7893138__REVISED_SOW_FOR_PM_OF_NEC_HVAC_SYSTEM_2019.docx
DOCX document 115 KB Posted
- Solicitation number
- RFQ7893138
- Issued by
-
Department of State US Embassy Abuja
About this file
PREVENTIVE MAINTENANCE ON AMERICAN EMBASSY ABUJA HEATING VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RESPONSE_TO_QUESTIONS_-_PR___7893138__HVAC.docx | DOCX document | |
| 7893138__COVER_LETTER.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
American Embassy XXXX UNCLASSIFIED U.S. Department of State
Preventive Maintenance Contract
Scope of Work
For
Heating Ventilation and Air conditioning System
United States Embassy
Abuja
American Embassy XXXX UNCLASSIFIED U.S. Department of State
TABLE OF CONTENTS
Section Page
| 1. | DESCRIPTION | 2 |
| 2. | PRICING | 2 |
| 3. | NOTICE TO PROCEED | 5 |
| 4. | EQUIPMENT AND PERFORMANCE REQUIREMENTS | 5 |
| 5. | HOURS OF PERFORMANCE | 6 |
| 6. | ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT | 6 |
| 7. | SCHEDULED PREVENTIVE MAINTENANCE | 9 |
| 8. | PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES | 11 |
| 9. | SOFTWARE, LICENSES AND PASSWORDS | 11 |
| 10. | DELIVERABLES | 11 |
| 11. | INSURANCE REQUIREMENTS | 12 |
| 12. | LOCAL LAW REGISTRATION | 12 |
| 13. | QUALITY ASSURANCE PLAN (QAP). | 12 |
| 14. | TRANSITIONS/CONTACTS | 13 |
| 15. | SUBMISSION OF INVOICES | 14 |
Attachments:
Exhibit A – Statement of Work
SECTION A – CONTRACT FORMS
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NO. PR7893138
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NO. RFP 7893138
6. SOLICITATION ISSUE DATE:
12-17-2018
7. FOR SOLICITATION
INFORMATION CALL
| a. NAME: Lance Marsha |
| b. TELEPHONE NO. (No collect calls) |
+234-9-461-4000
8. OFFER DUE DATE/LOCAL TIME
01/30/2019/1700hrs
9. ISSUED BY CODE
| 10. THIS ACQUISITION IS |
| 11. DELIVERY FOR FOB |
| 12. DISCOUNT TERMS |
General Services Office American Embassy Abuja Plot 1075 Diplomatic Drive CBD Abuja Nigeria
|X| UNRESTRICTED
|_| SET ASIDE: % FOR
|_| SMALL BUSINESS
DESTINATION UNLESS BLOCK IS MARKED
|_| SEE SCHEDULE
| |_| SMALL DISADV. BUSINESS | |
| |_| 13a. THIS CONTRACT IS A RATED ORDER | |
| UNDER DPAS (15 CFR 700) |
| |_| 8(A) |
| 13b. RATING |
SIC:
SIZE STD:
| 14. METHOD OF SOLICITATION | |||
| |_| RFQ | |_| IFB | |X| RFP |
15. DELIVER TO CODE
16. ADMINISTERED BY CODE
| 17a. CONTRACTOR/ | CODE |
| OFFEROR |
| FACILITY | |
| CODE |
18a. PAYMENT WILL BE MADE BY EFT A
CODE
NigeriaFMCInvoices@State.gov Abujaprocurement@State.gov
| |_| 17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER | |
| 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED | |_| SEE ADDENDUM |
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Technical Services for the Proper Care and Maintenance of Heating and Ventilation and Air-condition Systems in the American Embassy Compound Abuja Nigeria (Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
|X| 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA |_| ARE |_| ARE NOT ATTACHED.
|X| 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA |_| ARE |_| ARE NOT ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _____ COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REFERENCE ___________________ OFFER DATED _________________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
| 30a. SIGNATURE OF OFFEROR/CONTRACTOR |
| 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) |
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT)Edward Waters
31c. DATE SIGNED
| 32a. QUANTITY IN COLUMN 21 HAS BEEN |
| ACCEPTED, AND CONFORMS TO THE |
| 33. SHIP NUMBER |
34. VOUCHER NUMBER
35. AMOUNT VERIFIED CORRECT FOR
| |_| RECEIVED | |_| | INSPECTED | |_| | CONTRACT, EXCEPT AS NOTED |
| |_| PARTIAL | |_| FINAL |
| 36. PAYMENT |
| 37. CHECK NUMBER |
| 32b. SIGNATURE OF AUTHORIZED GOVT REPRESENTATIVE | ||
| 32c. DATE | ||
| |_| COMPLETE | |_| PARTIAL | |_| FINAL |
38. S/R ACCOUNT NO.
39. S/R VOUCHER NO.
40. PAID BY
42a. RECEIVED BY (Print)
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
| 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41c. DATE |
| 42b. RECEIVED AT (Location) |
| 42c. DATE REC’D (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
AUTHORIZED FOR LOCAL REPRODUCTION SEE REVERSE FOR OMB CONTROL STANDARD FORM 1449 (10-95)
1. DESCRIPTION
The American Embassy Abuja Nigeria requires preventive maintenance services for Heating Ventilation and Air conditioning System Equipment. These services shall result in all systems being serviced under this agreement being in good operational condition when activated.
1.1. Type of Contract
This is a firm fixed price contract payable entirely in United States Dollars (USD). Prices for all Contract Line Item Numbers (CLIN) shall include proper disposal of toxic substances as per Item 8.4 where applicable. No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.
1.2. Period of Performance
The contract will be for a period of one-year, with a maximum of one-year optional periods of performance and will be expected to commence no later than February 2019
2. PRICING
The rates below include all costs associated with providing preventive maintenance services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and GST (if applicable).
2.1. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.
| CLIN |
| Description |
| Quantity of Equipment |
| Type of services |
| No. of service |
| Unit price / service ($) |
| Total per year ($) |
| 001 |
| [Insert equipment description] |
Annual
| 002 |
| Tech. check reports & Permits |
Annual
Total Base Year
2.2. Option Year 1. The Contractor shall provide the services shown below for Option Year 1 of the contract, and continuing for a period of 12 months.)
| CLIN |
| Description |
| Quantity of Equipment |
| Type of services |
| No. of service |
| Unit price / service ($) |
| Total per year ($) |
| 101 |
| [Insert equipment description] |
Annual
| 102 |
| Tech. check reports & Permits |
Annual
Total Option Year 1
2.3. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.
| CLIN |
| Description |
| Quantity of Equipment |
| Type of services |
| No. of service |
| Unit price / service ($) |
| Total per year ($) |
| 001 |
| [Insert equipment description] |
Annual
| 002 |
| Tech. check reports & Permits |
Annual
Total Option Year 2
2.4. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.
| CLIN |
| Description |
| Quantity of Equipment |
| Type of services |
| No. of service |
| Unit price / service ($) |
| Total per year ($) |
| 001 |
| [Insert equipment description] |
Annual
| 002 |
| Tech. check reports & Permits |
Annual
Total Option Year 3
| 2.6. Total for all years: | Base Year | $_______ | ||
| Option Year 1 | $_______ | |||
| Option Year 2 | $_______ | |||
| Option Year 3 | $_______ | |||
| TOTAL | $_______ |
2.7 Repair option. Repairs are NOT included under this agreement (see 7.1.3) and are to be done outside this contract. However, the Government desires current labor rates in the event that there is an issue discovered during the preventive maintenance of the specified equipment. Please provide your current labor rates in the Repair Option fields below. As stated in 7.1.3 any necessary repairs or parts will be submitted for approval and then billed against a separate PO. The Contractor is not approved to do any additional work without specific authorization from the Contracting Officer.
Repair Labor Rates
| Base Year | $/hr |
| Option Year 1 | $/h |
3. NOTICE TO PROCEED
After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.
4. EQUIPMENT AND PERFORMANCE REQUIREMENTS
4.1. The US Embassy Abuja requires the Contractor to maintain the following equipment in a safe, reliable and efficient operating condition. Please see equipment list included in Exhibit A for a more detailed description.
| S/N |
| Equipment |
| Quantity |
| Manufacturer |
| Model |
| Specification |
| Airstack Chiller |
| 1 |
| Airstack |
| ASP30A, 20P |
201.8 tons, Compressor: 151hp, combined capacity
| Airstack Chiller |
| 1 |
| Airstack |
| ASP15A, 20P |
16.2 tons,2 Modules, 4 Compressor: combined capacity
| 03 |
| York Screw Chiller |
| 1 |
| York International |
| Model #: YR TCTB T1555a |
| 215 Tons, Motor: 305hp, 415V / 3ph / 50Hz |
| 04 |
| York Air cooled Chiller |
| 1 |
| York Intl |
| YCAL0117EB50XCASDTXXX3NXXXX445XXX |
| 29.4Ton,4 Compressor. 70W. R407. 415V / 3ph / 50Hz |
| ArctiChill Chiller |
| 1 |
| ArctiChill |
| PACVMV0600D7‐MM |
| Compressors: 30HP each. 415V / 3ph / 50Hz |
Air Handling Units
| 7 |
| York International |
| AHU1: PCAH-100X81 |
AHU2: PCAH-98X156
AHU3:PCAH-100X132
AHU#4: PCAH-68X81
AHU#5:PCAH – 98X81
AHU#6:PCAH – 98X82
AHU#7 PCAH-98X82
AHU#1:11,240 CFM,
AHU#2:24,000 CFM,
AHU#3:21,000 CFM,
AHU#4: 5,730 CFM
AHU#5&6: 8,800CFM
AHU#7:5,805CFM
Air Handling Units
| 9 |
| Daikin Mcquay |
| NX-AHU1:MCCB1X3 |
NX-AHU2: MCCB2X4
NX-AHU3: MCCB2X3
NX-AHU4: MCCB2X3
NX-AHU5:MCCB2X3
NX-AHU6:MCCB2X3
NX-AHU7:MCCB2X4
NX-AHU9:MCCB2X4
M-AHU-1:MCCB2X2
AHU1:5048CFM
AHU2: 13298CFM
AHU3:8762CFM
AHU4:7815CFM
AHU5: 9936CFM
AHU6: 7444CFM
AHU7: 10273CFM
AHU9:10595CFM
M-AHU1:5505CFM
All the AHUs are 415V, 3ph, 50Hz. Direct drive fans
| 08 |
| Cooling Tower |
| 1 |
| BALTIMORE AIR COIL |
| 3240A-JM-2 |
| 1,620gpm; MOTOR : 7.5 hp, 415V / 3ph / 50Hz |
| 09 |
| SECONDARY CHILLED WATER PUMPS |
| 2 |
| Bell and Gossett |
| Series HSC3 4X6X10M S/N QF6804 |
| PUMP : 430gpm @ 200 ft TDH; MOTOR: 40 hp, 2960 RPM, 415V / 3ph / 50Hz |
| 10 |
| PRIMARY CHILLED WATER PUMPS |
| 2 |
| BELL AND GOSSETT |
| Serial #CQ.2818-01 G30 |
| MOTOR: 1.0 hp, 1500 RPM, 415V / 3ph / 50Hz. PUMP : 430 gpm |
| 11 |
| Condenser water pumps |
| 2 |
| Bell and Gossett |
| S/N CQ-2820-01 |
H30 PUMP: 610gpm @ 65ft TDH; MOTOR: 20hp, 1480 RPM, 415V / 3ph / 50Hz
| 12 |
| Secondary chilled water pump |
| 1 |
| Bell & Gossett |
| Series 80. 2X9.5B |
| 1.5HP 1500RPM, 415V 3Ph/50Hz |
| 13 |
| Secondary Chilled Water Pumps |
| 2 |
| Bell and Gossett |
| 4GB Series 1510 |
| 465.99GPM, 20HP, 1500RPM, 415V 3Ph/50Hz |
| 14 |
| Packaged Roof Top Units AHU |
| 2 |
| Daikin Mcquay |
| RN018-AAON Roof Top Unit and RN025 |
| 190Kw, 18-25Ton, 415V, 3ph, 50Hz. R410A |
| 15 |
| Packaged Roof Top Units AHU |
| 1 |
| Daikin Mcquay |
| RCS035D |
| 34.2Kw 415V, 3ph, 50Hz. R410A |
| 16 |
| NX-AHU-1; M-AHU-1 |
| 2 |
| ABB |
| ACH550-VCR-023A-4+F267+K452 |
| 380V-480V, 3ph, 50Hz, 23A |
| 17 |
| NX-AHU-2; NB-AHU-5A |
| 2 |
| ABB |
| ACH550-VCR-038A-4+F267+K452 |
| 380V-480V, 3ph, 50Hz, 38A |
| 18 |
| NX-AHU-3,4,5,6,7,9 |
| 10 |
| ABB |
| ACH550-VCR-031A-4+F267+K452 |
| 380V-480V, 3ph, 50Hz, 31A |
| 32 |
| SCHP-1 |
| 1 |
| ABB |
| ACH550-VCR-017A-4+F267 |
| 380V-480V, 3ph, 50Hz, 17A |
| 33 |
| SCHP-2 |
| 1 |
| ABB |
| ACH550-VC-072A-4+F267 |
| 380V-480V, 3ph, 50Hz, 72A |
| 34 |
| CT-1; NB-AHU-4A; |
| 2 |
| ABB |
| AYK550-UH-012A-4+K465 |
| 380V-480V, 3ph, 50Hz, 12A |
| 35 |
| CT-2; NB-AHU-4B; NB-AHU-3A; NB-AHU-6A |
| 4 |
| ABB |
| ACH550-VC-015A-4+F267 |
| 380V-480V, 3ph, 50Hz, 15A |
| 37 |
| NB-AHU-3 RETURN |
| 2 |
| ABB |
| ACH550-UH-096A-4 |
| 380V-480V, 3ph, 50Hz, 96A |
| 39 |
| NB-AHU-1 RETURN |
| 1 |
| ABB |
| ACH550-UH-044A-4 |
| 380V-480V, 3ph, 50Hz, 23A |
| 45 |
| NB-AHU-5 RETURN |
| 1 |
| ABB |
| ACH550-VCR-072A-4+F267 |
| 380V-480V, 3ph, 50Hz, 72A |
| 1 |
| ABB |
| ACH550-UH-038A-4 |
| 380V-480V, 3ph, 50Hz, 38A |
| 48 |
| NB-AHU-6 RETURN |
| 1 |
| ABB |
| ACH550-UH-041A-4 |
| 380V-480V, 3ph, 50Hz, 41A |
4.2. The Contractor shall provide all necessary managerial, administrative and direct labor personnel, as well as all transportation, equipment, tools, supplies and materials required to perform inspection, maintenance, and component replacement as required to maintain the systems in accordance with this work statement. Under this Contract the Contractor shall provide:
· The services of trained and qualified technicians to inspect, adjust, and perform scheduled preventive maintenance.
4.3. Performance Standards
The air handling units shall be clean and in good operating condition upon completion of the service. The preventive maintenance service shall result in the parts of the system serviced being in a condition to operate efficiently and effectively.
5. HOURS OF PERFORMANCE
5.1. The Contractor shall maintain work schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post. The Contractor shall deliver standard services between the hours of 8:00AM and 4:30 PM Monday through Friday. No work shall be performed on US Government and local holidays. Below is a list of the holidays.
| Month |
| Date/Day of the Week |
| Holiday |
| US or Nigerian Holiday |
| JAN |
| 01 / Tuesday |
| New Year’s Day |
| US / Nigeria |
| JAN |
| 21 / Monday |
| Martin Luther King Day |
| US |
| FEB |
| 18 / Monday |
| Presidents’ Day |
| US |
| APR |
| 19 / Friday |
| Good Friday |
| Nigeria |
| APR |
| 22 / Monday |
| Easter Monday |
| Nigeria |
| MAY |
| 01 / Wednesday |
| Workers’ Day |
| Nigeria |
| MAY |
| 27 / Monday |
| U.S. Memorial Day |
| US |
| JUN |
| 05 / Wednesday |
| Eid-El-Fitri** |
| Nigeria |
| JUN |
| 12 / Wednesday |
| Democracy Day |
| Nigeria |
| JUL |
| 04 / Thursday |
| Independence Day |
| US |
| AUG |
| 12 / Monday |
| Eid-El-Kabir** |
| Nigeria |
| SEP |
| 02 / Monday |
| Labor Day |
| US |
| OCT |
| 01 / Tuesday |
| Independence Day |
| Nigeria |
| OCT |
| 14 / Monday |
| Columbus Day |
| US |
| NOV |
| 11 / Monday |
| Eid-El-Maulud** |
| Nigeria |
| NOV |
| 11 / Monday |
| Veterans Day |
| US |
| NOV |
| 28 / Thursday |
| Thanksgiving |
| US |
| DEC |
| 25 / Wednesday |
| Christmas Day |
| US / Nigeria |
6. ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT
6.1 General. The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor’s liaison with the American Embassy Abuja Nigeria. The Contractor’s employees shall be on-site only for contractual duties and not for any other business or purpose. Contractor employees will be given access to the equipment and equipment areas and will be escorted by Embassy personnel.
6.2 Personnel Security. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel who to be used on this Contract prior to their utilization. Submission of information shall be made within 30 days of award of contract. No technician will be allowed on site without prior authorization. Note: this may include cleared personnel if advance notice of visit is not given at least one week before the scheduled visit.
6.2.1 Vehicles. Contractor vehicles will not be permitted inside the embassy compound without prior approval. If vehicle access is necessary, submit contractor vehicle information (Make, Model, License Plate #) along with a written justification as to why access is necessary. This shall be submitted to the Facility Manager at least one (1) week prior to the visit.
6.2.2 Government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.
Government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.
6. 3 Security Clearances. All Work under this contractor that are designated as non-CAA areas may be performed by un-cleared American or local workers. However, all work done in CAA and PCC areas shall be performed by cleared American Construction personnel as needed to complete the services. The Contractor shall work closely with the COR, the Post Facility Manager [FM] or the General Services Officer [GSO].
6.3.1 The Contractor must comply with all of the following requirements relating to the protection of U.S. Embassy in Abuja personnel, property and compound project information and cooperate fully in all security matters Sensitive But Unclassified (SBU) and information that may arise relating to this contract.
Contractor personnel may also be exposed to various documents and signs, including Post notices, event schedules, DoS regulations and conversations or announcements relating to the operation of the U. S. Embassy [Insert Post] and diplomatic personnel. This information should not be shared with anyone not employed by or falling under the protection of the Embassy.
Contractor personnel may be exposed to various documents, such as blueprints, drawings, sketches, notes, surveys, reports, photographs, and specifications, received or generated in conjunction with this contract. These documents contain information associated with diplomatic facilities for the U.S. Department of State. These documents have been marked with the handling designations “Unclassified” or “Sensitive But Unclassified” and US Government warnings against reproduction and distribution. These documents require special handling and dissemination restrictions. All handling designations and warnings on original documents must be reproduced on subsequent copies.
The loss, compromise, or suspected compromise or loss of any SBU information, contract related information (personnel files, payroll information, etc.), any post or diplomatic facility related information (documents, notes, drawings, sketches, surveys, reports, exposed film, negatives, or photographs), or ANY information which may adversely affect the security interests of the United States, must be immediately brought to the attention of the Contracting Officer (CO) and Contracting Officer’s Representative (COR).
Photographs of any diplomatic overseas building or facility must be authorized in advance by the COR and Regional Security Officer (RSO), who will establish any controls, limits, and/or restrictions as necessary. Exposed film depicting any Controlled Access Area and/or sensitive equipment must be developed in a U.S.- controlled environment by appropriately cleared personnel. No further dissemination, publication, duplication, or other use beyond that which was requested and approved is authorized without specific, advance approval from DS. DS reserves the right to demand retention of all copies of said photographs and/or negatives, following fulfillment of the previously authorized usage.
Transmission of any information marked Sensitive But Unclassified (SBU) or contract/personnel sensitive information, via the Internet, is prohibited. SBU information can be transmitted via ProjNet, mail, FedEx (or other commercial carrier) or fax, or handcarried by authorized contractor personnel.
Discussion of U.S. Diplomatic post activities while not on post, to include in homes, hotel rooms, restaurants and all other public places, is prohibited. Any contact with host or third country nationals that seems suspicious (such as undue curiosity in the project or project personnel) shall be reported immediately to the COR and RSO.
The Contractor and its employees shall exercise utmost discretion in regard to all matters relating to their duties and functions. They shall not communicate to any person any information known to them by reason of their performance of services under this contract which has not been made public, except to the extent necessary to perform their required duties in the performance of the contract requirements or as provided by written authorization of the Contracting Officer. All documents and records (including photographs) generated during the performance of work under this contract shall be for sole use of and shall become the exclusive property of the U.S. Government. No article, book, pamphlet, recording, broadcast, speech, television appearance, film or photograph concerning any aspect of the work performed under this contract shall be published or disseminated through any media, to include company or personal websites, without the prior written authorization of the Contracting Officer. These obligations do not cease upon the expiration or termination of this contract or at any other point in time. The Contract shall include the substance of this provision in all subcontracts hereunder.
6.4 Standards of Conduct
6.4.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.
6.4.3 Neglect of Duties. Neglect of duties is unacceptable. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.
6.4.4 Disorderly Conduct. The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.
6.4.5 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.
6.4.6 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.
6.4.7 Key Control. The Contractor will not be issued any keys. The keys will be checked out by a “Cleared American” escort on the day of service requirements.
6.4.8 Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.
7. SCHEDULED PREVENTIVE MAINTENANCE
7.1. General
7.1.1. The Contractor shall perform preventive maintenance as outlined in Exhibit A - STATEMENT OF WORK. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown and deterioration when units are activated/running.
7.1.2. The Contractor shall inventory, supply and replace expendable parts (eg, filters, belts, hoses, gaskets) that have become worn due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor shall inventory the supply after each visit and order replacement supplies and have them delivered on site. Maintenance materials shall be unused and are to be industry standard and intended for the task to be performed. Parts shall be OEM approved. Refrigerants shall meet the AHRI Standard 700-2015 or most recent AHRI Standards.
7.1.3. Exclusion. This contract does NOT include repair of equipment and replacement of hardware. Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance. The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.
7.1.4. Replacement/repair of any electronic or electrical parts shall be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.
7.1.5. Stocking of recommended repair parts is at the discretion of the Facility Manager and is dependent upon the nearest location of the Equipment manufacturer, distributor or dealer. A recommended spare parts list shall be obtained by the contractor from the manufacturer or distributor and provided to the Facility Manager to procure.
7.1.6. Parts/materials/tools procurement and delivery for the CAA/PCC areas shall be at the discretion of the Regional Security Officer (RSO).
7.2 Checklist Approval
The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to perform. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement.
7.2.1. The Contractor shall provide trained technicians to perform the service at frequencies stated in Exhibit A and on the equipment called out in this SOW. The technician shall sign off on every item of the checklist and leave a copy of this signed checklist with the COR or the COR's designate after each maintenance visit.
7.2.2. It is the responsibility of the Contractor to perform all manufacturers’ recommended preventive maintenance including preventive maintenance recommended by the manufacturers’ technical manuals for the respective equipment.
7.2.3 Additionally, the maintenance contractor shall obtain and keep at the post O&M binders provided by the manufacturers. These binders shall be placed in a location accessible to post personnel to review as needed.
8. PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES
The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The Contractor shall provide all of the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.
8.1 Contractor furnished materials include but are not limited to appropriate tools, testing equipment, safety shoes and apparel for technicians, hands, hearing and eye protection, MSDS, cleaning material and oil spill containment kit. Expendable/consumable items (e.g. hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), generator starting batteries, grease, sealant, thermostat, fuse), shall be maintained in the onsite inventory. See 7.1.2.
8.2 Repairs are not included in this contract. See 7.1.3. Exclusions.
8.3 Disposal of used oil, fuel, battery and other toxic substances. The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.
9. SOFTWARE, LICENSES AND PASSWORDS
Copies of any and all software and licenses needed to control or to adjust the communications module shall be given to the post upon completion of the work.
10. DELIVERABLES
Provide a written report in English to Post Facilities Manager containing following:
a) System information (make, model, all devices types)
b) Pass/Fail of each feature and type of component tested. If a device fails, note device type, address and location within Post
c) Any comments on system (or device) condition pertaining to service life and dependability.
d) Full printout of test from system printer
e) Testing of exhaust gas by Gas Analyzer The following items shall be delivered under this contract:
| Description |
| QTY |
| Delivery Date |
| Deliver to |
| Names, biographic data, police clearance on Contractor personnel (#6.2) |
| 1 |
| 30 days after contract award |
| COR |
| Certificate of Insurance (#11.2) |
| 1 |
| 30 days after contract award |
| CO |
| PM Checklist signed by Contractor’s employee (#7.2.1) |
| 1 |
| After completion of each maintenance service |
| COR |
| Invoice (#15) |
| 1 |
| After completion of each maintenance service |
| COR |
11. INSURANCE REQUIREMENTS
11.1 Personal Injury, Property Loss or Damage (Liability). The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor’s personnel in the performance of this Contract.
The Contractor’s assumption of absolute liability is independent of any insurance policies.
11.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this Contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:
Public Liability Insurance
| Property damage: | $ | |
| Cumulative: | $ |
Workers’ Compensation and Employer’s Liability
11.3 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required under local laws (see FAR 52.228-4 “Worker’s Compensation and War-Hazard Insurance Overseas”).
12. LOCAL LAW REGISTRATION
If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to insure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the Contract shall be payable by the Contractor without Government reimbursement.
13. QUALITY ASSURANCE PLAN (QAP).
13.1 Plan. This plan is designed to provide an effective surveillance method to promote effective Contractor performance. The QAP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the Contract. The role of the Government is to conduct quality assurance to ensure that Contract standards are achieved.
| Performance Objective |
| SOW Para |
| Performance Threshold |
Services.
Performs all services set forth in the Statement of Work (SOW)
| 1 thru 12 & Exhibit A |
| All required services are performed and no more than one (1) customer complaint is received per month |
13.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.
13.3 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.
13.4. Procedures.
13.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed, they will immediately contact the COR.
13.4.2 The COR will complete appropriate documentation to record the complaint.
13.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.
13.4.4 If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.
13.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
| 13.4.6 | If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor shall notify the COR. The COR will review the matter to determine the validity of the complaint. |
| 13.4.7 | The COR will consider complaints as resolved unless notified otherwise by the complainant. |
13.4.8. Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.
14. TRANSITIONS/CONTACTS
Within Thirty (30) days after contract award, the Contracting Officer may ask the contractor to develop a plan for preparing the contractor to assume all responsibilities for preventive maintenance services. The plan shall establish the projected period for completion of all clearances of contractor personnel, and the projected start date for performance of all services required under this contract. The plan shall assign priority to the selection of all supervisors to be used under the contract.
14.1 On site contact. The following are the designated contact personnel between the US Embassy and the Contractor
| Facility Manager: | Heroux, Donald J. | |
| Telephone #: | +234 9461 4000 Ext. 4142 | |
| Email address: | HerouxDJ@state.gov |
| Technical Specialist: | Ogboyi E. John | |
| Phone Number: | +234 9461 4000 Ext. 4103 | |
| Email Address: | OgboyiJE@state.gov |
15. SUBMISSION OF INVOICES
The Contractor shall submit an invoice after each preventive maintenance service has been performed. Invoices must be accompanied by a signed copy of the Maintenance Checklist for the work performed including parts replacement and break down calls, if any. No invoice for preventive maintenance services will be considered for payment unless accompanied by the relevant documentation.
The Contractor should expect payment 30 days after completion of service or 30 days after receipt of invoice at the Embassy's payment office, whichever is later. Invoices shall be sent electronically to:
NigeriaFMC_Invoices@state.gov
EXHIBIT A
Statement of Work
I. GENERAL INFORMATION:
The United States Embassy Abuja Nigeria requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Heating Ventilation and Air conditioning System Equipment.
II. PROJECT REQUIREMENTS:
DESCRIPTION OF EQUIPMENT *:
*Please see attachment at the end of this sheet for more details
III. GENERAL REQUIREMENTS:
The Contractor under this SOW shall be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. the Government has the O&M manuals for the various equipment in the system to be provided to the Contractor.
IV. SCOPE OF WORK –
Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO) immediately. Material Safety Data Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials. Copies shall be provided to the COR for approval.
The contractor should inventory the supply and expendable parts after each visit and guide post order replacement supplies
If any discrepancies are found with the HVAC Equipment that are not covered under this scope of work the contractor shall provide the following:
1. Detailed report noting the discrepancy found.
2. Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.
3. Price quote for repair labor.
SAFETY AND SPECIAL INSTRUCTIONS:
1. Follow site safety procedures and supervisor’s instructions.
2. Schedule outage with operating personnel.
3. Use extreme caution when climbing access ladders.
4. Perform applicable lockout/tag out steps of site safety procedures.
5. Lockout and disconnect the main power before tightening the main supply lugs in order to avoid the hazard of electrical shock, which could result in serious personal injury or death.
6. Record and report equipment damage or deficiencies.
7. Review and follow the manufacturer’s O&M instructions.
8. Record results in the equipment history log.
9. Allow only qualified personnel to do maintenance work on this equipment.
10. Record results in the equipment history log.
11. Check manufacturer’s specifications for the maximum number of plugged tubes.
12. Allow only qualified personnel to do maintenance work on this equipment.
AIR HANDLING UNITS
MAINTENANCE PROCEDURES:
Annually
1. Perform semi-annual tasks.
2. Clean exterior of air handler cabinet.
3. Inspect doors, handles, latches and hinges for proper operation.
4. Inspect door gaskets for damage and proper seal.
5. Inspect panels for damage.
6. Clean fan segment and fan assembly (supply, return, exhaust).
7. Check fan housing, wheel, shaft, frame, inlet vanes and bearings for damage, wear, loose parts, dirt and debris.
8. Check fan base, vibration isolators and thrust restraints for damage, wear, loose parts, dirt and debris.
9. Check flex connector for damage and wear.
10. Lubricate fan bearings.
11. Clean variable inlet vanes.
12. Check adjustable fan motor base and mounting hardware for loose parts.
13. Check adjustable fan motor base for damage.
14. Check fan motor for leaky bearing seals.
15. Check fan for motor damage.
16. Check for dirt, dust & debris in air vents on fan motor housing.
17. Clean dehumidification coils.
18. Clean condensate drain pan, trap, drain line and adjacent wetted surfaces.
19. Check Energy Recovery Wheel, clean media, adjust seals, replace belt
CHILLERS
MAINTENANCE PROCEDURES:
Air Cooled Chiller:
Annually
1. Disconnect power source and lock out. Check electrical wiring and connections; tighten loose connections.
2. Perform all check items in the Semi-Annual schedule.
3. Perform analysis on oil and filter. Change if necessary. Check compressor oil pump and seals. Check oil heater and thermostat. Check all strainers, valves, etc.
4. Conduct vibration analysis of motor & assembly: Check all alignments to specifications. Check all seals.
5. Lubricate shaft bearings and motor bearings as required.
6. Check superheat and sub-cooling temperatures.
7. Check contactors, sensors, and mechanical safety limits.
8. Check the chiller for leaks. Add refrigerant if low. Record amounts and address leakage problems.
9. Thoroughly clean intake side condenser coils, fans, and intake screens.
10. Perform any additional maintenance tasks as recommended in the manufacture’s operation and maintenance manuals.
11. Perform operational test and return to service.
12. Remove debris from work-site.
13. Fill out maintenance checklist and report deficiencies.
Water Cooled Chiller:
Annually
1. Disconnect power source and lock out. Check electrical wiring and connections; tighten loose connections.
2. Perform all check items in the Semi-Annual schedule.
3. Clean dehydrator float valve.
4. Perform spectrochemical analysis of compressor oil; replace oil as necessary.
5. Replace oil filters and add oil as necessary.
6. Inspect cooler and condenser tubes for leaks; clean screens as necessary.
7. For dedicated PCC chillers the glycol level of the chill water is to be checked and adjusted to the percentage required by OBO Engineering Dept.
8. Inspect utility vessel vent piping and safety relief valve; replace as necessary.
9. Inspect/clean the economizer, gas line damper valve and actuator arm.
10. Run an insulation test on the centrifugal motor.
11. Clean area around equipment.
12. Document all maintenance and cleaning procedures.
Scroll Chiller:
Annually
1. Disconnect power source and lock out. Check electrical wiring and connections; tighten loose connections.
2. Complete all monthly maintenance checks.
3. Check the oil level and refrigerant charge.
4. Have a qualified laboratory perform a compressor oil analysis to determine system moisture content and acid level.
5. Leak test the chiller, check operating and safety controls, and inspect electrical components for proper operation.
6. Inspect all piping components for leaks and damage. Clean all water strainers
7. Clean and repaint any components that show corrosion.
8. Clean the condenser coils.
9. Clean the condenser fans. Check the fan assemblies for proper clearance in the fan shroud openings and for motor shaft misalignment or abnormal end-play, vibration and noise.
Modular Chiller:
Annually
1. Disconnect power source and lock out. Check electrical wiring and connections; tighten loose connections.
2. Inspect all electrical connections to check that they are not damaged and terminals are tight. Inspect all contactors for pitting and corrosion replace as necessary.
3. Inspect all cabinet screws nuts and bolts, fan motor mount bolts, fan blade set screws, shell and tube evaporator mounting, end cap bolts and connection bolts, brazed plate evaporator mounting bolts as well as compressor and pump mounting bolts for tightness as well as anti-vibration and isolator pads.
4. Check all fuses to make sure that they are sized correctly with proper amp rating.
5. Check all refrigerant pressures and inspect compressor in operation – look for signs of overheating, oil leaks or refrigerant leaks.
6. Conduct “sniffer” leak check of entire refrigerant piping system. Inspect compressor terminals when powered down for pitting, corrosion and loose connections.
7. Check that pressure switches and thermostats have correct cut-in and cut-out settings.
8. Check that the oil level is visible in each compressor and not discolored or bubbled. Take oil sample and analyze for destructive acids, corrosive materials and metal deposits.
9. Check that the pump(s) overload settings match the nameplate(s) and that they work properly.
10. Ensure that the condensing unit is clean and clear of surrounding debris and that panels are clear.
11. Check and record the compressor amperage draws and voltage.
12. Check and record the fan motor amp draws and voltage. Make sure of proper rotation and lubricate if required.
13. Check and record amp draw of the pumps and voltage. Check for signs of leakage at pump seal and suction and discharge connections.
14. Record G.P.M. water flow and compare to design specifications.
15. Check the glycol level of the chilled water.
16. Check that there is a sufficient Glycol level in feeder tank and check for proper operation.
17. Tighten all Rota-Lock nuts at the Compressors, Receivers and accumulators. Torque is per manufacturer’s recommendations.
18. Inspect all control capillary tubing to ensure that the lines are separated and not vibrating against each other or any part of the frame or housing.
19. Inspect all other refrigeration lines for secure mountings. Take corrective measures necessary to prevent piping from rubbing the frame etc.
20. Inspect all insulation on piping and control sensors. Repair and replace as necessary. Inspect entire plumbing system for leaks and clean any strainers on the system. Replace as necessary.
21. Check crank case heaters to verify proper operation. Keep spares in stock.
22. Take a refrigerant sample and analyze for moisture, acid, and rust.
23. Check operating pressures and temperatures and evaluate whether the system has a full refrigerant charge.
24. Review logged alarms and look for repeat trends.
25. Document the preventive maintenance task that have been completed and submit to the Government.
Panel, Electronic Controls:
Annually
1. Clean panel interior.
2. Verify functionality of supported devices.
3. Clean ventilation filter and fan (if applicable).
4. Record and report equipment damage or deficiencies.
5. Record results in the equipment history log
Bi-Annually
1. Replace battery where applicable.
COOLING TOWERS
MAINTENANCE PROCEDURES:
Seasonal Start-Up (SST)
1. Clean cooling towers by flushing, blowing down all associated piping.
2. Inspect cold and hot water basins.
3. Check and adjust water level in cold water basin.
4. Inspect spray nozzles.
5. Inspect structural supports.
6. Inspect and clean louvers.
7. Inspect collection trays and suction screens for plugging and clean.
8. Inspect and clean drift eliminators.
9. Test motor winding continuity on condenser fan motors.
10. Inspect fans, bearings, housings, protective shields, motors, drives and/or belts. Lubricate as necessary. Record observations.
11. Check fan for rotation without obstruction.
12. Check and recoat steel shafts.
13. Inspect fan motor starters.
14. Visually inspect motor starter/control center/variable frequency drive.
15. Check operation of starter and inspect contact surfaces for wear or pitting.
16. Check overload settings and check/tighten ALL electrical connections.
17. Vacuum cabinets to eliminate dust build-up.
18. Operate gear reducer (where applicable) until oil is warm. Drain oil and refill with new.
19. Start unit(s) and operate. If applicable, sequence unit(s) through entire operating range.
20. Record and address any abnormal vibrations.
Annually
1. Drain and flush cold water sump and clean strainer.
2. Clean inside of water tower; scrape, brush and wipe as required. Remove heavy deposits of scale.
3. Refill with water and check make-up water assembly for leakage, adjust float if necessary.
4. Remove, clean and reinstall conductivity and Ph electrodes in chemical water treatment system.
5. Check pumps for loose connections, failing bearings, cavitation, clogged strainers, excessive vibrations, and operations outside of manufacturer’s recommendations.
6. Check air inlets are clear from all dirt and debris to ensure proper airflow.
7. Clean clogged spray nozzles.
Seasonal Shut Down (SSH)
1. Drain condenser water from cooling towers and any piping that could freeze during the winter.
2. Secure all makeup water systems.
3. Inspect condition of spray nozzles and fill, check all structural supports and bolted connections and tighten as required.
4. Visually inspect the drift eliminators. Remove debris or scale as required.
5. Record and address any abnormal vibrations.
MOTOR STARTER /VARIABLE FREQUENCY DRIVE (5 HP to Less Than 100 HP):
MAINTENANCE PROCEDURES:
Annual:
1. Vacuum dust and dirt from heat sink fins
2. Check ventilation fans for proper operation and clean as needed.
3. Check line voltage, motor & output phase balance
4. Complete RCM Procedure CM-0002 (Qualitative Infrared Testing).
5. Visually inspect for broken parts, contact arcing, or any evidence of overheating.
6. Check motor nameplate for current rating and controller manufacturer’s recommended heater size (report discrepancy to supervisor).
7. Check line and load connections for tightness (check manufacturer’s instructions for torque specifications).
8. Check heater mounting screws for tightness.
9. Check all control wiring connections for tightness.
10. On units equipped with motor reversing capacity, check mechanical interlock.
11. On units equipped with two-stage starting, check dash pots and timing controls for proper operation. Adjust as required.
12. On units equipped with variable speed starters:
a. Record the VFD parameter settings using MCT-10
b. Confirm the VFD doors and covers are in place and properly closed.
c. Check tightness of connections to resistor bank.
d. Check resistor coils and plates for cracking, broken wires, mounting and signs of overheating. Clean as required.
e. Check tightness of connections to drum controller.
f. Check contacts of drum controller for arcing and overheating. Apply a thin film of lubricant to drum controller contacts and to rotating surfaces.
13. Check starter contact connections by applying a thin film of black contact grease to line and load stabs, operate contacts and check surface contact.
14. Lubricate all moving parts with proper lubricant.
15. Clean interior of cabinet.
16. Clean exterior of cabinet.
17. Energize circuit and check operation of starter and any pilot lights. Replace as required.
American Embassy XXXX UNCLASSIFIED U.S. Department of State
Equipment List:
END OF STATEMENT OF WORK
image1.emf
Microsoft_Excel_Worksheet.xlsx Sheet1
Equipment Manufacturer Model Serial Number Specifications Location
AIR HANDLER, N-AHU-1 TRANE TCPAID015V2M3720S0 M06K00276 10,000 CFM CHANCERY
AIR HANDLER, N-AHU-2 TRANE TCPAID013V2M3720F0 M07A000118 10,000 CFM CHANCERY
AIR HANDLER, N-AHU-3 TRANE TCPAIDO34V2M3720F0 M06K00281 10,000 CFM CHANCERY
AIR HANDLER, N-AHU-4 TRANE TCPAIDO34V2M3720F0 M06K00280 10,000 CFM CHANCERY
AIR HANDLER, N-AHU-5 TRANE TCPAID013V2M3720F0 M06K00282 10,000 CFM CHANCERY
MOTOR, STARTER ABB INDUSTRIAL SYSTEMS A12-30-10 A12TA250.63-10 10HP CHANCERY
VARIABLE SPEED DRIVE ABB INDUSTRIAL SYSTEMS ACH550-VC-059A-4+F268 2072804110 15HP CHANCERY
Sheet2
Sheet3
File details come from the government source that posted it.