RFQ918001-01 - Addendum 1.pdf
PDF 220 KB Posted
- Attached to
- DOC IMCC Hot Water Piping Replacement
- Solicitation number
- RFQ918001-01
- Issued by
- Johnson County, Iowa
About this file
This document is an Addendum for a Request for Quotes (RFQ) issued by the State of Iowa Department of Administrative Services for the DOC IMCC Hot Water Piping Replacement project. The base bid requires the removal and replacement of hot water piping and insulation at the Iowa Medical and Classification Center (IMCC) in Coralville, Iowa. There are no alternates or unit prices. Questions and substitution requests were due on March 21, 2024, with an addendum issued on March 26, 2024. Quotes are due on March 28, 2024 by 2:00 PM, with a tentative Notice of Intent to be issued the week of April 1, 2024. The contract is expected to be issued the week of April 1, 2024, with submittals due April 15-26, construction starting April 26, and substantial completion by May 17, 2024.
The contractor will be required to sign a modified ConsensusDocs 802 contract, provide project-specific insurance and performance/payment bonds, and submit a subcontractor/supplier list within 48 hours. Procore will be used for all project management, and the contractor's schedule of values must include a closeout line item of at least 1% of the total contract value. Site rules include onsite supervision, daily logs, and restrictions on work hours, water shutdowns, and demolition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ918001-01 - IMCC Hot Water Piping Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
Project Name:
DOC IMCC Hot Water Piping Replacement
DAS#9180.01
RFQ918001-01
Addendum #1
Dated: March 25, 2024
This Addendum forms a part of the Request For Quotes documents. This Addendum supersedes and supplements all portions of the original Request For Quotes with which it conflicts.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE REQUEST FOR PROPOSAL. FAILURE TO
DO SO MAY SUBJECT TO DISQUALIFICATION.
1. Questions:
a. Q1. Do the valves and pipe have to be the same manufacturer?
A1. No, there can be different manufacturers as long as they fit well.
b. Q2. Any idea the length of pipe between tie-ins and pumps? Is it in the same room?
A2. Yes, it is all in the same room and is likely under 30' per line, but the contractor will need to verify the lengths.
c. DQ3. What is called out as 1-1/2" MF on M700?
A3. That is intended to show the insulation. Refer to the insulation spec for actual material requirements.
d. Q4. Is any of the equipment being replaced or just the piping?
A4. Just the piping and the circuit setters will be replaced. The project is not replacing any pumps or other valves.
e. Q5. Is it okay to lose the recirculation capability during the construction period, as long as the hot water stays active?
A5. Yes.
2. Specifications: NONE
3. Substitution Requests: NONE
4. Drawings: NONE
Attachments: Pre-Quote Meeting Minutes.
END OF ADDENDUM
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9180.01 DOC IMCC Hot Water Piping Replacement
2700 Coral Ridge Ave Coralville, Iowa 52241
RFQ Pre-Quote Minutes: Meeting #1
Meeting Date Mar 19, 2024 Meeting Time 9:00 AM - 10:00 AM Central Time (US & Canada)
Meeting Location Virtual Meeting
Overview Meeting to allow prospective quoters to visit the site, when possible, and learn more about the project.
Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 291 878 408 166 Passcode: mW6H5S Download Teams | Join on the web Or call in (audio only) +1 515-598-7333,,608205447# United States, Iowa City Phone Conference ID: 608 205 447#
Notes
Attachments
Scheduled Attendees
Name Company Phone Number Email Attendance
Steve Bickford Iowa Medical Classification Center steve.bickford@iowa.gov
Christopher Varo Karges-Faulconbridge Inc P: (319) 284-3005 cjvaro@kfi-eng.com
Jeff Curtis Samuels Group, Inc. P: (515) 288-0467 jcurtis@samuelsgroup.net
Brian Polzin Samuels Group, Inc. P: (715) 841-1982 bpolzin@samuelsgroup.net
Bill Reynolds Samuels Group, Inc. P: (515) 288-0467 breynolds@samuelsgroup.net
Chitrangi Shastri Samuels Group, Inc. cshastri@samuelsgroup.net
Jennifer Kleene State of Iowa - Department of Administrative Services
P: (515) 725-0454 jennifer.kleene@iowa.gov
Introductions
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description Attendees
Official Documented Meeting Minutes S&S and Modern Piping were on the pre-quote meeting today
Project Overview
State of Iowa - Department of Administrative Services Page 1 of 5 Printed On: Mar 25, 2024 12:37 PM CDT
2.1 1 Project Description Open
Description
• Base bid - Remove and replace hot water piping and insulation at the Iowa Medical and Classification Center (IMCC), Coralville, Iowa 52241.
• Alternates - None
• Unit prices - None no questions
2.2 1 Quote Schedule Open
Description
• Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov: March 21, 2024 by 2:00 PM
• Addendum Issued: March 26, 2024
• Quotes Due: March 28, 2024 by 2:00 PM
• Tentative NOI Issued: Week of April 1, 2024
2.3 1 Quote Submission Open
Description
• Email Quotes are due March 28, 2024 at no later than 2:00 pm
• Quotes shall be submitted through email to the Issuing Officer at Construction.Procurement@iowa.gov.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Submit subcontractor/supplier list within 48hrs
Official Documented Meeting Minutes
Meeting #1 - RFQ Pre-Quote Project: 9180.01 DOC IMCC Hot Water Piping Replacement
State of Iowa - Department of Administrative Services Page 2 of 5 Printed On: Mar 25, 2024 12:37 PM CDT mailto:Construction.Procurement@iowa.gov:
mailto:construction.procurement@iowa.gov
2.4 1 Project Schedule Open
Description
• Contract(s) Issued: - Week of April 1, 2024
• Submittals: April 15 - April 26
• Construction: April 26, 2024
• Closeout: Substantially complete May 17, 2024
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day
2.5 1 Administrative Details Open
Description
• Contractor(s) will sign a modified ConsensusDocs 802. Example is linked in the RFQ.
• Project-specific Certificate of Insurance must be provided prior to contract execution.
Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
State of Iowa - Department of Administrative Services Page 3 of 5 Printed On: Mar 25, 2024 12:37 PM CDT
2.6 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractor(s) shall provide daily logs for each day they are on site.
• Construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• No smoking, vaping or smokeless tobacco use onsite.
• Temporary facilities - Use of Facility bathroom
• Demolished equipment - Must be removed from the project site
• Tool control - By the facility
• Cell phones -
• Background checks -
• Work hours - 7:00 am to 3:00 pm, Monday through Friday
• View RFQ for more information
• Water Line can only be shut down for a maximum of 4 hours.
• Contractor should plan to work on one line at a time to avoid night work
Official Documented Meeting Minutes Per Steve B. the facility will work with the contractor when it comes time to the water shut down. This can be discussed during the construction.
Questions
3.1 1 Questions Open
Description Submit all questions in writing to Construction.Procurement@iowa.gov.
Official Documented Meeting Minutes Q1. Do the valves and pipe have to be the same manufacturer?
A1. No, there can be different manufacturers as long as they fit well.
Q2. Any idea the length of pipe between tie-ins and pumps? Is it in the same room?
A2. Yes, it is all in the same room and is likely under 30' per line, but the contractor will need to verify the lengths.
Q3. What is called out as 1-1/2" MF on M700?
A3. That is intended to show the insulation. Refer to the insulation spec for actual material requirements.
Q4. Is any of the equipment being replaced or just the piping?
A4. Just the piping and the circuit setters will be replaced. The project is not replacing any pumps or other valves.
State of Iowa - Department of Administrative Services Page 4 of 5 Printed On: Mar 25, 2024 12:37 PM CDT
Q5. Is it okay to lose the recirculation capability during the construction period, as long as the hot water stays active?
A5. Yes.
These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.
Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.
State of Iowa - Department of Administrative Services Page 5 of 5 Printed On: Mar 25, 2024 12:37 PM CDT
File details come from the government source that posted it. Updated .