rfq2403bowie00071.pdf
PDF 1 MB Posted
- Attached to
- TxDOT Aviation Division- Notice to Consultants
- Solicitation number
- RFQ2403BOWIE00071
- Issued by
- Texas
About this file
This document is a Request for Qualifications (RFQ) issued by the Texas Department of Transportation (TxDOT) Aviation Division on behalf of the City of Bowie for professional engineering services to install wildlife fencing at the Bowie Municipal Airport.
The scope of services includes engineering and design, as well as construction administration for the wildlife fencing project. Responses must be submitted through the TxDOT eGrants system no later than July 23, 2024, 2:00 p.m. CST. The consultant selection committee will review and rate the responses, and the top-rated firm will be contacted to begin fee negotiations for the design and bidding phases. The DBE goal for the design phase is 0%, with the goal to be re-set for the construction phase. No interviews are planned unless the committee deems them necessary.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
BOWIE MUNICIPAL AIRPORT
TXDOT SOLICITATION NO.: RFQ-2403BOWIE-00071
1. REQUEST FOR QUALIFICATIONS SOLICITATION
2. EVALUATION CRITERIA
3 INSTRUCTIONS FOR RESPONDING TO A SOLICITATION IN EGRANTS
4. PROJECT DIAGRAM
5. AIRPORT LAYOUT PLAN
TxDOT Solicitation No.:RFQ2403BOWIE00071
TxDOT CSJ/Project No.:2403BOWIE
Texas Department of Transportation
Aviation Division
Request for Qualifications (RFQ) for
Professional Engineering Services
The City of Bowie, through its agent, the Texas Department of Transportation (TxDOT), intends to engage a professional engineering firm for services pursuant to Chapter 2254, Subchapter A, of the Government Code. TxDOT Aviation Division will solicit and receive qualification statements for the current aviation project as described below.
Current Project: City of Bowie; TxDOT CSJ/Project ID: 2403BOWIE.
The TxDOT Project Manager is Paul Slusser.
Scope: Provide engineering and design services, including construction administration to:
1. Install Wildlife Fencing
The Agent, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat.
252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all respondents that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit in response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
The proposed contract is subject to 49 CFR Part 26 concerning the participation of Disadvantaged
Business Enterprises (DBE).
The DBE goal for the design phase of the current project is 0%. The goal will be re-set for the construction phase.
To assist in your qualification statement preparation, the criteria, project diagram, and most recent Airport Layout Plan are available online at http://www.dot.state.tx.us/avn/avninfo/notice/consult/index.html by selecting “Bowie Municipal
Airport”. The qualification statement should address a technical approach for the current scope only.
Response Procedure:
The successful firms will be selected on the basis of a Response. A prime provider may only submit one Response. If a prime provider submits more than one Response, that prime provider will be deemed non-responsive. The Response must contain the required information, and should address the recommended information, as listed below. Response submissions will be scored accordingly.
If the Response is non-compliant with any of the following requirements, the Response may be deemed non-responsive.
http://www.dot.state.tx.us/avn/avninfo/notice/consult/index.htm
1. Qualifications Statement (QS) – The QS shall contain no more than nine
8.5x11-inch single-sided pages.
a. QS Format:
i. Readability – The submitter has latitude in formatting the QS for visual effectiveness. Graphics, tables, photos, and other visual aids are permitted within the nine allotted pages, except that Quick Response (QR) codes or other external link(s) are not permitted. There is no specific font, font size, color, or other formatting requirements, although a font size smaller than 10 is not recommended. Selection committee members may consider legibility and readability when scoring. Unreadable text will not be considered and may cause the QS to be deemed non-responsive. It is the submitter’s responsibility to provide a legible, readable document.
b. QS Content - It is recommended the QS include:
i. The RFQ number, airport name, name of firm, firm address, email address, telephone number and contact information for key personnel. The response shall also identify each proposed project team member, each proposed member’s time commitment to this project as a percentage of their total work week, and whether the proposed member is an employee of the responding firm or a sub-contractor to that firm.
c. QS Content – For scoring purposes, the QS must include:
i. Information showing the firm’s project understanding and technical approach, including similar project-related experience of the project manager and each task leader responsible for a major work category. For each project referenced, identify either the project manager’s or the task leader’s specific role(s) and work contributed. The project manager is required to be a Professional Engineer registered or licensed in Texas, by the submission deadline. If applicable to project, an Architect, is required to be registered or licensed in Texas, by the submission deadline. License number(s) must be included in the response submission.
ii. In addition to individual project-related experience of the project manager and task leaders required under (ii), list no more than ten relevant projects performed by the responding firm within the last 10 years. This shall include airport name, location, phone number, and airport contact person’s name, title, and phone number. It shall also include the original project completion time estimate vs. the actual completion time for the cited design project, as well as a brief narrative description of the project and whether or not your firm served as the prime or the sub on each project cited.
iii. Project Design Schedule: Indicate the number of weeks necessary to design the project in accordance with “Project
Design Schedule Information” below.
The Response must be submitted in eGrants following the Submission Procedures at the end of this notice.
Project Design Schedule Information
Based on the published project scope and your technical approach, indicate the number of weeks necessary for each phase and total design time to design the project. Some of the basic responsibilities within each design phase are included for reference. Do not include TxDOT review time. Assume, however, that your work will require some revision after TxDOT review, and that the time required to address these comments should be included within your schedule. If time is required for specialized studies, indicate the additional time.
NOTE: This proposed schedule will set the basis for the contract deadlines in the professional services agreement if your firm is selected.
Preliminary Report Phase
Attend pre-design conference
Obtain and analyze necessary survey data
Obtain and analyze necessary geotechnical data
Prepare comprehensive report
Preliminary Design Phase
Attend project meeting(s)
Prepare project drawings (70%)
Provide all technical specifications
Provide project cost estimate
Final Design Phase
Attend project meeting(s)
Finalize drawings and contract documents (100%)
Provide a revised opinion of probable total project costs
Prepare a Construction Management Plan
Update, if necessary, the Preliminary Report
Prepare and submit airspace study to FAA
Evaluation Criteria for Architectural/Engineering Qualifications
1. Recent experience of the project team with comparable airport projects within the past ten years. (25 points)
Do the qualifications indicate that the project team has recent direct experience on other general aviation airports designing similar improvements to those proposed at this location?
2. Proposed technical approach (30 points)
Does the architect/engineer provide evidence of understanding of the project; and any unique architectural/engineering aspects associated with the proposed project and how to address them?
3. Project design schedule and ability to meet schedules and deadlines (25 points)
Does the proposed design team have sufficient time to work on this project? Has the firm demonstrated an ability to meet design schedules in the past? Reasonableness of proposed schedule.
4. Construction Management Experience (20 points)
The architect/engineer will oversee the airport construction. Therefore, it is critical that the architect/engineer be involved in the day-to-day construction activities through a full-time resident project representative and periodic site visits. What evidence do the qualifications provide as to the architect/engineer’s commitment to proactive and consistent representation during construction?
Submission Procedure:
The completed Response must be received in the TxDOT Aviation eGrants system no later than July 23, 2024, 2:00 p.m. (CST).
Firms that wish to submit a Response to this solicitation must be a user in the TxDOT Aviation eGrants system no later than one business day before the solicitation due date. To request access to eGrants, please complete the Contact Us web form located at http://txdot.gov/government/funding/egrants-2016/aviation.html
The consultant selection committee will be composed of local government representatives. The final selection by the committee will generally be made following the completion of review of
Responses. The committee will review all Responses and rate and rank each. All firms will be notified, and the top-rated firm will be contacted to begin fee negotiations for the design and bidding phases. The selection committee does, however, reserve the right to conduct interviews http://txdot.gov/government/funding/egrants-2016/aviation.html for the top-rated firms if the committee deems it necessary. If interviews are conducted, selection will be made following interviews.
Please contact TxDOT Aviation for any technical or procedural questions at 1-800-68-PILOT
(74568). For procedural questions, please contact Noemi Rios, Contract Specialist. For technical questions, please contact Paul Slusser, Project Manager.
For questions regarding responding to this solicitation in eGrants, please contact the TxDOT
Aviation help desk at 1-800-687-4568 or avn-egrantshelp@txdot.gov.
mailto:avn-egrantshelp@txdot.gov eGrants Workflow:
RFQ Response eGrants Role:
Subgrantee Administrator (SA)
Subgrantee Staff (SS) eGrants link eGrants help:
https://apps2.dot.state.tx.us/apps/egrants2/logout2.aspx eGrants help desk Monday – Friday 8AM – 4PM CD/ST (excluding state/federal holidays) avn-egrantshelp@txdot.gov or 1-800-687-4568
STEP ROLE ACTIONS NOTES
SA
Go to View Opportunities.
a. Select Apply Now to the opportunity
b. The RFQ Response Menu is opened
Very important to click on the name of the document and not the organization name.
Make a note of the opportunity due date to ensure you respond in time
SA/SS
Click on View, Edit and Complete Forms
a. Select RFQ Applicant Form
b. Confirm Project information and address
c. Upload RFQ response
PLEASE MAKE SURE YOU SELECT
THE CORRECT PDF FILE BEFORE
CHANGING STATUS.*
d. Hit Save
You should print the proposal document to a PDF so that it becomes un-editable.
SA
When you are ready to submit your response, click on
"Save and submit to CS review". YOU ARE
DONE
You will get an email saying the response was successfully submitted;
the status must be changed to RFQ
Response in CS Review by the due date and time posted in the solicitation.
04 SA/SS
WAIT UNTIL A SELECTION NOTIFICATION
IS SENT TO YOU
SS/SA
AFTER SELECTION NOTIFICATION IS
RECEIVED Log in to view status of response.
Once the scores are verified, TxDOT will move the response to an interview, selected or not selected status of which you can log in to see the status of your response.
The selection notification will refer users to eGrants to view the status of their response. User may also view the TxDOT website for selection information.
Aviation Division https://apps2.dot.state.tx.us/apps/egrants2/logo
*If the responder posts the incorrect file.
• If status has been changed and the due date for the response has not expired, contact the help desk to ask for the status to be administratively changed back to Response in Process.
• If the incorrect submission was posted, the incorrect file may be deleted and the correct one posted as long as the status has not been changed to Response in CS Review. Respondent will need to check the
“delete” box and hit save. The page refreshes. Then post the correct submission, save, and change the status.
If you are not set up in eGrants and wish to respond to a posted solicitation, you may contact the aviation help desk for assistance by using the webform available at eGrants Help Desk Form
Some organizations will have many user members. Each organization should determine which user member will submit the completed submission in eGrants. After the opportunity is selected for the organization, it will no longer appear on any other user’s home page unless the initiating user cancels the response.
https://form.jotform.com/62164883455160
Fencing and GateBowie Municipal Airport (0F2)
Not for design purposes
AutoCAD SHX Text
SEP 2014
AutoCAD SHX Text
BOWIE, TEXAS (0F2)
AutoCAD SHX Text
BOWIE MUNICIPAL AIRPORT
AutoCAD SHX Text
SNODGRASS
AutoCAD SHX Text
TXDOT AVIATION DIV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text Aviation Division
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
DAN HARMON, DIRECTOR, AVIATION DIVISION
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
TITLE, AIRPORT SPONSOR'S REPRESENTATIVE
AutoCAD SHX Text CURRENT AND FUTURE DEVELOPMENT DEPICTED ON THIS ALP IS APPROVED AND SUPPORTED BY AIRPORT SPONSOR SPONSOR ACKNOWLEDGES APPROVAL OF ALP BY TXDOT DOES NOT CONSTITUTE A COMMITMENT TO FUNDING.
AutoCAD SHX Text ALP APPROVED ACCORDING TO FAA AC 150/5300-13A PLUS THE REQUIREMENTS OF A FAVORABLE ENVIRONMENTAL FINDING AND FAA NRA STUDY PRIOR TO THE START OF ANY LAND ACQUISITION OR CONSTRUCTION ON AIRPORT PROPERTY. COPYRIGHT 2020 TXDOT AVIATION DIVISION, ALL RIGHTS RESERVED.
AutoCAD SHX Text
TEXAS DEPARTMENT OF TRANSPORTATION AVIATION DIVISION
AutoCAD SHX Text
AIRPORT SPONSOR
AutoCAD SHX Text
DEC 2020
AutoCAD SHX Text
MACKE
AutoCAD SHX Text
STATE HWY. 59
AutoCAD SHX Text
BOWIE 5.5 MILES
AutoCAD SHX Text
AutoCAD SHX Text
HOUSE
AutoCAD SHX Text
SHED
AutoCAD SHX Text
ENTRANCE ROAD (PAVED)
AutoCAD SHX Text
POWERLINE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" AND 15" DIA.
AutoCAD SHX Text
GAS LINES
AutoCAD SHX Text
POND
AutoCAD SHX Text
POND
AutoCAD SHX Text
AutoCAD SHX Text 464'
AutoCAD SHX Text
0F2 A / AB2779
AutoCAD SHX Text
BOWPORT AZ MK / DN1426
AutoCAD SHX Text
BOWPORT / DN1425
AutoCAD SHX Text
BUILDING RESTRICTION LINE (BRL)
AutoCAD SHX Text
BRL 0'
AutoCAD SHX Text
PACS AND SACS MARKERS
AutoCAD SHX Text
HOLD POSITION AND SIGN
AutoCAD SHX Text
ASOS/AWOS
AutoCAD SHX Text
VGSI
AutoCAD SHX Text
C&G BEACON
AutoCAD SHX Text
CITY LIMIT LINE
AutoCAD SHX Text
WIND CONE & SEGMENTED CIRCLE
AutoCAD SHX Text
ULTIMATE
AutoCAD SHX Text
ALD LEGEND
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text L
AutoCAD SHX Text P (U)
AutoCAD SHX Text L
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text P (U)
AutoCAD SHX Text L
AutoCAD SHX Text P
AutoCAD SHX Text AIRPORT PROPERTY LINE w/FENCE
AutoCAD SHX Text
RUNWAY/TAXIWAY OUTLINE
AutoCAD SHX Text
BUILDINGS/FACILITIES
AutoCAD SHX Text
AIRPORT PROPERTY LINE
AutoCAD SHX Text
AIRPORT REFERENCE POINT
AutoCAD SHX Text
FENCE LINE
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
THRESHOLD LIGHTS
AutoCAD SHX Text
RW END IDENTIFIER LIGHTS (REILS)
AutoCAD SHX Text
SIGNIFICANT OBJECT LOCATION
AutoCAD SHX Text
GROUND CONTOURS
AutoCAD SHX Text
TREES/BRUSH
AutoCAD SHX Text
AutoCAD SHX Text xu
AutoCAD SHX Text xu
AutoCAD SHX Text xu
AutoCAD SHX Text
FEATURE
AutoCAD SHX Text
RUNWAY/TAXIWAY TO BE REMOVED
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text
CITY
AutoCAD SHX Text
40'(ULTIMATE)
AutoCAD SHX Text 293'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NNE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ENE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ESE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SSE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SSW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WSW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WNW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NNW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KNOTS
AutoCAD SHX Text
WIND COVERAGE:
AutoCAD SHX Text 61.5
AutoCAD SHX Text 1.2
AutoCAD SHX Text .9
AutoCAD SHX Text .7
AutoCAD SHX Text .4
AutoCAD SHX Text .3
AutoCAD SHX Text .2
AutoCAD SHX Text .2
AutoCAD SHX Text .2
AutoCAD SHX Text .3
AutoCAD SHX Text .3
AutoCAD SHX Text .4
AutoCAD SHX Text .6
AutoCAD SHX Text .9
AutoCAD SHX Text 1.6
AutoCAD SHX Text 2.1
AutoCAD SHX Text 2.4
AutoCAD SHX Text 2.6
AutoCAD SHX Text 2.4
AutoCAD SHX Text 1.8
AutoCAD SHX Text 1.3
AutoCAD SHX Text 1.0
AutoCAD SHX Text .7
AutoCAD SHX Text .4
AutoCAD SHX Text .3
AutoCAD SHX Text .2
AutoCAD SHX Text .1
AutoCAD SHX Text .2
AutoCAD SHX Text .2
AutoCAD SHX Text .3
AutoCAD SHX Text .4
AutoCAD SHX Text .4
AutoCAD SHX Text .5
AutoCAD SHX Text .5
AutoCAD SHX Text .6
AutoCAD SHX Text .8
AutoCAD SHX Text 1.5
AutoCAD SHX Text .4
AutoCAD SHX Text .3
AutoCAD SHX Text .2
AutoCAD SHX Text .1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .3
AutoCAD SHX Text .4
AutoCAD SHX Text .5
AutoCAD SHX Text .6
AutoCAD SHX Text .7
AutoCAD SHX Text .6
AutoCAD SHX Text .4
AutoCAD SHX Text .2
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .2
AutoCAD SHX Text .2
AutoCAD SHX Text .2
AutoCAD SHX Text .3
AutoCAD SHX Text .6
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .2
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text .1
AutoCAD SHX Text .1
AutoCAD SHX Text .2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
96.47 %
AutoCAD SHX Text
SOURCE: USWB STATION, WICHITA FALLS, TEXAS
AutoCAD SHX Text
72,351 OBSERVATIONS IN PERIOD 1988-1997
AutoCAD SHX Text
WIND COVERAGE AT 13 KTS: 96.47%%%
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RUNWAY END COORDINATES AND ELEVATIONS
AutoCAD SHX Text
LATITUDE
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
LONGITUDE
AutoCAD SHX Text
EXISTING END OF RWY 17
AutoCAD SHX Text
EXISTING END OF RWY 35
AutoCAD SHX Text
RUNWAY END
AutoCAD SHX Text
1082.6' (MSL)
AutoCAD SHX Text 97%%D46'29.95" W
AutoCAD SHX Text 33%%D35'48.25" N
AutoCAD SHX Text
1100.6' (MSL)
AutoCAD SHX Text 97%%D46'34.13" W
AutoCAD SHX Text 33%%D36'23.71" N
AutoCAD SHX Text
BUILDING TABLE
AutoCAD SHX Text
BLDG. #
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
TOP
AutoCAD SHX Text
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text 1116.8'
AutoCAD SHX Text
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text 1114.4'
AutoCAD SHX Text
AutoCAD SHX Text
TERMINAL
AutoCAD SHX Text 1107.5
AutoCAD SHX Text
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text 1114.5'
AutoCAD SHX Text
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text 1112.5'
AutoCAD SHX Text
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text 1114.1'
AutoCAD SHX Text
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FUELING STATION
AutoCAD SHX Text
UNKNOWN
AutoCAD SHX Text
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1100.6' (MSL)
AutoCAD SHX Text 97%%D46'34.22" W
AutoCAD SHX Text
ULTIMATE END OF RWY 17
AutoCAD SHX Text
ULTIMATE END OF RWY 35
AutoCAD SHX Text 33%%D36'23.70" N
AutoCAD SHX Text
1079.3' (MSL)
AutoCAD SHX Text 97%%D46'29.34" W
AutoCAD SHX Text 33%%D35'42.32" N
AutoCAD SHX Text 1 1
AutoCAD SHX Text
EX 3603' X 60' TRUE AZIMUTH 174.35° ULT 4203' X 75'
AutoCAD SHX Text
LOW POINT 1082.6'
AutoCAD SHX Text
HIGH POINT 1100.6'
AutoCAD SHX Text
ULT LOW POINT 1079.3'
AutoCAD SHX Text
ULT RPZ 500 X 700 X 1000'
AutoCAD SHX Text
EX RPZ 250 X 450 X 1000'
AutoCAD SHX Text
ULT RPZ 500 X 700 X 1000'
AutoCAD SHX Text
EXTENSION OF RW 35 WILL REQUIRE IN EXCESS OF 500,000 CUBIC YARDS OF FILL
AutoCAD SHX Text
1. TOPOGRAPHIC SURVEY PERFORMED BY SANBORN MAP CO. IN MAY 2004. 2. HAZARD ZONING DATE: JUNE 30, 1980 FOR A 3600 FOOT RUNWAY.
AutoCAD SHX Text
MAGNETIC DECLINATION 5°02'E (2007)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ULTIMATE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
AIRPORT DATA TABLE
AutoCAD SHX Text 1100.5'
AutoCAD SHX Text
GPS
AutoCAD SHX Text
97%%DF
AutoCAD SHX Text B-I
AutoCAD SHX Text
STD W/ REF
AutoCAD SHX Text
NONE
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text 33%%D36'06.0" N
AutoCAD SHX Text 97%%D46'32.0" W
AutoCAD SHX Text MEAN MAX TEMP (Hottest Month %%DF)
AutoCAD SHX Text
AIRPORT REFERENCE CODE (ARC)
AutoCAD SHX Text
AIRPORT REFERENCE POINT COORDINATES
AutoCAD SHX Text
TAXIWAY LIGHTING
AutoCAD SHX Text
TAXIWAY MARKING
AutoCAD SHX Text
AIRPORT NAVIGATION AIDS
AutoCAD SHX Text
AIRPORT ELEVATION (MSL)
AutoCAD SHX Text DATUM COORDINATE SYSTEMS - HORIZONTAL DATUM NAD 1983 State Plane Texas North Central 4202 Feet, VERTICAL DATUM NAVD88. NO KNOWN OFZ OBJECT PENETRATIONS NO CAUTION ZONE LIGHTS ARE INCLUDED IN THE RUNWAY LIGHTING. NO SURVEY WAS COMPLETED DURING PREPARATION OF THIS DRAWING. NO INNER PORTION OF THE APPROACH SURFACE DRAWINGS ARE INCLUDED BECAUSE THERE IS NO OBSTRUCTION DATA. FAA STUDY NUMBER 2009-ASW-855-NRA
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
ULTIMATE
AutoCAD SHX Text
RUNWAY DATA TABLE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3603'
AutoCAD SHX Text 3603' X 60'
AutoCAD SHX Text
MIRL
AutoCAD SHX Text
NPI
AutoCAD SHX Text
12.5 SW
AutoCAD SHX Text 240'
AutoCAD SHX Text 1100.5'
AutoCAD SHX Text
1 MILE
AutoCAD SHX Text
PAPI
AutoCAD SHX Text
RUNWAY VISUAL AIDS
AutoCAD SHX Text
APPROACH VISIBILITY MINIMA
AutoCAD SHX Text
TOUCHDOWN ZONE ELEVATION
AutoCAD SHX Text PAVEMENT DESIGN STRENGTH (1000 lbs.)
AutoCAD SHX Text
RSA - WIDTH
AutoCAD SHX Text
RSA - LENGTH BEYOND RW END
AutoCAD SHX Text RUNWAY LENGTH & WIDTH (ft.)
AutoCAD SHX Text
RUNWAY LIGHTING
AutoCAD SHX Text
RUNWAY MARKING
AutoCAD SHX Text
RUNWAY END
AutoCAD SHX Text
TAKE-OFF RUN AVAILABLE (TORA)
AutoCAD SHX Text
TAKE-OFF DISTANCE AVAILABLE (TODA)
AutoCAD SHX Text
ACCELERATE STOP DISTANCE AVAIL. (ASDA)
AutoCAD SHX Text
LANDING DISTANCE AVAILABLE (LDA)
AutoCAD SHX Text
NPI
AutoCAD SHX Text
PAPI
AutoCAD SHX Text
1 MILE
AutoCAD SHX Text 1097.7'
AutoCAD SHX Text 240'
AutoCAD SHX Text 120'
AutoCAD SHX Text 250'
AutoCAD SHX Text 200'
AutoCAD SHX Text
OFZ - LENGTH BEYOND RW END
AutoCAD SHX Text
OFA WIDTH
AutoCAD SHX Text
OFA - LENGTH BEYOND RW END
AutoCAD SHX Text 250'
AutoCAD SHX Text
OFZ WIDTH
AutoCAD SHX Text
RW 17-35
AutoCAD SHX Text
MAXIMUM ELEVATION ABOVE MSL
AutoCAD SHX Text
PERCENT WIND COVERAGE
AutoCAD SHX Text
ASPH
AutoCAD SHX Text 1100.6'
AutoCAD SHX Text
APPROACH TYPE
AutoCAD SHX Text
FAR PART 77 APPROACH CATEGORY
AutoCAD SHX Text
RW SURFACE TYPE
AutoCAD SHX Text
FAR PART 77 APPROACH SURFACE SLOPE
AutoCAD SHX Text 0.50%%%
AutoCAD SHX Text
PERCENT EFFECTIVE GRADIENT
AutoCAD SHX Text 96.47%%%
AutoCAD SHX Text 20:1
AutoCAD SHX Text 20:1
AutoCAD SHX Text
GPS
AutoCAD SHX Text
A(NP)
AutoCAD SHX Text B-I
AutoCAD SHX Text
RUNWAY ARC
AutoCAD SHX Text
DESIGN AIRCRAFT & ARC
AutoCAD SHX Text
BALANCED FIELD LENGTH
AutoCAD SHX Text 2323'
AutoCAD SHX Text
CESSNA 421 (BI)
AutoCAD SHX Text
THRESHOLD SITING SURFACE & SLOPE
AutoCAD SHX Text #4 20:1
AutoCAD SHX Text 4202' X 75'
AutoCAD SHX Text
MIRL
AutoCAD SHX Text
30 SW
AutoCAD SHX Text 300'
AutoCAD SHX Text 300'
AutoCAD SHX Text 150'
AutoCAD SHX Text 500'
AutoCAD SHX Text 200'
AutoCAD SHX Text 400'
AutoCAD SHX Text
ASPH
AutoCAD SHX Text 1100.6'
AutoCAD SHX Text 0.50%%%
AutoCAD SHX Text 96.47%%%
AutoCAD SHX Text
B-II
AutoCAD SHX Text 2323'
AutoCAD SHX Text
CESSNA 525 (BII)
AutoCAD SHX Text
A(NP)
AutoCAD SHX Text 3603'
AutoCAD SHX Text 3603'
AutoCAD SHX Text 3603'
AutoCAD SHX Text 3603'
AutoCAD SHX Text 3603'
AutoCAD SHX Text 3603'
AutoCAD SHX Text 3603'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 4202'
AutoCAD SHX Text
NPI
AutoCAD SHX Text 1100.5'
AutoCAD SHX Text
1 MILE
AutoCAD SHX Text
PAPI
AutoCAD SHX Text
NPI
AutoCAD SHX Text
PAPI
AutoCAD SHX Text
1 MILE
AutoCAD SHX Text 1097.7'
AutoCAD SHX Text 34:1
AutoCAD SHX Text 34:1
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text 4202'
AutoCAD SHX Text 4202'
AutoCAD SHX Text 4202'
AutoCAD SHX Text 4202'
AutoCAD SHX Text 4202'
AutoCAD SHX Text 4202'
AutoCAD SHX Text 4202'
AutoCAD SHX Text 1100.5'
AutoCAD SHX Text
LPV GPS
AutoCAD SHX Text
97%%DF
AutoCAD SHX Text
B-II
AutoCAD SHX Text
STD W/ REF
AutoCAD SHX Text
NONE
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text 33%%D36'03.01" N
AutoCAD SHX Text 97%%D46'31.78" W
AutoCAD SHX Text
EX RPZ 250 X 450 X 1000'
AutoCAD SHX Text
UNKNOWN
AutoCAD SHX Text
26-JAN-15: CHANGE TO TERMINAL AREA DEVELOPMENT
AutoCAD SHX Text
AutoCAD SHX Text #4 20:1
AutoCAD SHX Text #4 20:1
AutoCAD SHX Text #4 20:1
AutoCAD SHX Text
29-JUN-15: CHANGE TO TAXIWAY LOCATION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GPS
AutoCAD SHX Text
GPS
AutoCAD SHX Text
GPS
AutoCAD SHX Text
29-DEC-20: MINOR APRON LAYOUT CHANGE; UPDATE DATA TABLE, REMOVED NDB INFO
AutoCAD SHX Text
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
ONE INCH = THREE HUNDRED FEET 1" - 300'
| 0F2 Fencing Exhibit v2.pdf |
| Slide 1 |
| 2403BOWIE Airport Layout Plan.pdf |
| Sheets and Views |
| BOWIE_ALD_20-ANSI D PDF |
File details come from the government source that posted it. Updated .