rfq2603olney00019.pdf

PDF 807 KB Posted

Attached to
TxDOT Aviation Division- Notice to Consultants
Solicitation number
RFQ2603OLNEY00019
Issued by
Sterling County, Texas

About this file

This is a Request for Qualifications (RFQ) issued by the Texas Department of Transportation (TxDOT) Aviation Division on behalf of the City of Olney for professional engineering services related to runway reconstruction at Olney Municipal Airport. The solicitation seeks a qualified engineering firm to provide design services and, at the agent's discretion, construction administration for the reconstruction of Runway 17-35. The scope encompasses preliminary engineering reports, preliminary design (70% completion), and final design phases, including technical specifications, cost estimates, airspace studies, and a Construction Management Plan. Firms may submit only one response, and responses must be received through the TxDOT Aviation eGrants system no later than December 29, 2026, at 2:00 PM Central Standard Time. The qualifications statement is limited to nine single-sided, 8.5x11-inch pages and must include firm and project team information, technical approach, relevant project experience from the past ten years, and a proposed design schedule indicating the number of weeks required for each design phase. The selection committee, composed of TxDOT Aviation Division staff, will evaluate responses and may conduct interviews with top-rated firms before making a final selection.

Evaluation of responses will be based on four criteria: recent experience with comparable airport projects (25 points), proposed technical approach and project understanding (30 points), project design schedule and ability to meet deadlines (25 points), and construction management experience with commitment to full-time resident project representation (20 points). The responding firm's project manager must be a Professional Engineer registered or licensed in Texas by the submission deadline, with license number included in the response. The DBE goal for the design phase is 0%, with goals to be reset for the construction phase. This procurement is subject to Title VI of the Civil Rights Act of 1964 and 49 CFR Part 26 regarding Disadvantaged Business Enterprises. Additionally, respondents must provide written certification that the company and its affiliates are not listed in Section 889 of the 2019 National Defense Authorization Act, Section 1260H of the 2021 National Defense Authorization Act, or owned or controlled by governments on the U.S. Department of Commerce's foreign adversaries list.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

OLNEY MUNICIPAL AIRPORT

TXDOT SOLICITATION NO.: RFQ2603OLNEY00019

1. REQUEST FOR QUALIFICATIONS SOLICITATION

2. EVALUATION CRITERIA

3. PROJECT DIAGRAM

4. Airport Layout Drawing

5. INSTRUCTIONS FOR RESPONDING TO A SOLICITATION IN EGRANTS

TxDOT Solicitation No.: RFQ2603OLNEY00019 TxDOT CSJ/Project No.: 2603OLNEY

Texas Department of Transportation Aviation Division

Request for Qualifications (RFQ) for Professional Engineering Services

The City of Olney, through its agent, the Texas Department of Transportation (TxDOT), intends to engage a professional engineering firm for services pursuant to Chapter 2254, Subchapter A, of the Government Code. TxDOT Aviation Division will solicit and receive qualification statements for the current aviation project as described below.

Current Project: The City of Olney; TxDOT CSJ/Project No.: 2603OLNEY The TxDOT Project Manager is Brian Mosser, P.E.

Scope: Provide engineering and design services, and at the agent’s discretion, construction administration to: Reconstruct Runway 17-35.

The Agent, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all respondents that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit in response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

The proposed contract is subject to 49 CFR Part 26 concerning the participation of Disadvantaged Business Enterprises (DBE).

The DBE goal for the design phase of the current project is 0%. The goal will be re-set for the construction phase.

To assist in your qualification statement preparation, the criteria, project diagram, and most recent Airport Layout Drawing is available online http://www.dot.state.tx.us/avn/avninfo/notice/consult/index.html by selecting “Olney Municipal Airport.” The qualification statement should address a technical approach for the current scope only.

http://www.dot.state.tx.us/avn/avninfo/notice/consult/index.htm

Response Procedure:

The successful firm will be selected on the basis of a Response. A prime provider may only submit one Response. If a prime provider submits more than one Response, that prime provider will be deemed non-responsive. The Response must contain the required information, and should address the recommended information, as listed below. Response submissions will be scored accordingly. If the Response is non-compliant with any of the following requirements, the Response may be deemed non-responsive.

1. Qualifications Statement (QS) – The QS shall contain no more than nine 8.5x11-inch single-sided pages.

a. QS Format:

i. Readability – The submitter has latitude in formatting the QS for visual effectiveness. Graphics, tables, photos, and other visual aids are permitted within the nine allotted pages, except that Quick Response (QR) codes or other external link(s) are not permitted. There is no specific font, font size, color, or other formatting requirements, although a font size smaller than 10 is not recommended. Selection committee members may consider legibility and readability when scoring.

Unreadable text will not be considered and may cause the QS to be deemed non-responsive. It is the submitter’s responsibility to provide a legible, readable document.

b. QS Content - It is recommended the QS include:

i. The RFQ number, airport name, name of firm, firm address, email address, telephone number and contact information for key personnel. The response shall also identify each proposed project team member, each proposed member’s time commitment to this project as a percentage of their total work week, and whether the proposed member is an employee of the responding firm or a sub-contractor to that firm.

c. QS Content – For scoring purposes, the QS must include:

i. Information showing the firm’s project understanding and technical approach, including similar project-related experience of the project manager and each task leader responsible for a major work category. For each project referenced, identify either the project manager’s or the task leader’s specific role(s) and work contributed. The project manager is required to be a Professional Engineer registered or licensed in Texas, by the submission deadline. If applicable to project, an Architect is required to be registered or licensed in

Texas, by the submission deadline. License number(s) must be included in the response submission.

ii. In addition to individual project-related experience of the project manager and task leaders required under (ii), list no more than ten relevant projects performed by the responding firm within the last 10 years. This shall include project start date, airport name, location, phone number, and airport contact person’s name, title, and phone number. It shall also include the original project completion time estimate vs. the actual completion time for the cited design project, as well as a brief narrative description of the project and whether or not your firm served as the prime or the sub on each project cited.

iii. Project Design Schedule: Indicate the number of weeks (not months) necessary to design the project in accordance with “Project Design Schedule Information” below.

Respondent must include on the first page of its Response a written certification that the responding Company, or any of its holding companies or subsidiaries, is not:

(a) Listed in Section 889 of the 2019 National Defense Authorization Act;

(b) Listed in Section 1260H of the 2021 National Defense Authorization Act; or

(c) Owned by the government of a country on the U.S.

Department of Commerce’s foreign adversaries list under 15 C.F.R Section 791.4; or

(d) Controlled by any governing or regulatory body located in a country on the U.S. Department of Commerce’s foreign adversaries list under 15 C.F.R Section 791.4.

The Response must be submitted in eGrants following the Submission Procedures at the end of this notice.

Project Design Schedule Information

Based on the published project scope and your technical approach, indicate the number of weeks (not months) necessary for each phase and total design time to design the project. Some of the basic responsibilities within each design phase are included for reference. Do not include TxDOT review time. Assume, however, that your work will require some revision after TxDOT review, and that the time required to address these comments should be included within your schedule. If time is required for specialized studies, indicate the additional time.

NOTE: This proposed schedule may set the basis for the contract deadlines in the professional services agreement if your firm is selected. A draft contract will be sent out to the selected firm to begin the fee proposal/negotiations phase.

Preliminary Report Phase Attend pre-design conference Obtain and analyze necessary survey data Obtain and analyze necessary geotechnical data Prepare comprehensive report

Preliminary Design Phase Attend project meeting(s) Prepare project drawings (70%) Provide all technical specifications Provide project cost estimate

Final Design Phase Attend project meeting(s) Finalize drawings and contract documents (100%) Provide a revised opinion of probable total project costs Prepare a Construction Management Plan Update, if necessary, the Preliminary Report Prepare and submit airspace study to FAA

Evaluation Criteria for Architectural/Engineering Qualifications

1. Recent experience of the project team with comparable airport projects within the past ten years. (25 points)

Do the qualifications indicate that the project team has recent direct experience on other general aviation airports designing similar improvements to those proposed at this location?

2. Proposed technical approach (30 points)

Does the architect/engineer provide evidence of understanding of the project;

and any unique architectural/engineering aspects associated with the proposed project and how to address them?

3. Project design schedule and ability to meet schedules and deadlines (25 points)

Does the proposed design team have sufficient time to work on this project? Has the firm demonstrated an ability to meet design schedules in the past?

Reasonableness of proposed schedule.

4. Construction Management Experience (20 points)

The architect/engineer will oversee the airport construction. Therefore, it is critical that the architect/engineer be involved in the day-to-day construction activities through a full-time resident project representative and periodic site visits. What evidence do the qualifications provide as to the architect/engineer’s commitment to proactive and consistent representation during construction?

Submission Procedure:

The completed Response must be received in the TxDOT Aviation eGrants system no later than December 29, 2026, 2:00 PM. (CST).

Firms that wish to submit a Response to this solicitation must be a user in the TxDOT Aviation eGrants system no later than one business day before the solicitation due date.

To request access to eGrants, please complete the Contact Us web form located at http://txdot.gov/government/funding/egrants-2016/aviation.html

The consultant selection committee will be composed of TxDOT Aviation Division staff.

The final selection by the committee will generally be made following the completion of review of Responses. The committee will review all Responses and rate and rank each.

All firms will be notified, and the top-rated firm will be contacted to begin fee negotiations for the design and bidding phases. The selection committee does, however, reserve the right to conduct interviews for the top-rated firms if the committee deems it necessary. If interviews are conducted, selection will be made following interviews.

Please contact TxDOT Aviation for any technical or procedural questions at (800)-68- PILOT(74568). For procedural questions, please contact Debra Woodruff, Contract Specialist. For technical questions, please contact Brian Mosser P.E., Project Manager.

For questions regarding responding to this solicitation in eGrants, please contact the TxDOT Aviation help desk at 1-800-687-4568 or avn-egrantshelp@txdot.gov.

Respondents are responsible for checking the TxDOT Aviation website regularly for any changes to the RFQ documents, such as Addenda. Here is a link to the TxDOT Aviation website for your convenience. http://www.txdot.gov/inside-txdot/division/aviation/projects.html.

http://txdot.gov/government/funding/egrants-2016/aviation.html mailto:avn-egrantshelp@txdot.gov http://www.txdot.gov/inside-txdot/division/aviation/projects.html http://www.txdot.gov/inside-txdot/division/aviation/projects.html

Olney Municipal Airport (ONY) For illustration purposes only.

Legend

Reconstruct RWY 17-35

2000 ft

N

N

Image © 2025 Airbus

Image © 2025 Airbus

Image © 2025 Airbus eGrants Workflow: RFQ Response eGrants Role:

Subgrantee Administrator (SA)

Subgrantee Staff (SS) eGrants link eGrants help:

https://apps2.dot.state.tx.us/apps/egrants2/logout2.aspx eGrants help desk Monday – Friday 8AM – 4PM CD/ST (excluding state/federal holidays) avn-egrantshelp@txdot.gov or 1-800-687-4568

STEP ROLE ACTIONS NOTES

01 SA

Go to View Opportunities.

a. Select Apply Now to the opportunity

b. The RFQ Response Menu is opened

It is very important to click on the name of the document and not the organization’s name.

Make a note of the opportunity due date to ensure you respond in time

02 SA/SS

Click on View, Edit and Complete Forms

a. Select RFQ Applicant Form

b. Confirm Project information and address

c. Upload RFQ response

PLEASE MAKE SURE YOU SELECT

THE CORRECT PDF FILE BEFORE

CHANGING STATUS.*

d. Hit Save

You should print the proposal document to a PDF so that it becomes un-editable.

03 SA When you are ready to submit your response, click on "Save and submit to CS review". YOU ARE DONE

You will get an email saying the response was successfully submitted;

the status must be changed to RFQ Response in CS Review by the due date and time posted in the solicitation.

04 SA/SS WAIT UNTIL A SELECTION NOTIFICATION IS

SENT TO YOU

Aviation Division https://apps2.dot.state.tx.us/apps/egrants2/logo mailto:avn-egrantshelp@txdot.gov mailto:avn-egrantshelp@txdot.gov

05 SS/SA

AFTER SELECTION NOTIFICATION IS

RECEIVED Log in to view status of response.

Once the scores are verified, TxDOT will move the response to an interview, selected or not selected status of which you can log in to see the status of your response.

The selection notification will refer users to eGrants to view the status of their response. Users may also view the TxDOT website for selection information.

*If the responder posts the incorrect file.

• If status has been changed and the due date for the response has not expired, contact the help desk to ask for the status to be administratively changed back to Response in Process.

• If the incorrect submission was posted, the incorrect file may be deleted and the correct one posted as long as the status has not been changed to Response in CS Review.

Respondent will need to check the “delete” box and hit save. The page refreshes. Then post the correct submission, save, and change the status.

If you are not set up in eGrants and wish to respond to a posted solicitation, you may contact the aviation help desk for assistance by using the webform available at eGrants Help Desk Form

Some organizations will have many user members.

Each organization should determine which user member will submit the completed submission in eGrants. After the opportunity is selected for the organization, it will no longer appear on any other user’s home page unless the initiating user cancels the response.

https://form.jotform.com/62164883455160

Binder1.pdf
2603OLNEY00019.pdf
2603OLNEY00019.pdf
Binder1.pdf
2603OLNEY_1.1 FED-TOC for RFQ DC-CCMGMT
2603OLNEY00019.v.03.pdf
2603OLNEY00019.Photo
2603OLNEY00019.v.01
2603OLNEY_ProjExhibit-Rev.pdf
2603OLNEY_ALP.Rev
2603OLNEY00019
2603OLNEY00019
2603OLNEY00019.Photo
2603OLNEY00019.v.01
eGrants Help Desk Form

File details come from the government source that posted it. Updated .