RFQAttachment 3- Open Inspect Report (OIR).pdf

PDF 156 KB Posted

Attached to
QUANTAR Base Station Repairs
Solicitation number
2123403B4200RR008
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inspection Report (OIR) Date

From: (POC: name and phone number)

Contract Number:

Repair:

Line Item: ____ NIIN/NSN: 5840-01-628-3408 P/N: T5365A-25WATT Revision: ____ S/N: ____ RA number: ____

Problem(s) found: ____

Recommended solution: List Material/Parts____

Anticipated Material Cost: ____

Anticipated Labor Hrs: ____ Total Anticipated Repair Cost: ____ Cost includes Open/Inspect fee? YES NO

Or

BER:

Line Item: ____ NIIN/NSN: 5840-01-628-3408 P/N: T5365A-25WATT Revision: ____

Problem(s) found: ____

Recommended solution: List Material/Parts____

Anticipated Material Cost: ____

Anticipated Labor Hrs: ____ Total Anticipated Repair Cost: ____ Cost includes Open/Inspect fee? YES NO Obsolete Material/Parts: ____

Or

No Fault Found:

Line Item: ____ NIIN/NSN: 5840-01-628-3408 P/N: T5365A-25WATT Revision: ____

Effort made to determine the item was operational. Include any programming, alignment, set-up or material changes: ____

Inspection Report (OIR) Date: _________

From: (POC: name and phone number)

REPAIR:

Contract Number: ___________________________ Line Item: ________________ S/N: _____________________

NIIN/NSN: ___________________________

P/N: _______________________________ Revision: _________ Problem(s) found: ________________________________________________________ Recommended solution (List Material/Parts): __________________________________ Anticipated Material Cost: ___________Anticipated Labor Hrs: ___________ Total Anticipated Repair Cost: _____________ Cost includes Open/Inspect fee? YES NO

OR

BEYOND ECONOMICAL REPAIR (BER):

Contract Number:

Line Item: ________________ S/N: _____________________

NIIN/NSN: ___________________________

P/N: _______________________________ Revision: _________ Problem(s) found: ________________________________________________________ Recommended solution (List Material/Parts/Replacement): _______________________ Obsolete Material/Parts: __________________________________________________________________ Labor Hrs: ______ Cost (if any): __________ Cost includes Open/Inspect fee? YES NO

OR

NO FAULT FOUND:

Contract Number:

Line Item: ________________ S/N: _____________________ RA number: ___________

NIIN/NSN: ___________________________

P/N: _______________________________ Revision: _________ Effort made to determine the item was operational (Include any programming, alignment, set-up or material changes):

Labor Hours: ______ Cost (if any):_________ Cost includes Open/Inspect fee? YES NO

File details come from the government source that posted it. Updated .