RFQC_24_052 Traffic Sign and Wayfinding Sign .pdf
PDF 122 KB Posted
- Attached to
- 24-052 Traffic Sign and Wayfinding Sign Maintenance, Traffic Control, Road Closure, and Special Even
- Solicitation number
- PE-66098-NONST-2024-000000038
- Issued by
- Cobb County, Georgia
About this file
This document is an Addendum to a Request for Qualified Contractor (RFQC) issued by the City of Sandy Springs, Georgia for Traffic Sign and Wayfinding Sign Maintenance, Traffic Control, Road Closure, and Special Events Services. The successful contractor will be responsible for all personnel, equipment, and services necessary to provide these services throughout the City as directed. The contractor must be registered with the Georgia Department of Transportation as a Prequalified Contractor for the required work classes. The RFQC response is due on April 12, 2024 at 2:00 p.m. The contractor will be required to review and respond to assigned work orders daily, provide inventory maintenance and asset management support, and perform preventive maintenance on traffic signs. The contractor will also be responsible for implementing a quality inspection protocol prior to the City's inspection.
The pricing terms, set asides, funding requirements and sources, and other financial details are not specified in this document. However, the contractor will be expected to provide the required services and equipment within the City of Sandy Springs and Fulton County, Georgia.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_052_Traffic Sign and Wayfinding Sign Maint.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum Number 1
REQUEST FOR QUALIFIED CONTRACTOR
(“RFQC”) 24-052
Traffic Sign and Wayfinding Sign Maintenance, Traffic Control, Road Closure, and Special Events Services
COMPLETE THIS ADDENDUM, SIGN and SUBMIT with the RFQC
RESPONSE DUE DATE: April 12, 2024, 2:00 p.m.
To All Prospective Offerors: In reference to the RFQC listed above, the following changes are hereby incorporated into the RFQC.
**Questions**
Number Question Response
1. Based on prior and anticipated service level agreements or guidelines what is the expected response times for acknowledging work orders to ensure timely and efficient handling of requests?
The contractor will review and respond to assigned work orders on a daily basis. Work orders will be assigned and completed based on the priorities in Section 3.4.1 of the RFQC. Contractor will provide daily reports of work orders completed as well as update the City’s work order database. Contractor will provide a one-week look ahead schedule for work. Also refer to Sections 3.7 and 3.12 of the
RFQC.
2. Are we responsible for maintaining and tracking the inventory?
The contractor will provide inventory maintenance and asset management support as provided for in Section 3.8 of the RFQC. The City maintains a GIS-based existing field inventory of traffic signs, traffic control devices, and wayfinding signs. The contractor will assist the City in keeping the inventory current when new signs or materials are installed in the field.
The contractor will update and maintain the City’s electronic inventory of signs and barricades used for road closures and detours. As provided in Section 3.10.a, the City will provide a tablet with a data service plan which will be used for inventory updates.
3. Will the awardee be responsible for preventive maintenance?
The contractor will maintain traffic signs as provided in Section 3.4 of the RFQC to include, but not limited to checking sign conditions, retro-reflectivity, cleaning, and removing obstructive vegetation.
4. Are we going to be responsible for implementing a quality inspection protocol prior to your inspection?
Yes, all work performed for this project will be constructed to the requirements of Section 3.3 of the RFQC . The awarded contractor project manager shall inspect all completed work prior to City inspection.
I hereby acknowledge receipt of Addendum Number 1 for #24-052 Traffic Sign and Wayfinding Sign
Maintenance, Traffic Control, Road Closure, and Special Events Services and have incorporated the changes into my response for the above-mentioned Request for Qualified Contractor.
COMPANY NAME:
CONTACT PERSON:
ADDRESS:
CITY: _________________________________STATE: ___________ ZIP: ________________________
PHONE: ________________ FAX: _______________
EMAIL ADDRESS: ______________________________________
SIGNATURE: ____________________________________________
DATE: ______________________________________
File details come from the government source that posted it. Updated .