached for easy identification to each cable on both ends.
B. Label on cables shall be adhesive style striping covered with clear, heat shrink tubing, sized appropriately for the cable.
C. Wiring designator shall be alphanumeric code, unique for each cable.
D. Each cable type shall be labeled starting with different destinations (i.e. mic series “Mxxx”, speaker series “Sxxx”, etc.).
E. Locate the cable designator at the origination and the destination of each circuit. Locate cable designator within 2” of connection point.
3.3 MICROPHONE SUSPENSION
A. All microphones shall be suspended or mounted at the appropriate operating position in a safe, secure and permanent manner.
B. The aiming direction of all Microphones shall be adjusted for best reception and clarity.
3.4 CONTRACTOR COMMISSIONING
A. Prior to energizing or testing the system(s), ensure the following:
1. All products are installed in a proper and safe manner per the manufacturers’ instructions.
2. Insulation and shrink tubing are present where required.
3. Dust, debris, solder, splatter, etc. is removed.
4. Cable is dressed, routed, and labels and all connections are consistent with regard to polarity.
5. All labeling has been provided and installed.
6. All products are neat, clean, unmarred and securely fastened.
7. All debris has been cleaned and removed from the site.
8. All electronic devices are properly grounded.
B. System(s) Gain Adjustment:
1. Adjust each active device to have unity gain from the console output to the input of the amplifiers.
2. With all amplifiers turned off, connect a sine wave and pink noise to an input of the console. Using a RMS voltmeter, adjust the scale to an output between - 10 and 0dBu. Once level has been established, it should remain unchanged throughout the testing.
C. Amplifier Level Adjustment:
1. Adjust the gain of each amplifier to provide consistent and appropriate levels throughout the seating areas/facilities.
2. With the console and other electronic devices feeding the amplifiers adjusted as described above, adjust the output of the console to be -10dB on the output VU meter.
3. Adjust the appropriate amplifiers to achieve 85dBA in the area covered by one of the speakers. Use a calibrated sound level meter to make the adjustments.
4. If the speaker is utilizing an active crossover, mute the individual bandpass sections to adjust each section independently.
5. Start with the speaker closest to the stage area or the booth location as appropriate.
Once that speaker has been adjusted to the above criteria, repeat this procedure for each speaker cabinet.
6. Amplifiers should be set to provide an average of 85dBA plus or minus 1.5dB throughout each seating section.
D. Amplifier Level Adjustment 70 volt System:
1. Adjust the level of the 70 volt systems to achieve a volume level appropriate for their location and intended use.
2. After initial amplifier adjustment, walk all areas utilizing the 70 volt systems and check for volume uniformity. If any changes of 3dB or more occur, adjust that specific area or speaker as required for even coverage.
E. Input Verification Test:
1. Using a microphone, portable signal generator, or CD player, send signal from every microphone input to the console. Check every connection location in the facility.
2. Verify video signal presence at each component input with test equipment and verify the proper signal and uniform strength.
3. Verify that the receptacle under test appears at the correct position on the patch bay and is operating properly.
4. In a similar manner, check any other inputs or tie lines, as appropriate.
F. Polarity:
1. Verify the polarity of each device in the shop to obtain true polarity throughout the system.
2. Verify and document that polarity is kept throughout the system after wiring from inputs through output devices or receptacles.
G. Gain Structure:
1. Turn off amplifiers and set equalizers and filter controls to flat response. Do not bypass any equalizers or filters.
2. Adjust compressors and limiters to a 1:1 compression ratio and a +10 dBu limiting threshold. Do not bypass these processors.
3. Insert pink noise into the mixer or mixing console and adjust levels to obtain a
0 dBu reading for the mixer or mixing console output. Distribute this output to all systems and subsystems.
4. Adjust the output of line level electronics and signal processors to obtain a 0 dBu output at the output terminals. For equipment with input level controls, adjust the input controls so that input levels peak at -10 dB. For equipment not capable of providing 0 dBu output, adjust to achieve as close to 0 dBu as possible.
5. Turn amplifier gain controls to minimum and turn on the power amplifiers.
Adjust the gain controls to achieve a +4 dBu output level for low impedance amplifiers and a +18 dBu output level for high impedance or constant voltage amplifiers.
H. Hum and Noise Level:
1. Without changing the gain, terminate microphone and line level inputs with proper shielded resistors of 150 and 600 ohms respectively.
2. Measure and record overall hum and noise levels for each power amplifier output from each input and with all inputs simultaneously. Hum and noise shall be at least 50 dBA below rated power output levels with amplifier controls set for optimum signal-to-noise, using input from line level and microphone sources.
I. Electrical Distortion:
1. Load amplifier outputs with appropriate resistors matching the nominal impedance of the output terminals in place of the actual loudspeaker loads.
2. Adjust gain controls as for hum and noise level test.
3. Apply 250 Hz, 500 Hz, 1 kHz, and 2 kHz sine wave signal from an oscillator with less than 0.01% Total Harmonic Distortion to one input, such that a level of 0 dBu is obtained on the mixer.
4. Measure and record the electrical distortion at each power amplifier output.
Distortion shall be less than 0.5%.
J. Parasitic Oscillation and Radio Frequency Pick-up:
1. Set up system for each specified mode of operation.
2. Using a 5 MHz bandwidth oscilloscope and loudspeaker monitoring.
3. Ensure that the system is free from spurious oscillation and RF pick-up with the absence of any input signal and with a 160 Hz signal at a 0 dBu level on the mixer or mixing console.
4. Repeat this test for each mode of operation of the lighting dimmers (incandescent, neon, and fluorescent).
K. Background Noise:
1. Using a calibrated ANSI S1.4-1983 (1997) Type 1 or IEC 60651-01-1994, precision sound level meter, determine the average ambient noise level in the room. Record the level derived. The average background noise shall be 60 dBA or below during performance of the following tests. If noise level exceeds this criterion, promptly notify the Consultant before proceeding further.
L. Buzzes and Rattles:
1. Apply a 1 kHz sine wave signal such that a 0 dBu level is obtained on the mixer or mixing console.
2. Sweep loudspeaker systems from 50 Hz to 5 kHz at 6dB below full amplifier power.
Listen for buzzes, rattles, vibrations or resonance. Locate and correct problems.
3. If the cause is outside the system, promptly notify the Consultant, indicating the cause and recommended corrections.
M. Coverage:
1. Using pink noise as an input, adjust loudspeakers and output levels to provide ±6 dB coverage in the octave band centered at 1 kHz throughout the areas served by the system.
2. Measure and record results.
N. Equalization:
1. Equalize the sound systems in order to provide uniform seat-to-seat response, raise the threshold of feedback, suppress ring modes, and insure natural, pleasing sound in equal and adequate amplitude with maximum degree of intelligibility, and provide performance conforming to the requirements specified under "Acceptance Testing."
2. Turn off systems except the speaker system under test.
3. Using pink noise as an input and with system equalizers set to bypass operation, determine the average frequency response of the loudspeaker system in the room using a 1/3 octave real time analyzer.
4. Record the frequency response derived.
5. Locate the analyzer microphone approximately 1 m above the floor at a point which approximates the average frequency response, within ±3 dB from 50 Hz to 16 kHz.
6. Record the frequency response at this location.
7. Using pink noise as an input and with system equalizers set to normal operation, set low and high pass filters at 63 Hz and 16 kHz respectively.
8. Adjust the 1/3 octave filter settings to obtain the following response curves, minimizing the variation (±3 dB) between adjacent filter settings:
9. Roll off -6 dB per octave below 125 Hz.
10. Maintain ±3 dB, 125 Hz to 4 kHz.
11. Roll off -3 dB per octave from 4 kHz to 12 kHz.
12. Roll off sharply above 12 kHz.
13. With any system microphone open, make minor adjustments to maximize gain before feedback. No more than 3 filter settings shall be adjusted.
14. Record the frequency response derived.
O. System Input and Output Levels
1. Using pink noise source material and a calibrated ANSI S1.4-1983 (1997) Type 1 or IEC 60651-01-1994, precision sound level meter, perform the following:
a. For microphone level inputs: locate a pink noise source at a distance of
300 mm from the corresponding system microphone. Adjust the pink noise source to provide a level of 75 dBA at the microphone and set mixer levels to achieve a 0 dBu level at the mixer output.
b. For line level inputs: use system program source equipment, with pink noise playback media as a direct input to the mixer or mixing console and set mixer levels to achieve a 0 dBu level at the mixer output. Repeat for each system input individually where mixer inputs vary in input sensitivity.
Settings for equivalent sensitivity inputs may be duplicated.
c. With any input set as specified above, adjust audio distribution amplifiers to provide levels of -10 dBu at each output.
2. Measure and record results.
P. Feedback Stability:
1. With required output levels set, measure and record the available gain before feedback.
Feedback stability margin shall be 6 dB, minimum.
Q. Intelligibility:
1. Using a TEF analyzer, measure the percent articulation loss of consonants (% ALcons) for at least 4 various locations in the room in the 2000 Hz octave band.
2. % ALcons shall be less than 10 for each location.
3. Record results.
R. Assistive Listening Systems:
1. Set gain so that normal speech or music does not over modulate the transmitter.
2. Adjust emitter panels to provide even coverage throughout the courtroom.
S. Notification:
1. Once all of the above is complete, the system(s) is (are) ready for inspection.
Formally notify the COR at least seven (7) days prior to desired inspection date.
2. Final adjustments and equalization will be conducted at the time of inspection.
3.5 CONTRACTOR DIGITAL MEDIA TESTING AND COMMISSIONING
A. Demonstration and Acceptance Testing
1. The demonstration and acceptance tests shall be done by a Crestron
DigitalMedia Certified Engineer (DMC-E)
2. The contractor shall provide a copy of the following information in electronic format in order to verify the AV switching equipment has been installed and configured correctly:
3. The number of HDCP KSVs YKeys<I supported by each source.
4. The video timing, HDCP use and audio format of each source when operating (not needed for walk-in equipment).
5. The video timings and supported audio formats for each connected sink.
6. The length of cable used on all shielded twisted pair cable used for AV distribution.
7. The data rate supported by each shielded twisted pair cable used for AV distribution.
3.6 PRE-INSTALLATION MEETING
A. Prior to the start of the work, and at the COR's direction, meet at the project site to review methods and sequence of installation, special details and conditions, standard of workmanship, testing and quality control requirements, job organization and other pertinent topics related to the work. The meeting shall include the Contractor, Contractor's Project Manager, the COR, and the NIAID video project manager.
Inspection and testing services (if any) and any other subcontractors whose work requires coordination with this work shall be coordinated.
B. A Conduit/Wiring Analysis shall be conducted at the Pre-Installation Meeting. The
Contractor shall submit “as-built” drawings locating all existing conduit runs, junction boxes, and electrical outlets. Show location and type of all special receptacle boxes and plates to be supplied and/or modified by the Contractor. Verify and inspect all necessary conduits and outlets. Provide with the d e l i ve r a b l e s , a list of all conduits, boxes, and power changes necessary for installation of systems in each location.
3.7 APPLICABLE FEDERAL SPECIFICATIONS
A. The list below forms only a part of these specifications.
1. J-C-30A &Am-1 Cable and Wire, Electrical (Power, fixed installations)
2. W-C-3735B Circuit Breakers, Molded Case, Branch Circuit, and Service
3. W-C-586C Conduit outlet boxes, bodies, and entrance caps, electrical: cast metal
4. W-C-596E/Gen Connector, Electrical, Power, General Specifications
5. W-F-406B Fittings for Cable, Power, Electrical and Conduit, Metal, Flexible
6. W-F-408C Fittings for Conduit, Metal, Rigid, (Thick wall and EMT)
7. W-J-800D Junction Box: Extension, Junction Box; Cover, Junction Box
(Steel, Cadmium, or Zinc Coated)
8. HH-I-553C Insulation Tape, Electrical (Rubber, Natural, or Synthetic)
9. HH-i-595C Insulation Tape, Electrical, Pressure Sensitive Adhesive, Plastic
10. WW-C-0054OC Conduit, Metal, Rigid: and Coupling, Elbow, Nipple, Electrical
Conduit: Aluminum
11. WW-C-566C Conduit, Metal, Flexible
12. WW-C-581 E Conduit, Metal, Rigid, and Intermediate: and Coupling, Elbow, and
Nipple Electrical Conduit: Steel Zinc Coated
13. C2-1990 National Electrical Safety Code
14. C97.1-1972 Low Voltage Cartridge Fuses 600v or less
15. Institute of Electrical and Electronic Engineers (IEEE)
16. 142-1982 Recommended Practice for Grounding of Industrial and Commercial
Power Systems
4.1 CONTRACTING OFFICER REPRESENTATIVE (COR):
The (COR) will be identified by separate letter. The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.
The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in the contract. The Government may unilaterally change it’s COR designation.
Bill of Materials ‐ Attachment 1
DESCRIPTION Manufacturer CATALOG NUMBER QUANTITY
Three Element 360 degree Ceiling Microphone element in White Clear One 910‐001‐013‐W
2 DigitCat6 Plenum Orange 1000' Belden 2413 003A1000 2
3 "Audio DSP w 12 AEC inputs and 8 outputs" Biamp Tesira Forte CI 17
Table Hole Covers (The size required is 1” wide and 1” deep.)
Grommet
5 Dust Cover for XLR Chassis Connector ‐ Female SCF Neutrik 1
File details come from the government source that posted it. Updated .