RFI.docx

DOCX document 10 KB Posted

Attached to
Electrical Disconnect/Loop Switch
Solicitation number
RFQP04171100007
Issued by

About this file

RFI 1

View the file

Other files

File Type Posted
Loop Switch Pre-Bid and Sign In.PDF PDF
ncicform.rtf RTF text file
4TZ- Lift Station Switch 2010 sheet 1.pdf PDF
4TZ- Lift Station Switch 2010 sheet 2.pdf PDF
SF 1449 Loop Switch.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electrical Disconnect/Loop Switch

RFI #1 - If the time frame for switch-over is going to take longer than 1 hour, are the contractors responsible for providing a generator for temporary power?

Answer – FCI Milan is asking that the contractor provide a quote for providing a 60Kw generator for the day of transition as well as a quote without the generator being provided. FCI Milan will make the final decision after award of the project based on the total cost.