RFQ-519526.pdf

PDF 357 KB Posted

Attached to
Benchtop biophysical instrument
Solicitation number
RFQ519526
Issued by

About this file

This is a Request for Quote (RFQ) for a benchtop biophysical instrument issued by Oak Ridge National Laboratory (ORNL), a Department of Energy facility managed by UT-Battelle, LLC. The Radioisotope Science and Technology Division requires either the specific equipment identified in Attachment C (Bill of Materials) or an equivalent alternative meeting all stated requirements. Solicitation Number RFQ 519526 is open to all offerors with no small business set-aside. The procurement is for a Firm Fixed Price purchase order based on lowest-priced, technically acceptable (LPTA) evaluation. Proposals are due by December 5, 2026, at 5:00 PM EST, and the offer validity period is 120 days. Questions must be submitted in writing by November 30, 2026, at 2:00 PM EST to Procurement Officer B. Waring at waringbc@ornl.gov.

Offerors must submit a firm fixed price quote with proposed delivery schedule, clearly stating tariffs and FOB/shipping terms separately (FOB Destination for domestic shipments; Delivered at Place (DAP) preferred for international shipments). All quotes require completion of the Abbreviated Representations and Certifications form (BSD-CS-2260, dated 03/09/2026). Technical acceptability evaluation requires: (1) compliance with all Bill of Materials specifications or provision of equivalent alternatives with supporting technical documentation proving equivalency; (2) demonstration of authorized source status as either the original equipment manufacturer or an authorized distributor/reseller with supporting documentation; and (3) a stated delivery lead time in calendar days after order receipt. The offeror must be an authorized reseller with products authorized for sale in the U.S. by the original manufacturer. Special provisions apply regarding physical hazards (lasers, lockout/tagout), electrical safety, and post-receipt field evaluation requirements for non-NRTL-listed equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hello, Potential Offeror, Oak Ridge National Laboratory (ORNL) is inviting you to submit a Firm Fixed Price proposal/quote for the following items and/or services listed below. An award will be made based on the lowest priced, technically acceptable proposal.

Solicitation Number: RFQ 519526 Offers Due By: 12/5/2026 5pm EST Offer Validity Period: 120 days NAICS Code: 334516-Analytical Laboratory Instrument Manufacturing-1000

Employees

Subcontract Type Anticipated: Firm Fixed Price Small Business Set-Aside: No Description of Supplies/Services Sought: Benchtop biophysical instrument Anticipated Subcontract Period of Performance: N/A

ORNL Procurement Representative: B. Waring

Summary of Work/Description of Items:

UT-Battelle, LLC is the management and operating contractor of Oak Ridge National Laboratory (ORNL).

The Radioisotope Science and Technology Division needs a benchtop biophysical instrument or equivalent. Please reference Attachment C- RFQ519526 - Bill of Materials for product specifications.

Please provide the following documents in response to this proposal:

Quote: A firm fixed price quote with your proposed delivery schedule.

- Any tariffs shall be expressly stated and priced separately on the quote.

- FOB and Shipping Terms- FOB Destination for domestic shipments. The preferred terms for international shipments are Delivered at Place

(DAP). Do not ensure shipments.

Required Documents: Provide a completed and signed copy of the following attached documents:

- Abbreviated Representations and Certifications (BSD-CS-2260, dated 03/09/2026)

Basis of Award UT-B intends to award a single firm-fixed-price purchase order resulting from this solicitation to the responsible Offeror submitting the lowest-priced technically acceptable (LPTA) quotation.

Technical acceptability will be determined based on the factors identified below. A quotation must be rated acceptable under all technical acceptability factors to be eligible for award.

Offerors shall clearly demonstrate how their proposed solution meets or exceeds the requirements of this solicitation. Failure to provide sufficient information to determine technical acceptability may result in the quotation being rejected as technically unacceptable.

Technical Acceptability Factors

1. Bill of Materials Compliance

(a) The Offeror shall provide all items identified in Attachment C - Bill of Materials- or propose an equal alternative meeting all stated requirements.

(b) When proposing an equal alternative, the Offeror shall provide technical literature, catalog cuts, manufacturer specifications, drawings, or other documentation sufficient for the Procurement Officer to evaluate compliance with the solicitation requirements.

(c) The Procurement Officer will evaluate proposed equal products to determine whether the quoted item meets or exceeds the salient characteristics of the required equipment.

(d) The burden of proving equivalency rests solely with the Offeror.

2. Authorized Source

(a) The Offeror shall demonstrate that it is either:

The original equipment manufacturer (OEM); or An authorized distributor, reseller, or representative of the manufacturer.

(b) Evidence may include manufacturer authorization letters, reseller certifications, distributor agreements, or documentation from the manufacturer's website.

(c) Failure to demonstrate authorized source status may result in a determination that the quotation is technically unacceptable.

3. Delivery Lead Time

(a) The Offeror shall state the proposed delivery lead time in calendar days after receipt of order.

(b) The Procurement Officer will evaluate whether the proposed delivery schedule meets the Program's requirements.

(c) Failure to provide a delivery lead time may result in a determination that the quotation is technically unacceptable.

Exceptions: Any exceptions taken to the terms and conditions listed below. You are requested to explain the reason(s) for the non-compliance and identify any alternate solutions to achieve compliance. Any exceptions that are taken to the provisions of this solicitation will be considered in evaluating the Offeror’s proposal and may result in your offer being deemed non-responsive. The absence of a proposal section entitled “Exceptions/Non-Compliance” or a statement indicating “no exceptions are taken” implies complete and unequivocal acceptance of all requirements, terms, and conditions.

The following RFP Attachments and Special Provisions shall apply to any subcontract/purchase order as a result of this solicitation:

RFP ATTACHMENTS

Special Provisions:

-Physical Hazard – Lasers (July 22, 2019): Seller must submit completed AHA form https://contracts.ornl.gov/activity-hazard-analysis-aha/ Seller shall notify the ORNL Technical Project Officer prior to bringing Class 3B and 4 lasers on site. The TPO has responsibility for providing the Subcontractor with approval prior to bringing Class 3B and 4 lasers on site. Personnel working with high-power laser systems will ensure work areas are controlled with interlocks, barriers, protective windows, and signage per ANSI Z136.1 (2014)

-Physical Hazard – Lockout/Tagout (July 22, 2019): Seller must submit completed AHA form https://contracts.ornl.gov/activity-hazard-analysis-aha/ Control of hazardous energy sources that require lockout/tagout will be managed (i.e., identified, assessed, and controlled) by the Company. The Seller is required to follow OSHA (as applicable through 10 CFR 851.23) and NFPA 70E requirements for hazardous energy control which require the Seller to establish a written hazardous energy control process and train employees. These requirements also apply to a single source of hazardous energy. Seller shall comply with the requirements of 29 CFR 1910.147 for servicing and maintenance when the unexpected energization or release of stored energy could cause injury. Work requiring the control of sources of hazardous energy shall follow the applicable OSHA and NFPA requirements, e.g. 29 CFR 1910.147, 1910.269, 1910.333 and NFPA 70E. Planned work involving forms/sources of hazardous energy, e.g. electrical, pneumatic, hydraulic, mechanical, etc. shall be addressed by a procedure that specifies how those forms of hazardous energy will be properly controlled by lockout/tagout (LO/TO). Prior to beginning work, the following requirement(s) shall be observed by Seller (as applicable to the task): 1) Lockout/Tagout required by an outage of a portion of the [external] electrical distribution system shall be coordinated by ORNL Utilities. 2) Lockout of any permanently wired component, equipment, or system served by a facility's internal distribution system must be coordinated with the Technical Project Officer or their designated representative. The need to de-energize a disconnect switch or circuit breaker is a typical example of this. Note: This requirement does not apply to equipment that is supplied exclusively by flexible cord and plug that is under the exclusive control of the employee performing work. 3) Method for verifying zero energy isolation of electrical circuits must be performed in accordance with applicable NFPA 70E requirements (see Electrical section.)

-Electrical - Accessible/Exposed Electrical Hazards (July 22, 2019): Seller must submit completed AHA form https://contracts.ornl.gov/activity-hazard-analysis-aha/ The Seller shall perform service and maintenance activities employing work practices required for electrical safety by the Occupational Safety and Health Administration (OSHA) in 29 CFR 1910 Subpart S, 29 CFR 1926 Subpart K, and NFPA 70E, Standard for Electrical Safety in the Workplace 2015 Edition. Maintenance, testing, startup, and repair activities involving the potential for contact with exposed energized electrical circuits or parts shall be performed with the equipment de-energized unless this is infeasible because of diagnostic or operational limitations. To control potential electrical hazards, system components shall be disconnected from their electric energy source(s), with the disconnecting means (power cord and plug, safety switch, etc.) under the control of the service Seller. All stored electrical energy which might endanger personnel through contact (high amperage batteries, capacitors and high capacitance elements, high energy electromagnets, etc.) shall be discharged or safely isolated from the circuit. Prior to working on or near any energized parts, Seller shall, via the Technical Project Officer (TPO), obtain approval from the Company’s applicable Level II Manager prior to performing the proposed activities. The TPO has responsibility for providing the Subcontractor with approval prior to working on or near any energized part.

The TPO responsibility includes ensuring a pre- job dialogue on job hazards and controls between the service subcontractor and TPO and/or Company electrical SME.

-Electrical - Post Receipt Field Evaluation (July 22, 2019): For electrical equipment, assemblies or items that are not NRTL listed or field evaluated by an OSHA Recognized NRTL (https://www.osha.gov/dts/otpca/nrtl/), the Seller shall provide documentation to assist the Company with safety inspections and evaluations of the equipment, assembly or item. Documentation shall be submitted with the equipment and shall include the following: 1. Schematics and/or elementary diagrams. 2. Wiring diagrams, if applicable. 3. Detailed results of factory tests. Certificates of compliance or conformity alone are not acceptable. 4. Operating instructions. The Company will use the submitted information to conduct a post-receipt safety evaluation of the equipment, assembly or item against appropriate code(s) and standard(s). The Company may reject the equipment, assembly or item if the Company concludes that it does not satisfy requirements of the applicable code(s) or standard(s).

Thank you, B. Waring Procurement Officer Commercial Contracts Division Business Services Directorate Oak Ridge National Laboratory 1 Bethel Valley Road, Oak Ridge, TN 37831 Email: waringbc@ornl.gov

FAR 52.211-6 Brand Name or Equal shall apply

Authorized Reseller Requirement The Seller shall be an authorized reseller of the products or services purchased by this Agreement. All products or services provided by the seller shall be authorized for sale or use in the U.S. by the original manufacturer.

Important Dates -Questions: Questions are due on 11/30/2026 by 2:00 PM EST. All questions shall be provided in writing via email to the Procurement Officer listed below.

-Proposal Due Date: All proposals shall be submitted via email to the Procurement Officer listed below by 5:00 pm 12/5/2026

Blank Page

File details come from the government source that posted it. Updated .