RFI 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Loop Switch Pre-Bid and Sign In.PDF | ||
| ncicform.rtf | RTF text file | |
| 4TZ- Lift Station Switch 2010 sheet 1.pdf | ||
| 4TZ- Lift Station Switch 2010 sheet 2.pdf | ||
| SF 1449 Loop Switch.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical Disconnect/Loop Switch
RFI #1 - If the time frame for switch-over is going to take longer than 1 hour, are the contractors responsible for providing a generator for temporary power?
Answer – FCI Milan is asking that the contractor provide a quote for providing a 60Kw generator for the day of transition as well as a quote without the generator being provided. FCI Milan will make the final decision after award of the project based on the total cost.