About this file
This is a Request for Quote (RFQ738) issued by the Idaho Transportation Department (ITD) for the procurement of Diesel Exhaust Fluid (DEF) for ITD Districts 3 and 4. The solicitation contact is Douglas H. Buswell at 208-772-8077 or Doug.buswell@itd.idaho.gov. Vendors may submit quotes electronically via IPRO powered by LUMA or by email, and must include the required submittals: Attachment 2 (Price Sheet), Attachment 3 (Signature Page), and Attachment 4 (Bulk Delivery Locations). The initial contract term for District 3 begins on the day of award for one year; the initial term for District 4 begins March 7, 2025, for one year. Upon mutual written agreement, the contract may be renewed or extended for up to three additional one-year terms. Award will be made by district to the responsive, responsible vendor with the lowest total cost. Vendors are not required to quote on both districts but must provide quotes for all locations within the districts they pursue. Deliveries must be made within ten calendar days after receipt of order (ARO) on a FOB Destination basis with freight prepaid. Bulk DEF delivery must be fully burdened to include pumping into ITD-owned bulk containers, and product must have a minimum remaining shelf life of twelve months at delivery. Safety Data Sheets must accompany each shipment.
DEF must meet or exceed American Petroleum Institute (API) certification, German Institute of Standardization DIN 70700 and AUS-32 specifications, and International Standard Organization (ISO) 22241-01 standards, with a urea concentration of 32.5 percent by weight. The total spend over the entire contract term, including all renewals, cannot exceed $149,999.99. Prices must remain firm for one year from the effective contract date; thereafter, price adjustments may be requested annually with ninety days' notice and supporting documentation from the NOLA granular barge UREA price index, with increases limited to actual cost increases to the contractor. ITD reserves the right to reject any requested price increase. Invoices must be submitted within thirty days after delivery and include the IPRO contract number, ITD order number, delivery location, product description, quantity, unit and total price, authorized contact information, and distribution certification paperwork. Payment will be made in accordance with Idaho Code 67-2302. The file does not indicate any specific set-asides, incumbent information, or funding sources. Contractors must maintain all records for at least three years after contract termination or until all audits initiated within three years are completed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ738
ATTACHMENT 1 – REQUIREMENTS & SPECIFICATIONS
DISTRICT 3 AND DISTRICT 4 DIESEL EXHAUST FLUID
GENERAL INFORMATION
1. PURPOSE
Idaho Transportation Department (ITD) is requesting Quotes from qualified Vendors for diesel exhaust fluid (DEF) for ITD Districts 3 & 4 in accordance with the specifications provided.
2. SOLICITATION CONTACT
Douglas H. Buswell Phone: 208 772 - 8077 Email: Doug.buswell@itd.idaho.gov (preferred method of contact)
3. RESTRICTIONS ON COMMUNICATIONS
From the issue date of this RFQ, until a contract/purchase order is awarded or the RFQ is cancelled, vendors and their representatives are prohibited from communications (written or verbal) regarding this RFQ with the ITD staff, other than the ITD RFQ Lead. Any communications (written or verbal) with ITD staff other than the RFQ Lead may result in the submitting vendor being found Non-Responsible and Non-Responsive.
4. REQUIREMENTS AND SPECIFICATIONS
See Sections 1 and 2.
5. QUOTE
Your Quote may be submitted electronically via IPRO powered by LUMA or email (see below for additional details). ITD will not be accepting manual submissions for this solicitation. Your Quote must include the Required Submittals listed below and be received prior to the deadline established in IPRO.
IPRO – Enter your pricing in IPRO POWERED BY LUMA) and upload all Required Submittals.
Email:
Send an email to the Solicitation Contact (see Section 2) and attach all Required Submittals.
6. REQUIRED SUBMITTALS:
Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 2 – Bulk Delivery Locations
7. AWARD
7.1 Award will be made by District, to the responsive responsible vendor with the lowest total cost as provided on Attachment 2, Price Sheet.
7.2 Vendors are not required to quote on both Districts, however; submitting vendors are required to provide a quote for all locations within the districts they are providing a quote for.
7.3 State reserves the right not to evaluate or make an award in the best interest of the State. The State also reserves the right to make multiple awards per manufacturer, in accordance with Section 67-9211 of Idaho Code in the best interest of the State. of the State. Quoters are required to Quote on all line times.
8. Term The initial term of the Contract with District 3 is for one (1) year starting on the day of award. The initial term of the Contract for District 4 is for one (1) year and starts on March 7, 2025 and ends on the date indicated on the Contract document. Upon mutual, written agreement, the Contract may be renewed or extended with an anticipated total contract of three (3) additional one (1) year terms. Total spend cannot exceed one hundred fifty thousand ($149,999.99) over the entire course of the Contract to include renewals.
9. PAYMENT AND INVOICING
9.1. The Contractor must provide an invoice within thirty (30) calendar days after delivery. No invoice will be accepted or paid without the required information listed below, and will be returned to the Contractor for resubmission.
9.1.1. The Contractor must provide the following information with each invoice:
9.1.2. IPRO Contract number;
9.1.3. ITD Order number;
9.1.4. Delivery location;
9.1.5. Product description;
9.1.6. Quantity;
9.1.7. Unit and total price;
9.1.8. Name of authorized individual/contact information for Contractor; and
9.1.9. Distribution certification paperwork of origin.
INVOICE TO:
D3AP@itd.idaho.gov D4AP@itd.idaho.gov
Payment - Payments for correctly submitted invoices will be made in accordance with IC 67-2302: (https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/)
RFQ738
SECTION 1 – REQUIREMENTS
DIESEL EXHAUST FLUID
1. QUANTITY
The quantities listed in the Quote for bulk Diesel Exhaust Fluid (DEF) are estimates provided for Quoter information purposes only. No guarantee is given or implied as to the exact quantities which will be purchased from this Quote for both containerized and bulk lubricants. ITD reserves the right to increase or decrease all estimated quantities during the term of this contract or to delete any item or items as it deems appropriate, without affecting the Quote pricing or the terms and conditions of the Quote.
2. CONTRACTOR CONTACT
The Contractor shall provide the ITD District Contract Manager a single point-of-contact for matters relating to items, quantities, and services associated with the contract.
3. ORDERS, DELIVERIES AND ACCEPTANCE
Initial Order
3.1. Tanks are currently empty. The initial order is indicated on Attachment 2 – Price Sheet. As needed orders will follow after that.
3.2. Orders will be placed on an as needed basis by each ITD District via an ITD purchase/delivery order (Order).
3.3. Deliveries must be made within ten (10) calendar days ARO. Deliveries will be FOB Destination freight pre-paid and allowed. to the locations provided in Attachment 2 Bid Schedule and will be indicated on each Order as they are placed. The Contractor must confirm with the ordering ITD District if delivery cannot be made within the required timeframe.
3.4. Deliveries must include a delivery ticket with the following information:
3.3.1. IPRO Contract number;
3.3.2. ITD District purchase/delivery order number;
3.3.3. Delivery location;
3.3.4. Product description;
3.3.5. Quantity;
3.3.6. Date Code;
3.3.7. Delivery times
3.5. No deliveries will be accepted on weekends or State recognized holidays
3.6. https://www.idaho.gov/government/state-holidays/;
3.7. Delivery of bulk DEF, must be FOB destination, freight prepaid and allowed.
3.8. Safety Data Sheets (SDS) must be included with each shipment of DEF;
3.9. Delivery of bulk DEF is by the gallon and must be fully burdened to include the pumping of bulk Diesel Exhaust Fluid into ITD owend bulk containers;
4. SHELF LIFE & DATE CODES
DEF must have a minimum remaining shelf life of twelve (12) months at the time of delivery.
5. ACCEPTANCE
5.1. Documenting Acceptance - ITD’s Contract Monitor will be responsible for documenting Acceptance, in writing, using Attachment 4 - Deliverable Acceptance Form. This document will be emailed to the Contractor’s Contract Manager as proof of Acceptance and approval to proceed with the invoicing procedures and required in Section 9, Payment and Invoicing.
5.2. Documenting Non-Compliance - ITD’s Contract Monitor will be responsible for documenting non-compliance, in writing, using Attachment 5 - Contract Discrepancy Notice. This document will be emailed to the Contractor’s Contract Manager, providing details for each discrepancy that require corrective action. Invoicing must not occur until non-compliance has been corrected.
5.3. Correcting Non-Compliance - After receipt of the Contract Discrepancy Notice, the Contractor’s Contract Manager must respond, using the document, explaining how and when each discrepancy will be corrected. All discrepancies must be corrected and brought back into compliance with the Contract within thirty (30) calendar days after receipt of the notice from ITD. If the Contractor does not correct the discrepancies within this timeframe, ITD reserves the right to take further remedial action as detailed in Section 6, Remedial Action.
6. termination and cure See Idaho Contract Terms and Conditions on the Attachments tab.
7. SPECIFICATIONS
See SECTION 2 – SPECIFICATIONS
8. PRICE ADJUSTMENT
Prices must be firm for one (1) year from the effective date of the Contract. A price adjustment may be initiated by ITD or the Contractor on an annual basis thereafter. If a price adjustment is requested, ITD or the Contractor must notify the other party in writing at least ninety (90) calendar days in advance and provide supporting documentation from NOLA (New Orleans, LA) granular barge UREA price index pricing. https://www.barchart.com/futures/quotes/JCF23 information web page) resulting in an industry wide decrease or increase in cost to provide DEF. Increases will be limited to the actual cost increase to the Contractor. ITD reserves the right to reject any requested price increase and will notify the Contractor and DOP of such with its reasoning.
9. SUBCONTRACTORS
9.1. Any Quoter wishing to subcontract must submit a letter with its Quote that 1) identifies the subcontractor business name, 2) identifies portion(s) of the Contract that will be performed by the subcontractor, 3) identifies number of years the subcontractor has experience performing the identified portion(s) of the Contract, and 4) provides a statement confirming that, if awarded the contract, the Quoter understands the insurance requirements are applicable to its subcontractors;
9.2. Any requested changes to subcontractors after the Contract is awarded, must be submitted to ITD for review and approval; and
9.3. The Contractor is responsible for the performance of the Contract, regardless of whether or not the Contractor utilizes subcontractors.
10. AUDIT RIGHTS
The Contractor agrees to allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
11. RECORDS MAINTENANCE
The Contractor shall maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records shall be retained by the Contractor for at least three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
RFQ738
SECTION 2 – SPECIFICATIONS
DIESEL EXHAUST FLUID
1. THE DIESEL EXHAUST FLUID (DEF) SHALL MEET OR EXCEED THE FOLLOWING:
1.1. American Petroleum Institute (API) https://www.api.org (Certified);
1.2. German Institute of Standardization DIN 70700 and AUS – 32 specifications;
1.3. International Standard Organization (ISO) 22241-01, https://www.iso.org/home.html;
1.4. The production, handling, and transportation of Diesel Exhaust Fluid (DEF) are governed by the ISO 22241 standard. The standard covers five main points;
1.4.1. Urea concentration: DEF must have a urea concentration of thirty two and one half (32.5)% by weight. This concentration was selected because it has the lowest freezing temperature, twelve (12)°F minus eleven (-11)°C;
1.4.2. Contamination: Contaminated fluid can damage Selective Catalytic Reduction (SCR) injectors and catalysts, resulting in system malfunction or failure. Therefore, the maximum level of impurities permitted in DEF, such as calcium and various metals such as iron, copper, zinc and aluminum, are clearly specified. Their limits are set very low. For example, a spoon of table salt in a DEF tote would push the sodium content far above the ISO 22241 limit of one-half (0.5) parts per million (ppm);
1.4.3. Quality: ISO 22241 excludes the use of urea granules used as fertilizer in agriculture, and requires water purified by distillation or de-ionization;
1.4.4. Materials: Only certain materials are permitted for the storage and handling of DEF. DEF is corrosive to many materials, including carbon steel, copper and aluminum, which cannot be used. The main risk of using incorrect materials with DEF is that the DEF will be contaminated by the material, resulting in damage or failure of vehicle selective catalytic reduction (SCR) systems; and
1.4.5. Handling guidelines: Guidelines require manufacturers to follow clear procedures for the manufacture and distribution of DEF, ensuring that the product meets the requirements of vehicle manufacturers.
6 | Page DHB RFQ738 D3 & D4 Diesel Exhaust Fluid 01/25
File details come from the government source that posted it. Updated .