About this file

This is a Request for Qualifications (RFQ) issued by the Whitfield County Board of Commissioners in Georgia for engineering design services related to drainage improvements and stormwater management in the Gillum Drive drainage basin located in Dalton, Whitfield County. The selected engineering firm will provide hydrologic analysis, engineering design services, environmental studies, permitting coordination, and bid-ready construction documentation for drainage and stormwater improvements. The RFQ was issued on September 4, 2026, with final questions due by September 25, 2026 at 6:00 PM, addenda closing on September 28, 2026 at 5:00 PM, and sealed hard copy proposals (4 copies) due on October 5, 2026 by 2:00 PM EST. The anticipated award date is October 12, 2026. Submittals should be addressed to Whitfield County BOC Finance Department, C/O Brian McBrayer, 201 S. Hamilton Street, 4th Floor, Dalton, Georgia 30720. Questions should be directed to Whitfield County Engineer Kent Benson at kbenson@whitfieldcountyga.com.

Proposals will be evaluated based on experience and qualifications (35%), project understanding (25%), proposed schedule (20%), and company resources (20%), with the contract awarded to a single firm. The County will negotiate scope and fees with the selected firm and reserves the right to reject proposals, waive technicalities, or cancel the solicitation. The project was initially funded through local SPLOST sales tax funds, with Whitfield County having applied for grant funding from the Appalachian Regional Commission (ARC). If the ARC grant is awarded, the project will include full federal oversight with NEPA requirements; if not awarded, the project will remain locally funded with reduced environmental requirements and a reduced construction scope due to budget constraints. Topographic survey data and a Preliminary Engineering Report previously completed by Atlas, Inc. are available to support the selected consultant's design process. All proposals are subject to public disclosure under Georgia public records laws.

View the file

Other files

File Type Posted
RFQ2026_104 2.pdf PDF
RFQ2026_104 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFICATIONS

FOR

Engineering Design Services for Drainage Improvements

RFQ No.: 2026-104

Issued by:

Whitfield County Board of Commissioners

Whitfield County, Georgia

Request for Qualifications

Whitfield County invites sealed Statements of Qualifications (SOQ) from qualified professional engineering firms to provide engineering design services for drainage improvements and stormwater management in the Gillum Drive drainage basin in Dalton, Whitfield County, Georgia. This procurement shall be conducted in accordance with all applicable federal, state, and local public procurement laws and regulations.

SOQs will be received until the date and time listed below. Late submittals will not be accepted.

SOQs should be addressed to:

Whitfield County BOC Finance Dept.

C/O Brian McBrayer, 4th Floor

201 S. Hamilton St.

Dalton, GA 30720

Procurement Information

Item Information

RFQ Number 2026-104

Issue Date 09/04/2026

Final Questions Due 09/25/2026 at 6:00PM

Addenda Issued As Required; Final by 5:00PM on Monday, 09/28/2026

Proposal Due Date 10/05/2026 by 2:00PM EST

Submission Method Sealed Hard Copy (4 Copies)

Anticipated Award 10/12/2026

All questions regarding this RFQ must be submitted in writing to the person listed below. Verbal responses shall not be binding.

Whitfield County Engineer:

Kent Benson, P.E.

kbenson@whitfieldcountyga.com mailto:kbenson@whitfieldcountyga.com

Project Description

The project consists of hydrologic analysis and engineering design services for drainage improvements and stormwater management in the basin upstream of Gillum Drive in Whitfield

County. Also included are any required environmental studies, reports, and permitting.

The project was initially funded solely by local SPLOST sales tax funds. Whitfield County contracted with Atlas, Inc. to perform topographic surveys of the basin and develop preliminary conceptual sizing of drainage structures and channel improvements. This survey data will be made available to the selected firm for its use in the design process.

After reviewing the preliminary concept, Whitfield County became aware of and applied for a grant from the Appalachian Regional Commission. Our application has advanced to the final selection round and we should know if we have been awarded the grant funds by the submittal deadline of this RFQ.

ARC Grant funding would bring full Federal oversight to the project, including NEPA requirements. If we do not receive the grant, the project will remain locally funded and the environmental requirements will be reduced accordingly. The scope of the construction will necessarily be reduced as well for budgetary reasons.

As part of the ARC grant application, Whitfield County submitted a Preliminary Engineering

Report which gave greater detail on project specifics. The PER is posted adjacent to this SOQ on the County’s website. Please refer to that document for further project specifics.

Scope of Services

The selected consultant(s) shall provide all professional services necessary to complete the project, including but not limited to:

• Review existing data, studies, and concept drawings

• Conduct site visits and field investigations

• Conduct needed additional surveys

• Perform required environmental studies

• Develop preliminary and final concepts

• Coordinate with utility owners

• Produce bid-ready construction plans and easement/Right-of-Way plans

• Produce Engineer’s opinion of probable cost

• Coordinate and obtain environmental permitting

• Participate in coordination meetings with Whitfield County and, if applicable, other agencies

• Produce bid documents and support (review submittals, plan clarifications/errors)

Proposal Submission Requirements

SOQs shall be organized and clearly labeled. Provide four (4) hard copies of the SOQ. At a minimum, include the following sections:

Qualifications and Experience

• Firm name, address, and legal structure

• Relevant experience with hydraulic/hydrologic studies and drainage/stormwater management design on a comparable scale

• Description of at least three (3) comparable projects completed within the past 10 years

• Résumés of key personnel, including Project Manager

• Names and relevant experience of known and potential subcontractors

Project Understanding and Approach

• Understanding of project objectives

• Understanding of funding possibilities and their effects on design and environmental requirements

• Proposed technical approach

• Identification of risks and mitigation strategies

Schedule

• Proposed project schedule with major milestones if awarded the project

Company Resources

• Demonstrate how the company’s resources will allow the proposed schedule to be met

• In-house expertise that may not be evident in Qualifications and Experience

• Services that are offered in-house rather than by subcontract

Evaluation and Award

Whitfield County will award the project to a single firm. Proposals will be evaluated by a selection committee using the following criteria:

Criterion Scoring %

Experience and Qualifications 35

Project Understanding 25

Proposed Schedule 20

Company Resources 20

Whitfield County reserves the right to:

• Request clarifications during the evaluation process

• Negotiate scope and fees with the selected firm(s)

• Award a contract in the best interest of the public

Contract Terms and Conditions

Compliance with Laws

The consultant shall comply with all applicable federal, state, and local laws, ordinances, and regulations.

Non-Discrimination

The consultant shall not discriminate on the basis of race, color, national origin, sex, disability, or any other protected class.

Insurance and Licensing

The selected firm must maintain required insurance and professional licenses prior to contract execution.

Public Records

All proposals are subject to public disclosure under applicable public records laws. Original proprietary work may be copyrighted so that disclosure is by in-person viewing only with no document reproduction.

ARC Grant Requirements

If the project becomes partially funded by an ARC grant, there will be additional contract sections to which the contractor must agree. These sections/forms for federally-funded projects are posted adjacent to this RFQ on the County’s website. Keep in mind these forms are NOT required for submission of an SOQ, but they will be required in a contract between the County and the selected firm.

Reservation of Rights

Whitfield County reserves the right to:

• Reject any or all proposals

• Waive technicalities or minor defects

• Cancel or reissue this solicitation

• Negotiate with the selected proposer(s)

Required Forms

The following forms must be completed and submitted with the proposal:

• Form A: Proposal Signature Page

Proposal Signature Page (Form A)

The undersigned certifies that the information contained in this proposal is accurate and that the firm agrees to comply with all requirements of this bid packet.

Firm Name: _______________________________________________

Authorized Representative: __________________________________

Title: __________________________________

Signature: ______________________________________

Date: ___________________________