rfq24alptisb00038.pdf
PDF 1 MB Posted
- Attached to
- TxDOT Aviation Division- Notice to Consultants
- Solicitation number
- RFQ24ALPTISB00038
- Issued by
- Cameron County, Port Arthur City, Texas
About this file
This document is a Request for Qualifications (RFQ) announcement from the Texas Department of Transportation (TxDOT) Aviation Division on behalf of the Cameron County Airport Sponsor for an Airport Layout Plan (ALP) with Narrative Report project at the Port Isabel - Cameron County Airport.
The scope of work includes preparing an ALP with narrative report, using current FAA data and surveys, developing a capital improvement plan, updating the airport property map, establishing phased airport improvement goals, and reviewing any existing Runway Safety Area (RSA) determinations. The RFQ has a DBE goal of 0%. A voluntary pre-submittal meeting is scheduled for January 17, 2024, and qualifications are due by January 25, 2024, through the TxDOT eGrants system. The consultant selection committee will review and rate the submitted AVN-551 forms, with the top-rated firm contacted to begin fee negotiations. The evaluation criteria focus on the consultant's capability, relevant experience, ability to meet schedules, and technical approach.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
PORT ISABEL- CAMERON COUNTY AIRPORT
TXDOT SOLICITATION NO.: RFQ-24ALPTISB00038
1. REQUEST FOR QUALIFICATIONS ANNOUNCEMENT
2. EVALUATION CRITERIA
3. AIRPORT LAYOUT PLAN
4. INSTRUCTIONS FOR RESPONDING TO A SOLICITATION IN EGRANTS
5. FORM AVN-551 (PLEASE BE SURE TO DOWNLOAD THE MOST RECENT
REVISED FORM DATED 8/2016)
http://www.txdot.gov/inside-txdot/division/aviation/projects.html
TxDOT Solicitation No.: RFQ-24ALPTISB00038 TxDOT CSJ/Project No.: 24ALPTISB
Texas Department of Transportation Aviation Division
Request for Qualifications (RFQ) for Professional Services
Cameron County through its agent, the Texas Department of Transportation (TxDOT), intends to engage a qualified firm for services. This solicitation is subject to 49 U.S.C.
§47107(a)(17) and will be administered in the same manner as a solicitation conducted under Chapter 2254, Subchapter A, of the Texas Government Code. TxDOT Aviation Division will solicit and receive qualification statements for professional services as described below:
Airport Sponsor:
Cameron County Port Isabel - Cameron County; TxDOT CSJ/Project No.: 24ALPTISB.
The TxDOT Project Manager is Daniel Benson.
Scope:
Airport Layout Plan (ALP) with Narrative Report.
1. Prepare an ALP with Narrative report consistent with the most current Federal Aviation Administration (FAA) Advisory Circulars and Standard Operating Procedures.
2. Use the most current FAA obstacle data file and collect additional survey data necessary to complete the Inner Approach Surface Drawings sheets of the ALP plan set.
3. Develop a Capital Improvement Plan, including a recommended phasing plan and financial overview that considers local, state, federal, and alternative funding sources.
4. Prepare/update the airport property map (Exhibit A) consistent with the most current FAA Advisory Circulars and Standard Operating Procedures.
5. Establish phased, attainable goals for airport improvements and development based on the selected forecast of aviation demand using the current and future critical aircraft and considering airport geometry and taxiway distances from the Terminal area to the most used primary and secondary runway departure ends.
6. Per FAA SOP 8.00, review any existing RSA determinations and update as needed or complete a determination for any runway that does not have one. If an RSA Determination study is needed, that study will be conducted as part of this planning effort. A list of recommended RSA mitigation projects, if any, is a deliverable of this task.
The Agent, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all respondents that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit in response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
The proposed contract is subject to 49 CFR Part 26 concerning the participation of Disadvantaged Business Enterprises (DBE).
The DBE goal is set at 0%.
A voluntary pre-submittal meeting is scheduled at 10:30 am – Wednesday, January 17, 2024, at Port Isabel - Cameron County Airport, 27617 Buena Vista Boulevard, Los Fresnos, Texas, 78566. This will be an opportunity to visit the airport and have questions answered.
This is the only available time for interested firms to visit with local designated representatives prior to the AVN-551 submission.
To assist in your qualification statement preparation, the criteria and most recent Airport Layout Plan are available online at http://www.dot.state.tx.us/avn/avninfo/notice/consult/index.html by selecting “Port Isabel- Cameron County.”
AVN-551 Preparation Instructions:
Interested firms shall utilize the latest version of Form AVN-551, titled “Qualifications for Aviation Planning Services”. The form may be requested from TxDOT, Aviation Division, 125 E. 11th Street, Austin, Texas 78701-2483, phone number, (800)68-PILOT (74568).
The form may be emailed by request or downloaded from the TxDOT website at http://www.txdot.gov/inside-txdot/division/aviation/projects.html. The form may not be altered in any way and must not contain Quick Response (QR) codes or links. The form fields must be completed in black font, without changing the existing font size or color, and must not contain any bold or italicized words. If a firm is non-compliant, the submittal of AVN-551 will be deemed as non-responsive. Firms must carefully follow the instructions provided on each page of the form. Qualifications shall not exceed the number of pages in the AVN-551 template. The AVN-551 consists of eight pages of data plus one optional illustration page. A prime provider may only submit one AVN-551. If a prime provider submits more than one AVN-551 or submits a cover letter with the AVN-551, that provider will be disqualified. Responses to this solicitation WILL NOT BE
ACCEPTED IN ANY OTHER FORMAT.
ATTENTION: To ensure utilization of the latest version of Form AVN-551, firms are encouraged to download Form AVN-551 from the TxDOT website as addressed above.
Utilization of Form AVN-551 from a previous download may not be the exact same format.
Form AVN-551 is a PDF Template.
The Form AVN-551 must be completed accurately to include the correct Airport Name and TxDOT Project ID number. The completed Form AVN-551 must be received in the TxDOT Aviation eGrants system no later than January 25, 2024, 2:00 PM (CDST).
Electronic facsimiles or forms sent by email or regular/overnight mail will not be accepted.
Firms that wish to submit a response to this solicitation must be a user in the TxDOT Aviation eGrants system no later than one business day before the solicitation due date. To request access to eGrants, please complete the Contact Us web form located at http://txdot.gov/government/funding/egrants-2016/aviation.html
Instructions on how to respond to a solicitation in eGrants are available at http://txdot.gov/government/funding/egrants-2016/aviation.html
Step by step instructions on how to respond to a solicitation in eGrants will also be posted in the RFQ packet at http://www.dot.state.tx.us/avn/avninfo/notice/consult/index.html.
The consultant selection committee will be composed of local government representatives. The final selection by the committee will generally be made following the completion of review of AVN-551s. The committee will review all AVN-551s and rate and rank each. The evaluation criteria for airport planning projects can be found at http://www.txdot.gov/inside-txdot/division/aviation/projects.html under Information for Consultants. All firms will be notified, and the top-rated firm will be contacted to begin fee negotiations. The selection committee does, however, reserve the right to conduct interviews for the top-rated firms if the committee deems it necessary. If interviews are conducted, selection will be made following interviews.
Please contact TxDOT Aviation for any technical or procedural questions at (800)68-PILOT (74568). For procedural questions, please contact Sheri Quinlan, Contract Specialist, at 512-512-4988. For technical questions please contact Daniel Benson, Project Manager.
For questions regarding responding to this solicitation in eGrants, please contact the TxDOT Aviation help desk at 1-800-687-4568 or avn-egrantshelp@txdot.gov
EVALUATION CRITERIA FOR AIRPORT PLANNING QUALIFICATIONS
The following criteria will generally be used in evaluating consultants submitting qualifications;
however, the Consultant Selection Committee may develop additional consultant evaluation criteria and point values, if desired. The Consultant Selection Committee should assign points to be used for the Consultant Rating Sheet if they do not use the suggested point values. The TxDOT Project Manager can assist the Selection Committee in interpreting the criteria and establishing point values for each criterion, if necessary.
Suggested Point Values and Selection Criteria
1. Capability to perform all of the services required for this project and professional qualifications of key personnel assigned to this project relevant to the work to be performed. (25 points) Does the consultant have the necessary resources to perform all of the services required (e.g.: planning, surveying, CAD, etc.)? Who are the professionals that will be working on this project on a daily basis and how do their qualifications and experience with general aviation airport planning projects compare with other respondents? [Sources of information: Aviation Planning Team Form, Recent Relevant Airport Experience Form, Proposed Technical Approach Form, and possibly the Optional Summary.]
2. Recent experience, within the last ten years, in the development of airport plans comparable to the proposed project. (25 points) Does the consultant have direct experience developing general aviation airport plans similar to those proposed for this location?
[Sources of information: Aviation Planning Team Form, Recent Relevant Airport Experience Form, and possibly the Optional Summary.]
3. Ability to meet the schedules and deadlines of this project and reputation for competence, timeliness, and quality of performance and work product. (25 points) Does the proposed planning team have sufficient time to devote to this project in order to meet the schedule submitted in the qualifications? Is the proposed schedule realistic? Does the consultant consistently meet contractual timetables? Has the work performed for other airports been satisfactory?
[Sources of information: Aviation Planning Team Form, Recent Relevant Airport Experience Form, Project Schedule Form, possibly the Optional Summary, and reference check.]
4. Proposed Technical Approach and Schedule to Accomplish the Project. (25 points) Does the consultant show specific understanding and familiarity with the particular requirements of this project and how to address them? Is the consultant familiar with relevant planning guidance? Is the schedule appropriate to accomplish the project?
[Sources of information: Proposed Technical Approach Form, Proposed Schedule Form, and possibly the Optional Summary.]
AIRPORT MAINTENANCE ROAD
(CONTROLLED ACCESS)
.. !l
PAPI 2L (U)
IDZE 15.8' (E/U)
HIGH POINT
IDZE 13.6' (E)
ROT�TING BEACON (U)
4 5'
RU WAY\!7 END<'(E/'J)
EL V. 12.4' ·. ·
J!Lo POINT, ·.
ITR E(S) PENETRA TT;. . .
�Pl-2L (
RSA
OFZ
CFA
75' ,s
Z30
626'
'30
I I
RUNWAYPROTECTION ZONE (E/U)
500,'. )("1,700' X 1,010'
LEGEND
EXISTING ULTIMATE
RUNWAY/TAXIWAY OUTLINE -----
BUILDINGS/FACILITIES il?-llii:i!"""i!l
AIRPORT PROPERTY LINE ___ , __ .... ·····('. ;11),-- ---
AIRPORT PROPERTY LINE with FENCE -·-1!':-----------l<- ..... ,. . ---,': ·'.u}- _ _,_
AIRPORT REFERENCE POINT (ARP) � ffi WIND CONE AND SEGMENTED CIRCLE (5 r5 THRESHOLD UGHTS .... HU ooco 0000
C&G BEACON * *
FENCE LINE .,...__.�,-it,-"-.i--
TELEPHONE/POWER POLE LINE T
NONOIRECTlONAL BEACON (NDB) @
RWY ENO IDENTIFIER LIGHTS (REILS) .. "
BUILDING RESTRICTION LINE (BRL) �----- ""'·� )' _____ ,.,.
GROUND CONTOURS .,.. ·"'"" ... --�
TREE:S/BRUSH !\)
AWOS ,.
HOLD POSITION A.ND SIGN - -
SURVEY MARKERS ,,
GENERAL NOTES
1. NO EXISTING OR ULTIMATE OBSTACLE FREE ZONE (OFZ) OBJECT PENETRATIONS
FOR RUNWAY 13-31 OR RUNAY 17-35. THE EXISTING OFZs FOR RUNWAY 8-26
AND RUNWAY 3-21 ARE PENETRATED BY NUMEROUS OBJECTS. SEE SAFETY AREA
PENETRATION TABLE FOR DETAILS.
2. THERE ARE NO EXISTING OBJECT PENETRATIONS W1THIN THE RUNWAY 13-31
OFA OR RSA. RUNWAY 17-35, RUNWAY 8-26, AND RUNWAY 3-21 ALL
EXPERIENCE PENETRATIONS TO THEIR RESPECTIVE OFA AND RSA. SEE SAFETY
AREA PENETRATION TABLE FOR DETAILS.
3. THERE ARE NO EXISTING OR ULTIMATE THRESHOLD SITING SURFACE (TSS)
OBJECT PENETRATIONS FOR RUNWAY 13-31, RUNWAY 17-35, AND RUNWAY 8-26.
HOWEVER THE EXISTING RUNWAY 3-21 TSS IS PENETRATED BY GROUPS OF
TREES/BRUSH. SEE SEPERATE IPASDs FOR PENETRATION DETAILS .
4. SEE INNER PORTION OF THE APPROACH SURFACE DRA¼1NGS (IPASD) FOR
CLOSE-IN OBSTRUCTION CLEARANCE INFORMATION FOR THE APPROACH SURFACE
AND THRESHOLD !>TING SURF ACE.
5. ALL EXISTING AIRPORT ELEVATIONS AND CONTOURS ARE BASED ON
PHOTOGRAMETIC SURVEY COMPLETED TO FAA SPEC. 405 STANDARDS BY
GEODETIX, INC (06/05).
6. CAUTION ZONE LIGHTS ARE NOT PRESENT FOR ANY RUNWAY AT THE AIRPORT.
7. HORIZONTAL DAllUM NAD 1983 STATE PLANE, TEXAS SOUllH FIPS 4205 SURVEY FEET, VERllCAL DATIJM NAVO 1988, DO NOT APPLY CORRECTION FACTOR.
8. BUILDING RESTRICTION LINE ESTABLISHED TO PROVIDE 35.0' OF BUILDING /
OBJECT CLEARANCE BEYOND THE RUNWAY PRIMARY SURFACE AND TAXIWAY
OBJECT FREE AREA.
COPYRIGHT 2006, TEXAS DEPARTMENT OF TRANSPORTATION.
1 000 1,500
SCALE 1"- 500'
TEXAS DEPARTMENT OF TRANSPORTATION
AVIATION DIVISION
AIRPORT SPONSOR
□ ALP APPROVED ACCORDING TO FAA AC 150/5300-13 CH 9
PLUS THE REQUIREMENTS OF A FAVORABLE ENVIRONMENTAL
FINDING PRIOR TO llHE START OF ANY LAND ACQUISITION
OR CONSTRUCTION AND AN FAA FORM 7460-1 SUBMITTED
PRIOR TO ANY CONSTRUCTION ON AIRPORT PROPERTY
CURRENT AND FUTURE DEVELOPMENT DEPICTED ON THIS
ALP IS APPROVED AND SUPPORTED BY AIRPORT
SPONSOR
□ ALP APPROVED ACCORDING TO FAA AC 150/5300-13 CH 9
PLUS llHE CONDITIONS/COMMENTS IN LETTER DA TED:
2004.0547.01
PLH
OESjGNEO BY
BMN
DRAWN SY
PLH
CHECKED SY
AIRPORT LAYOUT DRAWING
PORT !SABEL-CAMERON COUNTY AIRPORT
CAMERON COUNTY, TEXAS
11/10/05
OATE
11/15/05
D4/05/06
OATE
Texas epartment Transportation
Aviation Division
SHEET 1 OF 13
eGrants Workflow:
RFQ Response eGrants Role:
Subgrantee Administrator (SA)
Subgrantee Staff (SS) eGrants link eGrants help:
https://apps2.dot.state.tx.us/apps/egrants2/logout2.aspx eGrants help desk Monday – Friday 8AM – 4PM CD/ST (excluding state/federal holidays) avn-egrantshelp@txdot.gov or 1-800-687-4568
STEP ROLE ACTIONS NOTES
01 SA
Go to View Opportunities.
a. Select Apply Now to the opportunity
b. The RFQ Response Menu is opened
Very important to click on the name of the document and not the organization name
Make a note of the opportunity due date to ensure you respond in time
02 SA/SS
Click on View, Edit and Complete Forms
a. Select RFQ Applicant Form
b. Confirm Project information and address
c. Upload AVN-550 or 551 PLEASE MAKE SURE
YOU SELECT THE CORRECT PDF FILE BEFORE
CHANGING STATUS.*
d. Hit Save
You should print the proposal document to a PDF so that it becomes un-editable. Or, you may upload a scanned copy of the AVN- 550/551.
03 SA When you are ready to submit your response, click on Save and submit to CS review YOU ARE DONE
You will get an email saying the response was successfully submitted; the status must be changed to RFQ Response in CS Review by the due date and time posted in the solicitation.
04 SA/SS WAIT UNTIL A SELECTION NOTIFICATION IS SENT TO
YOU
05 SS/SA
AFTER SELECTION NOTIFICATION IS RECEIVED Log in to view status of response. Once the scores are verified, TxDOT will move the response to an interview, selected or not selected status of which you can log in to see the status of your response.
The selection notification will refer users to eGrants to view the status of their response. User may also view the TxDOT website for selection information.
Instructions for Responding to an RFQ Solicitation
Aviation Division eGrants Workflow Test Script
*If the responder posts the incorrect file.
If status has been changed and the due date for the response has not expired, contact the help desk to ask for the status to be administratively changed back to Response in Process.
If the incorrect file was posted, the incorrect file may be deleted and the correct one posted as long as the status has not been changed to Response in CS Review. Respondent will need to check the “delete” box and hit save.
The page refreshes. Then post the correct file, save, and change the status.
If you are not set up in eGrants and wish to respond to a posted solicitation, you may contact the aviation help desk for assistance by using the webform available at eGrants Help Desk Form
Some organizations will have many user members. Each organization should determine which user member will submit the completed avn-550/551 in eGrants.
after the opportunity is selected for the organization, it will no longer appear on any other user’s home page unless the initiating user cancels the response.
February 2021
File details come from the government source that posted it. Updated .