This document is an attachment to Request for Quote (RFQ) 899 issued by the Idaho Transportation Department (ITD) for the purchase and delivery of a retroreflectometer. The solicitation seeks quotes from qualified vendors for a new retroreflectometer unit, specifically a Gamma Scientific INV (Road Vista) SM3RL Pavement Marking Retroreflectometer or an equivalent model that meets specified minimum requirements. The retroreflectometer must comply with American Society for Testing and Materials (ASTM) standards, including ASTM E2832, E2177, and E1710, as well as European Standards EN1436, and must include GPS capabilities with fifty-six channel Wide Area Augmentation System (WAAS) technology. Vendors must submit quotes electronically via the IPRO system or email to the solicitation contact, Denise Cooley (denise.cooley@itd.idaho.gov, 208-745-5652), with required submittals including a price sheet and signature page. The desired delivery timeframe is between 120 and 180 days after receipt of order (ARO), FOB destination with freight prepaid, to ITD District 1 in Coeur d'Alene, Idaho (600 W Prairie Ave., Coeur d'Alene, ID 83815).
Award will be made to the responsive and responsible vendor with the lowest total cost as stated on Attachment 2. Submitting vendors must be authorized distributors or manufacturers of the retroreflectometer offered, with written agreement from the manufacturer to sell or service its products; quotes from non-authorized distributors will not be considered. The manufacturer must provide a minimum one-year standard warranty covering all defects except normal wear and tear, with all repair or replacement work including tools, parts, equipment, labor, and freight to be completed within thirty calendar days of written notice. Vendors offering an equivalent product must provide documentation demonstrating that the offered item meets all solicitation requirements. The contractor is responsible for delivery, unloading, and any necessary reassembly at the delivery location, and invoicing may only occur within thirty days after formal written acceptance by ITD's Contract Monitor using the designated Deliverable Acceptance Form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 2 - Contract Discrepancy Notice.docx | DOCX document | |
| Exhibit 1 - Deliverable Acceptance Form.docx | DOCX document | |
| Insurance Requirements 2023.docx | DOCX document | |
| RFQ899 - Attachment 2 - Price Sheet.xlsx | XLSX spreadsheet | |
| Solicitation Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ899
ATTACHMENT 1
RETROREFLECTOMETER
GENERAL INFORMATION
1. Purpose Idaho Transportation Department is requesting Quotes from qualified Vendors for the purchase and delivery of a reflectometer accordance with the specifications provided.
2. Solicitation Contact The contact for this RFQ is:
Denise Cooley, PPS-CPPB 208-745-5652 Email: denise.cooley@itd.idaho.gov
3. Restrictions on Communications From the issue date of this RFQ, until a contract/purchase order is awarded or the RFQ is cancelled, vendors and their representatives are prohibited from communications (written or verbal) regarding this RFQ with the ITD staff, other than the ITD RFQ Lead. Any communications (written or verbal) with ITD staff other than the RFQ Lead may result in the submitting vendor being found Non-Responsible and Non-Responsive.
4. Requirements and Specifications See Sections 1 and 2.
5. Quote Your Quote may be submitted electronically via IPRO or email (see below for additional details). ITD will not be accepting manual submissions for this solicitation. Your Quote must include the Required Submittals listed below and be received prior to the deadline established in IPRO.
Electronic Submission:
IPRO – Enter your pricing in IPRO POWERED BY LUMA and upload all Required Submittals.
Email:
Send an email to the Solicitation Contact (see Section 2) and attach all Required Submittals.
6. Required Submittals:
Attachment 2 – Price Sheet Attachment 3 – Signature Page Supporting documentation if offering an equal.
Documentation, which demonstrates, to ITD’s satisfaction, that the offered item meets the requirements of the solicitation. Failure to provide satisfactory documentation may eliminate the Vendor from further consideration.
(See Section 1 and 2 – Requirements and Specifications)
7. Award Award will be made, to the responsive responsible vendor with the lowest total Cost as provided on Attachment 2 – Bid Schedule, Line 1.
The State reserves the right not to evaluate or make an award in the best interest of the State.
Though it is not mandatory to submit your Quotation electronically via IPRO, all vendors participating in a solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a quote outside of IPRO). It is free to establish an account and only takes a few minutes of your time.
RETROREFLECTOMETER
SECTION 1 – REQUIREMENTS & SPECIFICATIONS
Brand Name The brand names specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Vendors offering an “equal” must include documentation which demonstrates, to ITD’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, ITD reserves the right to seek clarification from the Vendor. Failure to provide satisfactory documentation or a clarifying response to ITD may eliminate the Vendor from further consideration.
Model & Assembly The retroreflectometer must be new, not used. Though they are not specifically covered herein, all parts necessary to provide a complete and functional retroreflectometer must be provided. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this RFQ.
Warranty
3.1. Manufacturer standard warranty must cover the entire retroreflectometer for a minimum period of one (1) year. Manufacturer standard warranty must cover all defects, with the exception, of normal wear and tear under normal working conditions.
3.2. Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire retroreflectometer. All warranty work must be completed within thirty (30) calendars days after receipt of written notice from ITD. If approved by the ITD, the Contractor may perform warranty work on-site, at the Delivery location identified in Section 7, in lieu of pick-up and return shipping. The Contractor shall be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the retroreflectometer on-site within thirty (30) calendars days, or if the retroreflectometer continuously malfunctions and causes it to be out of service on multiple occasions, ITD reserves the right to require the Contractor to pick-up, repair, and return the retroreflectometer at no additional cost to ITD.
Authorized DISTRIBUTOR Submitting vendors must be an authorized distributor or manufacturer of the retroreflectometer offered. An authorized distributor shall be defined as a company or organization that has a written agreement with the manufacturer to sell or service its products. Quotes from Contractors who are not an authorized distributor by the manufacturer shall not be considered.
Acceptance
5.1. Documenting Acceptance - ITD’s Contract Monitor will be responsible for documenting Acceptance, in writing, using Exhibit 1 - Deliverable Acceptance Form. This document will be emailed to the Contractor’s Contract Manager as proof of Acceptance and approval to proceed with the invoicing procedures and required in Section 9, Invoicing.
5.2. Documenting Non-Compliance - ITD’s Contract Monitor will be responsible for documenting non-compliance, in writing, using Exhibit 2 - Contract Discrepancy Notice. This document will be emailed to the Contractor’s Contract Manager, providing details for each discrepancy that require corrective action. Invoicing must not occur until non-compliance has been corrected.
5.3. Correcting Non-Compliance - After receipt of the Contract Discrepancy Notice, the Contractor’s Contract Manager must respond, using the document, explaining how and when each discrepancy will be corrected. All discrepancies must be corrected and brought back into compliance with the Contract within thirty (30) calendar days after receipt of the notice from ITD. If the Contractor does not correct the discrepancies within this timeframe, ITD reserves the right to take further cure action as detailed in State of Idaho Contract Terms and Conditions.
Termination and cure See State of Idaho Contract Terms and Conditions located on the Terms Tab RFQ899 IPRO powered by LUMA
Delivery Delivery is desired between one hundred and twenty (120) and one hundred and eighty (180) days ARO, FOB Destination, freight prepaid and allowed. ITD reserves the right to accept delivery dates outside of the desired delivery date if in the best interest of the State of Idaho. The Contractor must deliver and unload the Retroreflectometer to the location listed below by the desired delivery date or the date provided on Attachment 2 - Price Sheet if determined to be in the best interest of the State of Idaho. The contractor is responsible for providing the necessary labor and equipment to unload the Retroreflectometer, including any re-assembly of any Retroreflectometer components that were unassembled for delivery or unloading.
Delivery Location:
ITD District 1 600 W Prairie Ave.
Coeur d’ Alene, ID 83815
Insurance See Attachment 4 – Insurance Requirments on the Attachment Tab of RFQ899 IPRO powered by LUMA.
Invoicing The Contractor must submit its invoice within thirty (30) calendar days after Acceptance to the billing contact identified on each Order. Invoices submitted prior to acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission. The following information must be included with each invoice:
10.1. Contract Name and Order Number
10.2. Invoice Number and Date
10.3. Contractor Contact Information
10.4. Itemization of Property (description, quantity, unit of measure, unit price, and total price)
Electronic invoice submittal email: D1AP@ITD.IDAHO.GOV
RETROREFLECTOMETER
SECTION 2 – SPECIFICATIONS
1. Gamma Scientific INV (Road Vista) SM3RL Pavement Marking Retroreflectometer or equal and must at a minimum specifications;
1.1. Must meet American Society for Testing and Materials (ASTM) https://www.astm.org/; and European Standards (EN) EN1436 https://www.en-standard.eu/
1.1.1. Measure retroreflectivity in continuous rain as per ASTM E2832;
1.1.2. Measures retroreflectivity in wet conditions per ASTM E2177;
1.1.3. Photopic respnose in accordance with ASTM E1710 paragraph 6.3.2;
1.2. Record Global Positioning Sensor (GPS) coordinates with each measurement utilizing fifty-six (56) Channel Wide Area Augmentation System (WAAS), European Geostationary Navigation Overlay Service (EGNOS), Michibiki-Satellite-based Augmentation System (MSAS)-enabled for two point five <(2.5) meter position fix uncertainty;
1.3. Measurement ranges:RL Range (mcd/m²/lx) – zero to eight thousands (0 to 8,000);
1.6.1. Qd Range (mcd/m²/lx) - Zero to four hundred (0 to 400);
1.6.2. Entrance angle eighty-eight point seventy-six degrees (88.76) degrees per ASTM E1710;
1.6.3. Illumination angle- one point twenty-four degrees (1.24) degrees per EN1436;
1.6.4. Observation angle - one point zero five (1.05) degrees per ASTM E1710;
1.6.5. Observation angle - two point twenty-nine (2.29) per EN1436;
1.6.6. Illumination angle Qd – Diffuse;
1.6.7. Illumination Area - two point four inches by seven point nine inches (2.4)in. x 7.9in. (6cm x 20cm); nineteen (19) square-in one hundred twenty square centimeters (120cm.);
1.6.8. Profiled marking measurement - Up to zero point fifty-nine inches (0.59)in fifteen (15 mm);
1.6.9. Measurement Time - RL only: zero point one second <0.1 sec; RL and color: zero point one second <0.1 sec; RL and Qd: <0.2 sec;
1.4. Have custom file naming capabilities;
1.5. Twenty five thousand (25,000) measurements, data memory;
1.6. Have USB computerinterface for data transfer and instrucment configuration;
1.7. Include integration software compatible with Excel and Google Maps;
1.8. Be labled with calibration certification;
1.9. Data fields must be customizalbe to include but not limited to location, install date and materiral;
1.10. Settings for pass/fail criteria;
1.11. Built in printer for onsite use;
1.12. Universal Serial Bus (USB) flash drive;
1.13. Left or right hand trigger operaton;
1.14. Batteries and battery charger;
1.15. Minimum seven (7)in touch screen;
1.16. Certified calibration block for onsite calibration;
1.17. Bluetooth interface and;
1.18. Carry case.