This document is a Request for Quotation (RFQ) issued by the Idaho Department of Fish & Game (IDFG) for the purchase, installation, and wiring of twelve (12) custom-built headache racks to be installed on ten (10) 2024 Chevrolet Silverado 1500 trucks and two (2) 2024 Chevrolet Silverado 2500 trucks. The headache racks must meet detailed specifications outlined in the RFQ, including the ability to support 3,000 pounds of weight, custom fit to the vehicles, and include various mounting brackets and hardware for lighting and other equipment. Quotations must be submitted electronically via IPRO or email by the deadline established in the RFQ. Award will be made to the responsive and responsible vendor whose quotation is in the best interest of the state.

The RFQ includes pricing sheet, signature page, and insurance requirements as part of the submittal. Special terms and conditions cover delivery, acceptance, warranty, invoicing, and remedial actions. The headache racks must be the latest model of the manufacturer's current standard production and be powder coated black in color. Vendors offering an "equal" product must provide documentation to the satisfaction of IDFG. No third-party warranties will be allowed, and the contractor is responsible for all warranty requirements.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ263 Custom Built Headache Racks Page 1 of 12

IDAHO DEPARTMENT OF FISH & GAME

ATTACHMENT 1 – SECTION 1

RFQ Title: Custom Built Headache Racks

RFQ Number: RFQ263

RFQ Solicitation Contact: Doug Peterson, Buyer Doug.Peterson@idfg.idaho.gov 208.287.2816

Submit Electronically via IPRO: https://purchasing.idaho.gov/information-for-vendors/ipro-epurchasing-system/ipro-login/

Deadline to Receive Questions: See IPRO

RFQ Closing Date: See IPRO

Award: Award will be made, all or none, to the responsive responsible vendor in the best interest of the state.

A. Purpose The Idaho Department of Fish & Game (IDFG) is requesting Quotes from qualified vendors for the purchase, installation, and wiring of twelve (12) Custom Built Headache Racks (Racks) as further detailed below.

B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO - https://purchasing.idaho.gov/information-for-vendors/. The RFQ Lead is the only contact for this Solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.

C. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email (see below for additional details).

IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline established in IPRO. Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.

Electronic Submission:

IPRO – Enter your pricing in IPRO (https://purchasing.idaho.gov/information-for-vendors/) and upload all Required Submittals.

Email:

Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.

mailto:Doug.Peterson@idfg.idaho.gov https://purchasing.idaho.gov/information-for-vendors/ipro-epurchasing-system/ipro-login/ https://purchasing.idaho.gov/information-for-vendors/ipro-epurchasing-system/ipro-login/ https://purchasing.idaho.gov/information-for-vendors/ https://purchasing.idaho.gov/information-for-vendors/

RFQ263 Custom Built Headache Racks Page 2 of 12

D. Required Submittals As part of your response to this RFQ, the following documents are required.

Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Insurance

E. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Purchase Order (PO) document from the State’s eProcurement system (IPRO), which will be an acceptance of the successful bid. The PO will be comprised of the following documents: this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.

The following documents are incorporated into this RFQ as if set out in their entirety, whether or not they are attached in IPRO:

Solicitation Instructions for Vendors – January 2017 State of Idaho Standard Contract Terms and Conditions – May 2021

If not attached in IPRO, the documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) website (www.purchasing.idaho.gov ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.

ATTACHMENT 1 – SECTION 2

The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions.

A. Delivery Contractor located within seventy-five (75) miles of the location listed below, Contractor will pick up the vehicle and take it to the Contractor’s installation facility. Installation of the Racks and returning of the vehicle must be completed within thirty (30) calendar days once the Contractor has taken possession of the vehicle.

Pickup and delivery must be made Monday through Thursday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved in writing by IDFG.

Pickup & Delivery Location IDFG Region 3 HQ 15950 N. Gate Blvd. Nampa, Idaho 83687

B. Insurance In addition to the standard insurance requirements, Attachment 4 – Insurance, the Contractor must maintain Garage Keepers Liability Insurance with a coverage minimum of $75,000 per vehicle, per occurrence. Contractor must submit Proof of Insurance to IDFG before a Purchase Order (PO) is issued. Contractor may elect to submit Proof of Insurance with their bid submission.

http://www.purchasing.idaho.gov/ https://www.idaho.gov/government/holidays.html

RFQ263 Custom Built Headache Racks Page 3 of 12

C. Acceptance Upon receipt of the IDFG vehicle, per the delivery location identified in Section 2.A, Delivery, the Racks will be inspected by the delivery contact (or approved designee) to ensure the requirements and specifications are met.

The Acceptance period will be for thirty (30) calendar days from the date the Racks are delivered.

In the event the specifications are not met, the Contractor must pick-up, correct any discrepancies, and re-deliver within thirty (30) calendar days after notification from IDFG, at no additional cost to IDFG. In the event that the Racks do not meet the requirements, specifications, or found with discrepancies that are not fixed by the Contractor during the Acceptance period, IDFG reserves the right to reject the Racks via email notification.

If approved by IDFG, the Contractor may correct discrepancies on-site at IDFG’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor; tools, parts, supplies, and worksite clean up to make any necessary corrections. The timeframe for corrective action will still be as identified above.

D. Warranty Warranty must be for a minimum period of two (2) years after Acceptance. Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire Rack. All warranty work must be complete within thirty (30) calendars days after receipt of written notice from IDFG. If approved by IDFG, the Contractor may perform warranty work on-site, at the Delivery location identified in Section 2.A (above), in lieu of pick-up and return shipping.

The Contractor will be responsible for all travel costs and work-site clean-up associated with any necessary repairs.

The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Rack on-site within thirty (30) calendars days, or if the Rack continuously malfunctions and causes it to be out of service on multiple occasions, IDFG reserves the right to require the Contractor to pick-up, repair, and return the Rack at no additional cost to IDFG.

If any warranty work is to be performed, the Contractor may elect to authorize a dealer of its choice to perform the necessary repairs in accordance with the manufacturer’s standards. If the Contractor authorizes a dealer of its choice to perform any warranty work, it is the responsibility of the Contractor to guarantee that the work is completed in accordance with the manufacturer’s standards at the expense of the Contractor.

Contractor is responsible for all warranty requirements. No third-party warranties will be allowed.

E. Invoicing & Payments Invoices – Invoices must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission.

Invoices must include the following information:

• Contractor Company Name & Contact Information

• Contract Name & Number (PO #)

• Invoice Number & Date

• Itemization of the purchased goods to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoiced amount.

• IDFG vehicle Identification Number

• Serial or VIN#

• Payments – Payment for correctly submitted invoices will be made in accordance with Idaho Code 67- 2302: https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/

F. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/

RFQ263 Custom Built Headache Racks Page 4 of 12

Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 2.G, Termination of Contract, in addition to any remedies imposed by the State.

If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).

G. Termination of Contract For Cause - See Section 2, Termination, of the State of Idaho Standard Contract Terms and Conditions – May 2021.

For Fiscal Necessity – See Section 27, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions – May 2021.

For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.

ATTACHMENT 1 – SECTION 3

A. Requirements The Racks must be the latest model of the manufacturer's current standard production, as offered to commercial trade. Though they are not specifically covered herein, all parts necessary to provide complete and functional Rack must be furnished. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this RFQ.

All standard and supplemental equipment, must be installed per the manufacturer’s specifications, serviced and ready for continuous operation at the time of delivery, unless otherwise stated in this RFQ.

B. Brand Name The brand name(s) specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Vendors offering an “equal” must include documentation, which demonstrates, to IDFG’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, IDFG reserves the right to seek clarification from the Vendor. Failure to provide satisfactory documentation or a clarifying response to IDFG may eliminate the Vendor from further consideration.

C. Custom Built Headache Rack The Racks are to be fitted to and installed on the following vehicles:

Ten (10) 2024 Chevrolet Silverado 1500 trucks.

Two (2) 2024 Chevrolet Silverado 2500 trucks.

The Headache racks must meet the following minimum specifications:

1. Racks must be built strong enough to support three thousand (3000) pounds of dead weight being loaded into the truck bed by the attached wench.

2. Racks must be custom built to fit on top of the front and side bed rails of the above listed trucks and is to extend five (5) inches above cab height.

3. Racks must be powder coated with a durable finish, black in color

4. Frame of the rack must be constructed out of square steel tubing for strength. The square tubing needs to be welded in a way to allow for passage of internal wiring from mounted lighting down to electrical box mounted in the bed of the truck.

5. The upper horizontal tube of the Rack must be constructed of square steel tubing, four (4) inches wide by two (2) inched deep to allow for wiring of the light bar and install of associated lighting. See Exhibit 1-A.

RFQ263 Custom Built Headache Racks Page 5 of 12

6. The upper horizontal tube must have a thirty-six (36) inch in length by twelve (12) inch steel diamond plate bracket extending over the truck cab to mount the enforcement light bar. See exhibit 1-B

7. Vertical Rack frame, lower Horizontal frame, Horizontal and diagonal bracing is to be constructed of two

(2) inch steel square tube. See Exhibit 1.C.

8. Expanded steel, .312 inches in thickness must welded on driver and passenger sides of the Rack to protect vehicle occupants. See Exhibit 1.D.

9. Five eighths (5/8) inch by six (6) inch eyebolt is to be mounted in the center of the upper horizontal beam with a three (3) inch snatch block with a hook for a three eighths (3/8) inch rope must be provided by vendor. Snatch block must have at minimum a two (2) ton capacity. See Exhibit 1-E.

10. Two (2) horizontal bars must be welded into the center of the rack to protect the rear truck cab glass from snatch block while providing rear view mirror visibility. See Exhibit 1-F

11. Passenger and driver side horizontal bed rail supports must be constructed out of two (2) inch steel square tubing with diamond plate inserts as seen in exhibit 1.G

12. The rack must have horizontal bed rail supports along the passenger and driver side. Bed rail supports must be constructed out of three (3) inch by two (2) inch angle iron, quarter (1/4) inch thick. Length of these supports is to be seventy-one (71) inches. Three (3), three (3) inch Steel U-bolt type tie downs, one half (1/2) inch thick, are to be welded on the top of each bed rail support. First tie down is to be four and a half (4 1/2) inches on center from rear of the rail support. Second tie down is to be twenty-nine (29) inches on center from the rear of the support. Third tie down is to be forty-four and a half (44 ½) inches on center from the rear of the rail support.

13. The rack must have a quarter (1/4) inch steel plate with mounting bracket welded onto front passenger side bed rail support to mount Warn model VRX 45-S wench supplied by IDFG. See Exhibit 1-H

14. The rack must have a steel box constructed to house wiring components in front of the wench mounting bracket on passenger side of bed rail support. See Exhibit 1-H

15. The IDFG enforcement light package supplied by IDFG for the Rack is to be mounted to the Rack and wires run internally by the vendor to the wiring housing box. Connections do not need to be made to the power source.

D. Exhibit 1

RFQ263 Custom Built Headache Racks Page 6 of 12

RFQ263 Custom Built Headache Racks Page 7 of 12

RFQ263 Custom Built Headache Racks Page 8 of 12

RFQ263 Custom Built Headache Racks Page 9 of 12

RFQ263 Custom Built Headache Racks Page 10 of 12

RFQ263 Custom Built Headache Racks Page 11 of 12

RFQ263 Custom Built Headache Racks Page 12 of 12

Exhibit 1-H

C. Submission Requirements

File details come from the government source that posted it. Updated .